Photo Album for
Killington, VT
Job 31357
January 19, 2018
This week the cab was staged for content to be
installed. The chassis was assembled while the
pumphouse completed the paint process. The body
began the paint process in metal finishing. Next week
the cab may start the cab line where content to be
installed. The pumphouse should be staged while the
body may complete the paint process.
© 2005-2018 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC04000 DSC04001
DSC04002 DSC04003
© 2005-2018 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC04004 DSC04005
DSC04006 DSC00392
© 2005-2018 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC00393 DSC00394
DSC00395 DSC00396
© 2005-2018 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC00397 DSC00398
DSC07093 DSC07094
© 2005-2018 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC07095 DSC07096
DSC07097 DSC07098
© 2005-2018 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC00625 DSC00626
DSC00627 DSC00628
© 2005-2018 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC00629