Transcript
Page 1: Reimplementation: Changing the Way We Do Business

Reimplementation:Changing the Way We Do Business

David PetzelIT Director

A.J. Antunes

Page 2: Reimplementation: Changing the Way We Do Business

The Promise inOur Abstract :We promised to tell you how the QAD + Eagle Solution made A.J. Antunes a data-driven company.

A Data-Driven A.J. Antunes

A.J. Antunes

QAD Eagle

Page 3: Reimplementation: Changing the Way We Do Business

Keeping the Promise: 3 Questions

1. •How did a re-implementation of QAD Enterprise Applications reveal the potential for changing the way the company measures its business and makes decisions?

2. •What were the systems, processes or solutions that made that potential a reality?

3. •How do we know it worked?

Page 4: Reimplementation: Changing the Way We Do Business

About A.J. Antunes & Co.• Manufacturing company based in Carol Stream, IL• Facility in Suzhou, China• Product Lines:

Roundup Food Vizion Water CustomService Equipment Filtration Controls

Page 5: Reimplementation: Changing the Way We Do Business

About A.J. Antunes & QAD• QAD customer since 1996• May 2009 - Upgrade from eB 2.1 to QAD 2008SE with .Net 2.6.1• March 2010 - .Net Upgrade from .Net 2.7.1 to .Net 2.8.1• QAD Modules in use at AJA:

– Using most of the standard QAD modules– QPS– CSS– DRP

Page 6: Reimplementation: Changing the Way We Do Business

Why a “Reimplementation” of QAD?• May, 2008 - AJA CEO questioned the current QAD implementation:

– Why is it so hard to gather good data?– Need more than historical reporting at our fingertips– CEOs from other companies brag about their systems

• June, 2008 - Contracted Liberty Technology Advisors to evaluate AJA’s current ERP implementation

• August, 2008 – LTA recommended that AJA:1. Re-engineer all business processes2. Upgrade QAD to 2008SE and the .Net UI

QAD is right for our business .Net UI brings a whole new level of functionality Bad News/Good News………….14 years of experience using QAD

Page 7: Reimplementation: Changing the Way We Do Business

AJA Process Re-engineering• 4 months (Nov 15 to March 15)• 25 to 35 hours per week• Key decision to use Liberty Technology Advisors (LTA) for all

process mapping– RCM Technologies to provide expertise to blend our future state

process maps with the functionality available in QAD2008SE & .Net UI• China Team brought in to participate in process mapping on

key intercompany processes

Page 8: Reimplementation: Changing the Way We Do Business

1) Inventory Control is top priority• Implement discrete inventory locations• Eliminate handwritten “hot” sheets• Implement cycle counting

2) Real-time transaction processing required• Selected Eagle’s RF Express™ for QAD Enterprise Applications

3) Implement DRP module to manage orders with China

4) Consolidate China db

5) Manage Service Parts as a Profit Center

Key Decisions After Re-engineering

Page 9: Reimplementation: Changing the Way We Do Business

6) Adv Repetitive Backflush Analysis Required• Are we backflushing components at the right time at the

right place?

7) Point of Use Analysis for inventory items required• Which items belong in a Work Cell? Eliminate unnecessary

transfers.

8) Begin work on custom browses required by new processes

Key Decisions After Re-engineering

Page 10: Reimplementation: Changing the Way We Do Business

How AJA has become a data driven company

QAD tools to view/analyze data

Daily ActivitiesREAL-TIME BROWSES

Snapshot ReportingBROWSES FROM PROCESS MAPS Performance Metrics

BROWSES FROM OPERATIONAL METRICS

Eagle to execute transaction processing

New processes to streamline procedures

Page 11: Reimplementation: Changing the Way We Do Business

How AJA has become a data driven company

QAD tools to view/analyze data

Daily ActivitiesREAL-TIME BROWSES

Snapshot ReportingBROWSES FROM PROCESS MAPS Performance Metrics

BROWSES FROM OPERATIONAL METRICS

Eagle to execute transaction processing

New processes to streamline procedures

Page 12: Reimplementation: Changing the Way We Do Business

Why Eagle: Technical Considerations• Seamless plug-and-play integration with QAD• Online, real-time, Progress-based• No side databases, separate server or middleware• Calls QAD edit and update routines to provide real-time data

checking• Supports a wide array of devices, including Intermec CK3 RF

terminals• ALL Eagle installations are also QAD installations• Not a canned solution; over 2,000 configurable RFvalues

Page 13: Reimplementation: Changing the Way We Do Business

Why Eagle: Cost Considerations• Less hardware and software are required because RF

Express™ for QAD Enterprise Applications uses the existing database and existing server

• Reduced database/server ongoing maintenance• Simplified database control: QAD and Eagle work together

Page 14: Reimplementation: Changing the Way We Do Business

How AJA has become a data driven company

QAD tools to view/analyze data

Daily ActivitiesREAL-TIME BROWSES

Snapshot ReportingBROWSES FROM PROCESS MAPS Performance Metrics

BROWSES FROM OPERATIONAL METRICS

Eagle to execute transaction processing

New processes to streamline procedures

Page 15: Reimplementation: Changing the Way We Do Business

3.2 - Inventory Detail by Item BrowseUsed to monitor “SO” locations (daily)

Page 16: Reimplementation: Changing the Way We Do Business

How AJA has become a data driven company

QAD tools to view/analyze data

Daily ActivitiesREAL-TIME BROWSES

Snapshot ReportingBROWSES FROM PROCESS MAPS Performance Metrics

BROWSES FROM OPERATIONAL METRICS

Eagle to execute transaction processing

New processes to streamline procedures

Page 17: Reimplementation: Changing the Way We Do Business

AJA Process Map

Page 18: Reimplementation: Changing the Way We Do Business
Page 19: Reimplementation: Changing the Way We Do Business
Page 20: Reimplementation: Changing the Way We Do Business

How AJA has become a data driven company

QAD tools to view/analyze data

Daily ActivitiesREAL-TIME BROWSES

Snapshot ReportingBROWSES FROM PROCESS MAPS Performance Metrics

BROWSES FROM OPERATIONAL METRICS

Eagle to execute transaction processing

New processes to streamline procedures

Page 21: Reimplementation: Changing the Way We Do Business

Operational Metrics

Page 22: Reimplementation: Changing the Way We Do Business

Example of a browse“behind the metric”

Page 23: Reimplementation: Changing the Way We Do Business

275 Custom ProgramsTOTAL REPORTS MAINT EXTRACT UTILITY DATA

COLLECTIONBEFORE Reimplementation

275 165 35 32 33 10

AFTER Reimplementation

134 71 33 6 24 0

Reduction inCustom Code

51% 57% 6% 81% 27% 100%

Page 24: Reimplementation: Changing the Way We Do Business

Success Story #1 – Advanced Repetitive

Problem: Repetitive work cell activity is not transacted in real-time, causing material issues and handwritten “hot” sheets.

Goal: Use the future state Process Map to eliminate time delays and to empower Line Leaders to effectively manage their cells.

Page 25: Reimplementation: Changing the Way We Do Business

Success Story #1 – Advanced RepetitiveHow we did it:• Process Change: Add Operations to Routings to improve work cell visibility:

– Assembly (90% of BOM is backflushed here)– Testing (up to 24 hours)– Packaging– Staging (after completion)

• Process Change: Specify timing and parameters for Repetitive Picklists so that material for tomorrow’s production shows up before 1st shift begins

• Technology:– Eagle backflush transactions (handheld & PC’s)– Eagle label printing (on wireless printers) so that all material would be identified with a

Part Number/Bar Code– Production Line Schedule Browse (custom browse)

• Empowers Line Leaders to prioritize daily production• Paperless interaction w/Scheduling• Auto Refresh “Live” browse for anyone viewing it

Page 26: Reimplementation: Changing the Way We Do Business
Page 27: Reimplementation: Changing the Way We Do Business

Success Story #1 – Advanced RepetitiveResult:• Line Leaders rely on QAD browses• With timely backflushing, all Team Members rely on Inventory accuracy

within the Work Cells • Handwritten sheets are gone• Product identification is not an issue any more• Line Leaders are quick to identify BOM issues• Expedited orders are handled very easily without the burdensome

paperwork• Line Leaders are expected to be proactive for maintaining their Work Cell

inventory

Page 28: Reimplementation: Changing the Way We Do Business

Success Story #2 – Service Parts

Problem: Service Agencies supporting key accounts are complaining about late deliveries and shipping errors

Goal: Improve on-time and overall Shipping performance in the Service Parts Division

Page 29: Reimplementation: Changing the Way We Do Business

Success Story #2 – Service PartsOverview of Service Parts:• Replacement component parts• Kits that are assembled within the Service Parts assembly area; kitting

area set up as a repetitive w/c• High/growing volume• Daily demand for Next Day Air shipments domestically and internationally• Same components that are used by Work Cells for finished goods

assembly

Page 30: Reimplementation: Changing the Way We Do Business

Success Story #2 – Service PartsHow we did it:• Process Change: Get inventory under control in SP locations

– Delineate Service Parts Kitting work cell from Service Parts stock room– Operate the SP Kitting as a lean repetitive work cell; maintain inventory only

on exclusive items– Define a schedule for QPS planning and repetitive picklist printing for the

Kitting area– Define a schedule for Picklist printing for SP components– Develop a weekly Cycle Count schedule to cover stocking and staging locations

• Process Change: Develop policy that any “rush” order for a replacement part or kit received by 3:00pm CST will be shipped Next Day Air (6:00pm pickup)

Page 31: Reimplementation: Changing the Way We Do Business

Success Story #2 – Service Parts ShippingHow we did it:

• Process Change: Create locations, locations, locations to manage the flow of material to and from the Service Parts area:

SERVICEPARTS

STAGING 7(To China)

STAGING 8(Completed

Kits)

STAGING 5(From Gen

Warehouse)

Page 32: Reimplementation: Changing the Way We Do Business

Success Story #2 – Service Parts ShippingHow we did it:• Technology:

– Eagle backflushes kits (PC’s)– Eagle transfers product to/from Staging locations– Eagle picks product to an “SO” location (handheld device)– Eagle performs weekly Cycle Counts of Service Parts locations (handheld device)– SP Open Line Items (custom browse)

• Empowers order processors to prioritize picking/packing activity• Next Day Air “rush” orders are quickly identified• Takes advantage of Auto Refresh

– Inventory Detail By Item Browse (custom browse)– Production Line Schedule Browse (custom browse)

Page 33: Reimplementation: Changing the Way We Do Business
Page 34: Reimplementation: Changing the Way We Do Business

Success Story #2 – Service PartsResults: • Satisfaction of Service Agencies has improved tremendously

– Ownership is in the hands of Line Leaders– Adjustments to schedules are immediately visible to Line Leaders– Still requires communication for “rush” orders

• With improved efficiencies, SP is no longer overwhelmed by spikes in volume

• Service Parts continues to grow at a solid pace• On-Time Shipping has improved from 82% (July 2009) to 99.3% (August

2010)

Page 35: Reimplementation: Changing the Way We Do Business

AJA Service Parts On-Time Shipping

January February March April May June July August84.0%

86.0%

88.0%

90.0%

92.0%

94.0%

96.0%

98.0%

100.0%

SPAJA

Page 36: Reimplementation: Changing the Way We Do Business

Success Story #3 – Shipping

Problem: Frequent cases of incomplete shipments, incorrect shipments, duplicate shipments, or duplicate serial numbers

Goal: To provide Shipping with tools to improve Shipping performance measurements and to proactively manage outbound Staging locations

Page 37: Reimplementation: Changing the Way We Do Business

Success Story #3 – Shipping

Responsibilities of AJA’s Shipping Team• Picking and shipping for food equipment FG’s• Picking and shipping for water filtration FG’s• Shipping for Controls• Shipping for Service Parts• Shipping consolidation for China container shipments• Manage various Staging locations

Page 38: Reimplementation: Changing the Way We Do Business

Success Story #3 – ShippingHow we did it:• Process Change: Separate and identify product coming into Shipping

• Process Change: Implement controls for Picklist and Packing List management

• Process Change: Authorize Shipping to proactively pull FG’s coming out of work cells

Page 39: Reimplementation: Changing the Way We Do Business

Success Story #3 – ShippingHow we did it:• Technology:

– Eagle PIC transaction; creates a virtual “SO” location and once a serialized item is picked, it cannot be picked to another Sales Order. Allocating without formal SO Allocations

– PIC transaction provides option for printing a Post-Pick Packing List– Eagle DO Shipment/DO Receipts for all DRP orders To/From China (handheld device)– Eagle transfers; scan the Serial # and scan the To: location (handheld device)– Eagle used to perform Cycle Counts of Finished Goods bin locations (handheld

device)– Eagle IBL (Inventory By Location) used to locate product (handheld device)– Open Sales Order Browse (custom browse)– Inventory Detail By Item Browse (custom browse)

• Check/verify inventory availability• Manage Staging locations

Page 40: Reimplementation: Changing the Way We Do Business

Success Story #3 – ShippingResults: • Eagle PIC program provides a tracking tool for virtual “SO” locations• Inventory is not getting mixed up within the Shipping area because Staging

locations are helping• Real-time picking or shipping available to all users via browses• Phone calls between Shipping and Customer Service have dropped by 50%• Shipping is clean and organized

Page 41: Reimplementation: Changing the Way We Do Business

3.2 - Inventory Detail by Item BrowseUsed to monitor STAGING location (daily)

Page 42: Reimplementation: Changing the Way We Do Business

3.2 - Inventory Detail by Item BrowseUsed to monitor STAGING location (daily)

Page 43: Reimplementation: Changing the Way We Do Business

Lessons Learned• Browse Control

– Maintain code control; browses can easily get out of hand; think about a performance monitoring tool to identify any misbehaving browses

• .Net Upgrade– Users love their Favorites and moving them to a new version is very

tedious• Process Map Control

– Process Map Editor In Chief oversees all process map updates• Operational Metrics

– Take a Team approach to maintain consistency and to get approval on thresholds

Page 44: Reimplementation: Changing the Way We Do Business

Questions

Page 45: Reimplementation: Changing the Way We Do Business

Contact Information:David PetzelIT DirectorA.J. Antunes & Co.Ph: (630) 784-3435E: [email protected]: www.ajantunes.com

Jim MiceliSenior ConsultantEagle Consulting & DevelopmentPhone: (973) 838-5006 ext 120Email: [email protected] Web: www.eaglecondev.com