Page 1: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Mill Creek/Peaks Branch/ State Thomas

Drainage Relief Tunnel

Parkdale / Lawnview Avenue Neighborhood April 26, 2016

Page 2: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Mill Creek, Peaks Branch and State-Thomas Watersheds

2

PARKDALE

Page 3: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

3

Basin Area State-Thomas – 450 acres Mill Creek – 2,200 acres Peaks Branch – 3,100 acres East Peaks – 1,100 acres

Land Uses Upper Basin – Residential Lower Basin – Commercial

What’s in these basins? Baylor Hospital Old City Park Deep Ellum IH-30 Fair Park “M” Streets

Basin Characteristics

Page 4: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Flooding has been a problem in the Mill Creek, Peaks Branch and State-Thomas areas for years

Mill Creek and Peaks Branch were originally natural streams draining into the Trinity River and White Rock Creek

In the early 1900’s, the streams were enclosed in underground pipes

Re-development in the State-Thomas area has exceeded the capacity of local and outfall drainage systems

The drainage systems were sized to carry smaller standard storm events

4

Mill Creek / Peaks Branch State-Thomas Background

Page 5: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

In a 100-year rain event (1% annual chance):

Undersized local drainage systems cause streets to flood

Flood depths are up to 10 feet high

Additional capacity is needed in the storm sewers to accept added run-off from neighborhood drainage system

5

Mill Creek / Peaks Branch State-Thomas Background

Page 6: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Mill Creek and Peaks Branch History

Underground Storm Sewer Construction - 1930s

May 1995 Flood March 2006 Flood September 2007 Flood

Page 7: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Flooding businesses and homes

Baylor Emergency Room closed - flood damage $5M

Old City Park

Fair Park

IH 30 closed due to high water

May 1995 Flood Dallas Morning News Front Page May 7, 1995

7

Page 8: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Widespread flooding throughout Dallas

March 19th rainfall totals as high as 9.8” in Old East Dallas

Extensive street, structure and vehicle flooding in East Dallas

March 2006 Flood

Page 9: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Mill Creek Flooding – Baylor Hospital Area Flooding March 19, 2006

Page 10: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Monticello Avenue – West of Greenville Avenue

Mill Creek Flooding – March 2006

Page 11: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Zaragoza Elementary Flooding 11

Peaks Branch Flooding – March 2006

Page 12: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Worth Street Flooding 12

Peaks Branch Flooding – March 2006

Page 13: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

I-30 Flooding – March 2006

Page 14: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

City Commissioned Studies

14

Mill Creek Mill Creek Master Drainage Plan Study (2006)

Peaks Branch Lower Peaks Branch Preliminary Design Report (1976) Peaks Branch Preliminary Design Report (1989)

Mill Creek and Peaks Branch Initial Study (2008) State-Thomas Area Studies

Town Branch Study (1986) State-Thomas Master Drainage Plan (1998) Woodall Rodgers Drainage Tunnel Improvement Plan (2007)

Page 15: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

2006 Plan – Mill Creek(1) / Middle Peaks Branch(2) and State Thomas(3)

2

1

3

Page 16: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Mill Creek/Peaks Branch/State Thomas Drainage Tunnel

16

Page 17: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Tunnel Length – 5 Miles Tunnel Diameter – 30 Feet Tunnel Depth – 70 Feet to 150 Feet Tunnel Volume – 160 Million Gallons Project Budget – $320 Million Construction Duration – 5 Years starting in 2016 Construction method – Tunnel Boring Machine

17

Project Information

Page 18: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Mill Creek / Peaks Branch / State Thomas Drainage Relief Tunnel

Page 19: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Tunnel Profile

Page 20: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Drainage Relief Tunnel

http://voteyesdallas.com/press-room-images.html

Page 21: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

21

30’x35.5’ HORSESHOE MAIN TUNNEL SECTION

OUTFALL TO SITE A (2 MILES)

30’ CIRCULAR MAIN TUNNEL SECTION

SITE A TO END (3 MILES)

Tunnel Sections

Page 22: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Tunnel Boring Machine (TBM)

Page 23: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Deep Tunnel Construction

23

Tunnel Boring Machine (TBM) Workers on a TBM after break-through

Advantages to tunneling: • Minimal utility relocation • Reduced ROW acquisition • Minimal street replacement • Minimal traffic impacts

Page 24: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Areas Currently Subject to 100-Year Flooding in Mill Creek, Peaks Branch and State Thomas Watersheds

Note: Hatched area denotes known street flooding in the State Thomas area

24

Page 25: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

60% of the Areas Removed from 100-Year Flooding After Mill Creek, Peaks Branch and State-Thomas Tunnel is Constructed

25

Page 26: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

26

White Rock Creek Drainage Area

Page 27: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

27

Water surface elevations in the White Rock Creek and Forney Branch floodplains remain the same

Parkdale / Lawnview neighborhood impacts Construction truck traffic permitted along SH 352 (Scyene Road)

Construction hauling will be limited to 7 am to 7 pm

Parkdale / Lawnview Concerns - Mill Creek / Peaks Branch /

State Thomas Drainage Tunnel

Page 28: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

28

PARKDALE

White Rock Creek Floodplain

Page 29: Parkdale / Lawnview Avenue Neighborhood - Dallas Documents/Mill...Tunnel Boring Machine (TBM) Workers on a TBM after break-through Advantages to tunneling: • Minimal utility relocation

Mill Creek / Peaks Branch / State Thomas Drainage Relief Tunnel


Recommended