Page 1: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

Molonglo Aquatic Sports and Recreation Centre Feasibility Study

79

Molonglo Aquatic Sports and Recreation Centre Feasibility Study

7979997979797979797979999797979999797779977777

AAppendix A

Concept Design

Page 2: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

MOLONGLO AQUATIC SPORTS AND RECREATION FACILITY_FEASIBILITY STUDYPrepared for ACT Sports and Recreational Services_May 2012

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Page 3: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

DrawingSITE LOCATION

Stromlo

J O H N G O R T O N D R I V E

Forest Park

TOWESTON

MOLONGOLO RIVERPARK

MolongoloGroup Centre

WRIGHT

0 100 400 800m

STAGE 2

COOMBS

STAGE 1

SITE

Stromlo Forest ParkSITE

Continued construction of John Gorton Drive

Future Community/Residential Precinct

Coombs Stage 1

North Wright future residential

Uriarra Road

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Page 4: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

DrawingACTPLA SCHEMATIC

Page 5: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

S T R O M L O F O R E S T P A R K

FFUTFUTFUTFUTFUTFUTUTFUTFUTFUTFUTFFUTFUTTFUTFUTFFUTFUTFUTFUTFUTTFUTFUTTFUTTFUTF TTFUTTFUTTFUTFUTFUTTFUTFUTFF TTFUTFFUTFUTFUTF UREUREUREUREREUREREUREUREUREUREURERERREUREURERRUREEREU R RERRERE RE RERERERE RE RERERE REEREREER SIDSIDISIDIDIDSIDIDSIDSIDSIDISIDSIDSIDDSIDSS ENTENTNNNTENTENTNTENTNNTENTENTENTENTEENTENTNTIIIAALALALLALAALALAALLALALALA DEVDEVDDDEVDEVEVDEVDEEVDEVDEVDDDEDDDEDDDEVEEDDDDDDDDEVDEVDD VEE ELOELOELOELOELOLOELOELOELOEELOELELOELOEELOELOLLOPMEMEPMPMEPMEMPMEMEPMEMMEPMEPMEMMPPPMEPMENTNNNNTNTNTNTNTNNNNTNTTNTTNT

FUUUUUUUTUUUUUUUUU UREUUUUUUUUUUUU RERRRRRRRRRRRR SIDDENTENTENTENTENTENTENTENTE TTENTENTENTENTENTENTEENTIAL DEVDEVDEVDDEVDEVDEVDEVDEDEVDEVDDEVDEVDEVEVVE ELOEEEEEEEEEEEEEE PMEEEEEEEEEEEEENTNTNTNTNTNTNTNTNTNTNTNNTTNNTN

SITTTTTTTTTTTTTEAPPPPPPPPPPPPPPPPPPPPP ROXOOOOOOOOOOOO 500000000000,0000000000000 0M200M0M0M0M0M0MM00MM00M

FUTFUTTUTFUTFUTUTFUTFUTUTFUFUFUFFUFFUUUU URURRRURUREUUREUURUREUREUREUUREUURURERRRRR REEREREREEREREERESIDSIDSSSIDSIDSIDSSIDSIDSSSSSIDDDDDENTENENTENTENTTENTENTTENTENTENTENTENTENTENTTTNN IALI DEEVVDEVDEVDEVEVVVDEVDEVDDEDEDEDEDEDEVEDEVVVVVELOELOELOELOELOELOELOE OPMPMPMPPMEPMPMMPMPMMPMPMPMPMPPPPPPP NTTTNTTTTTTTTTT

E

HOHOHOHOHOHOHOHOHOHOHOHOHOHOOHOLDLDLDLDLDLDDLDLDLDLDLLDLDLDLENENENENENENENNENENNNNENNNS S S S S SS S SSSS SSSSSS CRCRCRCRCRCRCRCRCRCRCCRCRCCRRRCRCCC

EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEK KKKKKKKKKKKKK POPOPPOPOPOPOPOPOPOPOPOPOPOOPNNNNNNNNNN

POPOOPOPOOOPOOPPPNDNDNDDNDNDNDNDNDNDNDNNDNNDDN

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:5000@A31:2500@A1

0 50 100 200m DrawingSITE PLAN

Page 6: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

4 0 0 mp e d e s t r i a n s p h e r e

80

0m

Frequent rapid

bus service(15m

inintervals)

RT

ON

DR

I VE

JO

HN

GO

RS T R O M L O F O R E S T P A R K

FUTFUTFUTFUTFUTFUTFUTFUTFUTFUTFUTFUTTFUTFUTFFUTTFUTFUTFFUTFUTFUTFUTTFUTTTFUTTFUTFUTTTFUTTFUTFUTFUTTFUTFF TFUTFUTFFUTFUTFFF UREUREUREUREUREEREUREUREREUREUREUREUREREURERREUREE RE REREREREREREREREREREREREREREEREER SIDSIDSIISIDIIDSIDSIDSIDIDISIDSIDSIDDSS ENTENTENTNTNTENTENTNNNTENTNENTENTENTEENTENTNTIIALALAALALLALALALALALAAL DEVDEVDDDEVDEVEVDEVDEVDDEVDEVDDDEVDDDEVDDDEVDEVEDDDDDDDDEVDDEVD VE ELOELOELOELOELOELOELOELOELOEELOELOELOELOEELOLOLOL PMEMEPMPMEPMEMPMEPMEPMEPMMEPMEPMEPMPMPMEPMEP NTNNTNTNTNNTNNNNTNTTTTNTN

BUSBUSBUSBUSBUSBUSBUSBUSUSUSBUSBUSBUSUSBUSBUSUSSBUBUSUSSBUSBUSBUSBUBUSBUSUSSBUSBUSUSSBUUSBUSSBUSBUSBUSBUSUSBUSBUSBUSBUBUBUBUUSBUSBUUBUSBB ST ST STST STSS SSSSTSTST STST ST STS SSSTS STSSSTSSSTSSSSTTSTSTSTTTSTSTST STSTSTTSTSTTSTTSSSS OPOPOPOPOPOPOPPPOPOPOPOPOPOPOPOPOPOPOPPPOPOPOPOPOPOPOOPOOOOOOOOOOOO

BUSSUSSSSUSSUSSUSSU STSTSTSSSSSSSSSSS OP

FUUUUUUUTUUUUUUUUUUU UREUUUUUUUUUUUUU RERRRRRRRRRRRRRRRR SIDDENTENTENTENTENTENTEENTENTENTENTENTENTENTEENTTTE TIAL LDEVDEVDEDEVDEVDEVDDEVDEVDEVDDDEVVEVEVVELOEEEEEEEEEEEEE PMEEEEEEEEEENTNTNTNTNNTNTNTNTNTTNTTNTNNTN

20000200200002002002002002002000020020000200200 M OOOOOOOOOOOOOOOOOOOPTIMUMMUMUMUMMUMMUMMUMMUMMUMMUMMUMMUMMUMMMUMMUMMUMMUMUMMUMMM LO LOLOLOLOLO LOLOLOLLOL LOLOLOLOLLOLOLOLOCCCCCCCCCCCCA-CA-ACA-CA-CA-CA-CACA-CA-ACAAACA-CA-CAAA

TIOTIOTIOTIOTIOTIOTIOTIOTIOTIOTIOTTIOTTTIOTT N FNNNNNNNNNNNNNNNN OR OR ORORORORROROROR OR ORORROROR ROROROR HIGIGGIGIGGHIGHIGIGIGHIGHIGHIGGHIGIGIGGHIGGHERHERHEHERHERHERHERHERHERHEHERHERHERHERHERHEHERHERHERHHERR ORRORORORORORORROROROROROROROROORDDDDDDDDDERDERDERDEDERDERERDERDEDERDERDERDERDERDERDERDERDEDED

/ P// P/ P/ P/ P/ P/ P/ P/// P/ P/ P//////// PP/ PUBLUUUUUUUUUUUUUUUU IC LANLALANLALALALANLALALALAAALAAAAAC LANLANANLANLANLANLANLANLALANLANANANANLANLANANLANNLAND UD UUUD UD UD UUUD UD UD UD UD UD UUUD SESSESSESSESSESSESSESSSESSESSESSESSESESSESSESSESSSESSSE IIIIIIIIIIIIININNINNNININININININNINININNNCL.CCLCL.CLCLCLCLCLCL.CL.CLCLCC

FUTFUTFUTUTFUTFUTUTUTFUTFUTFUTFFUFUFFU URURRRRUREUUREUREURUREUREUUREUURERRRERERRRE REREREREREREREREESIDSIDSIDSSIDSSIDSIDSSIDSSIDSSIDSIDDDDDENTENTENTENTENTENTENTENTENTENTENTENTEENTENTENTIALIII DEEVVDEVDEVDEVEVDEVDEVDEVEVEVDDEDEDDEDEDEVVVEVVVELOELOELOELOELOELOELOE OOPMPMPMPPMEPMPMPMMPMPMMPMPMPMPPPPPPP NTTTTTTTTTTTTTTTT

E

HOHOHOHOHOHOHOHOHOHOHOOHOHOHOHOHOHOLDLDLDLDLDLDLDLDLDDLDLDLDDLDDLENENENENENENENENENENENENENNENENEE

S S S SSSS S S S S S SSSS CRCRCRCRCRCRRCRCRCRCRRCRCRCRCCREEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEK KKKKKKKKKKKKKKK POPOPPOPPOPOPPPOPOPOPOPONNNNNNNPOOPOOPOOPOOOPONDNDNDNDNDNDNDNDNDNDNDNDNDNDN

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:5000@A31:2500@A1

0 50 100 200m DrawingSITE TRANSPORT & CONNECTIONS

Page 7: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

JJJOOO

HHHNNN

GGGJ

EEE

RRTTT

OOONNN

DDDRRR

III VVVEEE

NNGGG

OOOOOOORRR

FUTFUU URERREREERERERERERERERERREREREERRE POPOPOOOPOOOOOOOOPOPOONDNDNDNDNNDNNDNDNNNDNNDNNNDNNNDNDNDNDNNNDDNDNNDD

T

TTTTTTTTT

T

TTTTTTT

TTTTT

TTTS T R O M L O F O R E S T P A R K

FUUUUUUUUUUUUUUUUUUTTTUTTUTTTUTTUTTTTUTUTTUTUU UREUREUUUURUURURUUUUUURRU RERERRRRRRRRERREESIDIIIIIIIIIIIII ENTNTNNENTNTNENENTENTENTENTENTE TENTENTENTENTTE TTENTIALAAAAAAAAAAAAAAA DEVEEDEVVDEVDEEDEEEEEEDEEEEEDEEDEDEDEE ELOELOLOELELOELOLELOLELOELOLOELOELELOOOOOOOPMEPMPMPMPMEPMPMPPMPPMPMPMPMPMPMPMMMMPMPMMM NTNNNNNNNNN

FUTUTUUUUUTUUTUTUUUTUUUTUTUTU UREURURUUREUREREEREURREREUREUREEEEUREUREUUREUREUREUREUREEU EERRRR RERRRRRRRRRRRRRR SIDISISISISIIISSISISSSSSSSSSSS ENTENTENTENTENTENTNTEENTENTTENTENTENTENTTENTENTEEEE IALIAIIIIIIIIII DEVDDDEVDEVDEVDEVDEVDEVDDDEVDDDDDDDDDDEVDEVVVELOOOOOOOOOOOOOOOOOOOOOOOPMEMMMMMMMMMMMMM NTNTTNTTNTTNTTTTTTNTNTNTTTTTNN

WATER EASEMENT

PRORRRRRRRRRRRRRRRRRR POSPOSPOSPOSPOSPOSPOSPOSSPOSPOSPOSPOSPP ED EDDDEDDDDEDDDDDEDDDD WATWATWWWATWATWATWATWWWWWW ER RRRRRRRRRRRRRRRRRRR MAIMAMAMMMAMMMMMMMMMAMMMM NNNNNNNNNNNNNNNNN

PROPPPPPPPPPPPPPPPPPP POSPOSPOSPOSPPPPPPP ED ED EDEEDED EDEEDEDDEDEDDEEDED GASASAAAASAAAAAAAAAAA M MAAAAAAAAAAAAAAAAAAAIN

PROOOOOOOOOOOOOOOOOOOOOPOSSSSSSSSSSSSSSSSSSED DDDDDDDDDDDDDDDDD SHAHHHHHHHHHHHHHHHHHH RRRRRRRRREDDDDDD TRTR TRTRR TR TRRRR TRR TRRRENCENCNCNCNCENCCNCNCENCCCENCEN H -H COCCCCCCCCCCCCCCCCCC MMUMMUMMUMMUMMUUMMUMMUMMUUMMUMUMMUMMUUMMUUMMUUMMUMMUM UUM NICNNNNNNNNNNNNN ATIATAAATAAAAAAAAAAAAATAAAAA ONSONSONSONSONSONSONSONSONONSOOONONSONONONOONNNNNNNNSSS

PRORRRRRRRRRRRRRRRRRRR POSOOOOOOOOOOOOOOOOOOO ED EDEDDEDDEDEDDE SHASSSSSSSSSSSSSSSS RRRRRRRRRRRRRED TRTTTTTTTTTTTTTT ENCENCENCENCEENCCCENCENCENCENCENCENCENCENCEENCENCCCCCENCENCEE H -HHHHHH GAGAAGAGAGAGAGGGGG SS &SSSSSSSSSSSSSSSSSS ELELEEELELEELELEELEELELLLLLLECTTTTTTTTTTTTTTTTTTRICRIRIRICRRIRIRIRRRRICRIRICRICRICRIRRRII ITYTYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY

LIKIIIIIIIIIIIIIIII ELYLLLLLLLLLLLLLLLLL STTTTTTTTTTORMRRRRRRRRRRRRRRRRRR WAWAWAWAWAAAAAAAAATER RRRRRRRRRRRRRRRRR CONONONONONNNNNNNNNECECEEEEECEEEEEEEEEEEEEEEEE TIOOOOOOOOOOOOOOOOOOOOOONSSSS

SEWSEWSEWSEWSEWSEWSEWSEWSEWSEWSEWSEWWSEWSEWSEWSEWSEWWSSS ERAAAAAAAAAAGE EEEEEEEEEEEEEEEE CONNNNNNNNNNNNNNNNNNNNNNECCCCCCCCCCCCCCCCCCCCCCCCTIONS NNNNNNNNNNNN (REEEEEEEEEEEEEEEEEEEFERRRRRRRRRRRRRRRRRR TO NNNNNNNNNORTRTRTTRTRTRTRTRTRTTRTRTRTRTRTRTRTRRRRR HROROOOOOOOOOOOOOOOOOOOOPPPPPPPPPPPPPPP RRRRRRRRRRRRRRRRREPOEPOEPOEPOEPOEPOPPOEPPOPOPPPPOPOPOPOPPEPOPPOORT T T TT TTTTTTTTTTTTTT FORFORORORFORFORRRORORORRFORRFORRRRRRF DEDEDDDEDDDDDDDDDD TAITAITAITAITAITAITAITAITATATAITATATAITATATTAIILS)SSSSSSSSSSSSSSSSSSS

EXIEXEXXXEXEXEXXEXEXXXXEEEEEEEE STISTSTSSTSTSSTSTSSTSSSSSSSSSSS NG NG NG GNGGNGGGNG NG GGGNGNGNGGNGNG TELTELTTELTELTELTELTELSTRSSSSSSSSSSSSSSSSSSSSSS A LAAAA A AAAAAAAAAAAAAA INEEEEEEEEEEEEE (APPRPRRPRPRPRRRPRPRRPRRRPPPPPP OX.XXXXXXXXXXXXXXXXXXXXXXXX LOOOOOOOOOOOOOOOOOCATCATCATCATCCATCATCATCATCATCATCATC TCATCATC TTCATCATTTTIONIONIONONIONIONNN))))))))))TTTTTTTTTTTTTT

HOHOHOHOHOHOHOHOOHOHOOOHOOHOHOOOOHOOOHHHHLL

HOLDENNNNENNNENENNNNNNENENNENNNNS SS SSSSSSSSSSSSSSSSS SS CRCRCRCRCRCRCRCRCCCCCCCCCCCRCCRCCCCRRRCRCRRRRRRRCRRCRCRRCRRRRCRCRCRRCRCRCREEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEK KKKKKKK KKKKKKKKKK POOPOPOPOPPOPOPOPOPOPOPOPOPOOPOPOPPPOPPPOPPPOP

NDNDNNDNNDNNDDNDNDNDNDNDNDNDNNNNNNNN

INDNNNNNNNNNNNNNNNNNNNNNN ICACCCCCCCCCCC TIVIVIVIIVIVIVIVIVVIVVVVVVVE RRRRRRRRRRRRIDGDDGDDGDDDDDDDDDDDDDDD ELIELIEELIELIELIIIELIELIELIIIELIELIEEEEEEE NESNEENENEENENEEENEEENEEENENENEN

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:2000@A31:1000@A1

0 20 40 80m DrawingSITE SERVICES

Page 8: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

JJJOOO

HHHNNN

GGGJ

EEE

RRTTT

OOONNN

DDDRRR

III VVVEEE

NNGGG

OOOOOOORRR

FUTFUU URERREREERERERERERERERERREREREERRE POPOPOOOPOOOOOOOOPOPOONDNDNDNDNNDNNDNDNNNDNNDNNNDNNNDNDNDNDNNNDDNDNNDD

WWWWWWWWWWAWWWWWWWATATATATATATTATATATTTTTTATATERCERCERCERCERCERCRCRCERCERRCRCRCERCERCERCRCERCRCOUROUROUROURUROUROUROURUROURROUROUROURUROUROURROUROUROUOURRRRSESESESESESESESESESESESESESESSSSSS

S T R O M L O F O R E S T P A R K

FUUUUUUUUUUUUUUUUUUTTTUTTUTTTUTTUTTTTUTUTTUTUU UREUREUUUURUURURUUUUUURRU RERERRRRRRRRERREESIDIIIIIIIIIIIII ENTNTNNENTNTNENENTENTENTENTENTE TENTENTENTENTTE TTENTIALAAAAAAAAAAAAAAA DEVEEDEVVDEVDEEDEEEEEEDEEEEEDEEDEDEDEE ELOELOLOELELOELOLELOLELOELOLOELOELELOOOOOOOPMEPMPMPMPMEPMPMPPMPPMPMPMPMPMPMPMMMMPMPMMM NTNNNNNNNNN

FUTUTUUUUUTUUTUTUUUTUUUTUTUTU UREURURUUREUREREEREURREREUREUREEEEUREUREUUREUREUREUREUREEU EERRRR RERRRRRRRRRRRRRR SIDISISISISIIISSISISSSSSSSSSSS ENTENTENTENTENTENTNTEENTENTTENTENTENTENTTENTENTEEEE IALIAIIIIIIIIII DEVDDDEVDEVDEVDEVDEVDEVDDDEVDDDDDDDDDDEVDEVVVELOOOOOOOOOOOOOOOOOOOOOOOPMEMMMMMMMMMMMMM NTNTTNTTNTTNTTTTTTNTNTNTTTTTNN

WATER EASEMENT

POTPOTTTTTTTTTTTTTTTTTTENTENTTENTENTENTTTTTENTTTEEEE IALIAIIAIAIAIAIAAAAAAAAA SISSSISSSISSSSSSISSSSSSSIITE TTTTTTTENTTTTTTIAL SISSSSS TEACCCCCCCCCCCCCCCCCCCCCCCCCCCCESSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS POPOPOOOOOO POOPOO INTINTNTINTINTNTNNNNN

POTOTTTTTTTTTTTTTTTENTTTTTTTTTTTTTTTTTIAL SISSSSSSSSS TTTTETEEE TTTETEETTTETEETTETTTTETETTTTTETTTEEEEEEEEEEEEEEACCCCCCCCCCCCCCC ESSSSSSSS POINTII TTTTTTI TTTTTTTTTTTTTTTTTTTTTTTTTTTTT

CORCORCORCORCORCORCOROCOROORRRCORC RCORRRRRCC RC RRNEREEEEEEEEEEEEEEEEEE ADAADAADADDDDDDDDDDDDDDDDDRERRRRRRRRRRRRRR SSSSSSSS SSSSSSSSSSSSSSSSSSSSS TO OOOOOOOOOOOOO OOO O JOHHHHHHHHHHHHHHHHHHHHHHN GORGOGORGORGORGORGOGORGORGORGORGORRGGORGGORGGGORGGGGG TONOONOONONOONONONNNNNNN DDDDDDDDDDDDDDRIVEVVVVVVVVVVVVVVVVVVVVVVVV

CORCOCORCORCORCORRCOCOCORCORCORCORRCOROORCOCORCORCORCORC NENEEENENENENENENENENENEENENENENENENENNNEENNENEEEERRRRRRRRRRRRRRRRRRR ADADAD ADAADADADADADADAADADAAAAA DREDREDRRRDREDRERDRDRERDRRRRDRERRDRERER SS SS SSSS SSS SSSSSSSSSSSSSSSS TO TOTOTOTOTTOTTTTTOTTOTOOOOOO JOHJOHJOHJOJOJJOHJOHJJJ HHHHOHHOHHOOO N NNNNNNNNNNNNNNNGGGGGGGGGGGGGGGGGGGGOROROROROROROROROROROROORROOOORRTONNTONTONTONTOTONONOTONTONTONNTOTOTTTTONNTONTONT DRDRDDDRDRDDRDRDDRDDDRDDDRDDRRDRDRRDRRIVEEEEEEEEEEEEEEEEE

COCOCOCOCOCCCOCOCOCCCOCOOCOCOCCCCOCCOONONONNONNNNNNNNNNNNNNNNNONNO NECNECNECNECNNECNECNECNECNECNNECNECNNNNECNNENNECCCCCTIOTIOTIOTIOTIOTIOOOTIOOTIOTTTTTTT N TN TN TN TN TNN TN TN TN TN TN TN TN TN TN TTTTTTTTTTTO OOOOOOOOOOOOOOOOOOOMOMOMOMMMMMMOOOOOLLLLLLLLLLLLONGONGONGONGONGONGGONGNGONGGGONGNGONGONGONGNNONNNOO LLO LO LO LO O O RECRECRECRECRECRECRECRECRECRECCRECCRECCRECRECRERECCRERECRRR REAREAREAREAEAREAEAEAREAREAEAEAAEAEAEAREAEAAEAAREAEEER TIOTIOTIOTIOTIOTIOTIOTIOOOIOTIOT OTIOTIOTIOTIOTIOTIOOOOIOOOOOOOOIOOOTIOTIOOTIIOOTTTT ON NN NN NNN NN NN NN NN NNNN NN NNNNN ETWETWETWETWETWWWWETWETWETWWWWWWWWORKORKORKORKORKOOORKORKORKORKRKKKKKKKKKKKK

TNATNATNATNATNATNNNNN TTTTTTTTTTTURAURAURAURAURAURAURAURAAAURAURAUUUUUUU L WL WL WL WL WL WL WL WWL WLLLLLLLLL ATEATEATEATEATEATEATEATEATEATEEEATEAATEATEAAAAATEATEAA RCORCOCOCOCOOOOCOCOCOCOCOCCCOCCCCCC URSURSURSRSURSRSURSURURRRRURURUUURUUUU EES EEEEEEEEEEEEEEEE THRTHRTHRTHTHRTHRTHRRTHRTHTHRRRTHRRRRRTHRTHRTTT OUGOUUUUUUUUUUUUUUUUU HHHHHHH H H HHHHHHHHH HHHHHHEXIEXIEXIEXIEXIEXIIIIIEXIIEXIEEE STISTSTSTSTSTTSTSTSTTSTSTSTSTTTSSSTTSTST NG NGNGNGNNGNGNNGNNGNGNNNGNGNG VALVALVALVALLLVALVALLLLLLVAVAVAAA LEYLEYYLEYLEYLEYLEYYLEYLEYLEYLEYLEYLLEYLEYLEYLLLEYYYSSSSSSSSSSSSSSS

PRERERERERERREREREEEEEEEEDOMOOOOOOOOOOOOOOOOOOOOOO INNAAAANT NNNNNNNNNNNNNNNNNNNNN WESWESWESWWESWESWESWESWESWESW SWWESWESWESWESW SWESWESSSTEREREEEEREEEEEE LY YYY WINWINWINWINWINWINWINWINWINW NWWINWINNWINWINNWWINWWWINWWWINW DS SSSS SSSSSSSSSSS IN NNNNNNNNNNNNNNNNNNWINWWWWWWWWWWWWWWW TERTERTERRTERRRTERRRTERRTERTERTERTERRTERRRRR

PR

EP

REEEEEEEEEEEEE

DO

MD

OM

DO

MD

OM

DO

MDD

OM

DO

MD

OM

DDO

MD

OM

DO

MD

OM

DO

MD

OM

DO

DO

MD

OM

DO

MD

OD

OD

OD

OM

OMM

INA

INA

INA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NAAAAA

TN

T N

TNN

T NN

TNNN

TN

TNN

T N

TNN

TN

TN

TN

TTTTTN

OR

NO

NO

NO

NNNNO

NNO

NO

NO

NO

NNO

NO

NO

NNNO

NO

NO

NO

NO

NO

NNNNOOOOOOOOOOO

THTHTHTTHTHTTTHTHTHTHTHTHTHTTHTHTHHHHHHHHHHHHHHHW

ES

WE

SW

ES

WE

SWW

ES

WWWWWE

SW

ES

WWWWE

SW

ES

WWWWE

SWW

ES

WE

SWWWW

ES

WWWWWWSSSSSSSSTE

RTE

RTE

RTE

RTE

RTE

RTE

RTETETE

RTE

RTE

RTE

RTE

RTTETETETETETEE

RE

RLY YYYYYYYYYYYYYY W

I W

I W

IW W W

IWWWW

IWW

IW

IWWWWWWW

IW

IND

SN

DS

ND

SN

DS

ND

SN

DS

DN

DS

ND

SN

DS

ND

SN

DS

NND

SNNNNNN

DS

NNND

SS ININIIIII

SECCCCCCCCCCCCCCCCCCCCCCCCCCONDDDDDDDDDDDDDDDDARYYYYYYYRYYRYYRYYYYYY COOOOOOOOOOOOOOOOOOOONNNENNNNNNNNNNNNNN CTITTTTTTTTTTT ON N N NNN TTTTO TTTTTTTTTTTCOMMOMMMMOMMOMOMMMMMMOMMMUNUUNUUNUNUUNUUNUNUUUUUNUUUUUUUNUNUUU ITYITITTITYITTTYITYIIIII YYYY PRPPPPPPPPPP ECIECCEECIECIECEECIEECECIEECECIEECECEEECECCICCCCC NCTNNNNNNNNNNNNNNNNN PRIPRIPRPRPPRPPRPRIPRIPRPRIPPRPRRRRRIIIRIRIRIRRIIIRIIIRIIR MMMMMMMMMMMARARMARARMARMARAMARMMAMAMAARARARRRMARMARRARMARMARMARMARRRMARMARMAAMARARMARMARMARARMARMARAMAMAMARMARAAMAAAAAMAAMMMM Y CYY CY CCYY CYY CY CY CYYY CYY CY CYYYYYYYY ONNOOOOOOOOOOOOOOOOO ECTTTTTTTTTTTIONONONOONOONOOOON TOTOTOTOTOTOTOOOTOTOTOTTTOTTTTTTTOTOTOT

COCOOOOOOOOOOOOOOOCOOMMUNMUNMUNMUNMUNNNMMUNMUNMUMUNNMUNMUNMMUNMMUNMM NITYTYTYYYTYTYYYYYYYYYYYYYYYYYY PR PRRRRRECICICCCCCCCCCCCCCCCC NCTNCTNCNCTNCTCCTNCTNCTCCTNCTNCCTCTTNCCTTTNCTTNCTCCCTTTCTOMMUNMUNMMMUMUMUMUMMU ITYTYTTTYTTTYTY PRECIECECEEECECECEECEECC NCTNCNCNCNCTNCTNCNCNNCTNCNCN

INDNNNNNNNNNNNNNNNNNNNNNN ICACCCCCCCCCCC TIVIVIVIIVIVIVIVIVVIVVVVVVVE RRRRRRRRRRRRIDGDDGDDGDDDDDDDDDDDDDDD ELIELIEELIELIELIIIELIELIELIIIELIELIEEEEEEE NESNEENENEENENEEENEEENEEENENENEN

GREGREGREGREEEGREEEGREGREEEEGREGREEEGRGRRGREGR EEEEEEEEEEEEEENEN EN ENENNNNNNNNNNNNN CONCONCONCOONCONCONCCOCONCONONCONNONNCOONCOO NECNECNECNECECNECECECECECNENECECNEEEEEEN TIOTIOTIOTIOTIOOTIOOOOOOOTIOTIOOTIOOOTITII NNNNNNNNNNNNNNNNNTO OOOOOOOOOOO STRSTRSTRRRRSTRSTRRS RRSTRSTRRSSTS OOMLOMLOMLOMLLOMLMMLMLMMMMMMMOMOMMMO O FFFFFO FFFFFFFFFFFFOREOREOREREREOREREEOREREOREEOREORORORORRRRRR ST STTTTTTTTTTTTTTTTT PARPARPARPARPARRARARARARARARARARARRARARARAAA KKKKKKKKKKKK

TSITSITSITTSITSITSITSITSITSITSITSITSITSITITSIISISSS TTTTTE LE LEE LE LE LE LEEEE LE LE LE LE LLLOW OWOWOWOWOWOWWOWOWOWOWOOWOWOWOWOWOWOOWWOWOW POIPOIPOIPOIPOIPOPOIPOPOIPOPOIPOIIPOPOPOIOOOOO NTNTNTNTTTNNTNNTNNNNTNTNNNT

SITSITSSITSITSITSITSSITTSITSITTTSITS EEEE HEEEEE HHHHHHHHHHHHIGHIGHIGHGHIGHHGHIGHGHGIGIGGGGGGGGI PO POPOPO PO POPO POPOPOPOOINTINTINTINTNTINTINTTINTINTINTINTNTT

OLDOLDDOLDOLDOLDOLDOLDOOLDO DDD URUUUUUUUUUUUUUUU IARIARARIARARARARARARARARRRRRRRRRRRRRRRA RD RRRRRRRRRRRRRRRDASDADADDDADDDDDDDDDDDDDDD SSSSSSSSSSSSSSSSSSSSHEDEDEDEDDEDEDEDDEDEDEDEDEDEDEDEDDEDEEEEE

URIURIRIRIURURIRRURIRRURRRIURIRRURURIURURIURIUU ARRARRARRAARRRRRRRRRRARRARARARRARRR A RA RA RA RA RRA RAA RRA RA RRA RRA RAAAAA RAAAA D DDDDDDDDDDDDRRRRRRRRRRRRRRRRRRRRRRE-RE-RE-RE-REEEEEE-REEEEREEEEEEEER ALIALALALAALALAAALAAALALAAALAAALLLL GNMGNMGNMGNMNNMMGNMGNMNMGNMGNMMNGNMMMGNMNGNMNNMMGNMENTENTENTENTENENTNTENTNTNNTTNTNTNTNNNNNNNN

VVISVISVISVISVISVISVIVISVISVISVISVISVISVIVISVISSVVISV SVISSSSSUALUALUALUALUALUAUALUALUUALUALUAUALUALUALUALUALUALAUALUAUALUAAAAA CO COCOC CO CO COCOCOCOCCCCOCOCOCO COOONNENNENNENNENNENNENENENNNENNNNNNN CTITIITIIIIIIIONOO

BRBRBRRBRBRBRBBRRBBRBRRRRRRIRIRIRIIIIIR DGEDGEDGEDGEDGEDGEDGDGDGDGED EDGD EDGEDGDGDGDGDDGDD

BRIBRIBRIBRIBRIBBBRBBRBRIBRIBRIRRRRRBRIBRBRBRIIBB DGEDGEDGEDGEDGEDDDGEGEDDDGEDGEDGEDGDGEGEGED EDG

HOHOHOHOHOHOHOHOOHOHOOOHOOHOHOOOOHOOOHHHHLL

HOLDENNNNENNNENENNNNNNENENNENNNNS SS SSSSSSSSSSSSSSSSS SS CRCRCRCRCRCRCRCRCCCCCCCCCCCRCCRCCCCRRRCRCRRRRRRRCRRCRCRRCRRRRCRCRCRRCRCRCREEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEK KKKKKKK KKKKKKKKKK POOPOPOPOPPOPOPOPOPOPOPOPOPOOPOPOPPPOPPPOPPPOP

NDNDNNDNNDNNDDNDNDNDNDNDNDNDNNNNNNNN

OOR

TOO

RT

OR

TO

RT

OR

TO

RT

OR

TTTTTTTTTTTH

HHHHHHHHHHHH

/ N/ N/N/ N/N/ N//N/

N/

N/////// ////N/////

N////// NNNNNNNNNNNNNNNNNNNNNNNNNN

OOOOOOOOOOOOOOOOOOOOOOMMMMMMMMMMMMMMMMMME

ME

MMMME

RRRRRRRRRRRRRRRRN

SU

SU

SU

SU

SU

SU

SSSU

SU

SU

SU

SU

SU

SU

SSU

SSU

SSSSSSU

SU

SU

SU

SUUUUUUUUUU

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

MMMMMMMMM

MM

MMM

MMMMMMMMMM

MMMMMMMMMMMMMMMMMMM

MMMMMM

MMMMMM

MMM

HHHHHHHHHHHHH/

N

POTPPPPPOPPPOPOPOPPOPPPPOPPPOPOPOPOO ENTNNTNNNNNNNNTNNNNNNNNNNNNNNN IAAAAAAAAALALLLLLLALLALLALLLALLLLLALAAAAAAAAAAAA SISSSSSSSSSSSSSSSSSSSSSS TE ACCACCACCCCACCCACACCACAACCACACACAAAAACCACCACCCCCCCCCCCCCCCCESSSSSSSSSSSSSSSSS POINTNTNTNTNTNTNTNTNNTTT

V I S T AA

S T T T OOOOOO OO OOOOOOOO O O OO OOOOOOOOOOOOOOOOOOOOOL O CL O CO CL O CL O CL O CL O CL O CCL O CO CO CO CCCCO CL O CO COL OL O A L LLLLLL LLLLLLLLLLAA C O NC OC O NC O NC O NC O NC O NC OC O NNNC O NC O NC OC O NOOOC OOC OC OCC OOOCCCC OC OCC OCC OC OCCCCCCCCC T E XT E XTT E XT E XT E XXXTT E XT E XT E XT E XT E XT E XT XT XXT TTTTTTTTTTTTTTTT VT VT VT VT VT VVTTTT VVV I E WE WE WE WE WEE WEE WEE WWWE WW SSSSSSS HH O LH OOH OH O LH O LH OOOHH OH O LH O LOOO LOO LOOOO LO LLOO LOOO E ND ED E NE NE NNE NEEEEEEE SS CS CS CS CS CSS CSS CSS CSS CCCCCCCCCCCCC R E EEEE EER E ER E ER E ER E ER EEE EE E KKKKKKK

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:2000@A31:1000@A1

0 20 40 80m DrawingSITE ANALYSIS

Page 9: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

Gym Area600 m²

Health Care Area75 m²

Community Spaces100 m²

3 Courts2220 m²

Swimming Pool - 50m1050 m²

Restaurant250 m²

Reception100 m²

Yoga/Aerobics300 m²

Rehabilitation75 m²

Theatrette250 m²

Stage120 m²

Retail100 m²

Office100 m²

Spin150 m²

Child Care60 m²

Mem

bers

Lou

nge

50 m

²

Storage100 m²

Play Pool250 m²

Change Rooms25 m²

Change Rooms25 m²

Change Rooms25 m²

Change Rooms25 m²

Spectator Seating150 m²

Wave Pool250 m²

Change Rooms -Spectator

25 m²

Cha

nge

Roo

ms

- D

ry30

0 m

²

Sp

ecta

tor

Se

atin

g3

00 m

²

Change Rooms -Spectator

25 m²

Cha

nge

Roo

ms

- W

et3

00 m

²

Cha

nge

Roo

ms

150

Green Room150 m²

Learn To Swim250 m²

Storage115 m²

Plant300 m²

Change Rooms -Disabled

15 m²

Change Rooms -Family15 m²

Change Rooms -Family15 m²

Change Rooms -Disabled

15 m²

Change Rooms -Family11 m²

Change Rooms -Family11 m²

Change rooms -Disabled

25 m²

Change rooms - Family25 m²

Plant100 m²

Kiosk60 m²

DrawingPROPOSED FACILITY MIX

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Page 10: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

MOLONGLO AQUATIC SPORTS AND RECREATION FACILITY Rev 3 Issued 13.04.12ACT Sports and Recreational Services

FACILITY MIX FACILITY BREAK DOWN PROJECTED NO. OF OCCUPANTS

AREA RATE PER PERSON (m²)

AREA (m²) NOTES

GYM Gym Area 200 3 600Yoga / Aerobics 100 3 300Spin 50 3 150Change Rooms / Toilets - - 150 Allow 150m²

Sub Total 350 1,200

MEDICAL Health Care Area 7 10 75Rehabilitation 7 10 75Child Care (Creche) 15 4 60Change Room / Toilets - - 25

Sub Total 29 235

COMMUNITY Community Spaces 100 1 100Theatrette 250 1 250Members Lounge 50 1 50Change Room / Toilets - - 25

Sub Total 400 425

INDOOR COURTS 3 Courts 100 22 2,2203 Additional Courts (Expansion) - - (2930) Not included in this stageAmenitites - Stage - - 120Amenitites - Green Room - - 150Amenities - Storage 3 30 100Amenities - Delivery Access - - -Spectator Seating 250 0.6 150Change Rooms / Toilets (Spectator) - - 25Change Rooms / Toilets (Dry) - - 300 Allow 300m²Family Change 25Disabled Change 25Plant 100

Sub Total 353 3,215

AQUATIC 50m Swimming Pool with Boom 80 13 1,05025m Swimming Pool / Learn to Swim Pool 20 12.5 250Children's Play Pool 50 5 250Standing Wave Pool 5 50 250Spectator Seating 500 0.6 300Change Rooms / Toilets (Spectator) - - 25Family Change 50Disabled Change 30Change Rooms / Toilets (Wet) - - 300 Allow 300m²Storage 100Plant 300 Allow 300m²

Sub Total 655 2,905

MISCELLANEOUS Restaurant / Cafe / Bar / Lounge 200 1.25 250 Includes 50m² for kitchen/storageRetail Suites 33 3 100Change Rooms / Toilets - - 25Kiosk 60

Sub Total 233 435

ADMINISTRATION Reception 10 10 100Office 10 10 100Change Rooms / Toilets - - 25

Sub Total 20 225

SUB TOTAL (Functional Areas Only) 2,040 8,640

GROSS BUILDING AREAS (30% Grossing for Circulation and Services) 11,232

CARPARK AREA (300 Cars @ 30m² / car ) 9,000

DrawingPROPOSED AREAS

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Page 11: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

STROMLO FOREST PARK

JOH

NG

OR

TO

ND

RIV

E

FUTURECOMMUNITY

DEVELOPMENT

FUTUREPOND

FUTURERESIDENTIAL

DEVELOPMENTBUILDINGFOOTPRINT12,000 sqm

EXPANSION

ENTRY

FUTUREDEVELOPMENT

OFF-STREETPARKING

(204 CARS)

OFF-STREETPARKING

(150 CARS)

ON-STREETPARKING

(158 CARS)

STROMLO FOREST PARK

JOH

NG

OR

TO

ND

RIV

E

FUTURECOMMUNITY

DEVELOPMENT

FUTUREPOND

FUTURERESIDENTIAL

DEVELOPMENTBUILDINGFOOTPRINT12,000 sqm

ENTRY

FUTUREDEVELOPMENT

OFF-STREETPARKING

(204 CARS)

OFF-STREETPARKING

(150 CARS)

ON-STREETPARKING

(158 CARS)

BUILDINGEXPANSION

PARKINGEXPANSION

STROMLO FOREST PARK

JOH

NG

OR

TO

ND

RIV

E

FUTURECOMMUNITY

DEVELOPMENT

FUTUREPOND

FUTURERESIDENTIAL

DEVELOPMENT

BUILDINGFOOTPRINT12,000 sqm

ENTRY

PARKING9,000 sqm

(300 CARS)

EXPANSION

STROMLO FOREST PARK

JOH

NG

OR

TO

ND

RIV

E

FUTURECOMMUNITY

DEVELOPMENT

FUTUREPOND

FUTURERESIDENTIAL

DEVELOPMENT

BUILDINGFOOTPRINT12,000 sqm

ENTRY

PARKING9,000 sqm

(300 CARS)

EXPANSIONPOTENTIAL ENTRYTO STROMLOFOREST PARK

OPTION B01_SITE STRATEGY

OPTION C01_SITE STRATEGY

OPTION B02_SITE STRATEGY

OPTION C02_SITE STRATEGY

DrawingSITE STRATEGY OPTIONS_DIAGRAMS

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Page 12: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

STROMLO FOREST PARK

JOH

NG

OR

TO

ND

RIV

E

FUTURECOMMUNITY

DEVELOPMENT

FUTUREPOND

FUTURERESIDENTIAL

DEVELOPMENT

FUTUREDEVELOPMENT

OFF-STREETPARKING

(204 CARS)

COURTSEXPANSION

OFF-STREETPARKING

(150 CARS)

ON-STREETPARKING

(158 CARS)

INDOORCOURTS

AQUATIC

GYM(ABOVE)

COMMUNITY

STROMLO FOREST PARK

JOH

NG

OR

TO

ND

RIV

E

FUTURECOMMUNITY

DEVELOPMENT

FUTUREPOND

FUTURERESIDENTIAL

DEVELOPMENTFUTURE

DEVELOPMENT

INDOORCOURTS

AQUATIC

GYM(ABOVE)

COMMUNITY

OFF-STREETPARKING

(204 CARS)

COURTSEXPANSION

OFF-STREETPARKING

(150 CARS)

ON-STREETPARKING

(158 CARS)

PARKINGEXPANSION

STROMLO FOREST PARK

JOH

NG

OR

TO

ND

RIV

E

FUTURECOMMUNITY

DEVELOPMENT

FUTUREPOND

FUTURERESIDENTIAL

DEVELOPMENT

OFF-STREETPARKING

(300 CARS)

INDOORCOURTSAQUATIC

GYM(ABOVE)

COMMUNITY

EXPANSION

STROMLO FOREST PARK

JOH

NG

OR

TO

ND

RIV

E

FUTURECOMMUNITY

DEVELOPMENT

FUTUREPOND

FUTURERESIDENTIAL

DEVELOPMENT

OFF-STREETPARKING

(300 CARS)

INDOORCOURTS

AQUATIC

GYM(ABOVE)

COMMUNITY

EXPANSION

DrawingSITE STRATEGY OPTIONS_MASSING

OPTION B01_SITE STRATEGY

OPTION C01_SITE STRATEGY

OPTION B02_SITE STRATEGY

OPTION C02_SITE STRATEGY

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Page 13: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

DrawingCONCEPT

EXISTING ROCK OUTCROPS AND NATURAL POOLS AND WATERWAYS - AN ARCHITECTURE THAT REFLECTS THIS - CARVED TERRACES AND SUNKEN POOLS, NATURAL LOCAL STONE.

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Page 14: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

DrawingCONCEPT

EXISTING TOPOGRAPHY(20.0 M FALL ACROSS SITE)

CARVED TERRACES TO DEFINE SPACES & SUNKEN POOLS

WALLS CREATED FROM LOCAL STONE TO FORM EDGES TO TERRACES & RETAIN TOPOGRAPHY

LINKS TO STROMLO FOREST PARK

SITE PERMEABILITY

DEFINE STREET EDGE & LINKS TO FUTURE RESIDENTIAL DEVELOPMENT

DEFINE SECONDARY INTERNAL ‘LANEWAY’BETWEEN POOLS & RETAIL EDGE

TRANSPARENT ENCLOSURE / MASSING, WITH RETAIL EDGE & INTERNAL ‘LANE’ DEFINED BY THREAD OF MORE SOLID FORM.

BUILDINGS BEGIN TO READ AS ‘FINGERS’ IN THE LANDSCAPE .

STREET EDGE

INTERNAL ‘LANE’

MODULATING ROOF FORMSOVER

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Page 15: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

RTTT

OOONNN

JJJOOO

HHHNNN

GGGOOO

RRR

JJJ

EEE

ONNN

DDDRRR

III VVVEE

FUTFFUUTFFUUTTUTUREUUUREEEUREUU EUU E POPPOOOOPOP NDNNNNNNNFUTFUTFUTFUTTFUTFUFUTFUTUTTFUTUTFUTFUTFUTTFUTFUTTTTTTF UREUREUREUREUREUREUREUREUUREUREUREUREUREUUUREUUUU EUREEU EUU EE POPOPPOOOOPOPOOOPPPPP NDDDDNDNDNDDDNDNDNDDDDDD

S T R O M L O F O R E S T P A R K

FUTUREUREUREURERUREUREUREUREUREUREREUREEURREEEREU RERERE RERE RERERE RE REEREE RERE REEREEEESIDSSSSIDSSSSIDDDENEEEEEENTNTNTNTNTNTNTNTNTNTNTNTNNTTIALLALLALLALALALALIALALLIALLALALLIALAAAA DEVEDEDEEDEDEDEDEEDEDDEEDDDDDD ELOELOOELOELOOEE OELOE OOEEE PMEMEMEMEMMEEEEMEEEMEEENNNNNNNNTN

OLDOLDOLDOLDOOOLDOOLDOLDOOLDOOOOOO DDD UR UR UR URURUU URURURRRRIARIAIAIAAIAAAIAIAAAAIAIAII RA RARARARAARARARARARARAARARARARRRR RDRDRRRDRRRRRR

URIRRRRRRRRRRRRRRRRRRRRRRRR ARRRRRRRRRRRRRRR A RA RA RA RA RAA RA RRRA RAA RA RA RRA RRRA RAA DRE-E-EEEEE-EEEEEEEEEEEEEEEE ALIALALAAAAALALAALAAAAAAL GNMGNMGNMGNMGNMGNMMGGNMGGNMGNNMGNMGGNMGNMGNMGNMMGNMGGNMGGGG ENTENTENTENTENTEENTEENTENENTTTENTTENTTENTTEEENTNTNTT

FUTFUTFUTFUTFUTFUTFUTFUTFUTFFUTFUTFUTFUTUTTUUTUTUREUREUREUREUREREUREUREREREUREREEUREUREREERURERERE DE DE DEDEDEDEDEDEDEDEDEDEEDEDEDDEDDEEDDDDED VELVELVELVELVELVELVELVELVELEVELELVELEEEVELVELVEVELVELVELEVELLVELVVVELOPOPOPOPOOPOOOOOOOOOOOOOOPMPMPMMPMMMMMPMPMMPMMPMPP ENTENTNTENTENTNNTENENNENTEENTNTEEENTEEE TE T SHSHSSHSSSHSHSHSHSHSSSSSHSHSSS OWNOWNOWNWWWWWWWWNWWWNWWWWWWWWN INDNDDNDNDNDNDNDNDDNDNNDNNDNNDNDDNNNNNN ICAICAICAICAICAICACAICAICAICACAICAICAICAICAACACAICAICAAICACAI ATIVTIVTIVTIVTIVTIVTIVTIVTIVTIVTIVTIVTIVTTIVTIVTIVTIVVTIVTTIVTIVVITIVTT ELYELYEELELYLYELYELYLYELYELYELYLELYELELYLYELYLLL

SITSITITITTSITSITTTSITSITIIIISS E BE BE BBE BBBBBBBBBBBBBBE BBBBOUNOUNOUNOUNOOOUNOUNOUNOOUNOUNOUNOUNOOOUNOUNOUNOOOUNNUNDARDARDARRRDARRDARDARDARDARRARRRADARYYYYYYYYYY

HOHOHOHOHOHOOHOHOHOHOHOOHOHOOHOOHOHOOOOOOOOOOOHOOHHOOOLDLDLDLDLDLDLDLDDDLDDDLDLDLDLDLDLLDLDLDLDLLLLLENENENENENENENNNENNNENENS CREEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEK K KKK KKKKKKKKKKKKK POPOOPOPOPOPOPOPOPOOPOOOPOOPOPOOPOOPOPOPOPOPOPPPPP

NDDNDNDNDDNDNDNDNDDNNDNDNDNDNDNDNDNDNDNDNDNDND

NOTOOOTTOOTTTOTTTTTTTTTTTTE: EEEEEEEEEEEEEEEEEE FFUTFUTFUTFUTFFUTFFUTTFFUTFUTFFFFFUTFUTFUTURERRRERERRERERRRERERRRERERERREREEEER ININ IN IN ININNINNNINN INNNININNNNNNNNNDDDDDODODOOODODODODODDDDODODOODDDODODODDDDDDODDDDDDDDDDNOTOOOTTOTOTOTTE FUTFUTFUTFUTTTTTURERRRRR INNNNNNNNDODDDDDDDDDDDDDDDOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO RRR SRRRRR PORPORPORPORPORPPORPPORPOPPOORRPOPORORORRORORORORP RORRORRORORORORORORORROROOOOPOOOOOOO TSTS TSTSTSTSTSTSTS SSTSTS TS TS TTSTS TSSSSS STSTSTSTS TSTTTTTTTTSTTTSSTTSSTTS FACFACFACCFACFACCFACACFACCCCACFACCCCCFACACCACACFACFACFACFACFACFACAFACFACFACAFAFACAFAAAFAFAFAFAFFF IIIIIIILILIIIIIIIIIII TY TYYYYYYYYYYYYYYYYOOOOOOOOOORRRRRRRRRRRRRR SRRRRRRRRRRRRR PORPPP TSTSTSTTSTTTSSSTSSS FFFACILLLLLLLLLLLLLILLLLLLLLL TYYYTYYYYEXPEXPEXPEXPEXPEXPEXPPPPPPPPPPPPANSANSSANSANSSANSSSSNSNSANSNSSSSSNSNSSSANSSSANSSANSANSANSANSANSANANNANANANANNANANANANANANANNANNSSSSSSSSSSSSSSSSSSSSSIONIONIONOONIOOONONONIONIONIONIONONONONOONIONIOONONONIONIONONONOIOIONONOOIOOONONONIONONONNNNONONNONONONONONNON OVOVOVOVOVOVVOVOV OVVVOVOVOVOVOVOVV OVOVVOVOVOVOVOV OV OVOVOVOVOOOO EEEEER EEEEEEEEEEE CARCARCARCAARAAARCAAACARARRCARRARRARRRRRRARARARRCARCARRCARRARCACAARCARARCAACARAAACAACACAAAAAAC PPAPPAPPAPPAPPPPPPPPPAPPAPAPPAPPPPPPPPPPAPPAPPPPPPPPPAPPAPPAPPPPPPAAAAPPAPPPPPPAPPAP AAPAPPARKKRKRKKRKRKRKRKRKKKRKRKRKRKRKRKRKRKRKRKKKRKK

(DA(DADA(DADA(DAADA(DADA(DADA(DA(DAA(DA(DA(DA(DA(DADADDDD(D(D SHSHSHSHSHSHEHHHHHHHHHHHHHHHH D RRED)ED)ED)EDED)ED)DD)ED)ED)ED)EDEDDED)EEEDEDEEDDD

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:2000@A31:1000@A1

0 20 40 80m DrawingSITE PLAN

Page 16: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

INDOOROOOO COURT / / GYMGG FACILITY

AQUATITIATIIC (C LEARN TO SWIWIWIM EMMM TC)

COUOUOUOUOUOUOUUOUOUUUOUUUOUO RTYRTYRTYRTYRTYRRTYTYRTYRT ARDARDARARARARAARDARDARDAAAA (C(C(CCCC(C(C(C(CCC(CCCCC( HILHIHIHIHHIHIHIHIHILHIHHIHIH D CCD CCD CCAREAREAREAREAREAREEARARREAREREREE)))))))))

HOLHOLH LHOLHHHHHHHHHHHOLDENEEEEEEEEEEEEEE S CS CS CS CCCS CCCS CCCCCREEEEEEEE K PK PKKK PKK PKK PKKKKKKK ONONONONDNNNNONNNNNDNNN

JOJOJOJOJOJOJOJOJOHNHNNHNHNHNNNNNNHNNN GG GG G G GGGGGGGGGGGGGOROROROROROROROROOROOOROOOROROROTOTOTTOTOTOTOTOTOTOTOTOTOTOTTOTOON NNNNNNNNNNNN DRDRDRDRDRRRRIVVVIVIVIVVIVVEEEEEEEEEEEEEEEEAQUAQUAAAQUAQUAQUAAAA ATIATATAA C FC FC FC FCC FC FCCCC FC FCCC FCC FCCC FC FFC F FFFFFACIAAAACIACIACIACIAAAAAA LITTLITLLL Y (Y ((((((((((((((((((((((LEALEALEALEALEALLELELELLELELELLLELLLLELE RNRNIRNIRNRNIIRNIIINIIIINING NGNG NG NG GGNGGNGNGG NGNG NGNGNGGGGNNNNNNNNNNNNG ETCETCEETETCETCETCETETETTCETETTETETTETEETETTETEETETTETETETTEEEETTEE )

COMCOCOMCCCCCCCCCCCCCCCCC MUNMUNMUNM NNNNNNITYITYITYYYYITYYTYYYYTYITYITYITYTYTYTYTYITTITITITITTTII AMAMAMA ENIENIENNINNININNINININNINNNININIITIETITITITTTTTTTTTTTTTTT S & RERERRRR TAIAIAIAIA L EDGEDGEDGEDGDGGGGEDGGGGGGGGGGGGGGEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

MEMEMEE BERBEBB S FS FS FS FS FS FSS FSS FS ACICICICICIACIICICC LITLLLLILLILITILLL Y ++ RESRERERE TAUTAUAUAA RANRAA T, TTTTT WITWITHH CCCH H CH OMMOMOMMMOMM UNINNINNIITY TYTYTY TYYYTYTYTYYYYYYYYYY YYYTYTYTYTTTHETHETHETHEEETHEEETHEEEATRATRTRTRE E BELBEBELBEBELLOWOOOW

WINNNNNNNNNTERTETTTTTTT GARGARARGARRDENDENDEDENNENDENDENDEDEDENDENDEDEDEDEEDEDEDDDDDDD / CAFCAFCACAFAAFAFFFAFFFFFFFFFFEEEEEEEEEEEEEEEEEEEEEEEEEEEEE(CONNENNENNEEEENNECTICTICTICTICTICTCTICTTTCTTCTICC ON ONONONONOONO TO POOPOPOOPOOOO L)))

FUTFUUFUUFUUFUFUUTFUUFUFUFUFFFFFFFUUFFUFFFF UREUREURUUUUUURUREUREUREUREUURURURREUURRRERRERRRREE DEDEDEDDE DDDEDE DEDDEDEEDEDEEDEDEEEVELV OPMPMOPMMPMMPMMPMPMMMPMPMPMPMPMPPMOPMPPPPPPMPPPPMPPPPPOP ENTN

S T R O M L O F O R E S T P A R K

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Drawing3D VIEW FROM THE SOUTH EAST

Page 17: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

564

565

566

567

568

569

570

571

572

573

DrawingTHEATRETTE LEVEL PLANRL+573.50 & RECONCILED AREAS

THEATRETTETHHEEATREETTTETHEATRETTETHEATRETTE

RL+

573.

50RR

L+57

0.00

OLD URIARRA RDRDRAAR

UROLD

AREAS

Name Area Brief AreaArea

Difference

ADMINISTRATIONENTRY PAVILION 685 m² 0 m² -685 m²MEZZANINE 428 m² 0 m² -428 m²OFFICE 109 m² 100 m² -9 m²RECEPTION 88 m² 100 m² 12 m²WC 21 m² 25 m² 4 m²

1332 m² 225 m²AQUATIC50m POOL 1050 m² 1050 m² 0 m²DISABLED CHANGE 15 m² 15 m² 0 m²DISABLED CHANGE 15 m² 15 m² 0 m²FAMILY CHANGE 15 m² 15 m² 0 m²FAMILY CHANGE 15 m² 15 m² 0 m²FAMILY CHANGE 11 m² 10 m² -1 m²FAMILY CHANGE 11 m² 10 m² -1 m²LEARN TO SWIM 250 m² 250 m² 0 m²PLANT 344 m² 300 m² -44 m²PLAY POOL 209 m²SPECTATOR 599 m² 300 m² -299 m²STANDING WAVE POOL 245 m² 250 m² 5 m²STORE 94 m² 115 m² 21 m²STORE 22 m² 0 m² -22 m²WET CHANGE 140 m² 150 m² 10 m²WET CHANGE 139 m² 150 m² 11 m²WINTERGARDEN / CAFE 186 m² 0 m² -186 m²

3359 m² 2645 m²COMMUNITYCOMMUNITY 215 m² 100 m² -115 m²KITCHEN 60 m² 50 m² -10 m²MEMBERS LOUNGE 139 m² 50 m² -89 m²THEATRETTE 575 m² 250 m² -325 m²WC 21 m² 25 m² 4 m²

1010 m² 475 m²GYMGYM AREA 614 m² 600 m² -14 m²SPIN 189 m² 150 m² -39 m²YOGA/AEROBICS 300 m² 300 m² 0 m²

1103 m² 1050 m²INDOOR COURTSDISABLED CHANGE 23 m² 23 m² 0 m²DRY CHANGE 318 m² 300 m² -18 m²FAMILY CHANGE 25 m² 25 m² 0 m²GREEN ROOM 67 m² 150 m² 83 m²INDOOR COURTS 2219 m² 2220 m² 1 m²PLANT 107 m² 100 m² -7 m²SPECTATOR 257 m² 150 m² -107 m²STAGE 111 m² 120 m² 9 m²STORE 134 m² 100 m² -34 m²

3259 m² 3188 m²MEDICALCHILD CARE 204 m² 75 m² -129 m²HEALTH CARE 155 m² 75 m² -80 m²REHABILITATION 157 m² 60 m² -97 m²WC 21 m² 25 m² 4 m²

537 m² 235 m²MISCELLANEOUSKIOSK 83 m² 60 m² -23 m²RETAIL 107 m² 100 m² -7 m²RETAIL 107 m² 0 m² -107 m²RETAIL 115 m² 0 m² -115 m²WC 21 m² 25 m² 4 m²

434 m² 185 m²11034 m² 8003 m²

OUTLINE OF BUILDINGSDILDASHED ABOVEHS VE

569

YSITE BOUNUNDARYANNBTE B55 UN

S T R O M L O F O R E S T P A R K

RE-ALIGNMENT OF URIARRA RDNT O R ARRA D(APPROX 20.0M WESTWARDS)(A 0.0M WESTWAR )

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:1000@A31:500@A1

0 10 20 40m

Page 18: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

564

565

566

567

568

569

570

571

572

573

574

575

576

577

578

579S T R O M L O F O R E S T P A R K

OLD URIARRA RDRDRAAR

UROLD

RAMPRAMP

RL+576.50

RL+576.50

FCCDCC

TP

LAN

TTP

LAN

T

POOL PLANT

TERRACE

569

YSITE BOUNUNDARYANNBTE B55 UN

RL+576.50

MEMBERSS FACILITY(INCL RESTTAURANT)

KITCHEN

WINTERGARDENE / CAFE//

STANDING WAVEPOOL

PLAY POOL

LEARNTO SWIM

TERRACE

RE-ALIGNMENT OF URIARRA RDNT O R ARRA D(APPROX 20.0M WESTWARDS)(A 0.0M WESTWAR )

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:1000@A31:500@A1

0 10 20 40m DrawingTERRACE LEVEL PLANRL+576.50

Page 19: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

564

565

566

567

56

569

570

571

572

573

574

575

576

577

578

579

580

RAMPRAMP

RL+576.50

RL+576.50RL 576 50

RL+576.50

RL+580.00R 0

RL+580.000

ENTRY PAVILION

RL+580.008+580

STORE PLANT

STAGE

DRY CHANGE

GRM

URTYARDCO

WE

T C

HAN

GE

WE

T C

HAN

GE

STORE

DC

DC

DC

KIOSK

FC

FC

FC

REHABILITATION WCWC

WC WCOFFICERETAILRETAILRETAIL CHILD CARE

MEMBERSS FACILITY(INCL RESTTAURANT)

KITCHEN

WINTERGARDENEWINTEE / CAFE/

HEALTHCARE

RE

CE

PTI

ON

RL+580.00

50M POOLSTANDING WAVE

POOL

PLAY POOL

LEARNTO SWIM

S T R O M L O F O R E S T P A R K

OLD URIARRA RDRDRAAR

UROLD

568 YSITE BOUNUNDARYANNBTS NUNUN

AAAA A

B

B

NOTE: FUTURE INDOOR SPORTSOTE TTT R NDOOR SPORTSD TOR SPORFACILITY EXPANSION OVERITY XP NANS ON VERRCARPPARKAR RK

NOTE:OTE:FC FAMILY CHANGEF FAFAMILY CHANGEMI GELY CHANDC DISABLED CHANGEC DDDISABLED CHANS HABLED CGRM GREEN ROOMG GRREEN RO

TRANSITION ZONE(TRIATHLON)

TERRACETERRACE

TERRACE

RE-ALIGNMENT OF URIARRA RDNT O R ARRA D(APPROX 20.0M WESTWARDS)(A 0.0M WESTWAR )

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:1000@A31:500@A1

0 10 20 40m DrawingENTRY LEVEL FLOOR PLANRL+580.00

Page 20: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

564

565

566

567

568

569

570

571

572

573

574

575

576

577

578

579

580

581

582

583

584

585

586

NOTE: FUTURE INDOOR SPORTSOT UUU EE NDOOR SPORTSROOR SPOFACILITY EXPANSION OVERLIT X APAANSIO OVECARPPARKCA ARK

S T R O M L O F O R E S T P A R K

OLD URIARRA RDRDRAAR

UROLD

RL+585.000RL+585.00

RL+585.00+585 00+585 00++585 00

569

YSITE BOUNUNDARYANNBTE B55 UN

RE-ALIGNMENT OF URIARRA RDNT O R ARRA D(APPROX 20.0M WESTWARDS)(A 0.0M WESTWAR )

POOL BELOWO L E OW

COURTS BELOWBS BELOUU

SPECTATORSSSSS ECTATORECTATORECCTTAATTOORR

GYM

YOGA SPIN

MEZZANINEM

SP

ECT

ATO

RS

TATO

RS

TATO

RSSS

RROOTTAATT

PPSS

ES

PE

SP

E

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:1000@A31:500@A1

0 10 20 40m DrawingSPECTATOR LEVEL PLANRL+585.00

Page 21: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

NOTNOTNOTNOTOON E: FUUUUUUUTUREURUREUUR INININNNDOOOOOOO R SPORPORPPORPOP TS TTTTTTFACILIILIILIITY TTTTTT EXPEXPEXPXPEXXEXPEEXPANSANANSANSAANAN IONOOOOO OVOVOVOVOVER EEEEEECARCCCCC PPAAAAAARRRRRRRRRKRKRKKKK

S T R O M L O F O R E S T P A R K

ININIIIINDOORR COC URT / GYMMM FACILITYTNDDDDDDDDOORROORO RR COCCCC URTURRRURURURURURUUU / GYMGYMGGYMGYMGYMMMMMMM FAFFFFFFFFFFFF CILITYTTTTT

YSITTTTTTTTE BBBBBBBBE BE BBBBE BBOUNNUNUNUNUNUNDARAAAA Y

RE-ALLIGNMENTTNTNTNTTN OFOOO URIARARARIARRARRA RARARAARAR RDDDDD(AP(A(A(A(A( PPROX 20.00.000.00.000 M WM WMM WESTESTESTTESTTWARWARWARWAWAW DS)

AAAAAAQUUATIAATIAATIAATIIITA C FCCCCCCCC ACICCCC LITTTTTTTTTY (YYYYYYYYYYYYY 50MMMMMM POOL)LOLOLLLL

COMCOMC MCOMCCC MUNMMMM NITYITYITYITYITYITY / MEMMEMEMMEMMEEEE BERRRRRRS SSSSFACCCCCILITY YYYY & R&&&& ESTSTTTTAURRAURAURAAA ANTANANAAAAA

AAAAAAAAAQUQUQUQQQQQQQUQ ATITIIIT C FC FC FFFFFACICACACACACACACACCAA LITTTTTY (LEARNINININININN NG GGGGG ETCETCETCETCCETCCC))

L LLLLLLLLCOMMCOMMMMMMUNUNUNUNUNMUNNNNNNNITYITYITYITY AMAMAMAAMAAMENINIENIINIITIETIETITITITIET S &S & RERERERER TAITATTAIL LLLLLEDGEDEDED E

OLDOLDLDOLDOLDOLDLDLDLDLDLDLDDOLDDDDLDDLDLD URRRRURURRRRRRRRRURRRRRRURURURURUUIAARRA RAARARAARARAARARARARARARARARARARRR

RDRDDRDDRDRDDRDDDDRRDDDDRDRDDRDRDR

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:1000@A31:500@A1

0 10 20 40m DrawingROOF PLAN

Page 22: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

DrawingSECTIONS

SECTION AA

SECTION BB

CONNECTING RAMP BETWEEN 50M POOL LEVEL & LOWER LEARN TO

SWIM POOLS

FUTURE DEVELOPMENT

LOCATION OF MEMBERS FACILITY, RESTAURANT & THEATERETTE DASHED IN FRONT

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:500@A31:250@A1

0 5 10 20m

Page 23: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

DrawingELEVATIONS

EASTERN ELEVATION

WESTERN ELEVATION

OUTOU LINL E OF FUTUUT RE DEVDEVELOELOPMEPMENT NT BEHBEHINDN

COMCO MUNITY & MEMBERSTERTERRACRACEE

ENTENTRY RY Y PAVPAVPA ILIIONNON CHICHILD LD LD CARRCACA E CE COURO RTYATYAARDRDRWINWINWINTERTERERGGARGARDENDE

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

Scale1:1000@A31:500@A1

0 10 20 40m

Page 24: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A
Page 25: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Drawing3D VIEW

Page 26: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

Drawing3D VIEW

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Page 27: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

Drawing3D VIEW

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Page 28: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

Drawing3D VIEW

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Page 29: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

DrawingPRECEDENTS

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS

Page 30: Molonglo Aquatic Sports and Recreation Facility Feasibility Study - Appendix A

DrawingPRECINCT CONCEPT MASTER PLAN

J O H N G O R T O N D R I V E

0 100 400 800m

STSTROROMLMLO O FOFORERESTST P PARARKKLLO O FOFO STSTTTROROMLMLSTST EE RRFOFORERESTST P PARAROO EE RR

POPOTETENTNTIAIALLPOPOTETENTNTIAIALLOOTETENTNTVEVELOLODRDROMOME E SISITTEELOLODRDROMOME E SISITETEVVVEVE RROMOME E

SITE

GOGONDNDOLOLA A TOTO M MT T STSTROROMLMLOODDOLOL

STSTROROMLMLO O FOFORERESTST P PARARKKOO ARARRERECRCREAEATITIONONALAL ‘ ‘RIRINGNG R ROAOAD’D’,,‘‘RR AADD

VEVEHIHICLCLE,E, C CYCYCLILINGNG,,LL GGEQEQUEUESTSTRIRIANAN, , RURUNNNNINING,G, NN G,G,

WAWALKLKININGG

OOTETENTNTIAIAL L RURUGBGBY Y / / RURURURURURUGGRURUGG Y Y / / TETENTNTPOPOTETENN AAL L RRSPSPORORTSTS A ACACADEDEMMAACCSS A AAACCAACC EEMYMYSPSPORORTTTSTS AA

WALKING / HORSE TRAILSTTAALKLKINING G / / HOHORSRSADJACENT TO WATEREEDDJAJACECENTNT T TO O WAWACOURSES & PONDSSSOOURURSESES S & & POPONN

HOTELOO

SNENEW W CACAFEFE O ON N WAWATETERSRSEERSRSSSRSRSNENEEDEDGEGEEDEDGEGEDDGG

HOLDEN’S CREEK POND REREEKEK P POODDENEN’S’S C CHHHOHOLL NNDDWATER SPORTS (NON-WATERRRTSTS ( (NONOSPSPTETERR N-N-WAWATETERRCONTACT)CCT)T)AA

NEW AQUATICE SPORTS & EEW W AQAQUAUATITICECE OORTRTS S &&NNRECREATIONAL FACILITYAARERECRCREAEATITIONONALAL

EXEXISISTITINGNG C CARAR P PARARKIKINGNGGGPPARARKIKINGNG

ACACCOCOMOMODADATITIONON

CACAMPMPINING G GRGROOGRGROUOUNDNDPPININ

\\syd.work.hassell.info\sites\Projects\003895\Presentations\26032012_DESIGN FEASIBILITY STUDY

ClientACT Sports & Recreational Services

Project Name MolongloAquatic Sports & Recreation Facility Design feasibility study

Date07-05-2012

ScaleNTS


Recommended