HOW TO ASSESS A SPINNING MILL�S PRODUCTIVITY?

THE SOUTH INDIA TEXTILE RESEARCH ASSOCIATION COIMBATORE

Vol.55 April 2010 No.1

Page 2: Sitra Norms 2010

This publication prepared by the following staff members of Liaison & Consultancy Division, SITRA.

Mr.D.Shanmuganandam Mr.N.Ravichandran Mr.J.Sreenivasan Mr.N.K.Nagarajan Mr.S.Rajesh Kumar Published by: The South India Textile Research Association Post Box No. 3205, Coimbatore Aerodrome Post, Coimbatore - 641 014, Phone : 0422-2574367-9, 4215333, 6544188 Fax :0422-2571896, E-mail:[email protected] Website :www.sitra.org.in

Page 3: Sitra Norms 2010

PREFACE

This edition replaces the last SITRA publication ‘How to

Assess Your Mill’s Productivity (Vol.48, No.4,

October 2003)’ authored by Mr.R.Rajamanickam,

Mr.R.Ranganathan and Ms.R.Suganthi. As the norms for

spinning as well as cone winding productivity have been

revised since the last publication, the conversion factors

have been reworked and given in the report. This

publication explains with illustrations, the method of

assessing the various productivity indices – both spinning

and cone winding – that are used in the SITRA

productivity surveys.

Page 4: Sitra Norms 2010

C O N T E N T S

Page no.

I Up to ring frames 1

1. Definitions of various productivity parameters 2

2. Operatives considered for the productivity assessment up to ring frames

4

3. Productivity estimation – an illustration 4

II Cone winding 11

1. Definitions of various productivity parameters 11

2. Productivity assessment in automatic cone winding – an illustration

13

Tables

A. Conversion factors for calculating standardised production up to ring frames – cotton yarns

17

B. Conversion factors for calculating standardised production up to ring frames – synthetic and blended yarns

30

C. Drums per tenter, machine efficiency, production per tenter and conversion factors for automatic cone winders

39

D. Drums per tenter, machine efficiency, production per tenter and conversion factors for conventional cone winders

41

Page 5: Sitra Norms 2010

1

I. UP TO RING FRAMES

This section describes the method of assessing labour and machine productivity

up to ring frames. Briefly, the method consists in adjusting the various productivity

parameters to 40s count. A mill can compare its productivity between months and also

judge its performance against SITRA standard, regardless of the differences in the counts

being produced. The standards are fixed such that they reflect the productivity levels

being attained or excelled by the top 10% of the mills in the industry. The revised

SITRA standards for HOK and OHS are given in Table 1.

Table 1 Standard HOK and OHS for different categories of operatives

up to ring frames (40s) Categories of operatives HOK OHS

Mixing attendant Blow room tenter Card tenter (chute feed) Draw frame tenter Fly frame tenter Fly frame doffer Ring frame tenter Ring frame doffer Ancillary operatives*

0.6 0.2 0.2 0.3 0.4 0.5 3.1 2.7 4.0

0.08 0.03 0.03 0.04 0.06 0.07 0.42 0.37 0.55

Total 12.0 1.65

Production per spindle per 8 hours adjusted to 40s (g) 110

* blow room to ring frames (excluding combers) including jobbers, maintenance operatives, materials handlers, roller coverers, etc.

Notes:

1. Level of modernisation assumed is as follows: Chute feed blow room line, cards fitted with automatic can changer, automatic waste evacuation system and auto leveller, draw frames fitted with automatic can changer for 1st passage, draw frames fitted with automatic can changer and autoleveller for 2nd passage, high speed fly frames and long length ring frames.

2. For work assignments, ancillary operatives as well as production rates assumed in various departments, reference may be made to SITRA publication ‘Norms for Spinning Mills’, 2010 edition.

Page 6: Sitra Norms 2010

2

3. HOK for combers and preparatory tenters and maintenance operatives may be taken as 1.0 (40s count).

4. Throughout this publication, 40s or 40s count always refer to 40s cotton carded yarn, unless otherwise qualified. Also, the phrase ‘adjusted to’ or ‘conversion to’ or ‘standardised’ or ‘conversion’ are used interchangeably.

1. Definitions of various productivity parameters

Definitions of various productivity parameters that are covered in SITRA’s inter-

mill productivity surveys are given below:

HOK : Operative hours to produce 100 kg of yarn. Adjusted HOK

: The HOK is adjusted to a common count of 40s by multiplying the actual production in ring frames in different counts by relevant conversion factors. The production so converted is termed as ‘standardised production’. Thus the adjusted HOK is calculated from: Operative hours = x 100 ∑Count-wise standardised ring frame production in kg

Conversion factors for HOK

: The conversion factors are the ratios of the HOKs of individual count to that of 40s count under given conditions.

HOK for a given count = HOK for 40s count

The count-wise HOKs are estimated taking into account count-wise production rates, work assignments, etc., that correspond to those for the standard mill. The conversion factors are different for various categories of operatives and for 40s count, they are unity for all the categories of operatives. Another major practical advantage of this method is that it is not required to obtain a break-up of the operatives according to each count (For count-wise, raw material-wise and category-wise HOK conversion factors, refer Tables A and B).

Standard HOK

: HOK for 40s count under the specified conditions. The standard HOKs for different categories of operatives are given in Table 1 and the conditions under which they can be attained are given in the footnotes to this table. As can be seen, the total standard HOK up to ring frames is 12.

Page 7: Sitra Norms 2010

3

Composite productivity index (CPI)

: A measure of productivity calculated by expressing the standard total HOK of 12 as a percentage of a mill’s total actual HOK adjusted to 40s count. It reflects the effect of both labour and machine.

P : Production per spindle per shift of 8 hours (adjusted to 40s count)

in grams. The overall production per spindle in ring frames, adjusted to 40s count, can be obtained by using the conversion factors. ∑Count-wise standardised ring frame production in kg = x 1000 Total spindle shifts (of 8 hours each) corresponding to the above production

Conversion factors for P

: These conversion factors are the ratios of the standard production per spindle in 40s count to the standard production per spindle in the given count. 110 g = Std. prodn. per spl. per 8 hrs. (g) in the given count

(for count-wise and raw material-wise conversion factors, refer Tables A and B)

OHS : Number of operatives employed per 1000 spindles adjusted to 40s

count. P x HOK = , where HOK and P are adjusted to 40s count 800

OHSAM : OHS modified to allow for a valid comparison of a mill’s OHS with the standard OHS of 1.65 taking into account the deviation of the mill’s production per spindle from the standard production per spindle. 1.65 x OHS = [1.65 – 0.0065 (110-P)]

SH : A measure of spindle utilisation expressed in terms of number of hours worked per spindle per day. It is calculated by dividing the total spindle hours worked per day by the installed spindles. The spindle utilisation is also expressed as percentage. SH ie. x 100 24

MPI : A combined measure of production per spindle and spindle utilisation. It is calculated by expressing the product of production per spindle (P) adjusted to 40s count and spindle utilisation (SH) as a percentage of 2640 (110 x 24). The index would be reduced by one-seventh if the mill works for only 6 days a week. P x SH = x 100 110 x 24

Page 8: Sitra Norms 2010

4

2. Operatives considered for the productivity assessment up to ring frames

A mill’s HOK - overall as well as category-wise, production per spindle and other

productivity parameters up to ring frames can be assessed based on one month data with

respect to operatives engaged in various departments, ring frame production and spindle

shifts worked in all the counts.

Operatives

Operatives actually engaged in different departments irrespective of whether they are permanent, badli and temporary are considered. The categories of operatives to be included for the calculation of HOK are as follows:

Mixing attendants, machine tenters, doffers, interval relievers and ancillary operatives such as jobbers (maistries/overlookers), fitters, fitter helpers, machine cleaners, oilers, tape stitchers, roller coverers, top arm draft zone cleaners, sweepers and materials handlers (lap/sliver cans/ bobbins/cops/ waste).

The following categories of operatives are not considered for the productivity assessment:

Contaminants removers, operatives pertain to comber and its preparatory machines, electricals, generators, humidification plant and workshop workers, watch and ward, attenders, investigators, gardeners, hostel/guest house/quarters workers, dispensary workers, canteen/mess workers, drivers, sanitary workers, civil workers, etc.

3. Productivity estimation � an illustration

This section explains the method of assessing the various productivity parameters

up to ring frames with an illustration. The data correspond to one month period.

i) Mill : XYZ Ltd. ii) Size : 21744 spindles iii) Shift duration: I shift: 8.5 hrs.; II shift: 8.5 hrs.; III shift: 7 hrs.; General shift: 8 hrs. iv) Working days during the month: 30 v) Yarn production obtained in different counts in the ring frames and the corresponding

spindle shifts (Table 2).

Page 9: Sitra Norms 2010

5

Table 2 Count-wise spindle shifts and yarn production

Spindle shifts worked Count

I II III

Total yarn production

(kg)

Prodn./spl./ 8 hours (g)

20s CH 24s CH 24s 30s CH 34s CH 40s CH 40s H

104356 32991 75379 61006 66685

153946 119507

104856 33393 75680 61605 67186

154623 120507

97020 27720 75600 54566 55123

126043 98033

96463 23078 54396 34593 31373 53561 42932

314 244 240 194 165 122 126

Total 613870 617850 534105 336396 -

Note: CH: Combed Hosiery; H: Carded Hosiery vi) Stopped spindle shifts (Table 3)

Table 3 Stopped spindle shifts

Causes I shift II shift III shift

General cleaning Repairs Count changes Power shortage Planned stoppage

33707 2153 2348 242

-

- 510

- 33960

-

- 273

- 4762

113180

Total 38450 34470 118215 vii) Operatives employed (Table 4)

Table 4 Operatives employed

Department/categories of operatives

General shift I shift II shift III shift

Mixing attendants - 290 - - Blow room

Back tenter - 30 30 30

Cards (chute feed) Tenter Fitter Fitter helpers Oiler Cleaners

- 30 60 30 60

30 - - - -

30 - - - -

30 - - - -

Page 10: Sitra Norms 2010

6

Table 4 (contd…)

Department/category of operatives

General shift I shift II shift III shift

Draw frames/fly frames Draw frame tenters Fly frame tenters Back tenter Doffers Bobbin carriers Fitter Fitter helper Cleaners

- - - - -

30 30 60

60 120 30 90 90 - - -

60 120 30 90 90 - - -

60 120 30 90 90 - - -

Ring frames Tenters Relievers for tenters Doffers Relievers for doffers Jobber Fitter Fitter helpers Roller coverers Machine cleaners Draft zone cleaners Doff carriers

- - - - -

30 60 60

312 180

-

510 90

330 60 30 - - - - -

60

510 90

330 60 30 - - - - -

60

510 90

330 60 30 - - - - -

60 Total 942 1820 1530 1530

a. Spindle utilisation [hours worked per spindle per day (SH)]

The first step in the estimation of spindle utilisation is to convert the spindles

worked in all the three shifts to 8 hour shift. If the duration of each shift is 8 hours and

the mill works the ring frames round the clock, then there is no need to convert the

spindle shifts to 8 hour shift.

The shift duration of the case study mill is; I shift: 8.5 hours; II shift: 8.5 hours;

III shift: 7 hours.

8.5 8.5 7 Total converted spindle shifts = 613870 x + 617850 x + 534105 x (of 8 hours each) 8 8 8 = 1776044

Page 11: Sitra Norms 2010

7

Total spindle shifts of 8 hours each x 8 SH = Installed spindles x working days 1776044 x 8 = = 21.78 21744 x 30

b. Production per spindle per 8 hours (P), adjusted to 40s count

Standardised ring frame production (kg) = x 1000 Total spindle shifts worked 96463 x 0.342 + 23078 x 0.420 + 54396 x 0.532 +

34593 x 0.553 + 31373 x 0.663 + 53561 x 0.775 +

42932 x 0.889 = x 1000 1776044

= 107.7 g

c. HOK, adjusted to 40s count

Estimation of operative hours

Total number of operative hours in different categories is estimated by

multiplying the number of operatives employed in different shifts with the respective

shift duration less 30 minutes (time for meals). For example, for the shift duration of 8.5

hours, to estimate the operative hours, the number of operatives who are actually

employed, are multiplied by 8.

In the case study mill, the operatives employed during the month in mixing and

blow room are as follows:

Page 12: Sitra Norms 2010

8

Categories of operatives

I shift (8.5 hours)

II shift (8.5 hours)

III shift (7 hours)

Mixing attendant 290 - - Blow room

Back tenter 30 30 30 Total 320 30 30

Mixing : 290 x 8 = 2320 Total operative

hours Blow room : (30 x 8) + (30 x 8) + (30 x 6.5) = 675

The operative hours for the remaining categories have also been estimated on the

above lines and the same are given in Table 5.

Standardised production

The count-wise, raw material-wise and category-wise HOK conversion factors are

given in Tables A and B. The ring frame production in different counts is multiplied by

the respective category-wise conversion factors and the sum is used to estimate category-

wise HOK.

Mixing attendant

40s standardised production: 96463 x 1.23 + 23078 x 1.23 + 54396 x 1.00 + 34593 x 1.23 + 31373 x 1.23 + 53561 x 1.23 + 42932 x 1.00 = 391382 kg 2320 HOK of mixing attendant = x 100 391382 = 0.59

The HOKs of various categories of operatives have also been estimated on the

above lines and the same are given in Table 5.

Page 13: Sitra Norms 2010

9

Table 5 Category-wise HOK and OHS

Department/categories of operatives

Operative hours

Standardised production

(kg) HOK* OHS*

Mixing attendants 2320 391382 0.59 0.08 Blow room back tenters 675 388991 0.17 0.02 Card tenters 675 388991 0.17 0.02 Draw frame tenters 1350 222560 0.61 0.08 Fly frame - Tenters$ - Doffers

3375 2025

334439 336396

1.01 0.60

0.14 0.08

Ring frame - Tenters@ - Doffers@

13500 8775

232790 306827

5.80 2.86

0.78 0.39

Ancillary operatives 11115 212970 5.22 0.70 Total 43810 - 17.03 2.29

* adjusted to 40s count; $ including back tenters; @ including relievers

d. Operatives per 1000 spindles (OHS)

HOK x P OHS = 800 17.0 x 107.7 = = 2.29 800

The OHS figures for different categories of operatives are given in Table 5.

Modified OHS (OHSAM)

From the definition of OHS given above, it follows that OHS is a function of

production per spindle (P), although for small deviations in the production per spindle,

say, less than 5%, the workers’ complement engaged in different departments can be

expected to remain practically unchanged. However, for any large increase in the

production per spindle, the OHS would increase significantly. This is because ring frame

doffers and preparatory departments’ operatives would require to be engaged

proportionately in larger numbers to cope with the higher volume of ring frame

production.

Page 14: Sitra Norms 2010

10

The OHSAM can be worked out from the expression:

OHSAM = (1.65 x OHS) / [1.65 - 0.0065 x (110 - P)]

For the example considered,

OHSAM = (1.65 x 2.29) / [1.65 - 0.0065 x (110 - 107.7)] = 2.31

e. Composite productivity index (CPI)

Std. HOK 12 CPI = x 100 = x 100 = 71 Mill HOK 17

f. Machine productivity index (MPI)

P SH MPI = x x 100 110 24.0 107.7 21.78 MPI = x x 100 = 89 110 24

g. Consolidated productivity figures

Table 6 shows the various productivity parameters up to ring frames, as estimated

above, along with remarks pertaining to the case study mill.

Table 6 Estimated productivity parameters for the case study mill – up to ring frames

Parameter Mill figure

SITRA standard

Remarks**

Total HOK* 17.0 12.0 -

Composite Productivity Index (CPI) 71 100 About 30% lower

OHSAM* 2.31 1.65 40% higher

Production per spindle per 8 hours (g)* (P) 108 110 2% lower

Machine Productivity Index (MPI) 89 100 11% lower

* adjusted to 40s count

** as compared to SITRA standard

Page 15: Sitra Norms 2010

11

II. CONE WINDING

The standard production per tenter in conventional cone winding and automatic cone winding for different counts are given in the ‘SITRA Norms for Spinning Mills, 7th Edition, 2010. The drums per tenter, machine efficiency, winding-on speed, breakage rates, cop contents and work load taken for estimating the standard production per tenter are also given in the publication.

1. Definitions of various productivity parameters

In cone winding, only tenter HOK is estimated. The ancillary workers such as maintenance workers, sweepers, jobbers and materials handlers are not considered for the HOK calculation. The term ‘operative’ used in this section also indicates tenter.

Winding tenter Total operative hours HOK (adjusted = x 100 to 40s count) Σ Count-wise standardised winding production (kg) Standard production per tenter per Conversion 8 hours (kg) for 40s count factor = Standard production per tenter per 8 hours (kg) for the given count

(or) Standard HOK for the given count = Standard HOK for 40s count

The count-wise conversion factors are given in Tables C and D respectively for automatic cone winding and conventional cone winding.

SITRA standard HOK for 40s count

Automatic cone winding tenter : 2

Conventional cone winding tenter : 9

Σ Count-wise operative hours expected Productivity for the standard production per tenter index (PI) = x 100 Σ Count-wise operative hours actually engaged

(or)

Standard tenter HOK in 40s count = x 100 Mill’s tenter HOK (adjusted to 40s count)

Page 16: Sitra Norms 2010

12

Σ Count-wise operative hours expected Agreement for the standard production per tenter productivity = x 100 index (API1) Σ Count-wise operative hours expected for the mill’s agreement production per tenter Agreement PI performance = x 100 index (API2) API1 Σ Count-wise operative hours expected Work for the standard production per tenter assignment = x 100 index (WAI) Σ Count-wise operative hours Std. drum assignment expected for the standard x production per tenter Mill’s drum assignment Mill’s average winding-on speed (mpm) Speed index (SI) = x 100 Standard winding-on speed (mpm) Σ Count-wise operatives hours Mill expected for the standard x speed Mill’s average production per tenter (mpm) winding-on = speed (mpm) Σ Count-wise operative hours expected for the standard production per tenter PI Production index = x 100 (Prod.I) WAI Efficiency Prod. I index (EI) = x 100 SI WAI x SI x EI PI = 100 x 100

Page 17: Sitra Norms 2010

13

2. Productivity assessment in automatic cone winding � an illustration

The method of estimation of HOK and other productivity parameters for automatic cone winding is explained below with an illustration.

Mill data:

Average winding-on speed, drums assigned per tenter, tenters actually engaged and production obtained by the mill in different counts* in automatic cone winding are given in Table 7 along with SITRA standards.

Table 7 Automatic cone winding production particulars Avg.winding-on

speed (mpm) Drums/ tenter

Tenters actually engaged

Count Mill Std. Mill Std. I

shiftII

shift III

shift

Total production

(kg)

Prodn./ tenter/ 8

hours (kg)

20s CH 24s CH 24s 30s CH 34s CH 40s CH 40s H

1500 1400 1500 1500 1400 1400 1400

1400 1400 1400 1400 1400 1400 1400

30 30 30 30 30 30 30

30 40 40 40 40 50 50

60 60 60 60 60 60

120

60 60 60 60 60 60

120

60 60 60 60 60 60

120

96342 33078 54396 23812 31373 22335 62452

571 196 322 141 186 132 185

Total 480 480 480 323788 -

* data pertain to the mill that has been considered in the spinning section Total operative hours = (480 x 8) + (480 x 8) + (480 x 6.5) = 10800 Standardised = (96342 x 0.889) + (33078 x 0.834) + (54396 x 0.834) + production (23812 x 1.000) + (31373 x 1.090) + (22335 x 1.000) + (62452 x 1.000) = 301397 kg Total operative hours x 100 Winding tenter HOK = (adj.to 40s count) Standardised production (kg) 10800 = x 100 301397 = 3.6

Page 18: Sitra Norms 2010

14

The HOK can also be worked out from the cone winding productivity index, as explained below. Table 8 shows count-wise operative hours expected as per mill agreement production per tenter and SITRA standard production per tenter.

Table 8 Operative hours expected for the mill agreement production per tenter and standard production per tenter

Expected operative hours Count

Agreement production/

tenter/ 8 hours (kg)

SITRA standard production/

tenter/ 8 hours (kg)

Mill agreement

SITRA standard

20s CH 24s CH 24s 30s CH 34s CH 40s CH 40s H

535 330 330 300 270 280 280

447 476 476 397 364 397 397

1441 802

1319 635 930 638

1784

1724 556 914 480 690 450

1258 Total 7549 6072

Σ Count-wise operative hours expected Productivity for the standard production per tenter index (PI) = x 100 Σ Count-wise operative hours actually engaged 6072 = x 100 = 56 10800 Cone winding Standard HOK (40s count) tenter HOK = x 100 (adj.to 40s) PI 2.0 x 100 = = 3.6 56

which is same as that obtained by applying the conversion factors.

Agreement 6072 productivity = x 100 = 80 index (API1) 7549 Agreement PI performance = x 100 index (API2) API1

Page 19: Sitra Norms 2010

15

56 = x 100 = 70 80 Work 6072 assignment = x 100 = 75 index (WAI) 8091 Mill’s average 8812600 winding-on = = 1450 speed (mpm) 6072 1450 Speed index (SI) = x 100 = 104 1400 PI 56 Production index = x 100 = x 100 = 75 (Prod.I) WAI 75 Efficiency Prod. I 75 index (EI) = x 100 = x 100 = 72 SI 104 WAI x SI x EI 75 x 104 x 72 PI = = = 56 100 x 100 100 x 100

Consolidated productivity figures

Table 9 shows the consolidated productivity figures in automatic cone winding along with remarks pertain to the case study mill.

Table 9 Estimated productivity parameters for the case study mill in automatic cone winding

* compared to standard

Conventional cone winding

The procedure for working out the conventional cone winding HOK and other productivity parameters are exactly similar to that for automatic cone winding.

Parameter Mill figure

SITRA standard Remarks*

Tenter HOK (adjusted to 40s count) 3.6 2.0 - Productivity Index 56 100 44% lower Work Assignment Index 75 100 25% lower Speed Index 104 100 4% higher Efficiency Index 72 100 28% lower

Page 20: Sitra Norms 2010

16

Conversion factors for calculating standardised production

Table Department Page no.

A Up to ring frames – cotton yarns 17

B Up to ring frames – synthetic and blended yarns 30

C Automatic cone winding 39

D Conventional cone winding 41

Notes:

i) For count descriptions, refer page no.43

ii) For the various assumptions (other than those given in this publication) made to arrive at the conversion factors viz.

- Work assignments for different categories of operatives.

- Production rates in different departments.

- Process parameters, etc.

reference may be made to SITRA publication ‘Norms for Spinning Mills’ 2010 edition.

Page 21: Sitra Norms 2010

17

Table A Conversion factors for calculating standardised production up to ring frames

– Cotton yarns Fly frame Ring frame

Count Prodn./ spl.

Mixing attend-

ants

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

10s 0.201 1.03 1.04 1.00 0.93 1.02 0.88 0.50 0.77 0.36 0.60 10s C 0.172 1.23 1.22 1.22 0.52 0.88 0.88 0.43 0.77 0.31 0.57 10s CH 0.161 1.23 1.22 1.22 0.52 0.88 0.88 0.40 0.77 0.29 0.55 10s C-HT 0.342 1.23 1.22 1.22 0.52 0.88 0.88 0.86 0.77 0.61 0.78 11s 0.231 1.03 1.04 1.00 0.93 1.02 0.88 0.39 0.77 0.41 0.59 11s C 0.197 1.23 1.22 1.22 0.52 0.88 0.88 0.33 0.77 0.35 0.56 11s CH 0.184 1.23 1.22 1.22 0.52 0.88 0.88 0.31 0.77 0.33 0.54 11s C-HT 0.392 1.23 1.22 1.22 0.52 0.88 0.88 0.65 0.77 0.70 0.76 12s 0.243 1.03 1.04 1.00 0.93 1.07 0.88 0.41 0.77 0.43 0.60 12s C 0.224 1.23 1.22 1.22 0.52 0.88 0.88 0.37 0.77 0.40 0.58 12s CH 0.208 1.23 1.22 1.22 0.52 0.88 0.88 0.35 0.77 0.37 0.57 12s C-HT 0.447 1.23 1.22 1.22 0.52 0.88 0.88 0.75 0.77 0.80 0.81 13s 0.273 1.03 1.04 1.00 0.93 1.07 0.88 0.45 0.77 0.49 0.63 13s C 0.251 1.23 1.22 1.22 0.52 0.88 0.88 0.42 0.77 0.45 0.61 13s CH 0.235 1.23 1.22 1.22 0.52 0.88 0.88 0.39 0.77 0.42 0.60 13s C-HT 0.501 1.23 1.22 1.22 0.52 0.88 0.88 0.84 0.77 0.89 0.87 14s 0.283 1.03 1.04 1.00 0.93 1.07 0.88 0.47 0.77 0.51 0.65 14s C 0.261 1.23 1.22 1.22 0.52 0.88 0.88 0.43 0.77 0.47 0.62 14s CH 0.241 1.23 1.22 1.22 0.52 0.88 0.88 0.40 0.77 0.43 0.60 14s C-HT 0.521 1.23 1.22 1.22 0.52 0.88 0.88 0.87 0.77 0.93 0.89 15s 0.312 1.03 1.04 1.00 0.93 1.07 0.88 0.52 0.77 0.56 0.67 15s C 0.288 1.23 1.22 1.22 0.52 0.88 0.88 0.48 0.77 0.51 0.65 15s CH 0.267 1.23 1.22 1.22 0.52 0.88 0.88 0.45 0.77 0.48 0.63 15s C-HT 0.578 1.23 1.22 1.22 0.52 0.88 0.88 0.96 0.77 1.03 0.95 16s 0.332 1.03 1.04 1.00 0.93 1.07 0.88 0.55 0.77 0.59 0.69 16s H 0.287 1.03 1.04 1.00 0.93 1.07 0.88 0.48 0.77 0.51 0.65 16s HT 0.637 1.03 1.04 1.00 0.93 1.07 0.88 1.06 0.77 1.14 1.01 16s C 0.290 1.23 1.22 1.22 0.52 0.88 0.88 0.48 0.77 0.52 0.65 16s CH 0.274 1.23 1.22 1.22 0.52 0.88 0.88 0.46 0.77 0.49 0.64 16s C-HT 0.596 1.23 1.22 1.22 0.52 0.88 0.88 0.99 0.77 1.06 0.97 17s 0.363 1.03 1.04 1.00 0.93 1.07 0.88 0.60 0.77 0.65 0.73 17s H 0.315 1.03 1.04 1.00 0.93 1.07 0.88 0.52 0.77 0.56 0.68 17s HT 0.697 1.03 1.04 1.00 0.93 1.07 0.88 1.16 0.77 1.25 1.07 17s C 0.316 1.23 1.22 1.22 0.52 0.88 0.88 0.53 0.77 0.56 0.68 17s CH 0.298 1.23 1.22 1.22 0.52 0.88 0.88 0.50 0.77 0.53 0.66 17s C-HT 0.652 1.23 1.22 1.22 0.52 0.88 0.88 1.09 0.77 1.16 1.02 18s 0.383 1.03 1.04 1.00 0.93 0.98 0.88 0.64 0.77 0.68 0.74 18s H 0.331 1.03 1.04 1.00 0.93 0.98 0.88 0.55 0.77 0.59 0.69 18s HT 0.730 1.03 1.04 1.00 0.93 0.98 0.88 1.22 0.77 1.30 1.10 18s C 0.333 1.23 1.22 1.22 0.52 0.88 0.88 0.56 0.77 0.59 0.70

Page 22: Sitra Norms 2010

18

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns Fly frame Ring frame

Count Prodn./ spl.

Mixing attend-

ants

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

18s CH 0.313 1.23 1.22 1.22 0.52 0.88 0.88 0.52 0.77 0.56 0.68 18s C-HT 0.689 1.23 1.22 1.22 0.52 0.88 0.88 1.15 0.77 1.23 1.06 19s 0.415 1.03 1.04 1.00 0.93 0.98 1.02 0.69 0.83 0.74 0.80 19s H 0.359 1.03 1.04 1.00 0.93 0.98 1.02 0.60 0.83 0.64 0.74 19s HT 0.792 1.03 1.04 1.00 0.93 0.98 1.02 1.32 0.83 1.41 1.18 19s C 0.361 1.23 1.22 1.22 0.52 0.88 1.02 0.60 0.83 0.65 0.75 19s CH 0.340 1.23 1.22 1.22 0.52 0.88 1.02 0.57 0.83 0.61 0.72 19s C-HT 0.746 1.23 1.22 1.22 0.52 0.88 1.02 1.24 0.83 1.33 1.14 20s 0.420 1.00 1.00 1.00 0.93 0.98 1.00 0.70 0.83 0.50 0.71 20s H 0.372 1.00 1.00 1.00 0.93 0.98 1.00 0.62 0.83 0.44 0.68 20s HT 0.827 1.00 1.00 1.00 0.93 0.98 1.00 1.38 0.83 0.99 1.05 20s C 0.348 1.23 1.22 1.22 0.52 0.88 1.00 0.58 0.83 0.42 0.66 20s CH 0.342 1.23 1.22 1.22 0.52 0.88 1.00 0.57 0.83 0.41 0.66 20s C-HT 0.754 1.23 1.22 1.22 0.52 0.88 1.00 1.26 0.83 0.90 1.00 21s 0.452 1.00 1.00 1.00 0.93 0.98 1.00 0.56 0.83 0.54 0.69 21s H 0.399 1.00 1.00 1.00 0.93 0.98 1.00 0.50 0.83 0.48 0.66 21s HT 0.670 1.00 1.00 1.00 0.93 0.98 1.00 0.84 0.83 0.80 0.85 21s C 0.372 1.23 1.22 1.22 0.52 0.88 1.00 0.47 0.83 0.44 0.64 21s CH 0.366 1.23 1.22 1.22 0.52 0.88 1.00 0.46 0.83 0.44 0.64 21s C-HT 0.615 1.23 1.22 1.22 0.52 0.88 1.00 0.77 0.83 0.73 0.82 22s 0.482 1.00 1.00 1.00 0.93 0.98 1.00 0.60 0.83 0.57 0.71 22s H 0.427 1.00 1.00 1.00 0.93 0.98 1.00 0.53 0.83 0.51 0.68 22s HT 0.719 1.00 1.00 1.00 0.93 0.98 1.00 0.90 0.83 0.86 0.89 22s C 0.399 1.23 1.22 1.22 0.52 0.88 1.00 0.50 0.83 0.48 0.66 22s CH 0.392 1.23 1.22 1.22 0.52 0.88 1.00 0.49 0.83 0.47 0.66 22s C-HT 0.655 1.23 1.22 1.22 0.52 0.88 1.00 0.82 0.83 0.78 0.85 23s 0.515 1.00 1.00 1.00 0.93 0.98 1.00 0.64 0.83 0.62 0.74 23s H 0.457 1.00 1.00 1.00 0.93 0.98 1.00 0.57 0.83 0.55 0.70 23s HT 0.768 1.00 1.00 1.00 0.93 0.98 1.00 0.96 0.83 0.92 0.92 23s C 0.427 1.23 1.22 1.22 0.52 0.88 1.00 0.53 0.83 0.51 0.68 23s CH 0.419 1.23 1.22 1.22 0.52 0.88 1.00 0.52 0.83 0.50 0.68 23s C-HT 0.700 1.23 1.22 1.22 0.52 0.88 1.00 0.87 0.83 0.84 0.88 24s 0.532 1.00 1.00 1.00 0.97 1.10 1.00 0.67 0.83 0.64 0.76 24s H 0.472 1.00 1.00 1.00 0.97 1.10 1.00 0.59 0.83 0.57 0.71 24s HT 0.793 1.00 1.00 1.00 0.97 1.10 1.00 0.99 0.83 0.95 0.95 24s C 0.430 1.23 1.22 1.22 0.52 0.98 1.00 0.54 0.83 0.51 0.69 24s CH 0.420 1.23 1.22 1.22 0.52 0.98 1.00 0.52 0.83 0.50 0.68 24s C-HT 0.705 1.23 1.22 1.22 0.52 0.98 1.00 0.88 0.83 0.84 0.89 25s 0.565 1.00 1.00 1.00 0.97 1.10 1.00 0.71 0.83 0.68 0.78 25s H 0.498 1.00 1.00 1.00 0.97 1.10 1.00 0.62 0.83 0.60 0.73

Page 23: Sitra Norms 2010

19

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ants

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

25s HT 0.843 1.00 1.00 1.00 0.97 1.10 1.00 1.05 0.83 1.01 0.98 25s C 0.454 1.23 1.22 1.22 0.52 0.98 1.00 0.57 0.83 0.54 0.70 25s CH 0.446 1.23 1.22 1.22 0.52 0.98 1.00 0.56 0.83 0.53 0.70 25s C-HT 0.749 1.23 1.22 1.22 0.52 0.98 1.00 0.94 0.83 0.90 0.92 26s 0.600 1.00 1.00 1.00 0.97 1.10 1.00 0.75 0.83 0.72 0.81 26s H 0.529 1.00 1.00 1.00 0.97 1.10 1.00 0.66 0.83 0.63 0.75 26s HT 0.894 1.00 1.00 1.00 0.97 1.10 1.00 1.12 0.83 1.07 1.02 26s C 0.482 1.23 1.22 1.22 0.52 0.98 1.00 0.60 0.83 0.58 0.72 26s CH 0.471 1.23 1.22 1.22 0.52 0.98 1.00 0.59 0.83 0.56 0.72 26s C-HT 0.795 1.23 1.22 1.22 0.52 0.98 1.00 0.99 0.83 0.95 0.95 27s 0.634 1.00 1.00 1.00 0.97 1.10 1.00 0.79 0.83 0.76 0.83 27s H 0.542 1.00 1.00 1.00 0.97 1.10 1.00 0.68 0.83 0.65 0.76 27s HT 0.947 1.00 1.00 1.00 0.97 1.10 1.00 1.18 0.83 1.13 1.06 27s C 0.510 1.23 1.22 1.22 0.52 0.98 1.00 0.64 0.83 0.61 0.74 27s CH 0.498 1.23 1.22 1.22 0.52 0.98 1.00 0.62 0.83 0.59 0.74 27s C-HT 0.841 1.23 1.22 1.22 0.52 0.98 1.00 1.05 0.83 1.00 0.98 28s 0.670 1.00 1.00 1.00 0.97 1.14 1.00 0.84 0.83 0.80 0.86 28s H 0.573 1.00 1.00 1.00 0.97 1.14 1.00 0.71 0.83 0.69 0.79 28s HT 1.000 1.00 1.00 1.00 0.97 1.14 1.00 1.25 0.83 1.20 1.10 28s C 0.539 1.23 1.22 1.22 0.52 1.07 1.00 0.67 0.83 0.64 0.77 28s CH 0.526 1.23 1.22 1.22 0.52 1.07 1.00 0.66 0.83 0.63 0.76 28s C-HT 0.889 1.23 1.22 1.22 0.52 1.07 1.00 1.11 0.83 1.06 1.02 29s 0.702 1.00 1.00 1.00 0.97 1.14 1.00 0.88 0.83 0.84 0.88 29s H 0.603 1.00 1.00 1.00 0.97 1.14 1.00 0.75 0.83 0.72 0.81 29s HT 1.048 1.00 1.00 1.00 0.97 1.14 1.00 1.31 0.83 1.25 1.13 29s C 0.568 1.23 1.22 1.22 0.52 1.07 1.00 0.71 0.83 0.68 0.79 29s CH 0.554 1.23 1.22 1.22 0.52 1.07 1.00 0.69 0.83 0.66 0.78 29s C-HT 0.936 1.23 1.22 1.22 0.52 1.07 1.00 1.17 0.83 1.12 1.06 30s 0.692 1.00 1.00 1.00 0.97 1.14 1.00 0.86 1.00 0.83 0.91 30s H 0.597 1.00 1.00 1.00 0.97 1.14 1.00 0.75 1.00 0.71 0.84 30s HT 1.044 1.00 1.00 1.00 0.97 1.14 1.00 1.31 1.00 1.25 1.17 30s C 0.551 1.23 1.22 1.22 0.52 1.07 1.00 0.69 1.00 0.66 0.81 30s CH 0.553 1.23 1.22 1.22 0.52 1.07 1.00 0.69 1.00 0.66 0.82 30s C-HT 0.909 1.23 1.22 1.22 0.52 1.07 1.00 1.14 1.00 1.09 1.07 31s 0.726 1.00 1.00 1.00 0.97 1.14 1.00 0.91 1.00 0.87 0.94 31s H 0.628 1.00 1.00 1.00 0.97 1.14 1.00 0.78 1.00 0.75 0.87 31s HT 1.096 1.00 1.00 1.00 0.97 1.14 1.00 1.37 1.00 1.31 1.20 31s C 0.579 1.23 1.22 1.22 0.52 1.07 1.00 0.72 1.00 0.69 0.84 31s CH 0.577 1.23 1.22 1.22 0.52 1.07 1.00 0.72 1.00 0.69 0.83 31s C-HT 0.956 1.23 1.22 1.22 0.52 1.07 1.00 1.19 1.00 1.14 1.11

Page 24: Sitra Norms 2010

20

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

32s 0.758 1.00 1.00 1.00 1.00 1.02 1.00 0.95 1.00 0.91 0.96 32s H 0.658 1.00 1.00 1.00 1.00 1.02 1.00 0.82 1.00 0.79 0.88 32s HT 1.149 1.00 1.00 1.00 1.00 1.02 1.00 1.44 1.00 1.37 1.24 32s C 0.607 1.23 1.22 1.22 0.55 0.90 1.00 0.76 1.00 0.73 0.85 32s CH 0.606 1.23 1.22 1.22 0.55 0.90 1.00 0.76 1.00 0.72 0.85 32s C-HT 1.002 1.23 1.22 1.22 0.55 0.90 1.00 1.25 1.00 1.20 1.14 33s 0.793 1.00 1.00 1.00 1.00 1.02 1.00 0.99 1.00 0.95 0.98 33s H 0.689 1.00 1.00 1.00 1.00 1.02 1.00 0.86 1.00 0.83 0.91 33s HT 1.203 1.00 1.00 1.00 1.00 1.02 1.00 1.50 1.00 1.44 1.28 33s C 0.636 1.23 1.22 1.22 0.55 0.90 1.00 0.79 1.00 0.76 0.87 33s CH 0.634 1.23 1.22 1.22 0.55 0.90 1.00 0.79 1.00 0.76 0.87 33s C-HT 1.050 1.23 1.22 1.22 0.55 0.90 1.00 1.31 1.00 1.26 1.17 34s 0.830 1.00 1.00 1.00 1.00 1.02 1.00 1.04 1.00 0.99 1.01 34s H 0.721 1.00 1.00 1.00 1.00 1.02 1.00 0.90 1.00 0.86 0.93 34s HT 1.251 1.00 1.00 1.00 1.00 1.02 1.00 1.56 1.00 1.50 1.31 34s C 0.665 1.23 1.22 1.22 0.55 0.90 1.00 0.83 1.00 0.80 0.89 34s CH 0.663 1.23 1.22 1.22 0.55 0.90 1.00 0.83 1.00 0.79 0.89 34s C-HT 1.098 1.23 1.22 1.22 0.55 0.90 1.00 1.37 1.00 1.31 1.21 35s 0.866 1.00 1.00 1.00 1.00 1.02 1.00 1.08 1.00 1.04 1.03 35s H 0.753 1.00 1.00 1.00 1.00 1.02 1.00 0.94 1.00 0.90 0.95 35s HT 1.308 1.00 1.00 1.00 1.00 1.02 1.00 1.63 1.00 1.57 1.35 35s C 0.695 1.23 1.22 1.22 0.55 0.90 1.00 0.87 1.00 0.83 0.91 35s CH 0.693 1.23 1.22 1.22 0.55 0.90 1.00 0.86 1.00 0.83 0.91 35s C-HT 1.147 1.23 1.22 1.22 0.55 0.90 1.00 1.43 1.00 1.37 1.24 36s 0.904 1.00 1.00 1.00 1.00 1.02 1.00 1.13 1.00 0.90 1.00 36s H 0.785 1.00 1.00 1.00 1.00 1.02 1.00 0.98 1.00 0.79 0.92 36s HT 1.363 1.00 1.00 1.00 1.00 1.02 1.00 1.70 1.00 1.36 1.30 36s C 0.721 1.23 1.22 1.22 0.55 0.90 1.00 0.90 1.00 0.72 0.89 36s CH 0.703 1.23 1.22 1.22 0.55 0.90 1.00 0.88 1.00 0.70 0.87 36s C-HT 1.195 1.23 1.22 1.22 0.55 0.90 1.00 1.50 1.00 1.19 1.20 37s 0.942 1.00 1.00 1.00 1.00 1.02 1.00 0.94 1.00 0.94 0.97 37s H 0.818 1.00 1.00 1.00 1.00 1.02 1.00 0.82 1.00 0.82 0.89 37s HT 1.421 1.00 1.00 1.00 1.00 1.02 1.00 1.42 1.00 1.42 1.25 37s C 0.751 1.23 1.22 1.22 0.55 0.90 1.00 0.75 1.00 0.75 0.86 37s CH 0.733 1.23 1.22 1.22 0.55 0.90 1.00 0.73 1.00 0.73 0.85 37s C-HT 1.245 1.23 1.22 1.22 0.55 0.90 1.00 1.24 1.00 1.25 1.15 38s 0.926 1.00 1.00 1.00 1.00 1.00 1.00 0.93 1.00 0.93 0.96 38s H 0.823 1.00 1.00 1.00 1.00 1.00 1.00 0.82 1.00 0.82 0.89 38s HT 1.397 1.00 1.00 1.00 1.00 1.00 1.00 1.40 1.00 1.40 1.24 38s C 0.782 1.23 1.22 1.22 0.55 1.10 1.00 0.78 1.00 0.78 0.88

Page 25: Sitra Norms 2010

21

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

38s CH 0.762 1.23 1.22 1.22 0.55 1.10 1.00 0.76 1.00 0.76 0.87 38s C-HT 1.289 1.23 1.22 1.22 0.55 1.10 1.00 1.29 1.00 1.29 1.18 39s 0.962 1.00 1.00 1.00 1.00 1.00 1.00 0.96 1.00 0.96 0.98 39s H 0.855 1.00 1.00 1.00 1.00 1.00 1.00 0.86 1.00 0.86 0.91 39s HT 1.453 1.00 1.00 1.00 1.00 1.00 1.00 1.45 1.00 1.45 1.27 39s C 0.813 1.23 1.22 1.22 0.55 1.10 1.00 0.81 1.00 0.81 0.90 39s CH 0.766 1.23 1.22 1.22 0.55 1.10 1.00 0.77 1.00 0.77 0.87 39s C-HT 1.341 1.23 1.22 1.22 0.55 1.10 1.00 1.34 1.00 1.34 1.21 40s 1.000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 40s H 0.889 1.00 1.00 1.00 1.00 1.00 1.00 0.89 1.00 0.89 0.93 40s HT 1.508 1.00 1.00 1.00 1.00 1.00 1.00 1.51 1.00 1.51 1.30 40s C 0.823 1.23 1.22 1.22 0.55 1.10 1.00 0.82 1.00 0.82 0.91 40s CH 0.775 1.23 1.22 1.22 0.55 1.10 1.00 0.77 1.00 0.77 0.88 40s C-HT 1.358 1.23 1.22 1.22 0.55 1.10 1.00 1.36 1.00 1.36 1.22 41s 1.038 0.98 1.00 1.00 1.00 1.00 1.00 1.04 1.00 1.04 1.02 41s H 0.922 0.98 1.00 1.00 1.00 1.00 1.00 0.92 1.00 0.92 0.95 41s HT 1.566 0.98 1.00 1.00 1.00 1.00 1.00 1.57 1.00 1.57 1.33 41s C 0.854 1.22 1.22 1.22 0.55 1.10 1.00 0.86 1.00 0.86 0.92 41s CH 0.804 1.22 1.22 1.22 0.55 1.10 1.00 0.80 1.00 0.80 0.89 41s C-HT 1.408 1.22 1.22 1.22 0.55 1.10 1.00 1.41 1.00 1.41 1.25 42s 1.076 0.98 1.00 1.00 1.00 1.00 1.00 1.08 1.00 1.08 1.04 42s H 0.957 0.98 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.96 0.97 42s HT 1.622 0.98 1.00 1.00 1.00 1.00 1.00 1.62 1.00 1.62 1.37 42s C 0.886 1.22 1.22 1.22 0.55 1.10 1.00 0.88 1.00 0.88 0.94 42s CH 0.833 1.22 1.22 1.22 0.55 1.10 1.00 0.83 1.00 0.83 0.91 42s C-HT 1.460 1.22 1.22 1.22 0.55 1.10 1.00 1.46 1.00 1.46 1.28 43s 1.114 0.98 1.00 1.00 1.00 1.00 1.00 1.11 1.00 1.11 1.07 43s H 0.991 0.98 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 0.99 43s HT 1.681 0.98 1.00 1.00 1.00 1.00 1.00 1.68 1.00 1.68 1.40 43s C 0.918 1.22 1.22 1.22 0.55 1.10 1.00 0.92 1.00 0.92 0.96 43s CH 0.863 1.22 1.22 1.22 0.55 1.10 1.00 0.86 1.00 0.86 0.93 43s C-HT 1.512 1.22 1.22 1.22 0.55 1.10 1.00 1.51 1.00 1.51 1.31 44s 1.153 0.98 1.00 1.00 1.00 1.24 1.00 1.15 1.00 1.15 1.10 44s H 1.026 0.98 1.00 1.00 1.00 1.24 1.00 1.03 1.00 1.03 1.02 44s HT 1.739 0.98 1.00 1.00 1.00 1.24 1.00 1.74 1.00 1.74 1.45 44s C 0.949 1.22 1.22 1.22 0.55 1.19 1.00 0.95 1.00 0.95 0.98 44s CH 0.894 1.22 1.22 1.22 0.55 1.19 1.00 0.89 1.00 0.89 0.95 44s C-HT 1.566 1.22 1.22 1.22 0.55 1.19 1.00 1.57 1.00 1.57 1.35 45s 1.186 0.98 1.00 1.00 1.00 1.24 1.00 1.19 1.00 1.19 1.12 45s H 1.061 0.98 1.00 1.00 1.00 1.24 1.00 1.06 1.00 1.06 1.04

Page 26: Sitra Norms 2010

22

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

45s HT 1.799 0.98 1.00 1.00 1.00 1.24 1.00 1.80 1.00 1.80 1.48 45s C 0.982 1.22 1.22 1.22 0.55 1.19 1.00 0.98 1.00 0.98 1.00 45s CH 0.924 1.22 1.22 1.22 0.55 1.19 1.00 0.92 1.00 0.92 0.97 45s C-HT 1.619 1.22 1.22 1.22 0.55 1.19 1.00 1.62 1.00 1.62 1.38 46s 1.226 0.98 1.00 1.00 1.00 1.24 1.00 1.23 1.00 1.23 1.14 46s H 1.097 0.98 1.00 1.00 1.00 1.24 1.00 1.10 1.00 1.10 1.06 46s HT 1.860 0.98 1.00 1.00 1.00 1.24 1.00 1.86 1.00 1.86 1.52 46s C 1.015 1.22 1.22 1.22 0.55 1.19 1.00 1.01 1.00 1.01 1.02 46s CH 0.955 1.22 1.22 1.22 0.55 1.19 1.00 0.95 1.00 0.96 0.99 46s C-HT 1.673 1.22 1.22 1.22 0.55 1.19 1.00 1.67 1.00 1.67 1.41 47s 1.253 0.98 1.00 1.00 1.00 1.24 1.00 1.25 1.00 1.25 1.16 47s H 1.132 0.98 1.00 1.00 1.00 1.24 1.00 1.13 1.00 1.13 1.09 47s HT 1.921 0.98 1.00 1.00 1.00 1.24 1.00 1.92 1.00 1.92 1.55 47s C 1.049 1.22 1.22 1.22 0.55 1.19 1.00 1.05 1.00 1.05 1.04 47s CH 0.987 1.22 1.22 1.22 0.55 1.19 1.00 0.99 1.00 0.99 1.01 47s C-HT 1.728 1.22 1.22 1.22 0.55 1.19 1.00 1.73 1.00 1.73 1.45 48s 1.292 0.98 1.00 1.00 1.21 1.43 1.00 1.29 1.00 1.29 1.19 48s H 1.169 0.98 1.00 1.00 1.21 1.43 1.00 1.17 1.00 1.17 1.12 48s HT 1.984 0.98 1.00 1.00 1.21 1.43 1.00 1.98 1.00 1.98 1.60 48s C 1.082 1.22 1.22 1.22 0.66 1.31 1.00 1.08 1.00 1.08 1.07 48s CH 1.019 1.22 1.22 1.22 0.66 1.31 1.00 1.02 1.00 1.02 1.03 48s C-HT 1.784 1.22 1.22 1.22 0.66 1.31 1.00 1.78 1.00 1.78 1.49 49s 1.333 0.98 1.00 1.00 1.21 1.43 1.00 1.33 1.00 1.33 1.22 49s H 1.205 0.98 1.00 1.00 1.21 1.43 1.00 1.20 1.00 1.20 1.14 49s HT 2.046 0.98 1.00 1.00 1.21 1.43 1.00 2.05 1.00 2.05 1.64 49s C 1.110 1.22 1.22 1.22 0.66 1.31 1.00 1.11 1.00 1.11 1.09 49s CH 1.050 1.22 1.22 1.22 0.66 1.31 1.00 1.05 1.00 1.05 1.05 49s C-HT 1.841 1.22 1.22 1.22 0.66 1.31 1.00 1.84 1.00 1.84 1.52 50s 1.375 0.98 1.00 1.00 1.21 1.43 1.00 1.37 1.00 1.37 1.24 50s H 1.243 0.98 1.00 1.00 1.21 1.43 1.00 1.24 1.00 1.24 1.16 50s HT 2.109 0.98 1.00 1.00 1.21 1.43 1.00 2.11 1.00 2.11 1.68 50s C 1.144 1.22 1.22 1.22 0.66 1.31 1.00 1.14 1.00 1.14 1.11 50s CH 1.027 1.22 1.22 1.22 0.66 1.31 1.00 1.03 1.00 1.03 1.04 50s C-HT 1.898 1.22 1.22 1.22 0.66 1.31 1.00 1.90 1.00 1.90 1.55 51s 1.415 0.98 1.00 1.00 1.21 1.43 1.00 1.41 1.11 1.42 1.29 51s H 1.280 0.98 1.00 1.00 1.21 1.43 1.00 1.28 1.11 1.28 1.21 51s HT 1.945 0.98 1.00 1.00 1.21 1.43 1.00 1.95 1.11 1.95 1.60 51s C 1.185 1.22 1.22 1.22 0.66 1.31 1.00 1.18 1.11 1.18 1.15 51s CH 1.058 1.22 1.22 1.22 0.66 1.31 1.00 1.06 1.11 1.06 1.08 51s C-HT 1.750 1.22 1.22 1.22 0.66 1.31 1.00 1.75 1.11 1.75 1.49

Page 27: Sitra Norms 2010

23

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

52s 1.458 0.98 1.00 1.00 1.21 1.43 1.00 1.46 1.11 1.46 1.31 52s H 1.317 0.98 1.00 1.00 1.21 1.43 1.00 1.32 1.11 1.32 1.23 52s HT 2.002 0.98 1.00 1.00 1.21 1.43 1.00 2.00 1.11 2.00 1.64 52s C 1.219 1.22 1.22 1.22 0.66 1.31 1.00 1.22 1.11 1.22 1.17 52s CH 1.089 1.22 1.22 1.22 0.66 1.31 1.00 1.09 1.11 1.09 1.10 52s C-HT 1.802 1.22 1.22 1.22 0.66 1.31 1.00 1.80 1.11 1.80 1.52 53s 1.500 0.98 1.00 1.00 1.21 1.43 1.00 1.50 1.11 1.50 1.34 53s H 1.356 0.98 1.00 1.00 1.21 1.43 1.00 1.36 1.11 1.36 1.25 53s HT 2.062 0.98 1.00 1.00 1.21 1.43 1.00 2.06 1.11 2.06 1.67 53s C 1.255 1.22 1.22 1.22 0.66 1.31 1.00 1.25 1.11 1.26 1.20 53s CH 1.121 1.22 1.22 1.22 0.66 1.31 1.00 1.12 1.11 1.12 1.12 53s C-HT 1.854 1.22 1.22 1.22 0.66 1.31 1.00 1.85 1.11 1.85 1.55 54s 1.542 0.98 1.00 1.00 1.28 1.57 1.00 1.54 1.11 1.54 1.37 54s H 1.394 0.98 1.00 1.00 1.28 1.57 1.00 1.39 1.11 1.39 1.28 54s HT 2.117 0.98 1.00 1.00 1.28 1.57 1.00 2.12 1.11 2.12 1.71 54s C 1.285 1.22 1.22 1.22 0.72 1.43 1.00 1.28 1.11 1.29 1.22 54s CH 1.153 1.22 1.22 1.22 0.72 1.43 1.00 1.15 1.11 1.15 1.14 54s C-HT 1.908 1.22 1.22 1.22 0.72 1.43 1.00 1.91 1.11 1.91 1.59 55s 1.584 0.98 1.00 1.00 1.28 1.57 1.00 1.58 1.11 1.58 1.40 55s H 1.434 0.98 1.00 1.00 1.28 1.57 1.00 1.43 1.11 1.43 1.31 55s HT 2.180 0.98 1.00 1.00 1.28 1.57 1.00 2.18 1.11 2.18 1.75 55s C 1.320 1.22 1.22 1.22 0.72 1.43 1.00 1.32 1.11 1.32 1.24 55s CH 1.185 1.22 1.22 1.22 0.72 1.43 1.00 1.18 1.11 1.18 1.16 55s C-HT 1.959 1.22 1.22 1.22 0.72 1.43 1.00 1.96 1.11 1.96 1.62 56s 1.629 0.98 1.00 1.00 1.28 1.57 1.00 1.63 1.11 1.63 1.42 56s H 1.472 0.98 1.00 1.00 1.28 1.57 1.00 1.47 1.11 1.47 1.33 56s HT 2.238 0.98 1.00 1.00 1.28 1.57 1.00 2.24 1.11 2.24 1.78 56s C 1.356 1.22 1.22 1.22 0.72 1.43 1.00 1.36 1.11 1.36 1.26 56s CH 1.211 1.22 1.22 1.22 0.72 1.43 1.00 1.21 1.11 1.21 1.18 56s C-HT 2.013 1.22 1.22 1.22 0.72 1.43 1.00 2.01 1.11 2.01 1.65 57s 1.673 0.98 1.00 1.00 1.28 1.57 1.00 1.67 1.11 1.67 1.45 57s H 1.504 0.98 1.00 1.00 1.28 1.57 1.00 1.50 1.11 1.50 1.35 57s HT 2.299 0.98 1.00 1.00 1.28 1.57 1.00 2.30 1.11 2.30 1.82 57s C 1.392 1.22 1.22 1.22 0.72 1.43 1.00 1.39 1.11 1.39 1.28 57s CH 1.243 1.22 1.22 1.22 0.72 1.43 1.00 1.24 1.11 1.24 1.19 57s C-HT 2.070 1.22 1.22 1.22 0.72 1.43 1.00 2.07 1.11 2.07 1.68 58s 1.718 0.98 1.00 1.00 1.28 1.76 1.00 1.72 1.11 1.72 1.48 58s H 1.544 0.98 1.00 1.00 1.28 1.76 1.00 1.54 1.11 1.54 1.38 58s HT 2.358 0.98 1.00 1.00 1.28 1.76 1.00 2.36 1.11 2.36 1.86 58s C 1.430 1.22 1.22 1.22 0.72 1.57 1.00 1.43 1.11 1.43 1.31

Page 28: Sitra Norms 2010

24

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

58s CH 1.276 1.22 1.22 1.22 0.72 1.57 1.00 1.28 1.11 1.28 1.22 58s C-HT 2.121 1.22 1.22 1.22 0.72 1.57 1.00 2.12 1.11 2.12 1.72 59s 1.762 0.98 1.00 1.00 1.28 1.76 1.00 1.76 1.11 1.76 1.51 59s H 1.584 0.98 1.00 1.00 1.28 1.76 1.00 1.58 1.11 1.58 1.40 59s HT 2.420 0.98 1.00 1.00 1.28 1.76 1.00 2.42 1.11 2.42 1.90 59s C 1.466 1.22 1.22 1.22 0.72 1.57 1.00 1.47 1.11 1.47 1.33 59s CH 1.309 1.22 1.22 1.22 0.72 1.57 1.00 1.31 1.11 1.31 1.24 59s C-HT 2.180 1.22 1.22 1.22 0.72 1.57 1.00 2.18 1.11 2.18 1.76 60s 1.805 0.98 1.00 1.00 1.28 1.76 1.00 1.50 1.11 1.80 1.46 60s H 1.624 0.98 1.00 1.00 1.28 1.76 1.00 1.35 1.11 1.62 1.36 60s HT 2.480 0.98 1.00 1.00 1.28 1.76 1.00 2.06 1.11 2.48 1.83 60s C 1.504 1.22 1.22 1.22 0.72 1.57 1.00 1.25 1.11 1.50 1.29 60s CH 1.343 1.22 1.22 1.22 0.72 1.57 1.00 1.12 1.11 1.34 1.20 60s C-HT 2.233 1.22 1.22 1.22 0.72 1.57 1.00 1.86 1.11 2.23 1.69 61s 1.850 0.98 1.00 1.00 1.28 1.76 1.00 1.54 1.11 1.52 1.37 61s H 1.666 0.98 1.00 1.00 1.28 1.76 1.00 1.39 1.11 1.37 1.28 61s HT 2.543 0.98 1.00 1.00 1.28 1.76 1.00 2.12 1.11 2.09 1.71 61s C 1.542 1.22 1.22 1.22 0.72 1.57 1.00 1.28 1.11 1.27 1.22 61s CH 1.376 1.22 1.22 1.22 0.72 1.57 1.00 1.15 1.11 1.13 1.14 61s C-HT 2.289 1.22 1.22 1.22 0.72 1.57 1.00 1.91 1.11 1.88 1.58 62s 1.898 0.98 1.00 1.00 1.28 1.76 1.00 1.58 1.11 1.56 1.39 62s H 1.707 0.98 1.00 1.00 1.28 1.76 1.00 1.42 1.11 1.40 1.30 62s HT 2.609 0.98 1.00 1.00 1.28 1.76 1.00 2.17 1.11 2.14 1.74 62s C 1.580 1.22 1.22 1.22 0.72 1.57 1.00 1.32 1.11 1.30 1.24 62s CH 1.410 1.22 1.22 1.22 0.72 1.57 1.00 1.17 1.11 1.16 1.15 62s C-HT 2.348 1.22 1.22 1.22 0.72 1.57 1.00 1.95 1.11 1.93 1.61 63s 1.942 0.98 1.00 1.00 1.28 1.76 1.00 1.62 1.11 1.59 1.42 63s H 1.748 0.98 1.00 1.00 1.28 1.76 1.00 1.46 1.11 1.43 1.32 63s HT 2.672 0.98 1.00 1.00 1.28 1.76 1.00 2.23 1.11 2.19 1.77 63s C 1.619 1.22 1.22 1.22 0.72 1.57 1.00 1.35 1.11 1.33 1.26 63s CH 1.445 1.22 1.22 1.22 0.72 1.57 1.00 1.20 1.11 1.19 1.17 63s C-HT 2.404 1.22 1.22 1.22 0.72 1.57 1.00 2.00 1.11 1.97 1.64 64s 1.991 0.98 1.00 1.00 1.28 1.90 1.00 1.66 1.11 1.63 1.44 64s H 1.790 0.98 1.00 1.00 1.28 1.90 1.00 1.49 1.11 1.47 1.35 64s HT 2.732 0.98 1.00 1.00 1.28 1.90 1.00 2.28 1.11 2.24 1.81 64s C 1.658 1.22 1.22 1.22 0.72 1.62 1.00 1.38 1.11 1.36 1.28 64s CH 1.480 1.22 1.22 1.22 0.72 1.62 1.00 1.23 1.11 1.22 1.19 64s C-HT 2.463 1.22 1.22 1.22 0.72 1.62 1.00 2.05 1.11 2.02 1.67 65s 2.035 0.98 1.00 1.00 1.28 1.90 1.00 1.69 1.11 1.67 1.47 65s H 1.832 0.98 1.00 1.00 1.28 1.90 1.00 1.53 1.11 1.50 1.37

Page 29: Sitra Norms 2010

25

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

65s HT 2.802 0.98 1.00 1.00 1.28 1.90 1.00 2.33 1.11 2.30 1.84 65s C 1.696 1.22 1.22 1.22 0.72 1.62 1.00 1.41 1.11 1.39 1.30 65s CH 1.514 1.22 1.22 1.22 0.72 1.62 1.00 1.26 1.11 1.24 1.21 65s C-HT 2.519 1.22 1.22 1.22 0.72 1.62 1.00 2.10 1.11 2.07 1.70 66s 2.085 0.98 1.00 1.00 1.28 1.90 1.00 1.74 1.11 1.71 1.49 66s H 1.872 0.98 1.00 1.00 1.28 1.90 1.00 1.56 1.11 1.54 1.39 66s HT 2.860 0.98 1.00 1.00 1.28 1.90 1.00 2.38 1.11 2.35 1.87 66s C 1.737 1.22 1.22 1.22 0.72 1.62 1.00 1.45 1.11 1.43 1.32 66s CH 1.549 1.22 1.22 1.22 0.72 1.62 1.00 1.29 1.11 1.27 1.22 66s C-HT 2.578 1.22 1.22 1.22 0.72 1.62 1.00 2.15 1.11 2.12 1.73 67s 2.130 0.98 1.00 1.00 1.28 1.90 1.00 1.77 1.11 1.75 1.51 67s H 1.918 0.98 1.00 1.00 1.28 1.90 1.00 1.60 1.11 1.57 1.41 67s HT 2.928 0.98 1.00 1.00 1.28 1.90 1.00 2.44 1.11 2.41 1.90 67s C 1.776 1.22 1.22 1.22 0.72 1.62 1.00 1.48 1.11 1.46 1.33 67s CH 1.584 1.22 1.22 1.22 0.72 1.62 1.00 1.32 1.11 1.30 1.24 67s C-HT 2.634 1.22 1.22 1.22 0.72 1.62 1.00 2.19 1.11 2.16 1.76 68s 2.180 0.98 1.00 1.00 1.28 1.90 1.00 1.82 1.11 1.79 1.54 68s H 1.959 0.98 1.00 1.00 1.28 1.90 1.00 1.63 1.11 1.61 1.43 68s HT 2.992 0.98 1.00 1.00 1.28 1.90 1.00 2.49 1.11 2.46 1.94 68s C 1.814 1.22 1.22 1.22 0.72 1.62 1.00 1.51 1.11 1.49 1.35 68s CH 1.619 1.22 1.22 1.22 0.72 1.62 1.00 1.35 1.11 1.33 1.26 68s C-HT 2.692 1.22 1.22 1.22 0.72 1.62 1.00 2.24 1.11 2.21 1.78 69s 2.215 0.98 1.00 1.00 1.28 1.90 1.00 1.85 1.11 1.82 1.55 69s H 2.002 0.98 1.00 1.00 1.28 1.90 1.00 1.67 1.11 1.64 1.45 69s HT 3.058 0.98 1.00 1.00 1.28 1.90 1.00 2.55 1.11 2.51 1.97 69s C 1.857 1.22 1.22 1.22 0.72 1.62 1.00 1.55 1.11 1.53 1.37 69s CH 1.656 1.22 1.22 1.22 0.72 1.62 1.00 1.38 1.11 1.36 1.28 69s C-HT 2.753 1.22 1.22 1.22 0.72 1.62 1.00 2.29 1.11 2.26 1.81 70s 2.265 0.98 1.00 1.00 1.28 2.26 1.00 1.89 1.11 1.86 1.59 70s H 2.046 0.98 1.00 1.00 1.28 2.26 1.00 1.70 1.11 1.68 1.48 70s HT 3.128 0.98 1.00 1.00 1.28 2.26 1.00 2.60 1.11 2.57 2.01 70s C 1.895 1.22 1.22 1.22 0.72 1.83 1.00 1.58 1.11 1.56 1.40 70s CH 1.691 1.22 1.22 1.22 0.72 1.83 1.00 1.41 1.11 1.39 1.30 70s C-HT 2.816 1.22 1.22 1.22 0.72 1.83 1.00 2.34 1.11 2.31 1.85 71s 2.313 0.98 1.00 1.00 1.28 2.26 1.00 1.93 1.11 1.90 1.61 71s C 1.935 1.22 1.22 1.22 0.72 1.83 1.00 1.61 1.11 1.59 1.42 71s CH 1.728 1.22 1.22 1.22 0.72 1.83 1.00 1.44 1.11 1.42 1.32 71s C-HT 2.875 1.22 1.22 1.22 0.72 1.83 1.00 2.40 1.11 2.36 1.88 72s 2.363 0.98 1.00 1.00 1.28 2.26 1.00 1.97 1.11 1.94 1.64 72s C 1.977 1.22 1.22 1.22 0.72 1.83 1.00 1.65 1.11 1.62 1.44

Page 30: Sitra Norms 2010

26

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

72s CH 1.764 1.22 1.22 1.22 0.72 1.83 1.00 1.47 1.11 1.45 1.34 72s C-HT 2.936 1.22 1.22 1.22 0.72 1.83 1.00 2.45 1.11 2.41 1.91 73s 2.409 0.98 1.00 1.00 1.28 2.26 1.00 2.01 1.11 1.98 1.66 73s C 2.020 1.22 1.22 1.22 0.72 1.83 1.00 1.68 1.11 1.66 1.46 73s CH 1.802 1.22 1.22 1.22 0.72 1.83 1.00 1.50 1.11 1.48 1.35 73s C-HT 3.000 1.22 1.22 1.22 0.72 1.83 1.00 2.50 1.11 2.46 1.94 74s 2.463 0.98 1.00 1.00 1.28 2.26 1.00 2.05 1.11 2.02 1.69 74s C 2.062 1.22 1.22 1.22 0.72 1.83 1.00 1.72 1.11 1.69 1.48 74s CH 1.838 1.22 1.22 1.22 0.72 1.83 1.00 1.53 1.11 1.51 1.37 74s C-HT 3.058 1.22 1.22 1.22 0.72 1.83 1.00 2.55 1.11 2.51 1.97 75s 2.514 0.98 1.00 1.00 1.28 2.26 1.00 2.09 1.11 2.06 1.71 75s C 2.101 1.22 1.22 1.22 0.72 1.83 1.00 1.75 1.11 1.72 1.50 75s CH 1.876 1.22 1.22 1.22 0.72 1.83 1.00 1.56 1.11 1.54 1.39 75s C-HT 3.119 1.22 1.22 1.22 0.72 1.83 1.00 2.60 1.11 2.56 2.00 76s 2.560 0.98 1.00 1.00 1.28 2.26 1.00 2.13 1.11 2.10 1.74 76s C 2.146 1.22 1.22 1.22 0.72 1.83 1.00 1.79 1.11 1.76 1.52 76s CH 1.915 1.22 1.22 1.22 0.72 1.83 1.00 1.59 1.11 1.57 1.41 76s C-HT 3.182 1.22 1.22 1.22 0.72 1.83 1.00 2.65 1.11 2.61 2.03 77s 2.609 0.98 1.00 1.00 1.28 2.26 1.00 2.17 1.11 2.14 1.76 77s C 2.189 1.22 1.22 1.22 0.72 1.83 1.00 1.82 1.11 1.80 1.55 77s CH 1.952 1.22 1.22 1.22 0.72 1.83 1.00 1.63 1.11 1.60 1.43 77s C-HT 3.248 1.22 1.22 1.22 0.72 1.83 1.00 2.70 1.11 2.67 2.06 78s 2.666 0.98 1.00 1.00 1.28 2.26 1.00 2.22 1.11 2.19 1.79 78s C 2.229 1.22 1.22 1.22 0.72 1.83 1.00 1.86 1.11 1.83 1.56 78s CH 1.991 1.22 1.22 1.22 0.72 1.83 1.00 1.66 1.11 1.63 1.45 78s C-HT 3.306 1.22 1.22 1.22 0.72 1.83 1.00 2.76 1.11 2.71 2.09 79s 2.712 0.98 1.00 1.00 1.28 2.26 1.00 2.26 1.11 2.23 1.81 79s C 2.270 1.22 1.22 1.22 0.72 1.83 1.00 1.89 1.11 1.86 1.58 79s CH 2.028 1.22 1.22 1.22 0.72 1.83 1.00 1.69 1.11 1.67 1.47 79s C-HT 3.377 1.22 1.22 1.22 0.72 1.83 1.00 2.81 1.11 2.77 2.13 80s 2.705 0.98 1.00 1.22 1.52 2.52 1.31 2.25 1.11 2.22 1.84 80s C 2.318 1.22 1.22 1.50 0.90 2.05 1.31 1.93 1.11 1.90 1.64 80s CH 2.066 1.22 1.22 1.50 0.90 2.05 1.31 1.72 1.11 1.70 1.51 80s C-HT 3.441 1.22 1.22 1.50 0.90 2.05 1.31 2.86 1.11 2.83 2.19 81s 2.753 0.98 1.00 1.22 1.52 2.52 1.31 2.29 1.11 2.26 1.86 81s C 2.358 1.22 1.22 1.50 0.90 2.05 1.31 1.96 1.11 1.94 1.66 81s CH 2.105 1.22 1.22 1.50 0.90 2.05 1.31 1.75 1.11 1.73 1.53 81s C-HT 3.506 1.22 1.22 1.50 0.90 2.05 1.31 2.92 1.11 2.88 2.22 82s 2.802 0.98 1.00 1.22 1.52 2.52 1.31 2.33 1.11 2.30 1.89 82s C 2.404 1.22 1.22 1.50 0.90 2.05 1.31 2.00 1.11 1.97 1.68

Page 31: Sitra Norms 2010

27

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

82s CH 2.146 1.22 1.22 1.50 0.90 2.05 1.31 1.79 1.11 1.76 1.55 82s C-HT 3.563 1.22 1.22 1.50 0.90 2.05 1.31 2.97 1.11 2.93 2.25 83s 2.852 0.98 1.00 1.22 1.52 2.52 1.31 2.38 1.11 2.34 1.91 83s C 2.447 1.22 1.22 1.50 0.90 2.05 1.31 2.04 1.11 2.01 1.70 83s CH 2.185 1.22 1.22 1.50 0.90 2.05 1.31 1.82 1.11 1.79 1.57 83s C-HT 3.634 1.22 1.22 1.50 0.90 2.05 1.31 3.03 1.11 2.99 2.28 84s 2.905 0.98 1.00 1.22 1.52 2.52 1.31 2.42 1.11 2.39 1.94 84s C 2.491 1.22 1.22 1.50 0.90 2.05 1.31 2.07 1.11 2.05 1.72 84s CH 2.224 1.22 1.22 1.50 0.90 2.05 1.31 1.85 1.11 1.83 1.59 84s C-HT 3.695 1.22 1.22 1.50 0.90 2.05 1.31 3.08 1.11 3.03 2.31 85s 2.960 0.98 1.00 1.22 1.52 2.52 1.31 2.47 1.11 2.43 1.96 85s C 2.672 1.22 1.22 1.50 0.90 2.05 1.31 2.23 1.11 2.19 1.81 85s CH 2.388 1.22 1.22 1.50 0.90 2.05 1.31 1.99 1.11 1.96 1.67 85s C-HT 3.960 1.22 1.22 1.50 0.90 2.05 1.31 3.30 1.11 3.25 2.44 86s 3.008 0.98 1.00 1.22 1.52 2.83 1.31 2.50 1.11 2.47 2.00 86s C 2.719 1.22 1.22 1.50 0.90 2.33 1.31 2.26 1.11 2.23 1.84 86s CH 2.430 1.22 1.22 1.50 0.90 2.33 1.31 2.03 1.11 2.00 1.70 86s C-HT 4.033 1.22 1.22 1.50 0.90 2.33 1.31 3.36 1.11 3.31 2.49 87s 3.067 0.98 1.00 1.22 1.52 2.83 1.31 2.55 1.11 2.52 2.03 87s C 2.753 1.22 1.22 1.50 0.90 2.33 1.31 2.29 1.11 2.26 1.86 87s CH 2.458 1.22 1.22 1.50 0.90 2.33 1.31 2.05 1.11 2.02 1.72 87s C-HT 4.108 1.22 1.22 1.50 0.90 2.33 1.31 3.42 1.11 3.37 2.53 88s 3.119 0.98 1.00 1.22 1.52 2.83 1.31 2.60 1.11 2.56 2.05 88s C 2.794 1.22 1.22 1.50 0.90 2.33 1.31 2.33 1.11 2.29 1.88 88s CH 2.502 1.22 1.22 1.50 0.90 2.33 1.31 2.08 1.11 2.05 1.74 88s C-HT 4.170 1.22 1.22 1.50 0.90 2.33 1.31 3.47 1.11 3.43 2.56 89s 3.173 0.98 1.00 1.22 1.52 2.83 1.31 2.64 1.11 2.61 2.08 89s C 2.845 1.22 1.22 1.50 0.90 2.33 1.31 2.37 1.11 2.34 1.91 89s CH 2.543 1.22 1.22 1.50 0.90 2.33 1.31 2.12 1.11 2.09 1.76 89s C-HT 4.251 1.22 1.22 1.50 0.90 2.33 1.31 3.54 1.11 3.49 2.60 90s 3.219 0.98 1.00 1.22 1.52 2.83 1.31 2.68 1.11 2.64 2.10 90s C 2.976 1.22 1.22 1.50 0.90 2.33 1.31 2.48 1.11 2.44 1.97 90s CH 2.659 1.22 1.22 1.50 0.90 2.33 1.31 2.22 1.11 2.18 1.81 90s C-HT 4.440 1.22 1.22 1.50 0.90 2.33 1.31 3.70 1.11 3.65 2.69 91s 3.277 0.98 1.00 1.22 1.52 2.83 1.31 2.73 1.11 2.69 2.13 91s C 3.025 1.22 1.22 1.50 0.90 2.33 1.31 2.52 1.11 2.48 1.99 91s CH 2.705 1.22 1.22 1.50 0.90 2.33 1.31 2.25 1.11 2.22 1.84 91s C-HT 4.512 1.22 1.22 1.50 0.90 2.33 1.31 3.76 1.11 3.71 2.72 92s 3.336 0.98 1.00 1.22 1.52 2.83 1.31 2.78 1.11 2.74 2.16 92s C 3.075 1.22 1.22 1.50 0.90 2.33 1.31 2.56 1.11 2.53 2.02

Page 32: Sitra Norms 2010

28

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

92s CH 2.746 1.22 1.22 1.50 0.90 2.33 1.31 2.29 1.11 2.26 1.86 92s C-HT 4.588 1.22 1.22 1.50 0.90 2.33 1.31 3.82 1.11 3.77 2.76 93s 3.388 0.98 1.00 1.22 1.52 2.83 1.31 2.82 1.11 2.78 2.18 93s C 3.119 1.22 1.22 1.50 0.90 2.33 1.31 2.60 1.11 2.56 2.04 93s CH 2.794 1.22 1.22 1.50 0.90 2.33 1.31 2.33 1.11 2.29 1.88 93s C-HT 4.665 1.22 1.22 1.50 0.90 2.33 1.31 3.89 1.11 3.83 2.80 94s 3.441 0.98 1.00 1.22 1.52 2.83 1.31 2.86 1.11 2.83 2.21 94s C 3.173 1.22 1.22 1.50 0.90 2.33 1.31 2.64 1.11 2.61 2.07 94s CH 2.838 1.22 1.22 1.50 0.90 2.33 1.31 2.36 1.11 2.33 1.90 94s C-HT 4.725 1.22 1.22 1.50 0.90 2.33 1.31 3.94 1.11 3.88 2.83 95s 3.495 0.98 1.00 1.22 1.52 2.83 1.31 2.91 1.11 2.87 2.24 95s C 3.219 1.22 1.22 1.50 0.90 2.33 1.31 2.68 1.11 2.64 2.09 95s CH 2.882 1.22 1.22 1.50 0.90 2.33 1.31 2.40 1.11 2.37 1.92 95s C-HT 4.808 1.22 1.22 1.50 0.90 2.33 1.31 4.00 1.11 3.95 2.87 96s 3.552 0.98 1.00 1.44 1.55 3.14 1.31 2.96 1.11 2.92 2.28 96s C 3.277 1.22 1.22 1.78 0.90 2.71 1.31 2.73 1.11 2.69 2.13 96s CH 2.928 1.22 1.22 1.78 0.90 2.71 1.31 2.44 1.11 2.41 1.96 96s C-HT 4.893 1.22 1.22 1.78 0.90 2.71 1.31 4.08 1.11 4.02 2.93 97s 3.610 0.98 1.00 1.44 1.55 3.14 1.31 3.01 1.11 2.97 2.31 97s C 3.326 1.22 1.22 1.78 0.90 2.71 1.31 2.77 1.11 2.73 2.16 97s CH 2.976 1.22 1.22 1.78 0.90 2.71 1.31 2.48 1.11 2.44 1.99 97s C-HT 4.959 1.22 1.22 1.78 0.90 2.71 1.31 4.13 1.11 4.07 2.96 98s 3.658 0.98 1.00 1.44 1.55 3.14 1.31 3.05 1.11 3.00 2.33 98s C 3.377 1.22 1.22 1.78 0.90 2.71 1.31 2.81 1.11 2.77 2.18 98s CH 3.025 1.22 1.22 1.78 0.90 2.71 1.31 2.52 1.11 2.48 2.01 98s C-HT 5.050 1.22 1.22 1.78 0.90 2.71 1.31 4.21 1.11 4.15 3.00 99s 3.720 0.98 1.00 1.44 1.55 3.14 1.31 3.10 1.11 3.05 2.36 99s C 3.430 1.22 1.22 1.78 0.90 2.71 1.31 2.86 1.11 2.82 2.21 99s CH 3.067 1.22 1.22 1.78 0.90 2.71 1.31 2.55 1.11 2.52 2.03 99s C-HT 5.121 1.22 1.22 1.78 0.90 2.71 1.31 4.27 1.11 4.21 3.04 100s 3.771 0.98 1.00 1.44 1.55 3.14 1.31 3.14 1.11 3.10 2.39 100s C 3.484 1.22 1.22 1.78 0.90 2.71 1.31 2.90 1.11 2.86 2.24 100s CH 3.110 1.22 1.22 1.78 0.90 2.71 1.31 2.59 1.11 2.56 2.05 100s C-HT 5.169 1.22 1.22 1.78 0.90 2.71 1.31 4.31 1.11 4.25 3.06 101s 3.850 0.98 1.00 1.44 1.55 3.14 1.31 3.21 1.11 3.16 2.43 101s C 3.529 1.22 1.22 1.78 0.90 2.71 1.31 2.94 1.11 2.90 2.26 102s 3.904 0.98 1.00 1.44 1.55 3.14 1.31 3.25 1.11 3.21 2.45 102s C 3.586 1.22 1.22 1.78 0.90 2.71 1.31 2.99 1.11 2.95 2.29 103s 3.960 0.98 1.00 1.44 1.55 3.14 1.31 3.30 1.11 3.25 2.48 103s C 3.634 1.22 1.22 1.78 0.90 2.71 1.31 3.03 1.11 2.99 2.31

Page 33: Sitra Norms 2010

29

Table A (contd…) Conversion factors for calculating standardised production up to ring frames

– Cotton yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

104s 4.018 0.98 1.00 1.44 1.55 3.14 1.31 3.35 1.11 3.30 2.51 104s C 3.695 1.22 1.22 1.78 0.90 2.71 1.31 3.08 1.11 3.03 2.34 105s 4.078 0.98 1.00 1.44 1.55 3.14 1.31 3.40 1.11 3.35 2.54 105s C 3.745 1.22 1.22 1.78 0.90 2.71 1.31 3.12 1.11 3.08 2.36 106s 4.139 0.98 1.00 1.44 1.55 3.14 1.31 3.45 1.11 3.40 2.57 106s C 3.797 1.22 1.22 1.78 0.90 2.71 1.31 3.16 1.11 3.12 2.39 107s 4.186 0.98 1.00 1.44 1.55 3.14 1.31 3.49 1.11 3.44 2.59 107s C 3.850 1.22 1.22 1.78 0.90 2.71 1.31 3.21 1.11 3.16 2.42 108s 4.251 0.98 1.00 1.44 1.55 3.14 1.31 3.54 1.11 3.49 2.62 108s C 3.904 1.22 1.22 1.78 0.90 2.71 1.31 3.25 1.11 3.21 2.44 109s 4.318 0.98 1.00 1.44 1.55 3.14 1.31 3.60 1.11 3.55 2.66 109s C 3.960 1.22 1.22 1.78 0.90 2.71 1.31 3.30 1.11 3.25 2.47 110s 4.369 0.98 1.00 1.61 1.59 2.86 1.31 3.64 1.11 3.59 2.67 110s C 4.018 1.22 1.22 1.94 0.93 2.86 1.31 3.35 1.11 3.30 2.51 111s 4.705 0.98 1.00 1.61 1.59 2.86 1.31 3.92 1.11 3.86 2.84 111s C 4.186 1.22 1.22 1.94 0.93 2.86 1.31 3.49 1.11 3.44 2.59 112s 4.766 0.98 1.00 1.61 1.59 2.86 1.31 3.97 1.11 3.91 2.87 112s C 4.235 1.22 1.22 1.94 0.93 2.86 1.31 3.53 1.11 3.48 2.61 113s 4.829 0.98 1.00 1.61 1.59 2.86 1.31 4.02 1.11 3.97 2.90 113s C 4.301 1.22 1.22 1.94 0.93 2.86 1.31 3.58 1.11 3.53 2.65 114s 4.893 0.98 1.00 1.61 1.59 2.86 1.31 4.08 1.11 4.02 2.93 114s C 4.352 1.22 1.22 1.94 0.93 2.86 1.31 3.62 1.11 3.57 2.67 115s 4.959 0.98 1.00 1.61 1.59 2.86 1.31 4.13 1.11 4.07 2.96 115s C 4.404 1.22 1.22 1.94 0.93 2.86 1.31 3.67 1.11 3.62 2.70 116s 5.027 0.98 1.00 1.61 1.59 2.86 1.31 4.19 1.11 4.13 3.00 116s C 4.476 1.22 1.22 1.94 0.93 2.86 1.31 3.73 1.11 3.68 2.73 117s 5.097 0.98 1.00 1.61 1.59 2.86 1.31 4.24 1.11 4.19 3.03 117s C 4.531 1.22 1.22 1.94 0.93 2.86 1.31 3.77 1.11 3.72 2.76 118s 5.169 0.98 1.00 1.61 1.59 2.86 1.31 4.31 1.11 4.25 3.07 118s C 4.588 1.22 1.22 1.94 0.93 2.86 1.31 3.82 1.11 3.77 2.79 119s 5.218 0.98 1.00 1.61 1.59 2.86 1.31 4.35 1.11 4.29 3.09 119s C 4.646 1.22 1.22 1.94 0.93 2.86 1.31 3.87 1.11 3.82 2.81 120s 5.293 0.98 1.00 1.61 1.59 2.86 1.31 4.41 1.11 4.35 3.13 120s C 4.705 1.22 1.22 1.94 0.93 2.86 1.31 3.92 1.11 3.86 2.84

Note: Other operatives include maintenance operatives, materials handlers, jobbers, etc. from

blow room to ring frames.

Page 34: Sitra Norms 2010

30

Table B Conversion factors for calculating standardised production up to ring frames

– Synthetic and blended yarns Fly frame Ring frame

Count Prodn./ spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

10s PV 0.115 0.92 0.91 1.00 0.93 0.71 0.87 0.29 0.71 0.20 0.46 11s PV 0.127 0.92 0.91 1.00 0.93 0.71 0.87 0.32 0.71 0.23 0.48 12s PV 0.139 0.92 0.91 1.00 0.93 0.71 0.87 0.35 0.71 0.25 0.49 13s PV 0.156 0.92 0.91 1.00 0.93 0.71 0.87 0.39 0.71 0.28 0.51 14s PV 0.173 0.92 0.91 1.00 0.93 0.71 0.87 0.29 0.71 0.31 0.50 15s PV 0.191 0.92 0.91 1.00 0.93 0.71 0.87 0.32 0.71 0.34 0.52 16s PV 0.197 0.92 0.91 1.00 0.93 0.71 0.87 0.33 0.71 0.35 0.52 17s PV 0.215 0.92 0.91 1.00 0.93 0.71 0.87 0.36 0.71 0.38 0.54 18s PV 0.234 0.92 0.91 1.00 0.93 0.71 0.87 0.39 0.71 0.42 0.56 19s PV 0.254 0.92 0.91 1.00 0.93 0.71 1.00 0.42 0.77 0.45 0.60 20s PV 0.265 0.92 0.91 1.00 0.93 0.71 1.00 0.44 0.77 0.32 0.56 20s PV-HT 0.468 0.92 0.91 1.00 0.93 0.71 1.00 0.78 0.77 0.56 0.73 21s PV 0.285 0.92 0.91 1.00 0.93 0.71 1.00 0.48 0.77 0.34 0.57 22s PV 0.305 0.92 0.91 1.00 0.93 0.71 1.00 0.51 0.77 0.37 0.59 23s PV 0.325 0.92 0.91 1.00 0.93 0.71 1.00 0.41 0.77 0.39 0.57 24s PV 0.346 0.92 0.91 1.00 0.97 0.71 1.00 0.43 0.77 0.41 0.59 24s PV-HT 0.612 0.92 0.91 1.00 0.97 0.71 1.00 0.77 0.77 0.73 0.78 25s PV 0.368 0.92 0.91 1.00 0.97 0.71 1.00 0.46 0.77 0.44 0.60 26s PV 0.388 0.92 0.91 1.00 0.97 0.71 1.00 0.49 0.77 0.46 0.62 27s PV 0.411 0.92 0.91 1.00 0.97 0.71 1.00 0.51 0.77 0.49 0.64 28s PV 0.421 0.92 0.91 1.00 0.97 0.71 1.00 0.52 0.77 0.50 0.64 29s PV 0.444 0.92 0.91 1.00 0.97 0.71 1.00 0.55 0.77 0.53 0.66 30s PV 0.453 0.92 0.91 1.00 0.97 0.67 1.00 0.57 0.91 0.54 0.70 30s PV-HT 0.807 0.92 0.91 1.00 0.97 0.67 1.00 1.01 0.91 0.97 0.95 31s PV 0.476 0.92 0.91 1.00 0.97 0.67 1.00 0.59 0.91 0.57 0.71 32s PV 0.500 0.92 0.91 1.00 1.00 0.67 1.00 0.62 0.91 0.60 0.73 33s PV 0.523 0.92 0.91 1.00 1.00 0.67 1.00 0.52 0.91 0.63 0.71 34s PV 0.547 0.92 0.91 1.00 1.00 0.67 1.00 0.55 0.91 0.65 0.73 35s PV 0.571 0.92 0.91 1.00 1.00 0.67 1.00 0.57 0.91 0.68 0.75 36s PV 0.576 0.92 0.91 1.00 1.00 0.67 1.00 0.58 0.91 0.58 0.71 37s PV 0.601 0.92 0.91 1.00 1.00 0.67 1.00 0.60 0.91 0.60 0.72 38s PV 0.625 0.92 0.91 1.00 1.00 0.67 1.00 0.62 0.91 0.62 0.74 39s PV 0.650 0.92 0.91 1.00 1.00 0.67 1.00 0.65 0.91 0.65 0.75 40s PV 0.657 0.92 0.91 1.00 1.00 0.86 1.00 0.66 0.91 0.66 0.76 40s PV-HT 1.168 0.92 0.91 1.00 1.00 0.86 1.00 1.17 0.91 1.17 1.07 41s PV 0.682 0.92 0.91 1.00 1.00 0.86 1.00 0.68 0.91 0.68 0.78 42s PV 0.707 0.92 0.91 1.00 1.00 0.86 1.00 0.71 0.91 0.71 0.79 43s PV 0.732 0.92 0.91 1.00 1.00 0.86 1.00 0.73 0.91 0.73 0.81 44s PV 0.758 0.92 0.91 1.00 1.00 0.86 1.00 0.63 0.91 0.76 0.79 45s PV 0.784 0.92 0.91 1.00 1.00 0.93 1.00 0.65 0.91 0.78 0.81

Page 35: Sitra Norms 2010

31

Table B (contd…) Conversion factors for calculating standardised production up to ring frames

– Synthetic and blended yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

45s PV-HT 1.394 0.92 0.91 1.00 1.00 0.93 1.00 1.16 0.91 1.39 1.14 46s PV 0.810 0.92 0.91 1.00 1.00 0.93 1.00 0.68 0.91 0.81 0.82 47s PV 0.832 0.92 0.91 1.00 1.00 0.93 1.00 0.69 0.91 0.83 0.84 48s PV 0.859 0.92 0.91 1.00 1.21 0.93 1.00 0.71 0.91 0.86 0.85 49s PV 0.886 0.92 0.91 1.00 1.21 0.93 1.00 0.74 0.91 0.88 0.87 50s PV 0.913 0.92 0.91 1.00 1.21 1.10 1.00 0.76 0.91 0.91 0.89 50s PV-HT 1.634 0.92 0.91 1.00 1.21 1.10 1.00 1.36 0.91 1.63 1.29 51s PV 0.940 0.92 0.91 1.00 1.21 1.10 1.00 0.78 1.00 0.94 0.93 52s PV 0.968 0.92 0.91 1.00 1.21 1.10 1.00 0.81 1.00 0.97 0.94 53s PV 0.996 0.92 0.91 1.00 1.21 1.10 1.00 0.83 1.00 1.00 0.96 54s PV 1.025 0.92 0.91 1.00 1.28 1.10 1.00 0.86 1.00 1.02 0.98 55s PV 1.054 0.92 0.91 1.00 1.28 1.10 1.00 0.88 1.00 1.05 0.99 55s PV-HT 1.882 0.92 0.91 1.00 1.28 1.10 1.00 1.57 1.00 1.88 1.45 56s PV 1.083 0.92 0.91 1.00 1.28 1.10 1.00 0.90 1.00 1.08 1.01 57s PV 1.112 0.92 0.91 1.00 1.28 1.10 1.00 0.93 1.00 1.11 1.02 58s PV 1.141 0.92 0.91 1.00 1.28 1.10 1.00 0.95 1.00 1.14 1.04 59s PV 1.170 0.92 0.91 1.00 1.28 1.10 1.00 0.97 1.00 1.17 1.05 60s PV 1.201 0.92 0.91 1.00 1.28 1.10 1.00 1.00 1.00 1.20 1.07 60s PV-HT 2.146 0.92 0.91 1.00 1.28 1.10 1.00 1.79 1.00 2.14 1.59 61s PV 1.230 0.92 0.91 1.06 1.28 1.10 1.00 1.03 1.00 1.01 1.01 62s PV 1.261 0.92 0.91 1.06 1.28 1.10 1.00 1.05 1.00 1.04 1.03 63s PV 1.292 0.92 0.91 1.06 1.28 1.10 1.00 1.08 1.00 1.06 1.05 64s PV 1.322 0.92 0.91 1.06 1.28 1.10 1.00 1.10 1.00 1.09 1.06 65s PV 1.354 0.92 0.91 1.06 1.28 1.10 1.00 1.13 1.00 1.11 1.08 66s PV 1.385 0.92 0.91 1.06 1.28 1.10 1.00 1.15 1.00 1.14 1.09 67s PV 1.417 0.92 0.91 1.06 1.28 1.10 1.00 1.18 1.00 1.16 1.11 68s PV 1.449 0.92 0.91 1.06 1.28 1.10 1.00 1.21 1.00 1.19 1.12 69s PV 1.480 0.92 0.91 1.06 1.28 1.10 1.00 1.23 1.00 1.22 1.14 70s PV 1.474 0.92 0.91 1.06 1.28 1.10 1.00 1.23 1.00 1.21 1.13 71s PV 1.504 0.92 0.91 1.06 1.28 1.10 1.00 1.25 1.00 1.24 1.15 72s PV 1.538 0.92 0.91 1.06 1.28 1.10 1.00 1.28 1.00 1.26 1.17 73s PV 1.568 0.92 0.91 1.06 1.28 1.10 1.00 1.31 1.00 1.29 1.18 74s PV 1.593 0.92 0.91 1.06 1.28 1.10 1.00 1.33 1.00 1.31 1.19 75s PV 1.624 0.92 0.91 1.06 1.28 1.10 1.00 1.35 1.00 1.33 1.21 76s PV 1.658 0.92 0.91 1.06 1.28 1.10 1.00 1.38 1.00 1.36 1.22 77s PV 1.691 0.92 0.91 1.06 1.28 1.10 1.00 1.41 1.00 1.39 1.24 78s PV 1.723 0.92 0.91 1.06 1.28 1.10 1.00 1.43 1.00 1.42 1.26 79s PV 1.756 0.92 0.91 1.06 1.28 1.10 1.00 1.46 1.00 1.44 1.27 80s PV 1.790 0.92 0.91 1.06 1.52 1.10 1.31 1.49 1.00 1.47 1.31 80s PV-HT 3.201 0.92 0.91 1.06 1.52 1.10 1.31 2.67 1.00 2.63 2.00

Page 36: Sitra Norms 2010

32

Table B (contd…) Conversion factors for calculating standardised production up to ring frames

– Synthetic and blended yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

81s PV 1.823 0.92 0.91 1.44 1.52 1.10 1.31 1.52 1.00 1.50 1.33 82s PV 1.857 0.92 0.91 1.44 1.52 1.10 1.31 1.55 1.00 1.53 1.35 83s PV 1.892 0.92 0.91 1.44 1.52 1.10 1.31 1.58 1.00 1.55 1.36 84s PV 1.928 0.92 0.91 1.44 1.52 1.10 1.31 1.61 1.00 1.58 1.38 85s PV 1.963 0.92 0.91 1.44 1.52 1.10 1.31 1.63 1.00 1.61 1.40 86s PV 1.995 0.92 0.91 1.44 1.52 1.10 1.31 1.66 1.00 1.64 1.42 87s PV 2.031 0.92 0.91 1.44 1.52 1.10 1.31 1.69 1.00 1.67 1.43 88s PV 2.066 0.92 0.91 1.44 1.52 1.10 1.31 1.72 1.00 1.70 1.45 89s PV 2.101 0.92 0.91 1.44 1.52 1.10 1.31 1.75 1.00 1.72 1.47 90s PV 2.138 0.92 0.91 1.44 1.52 1.10 1.31 1.78 1.00 1.76 1.49 10s PSF 0.146 0.92 0.91 1.00 0.93 0.71 0.87 0.36 0.71 0.26 0.50 11s PSF 0.160 0.92 0.91 1.00 0.93 0.71 0.87 0.40 0.71 0.29 0.52 12s PSF 0.166 0.92 0.91 1.00 0.93 0.71 0.87 0.41 0.71 0.30 0.53 13s PSF 0.186 0.92 0.91 1.00 0.93 0.71 0.87 0.47 0.71 0.33 0.55 14s PSF 0.207 0.92 0.91 1.00 0.93 0.71 0.87 0.34 0.71 0.37 0.53 15s PSF 0.230 0.92 0.91 1.00 0.93 0.71 0.87 0.38 0.71 0.41 0.56 16s PSF 0.234 0.92 0.91 1.00 0.93 0.71 0.87 0.39 0.71 0.42 0.56 17s PSF 0.254 0.92 0.91 1.00 0.93 0.71 0.87 0.42 0.71 0.45 0.58 18s PSF 0.267 0.92 0.91 1.00 0.93 0.71 0.87 0.44 0.71 0.48 0.59 19s PSF 0.279 0.92 0.91 1.00 0.93 0.71 1.00 0.47 0.77 0.50 0.63 20s PSF 0.281 0.92 0.91 1.00 0.93 0.71 1.00 0.47 0.77 0.34 0.57 20s PSF-HT 0.515 0.92 0.91 1.00 0.93 0.71 1.00 0.86 0.77 0.62 0.77 21s PSF 0.301 0.92 0.91 1.00 0.93 0.71 1.00 0.50 0.77 0.36 0.59 22s PSF 0.323 0.92 0.91 1.00 0.93 0.71 1.00 0.54 0.77 0.39 0.61 23s PSF 0.345 0.92 0.91 1.00 0.93 0.71 1.00 0.43 0.77 0.41 0.59 24s PSF 0.368 0.92 0.91 1.00 0.97 0.71 1.00 0.46 0.77 0.44 0.60 24s PSF-HT 0.673 0.92 0.91 1.00 0.97 0.71 1.00 0.84 0.77 0.81 0.83 25s PSF 0.389 0.92 0.91 1.00 0.97 0.71 1.00 0.49 0.77 0.46 0.62 26s PSF 0.413 0.92 0.91 1.00 0.97 0.71 1.00 0.51 0.77 0.49 0.64 27s PSF 0.437 0.92 0.91 1.00 0.97 0.71 1.00 0.55 0.77 0.52 0.66 28s PSF 0.461 0.92 0.91 1.00 0.97 0.71 1.00 0.58 0.77 0.55 0.67 29s PSF 0.484 0.92 0.91 1.00 0.97 0.71 1.00 0.60 0.77 0.58 0.69 30s PSF 0.479 0.92 0.91 1.00 0.97 0.67 1.00 0.60 0.91 0.57 0.71 30s PSF-HT 0.882 0.92 0.91 1.00 0.97 0.67 1.00 1.10 0.91 1.05 1.01 31s PSF 0.488 0.92 0.91 1.00 0.97 0.67 1.00 0.61 0.91 0.58 0.72 32s PSF 0.512 0.92 0.91 1.00 1.00 0.67 1.00 0.64 0.91 0.61 0.74 33s PSF 0.536 0.92 0.91 1.00 1.00 0.67 1.00 0.54 0.91 0.64 0.72 34s PSF 0.561 0.92 0.91 1.00 1.00 0.67 1.00 0.56 0.91 0.67 0.74 35s PSF 0.583 0.92 0.91 1.00 1.00 0.67 1.00 0.58 0.91 0.70 0.75 36s PSF 0.608 0.92 0.91 1.00 1.00 0.67 1.00 0.61 0.91 0.61 0.73

Page 37: Sitra Norms 2010

33

Table B (contd…) Conversion factors for calculating standardised production up to ring frames

– Synthetic and blended yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

37s PSF 0.633 0.92 0.91 1.00 1.00 0.67 1.00 0.63 0.91 0.63 0.74 38s PSF 0.659 0.92 0.91 1.00 1.00 0.67 1.00 0.66 0.91 0.66 0.76 39s PSF 0.686 0.92 0.91 1.00 1.00 0.67 1.00 0.68 0.91 0.69 0.78 40s PSF 0.671 0.92 0.91 1.00 1.00 0.86 1.00 0.67 0.91 0.67 0.77 40s PSF-HT 1.234 0.92 0.91 1.00 1.00 0.86 1.00 1.23 0.91 1.23 1.11 41s PSF 0.697 0.92 0.91 1.00 1.00 0.86 1.00 0.70 0.91 0.70 0.79 42s PSF 0.722 0.92 0.91 1.00 1.00 0.86 1.00 0.72 0.91 0.72 0.80 43s PSF 0.748 0.92 0.91 1.00 1.00 0.86 1.00 0.75 0.91 0.75 0.82 44s PSF 0.775 0.92 0.91 1.00 1.00 0.86 1.00 0.65 0.91 0.77 0.80 45s PSF 0.797 0.92 0.91 1.00 1.00 0.93 1.00 0.66 0.91 0.80 0.82 45s PSF-HT 1.474 0.92 0.91 1.00 1.00 0.93 1.00 1.23 0.91 1.47 1.19 46s PSF 0.823 0.92 0.91 1.00 1.00 0.93 1.00 0.68 0.91 0.82 0.83 47s PSF 0.850 0.92 0.91 1.00 1.00 0.93 1.00 0.71 0.91 0.85 0.85 48s PSF 0.878 0.92 0.91 1.00 1.21 0.93 1.00 0.73 0.91 0.88 0.87 49s PSF 0.905 0.92 0.91 1.00 1.21 0.93 1.00 0.76 0.91 0.90 0.88 50s PSF 0.933 0.92 0.91 1.00 1.21 1.10 1.00 0.78 0.91 0.93 0.90 50s PSF-HT 1.726 0.92 0.91 1.00 1.21 1.10 1.00 1.44 0.91 1.72 1.34 51s PSF 0.962 0.92 0.91 1.00 1.21 1.10 1.00 0.80 1.00 0.96 0.94 52s PSF 0.990 0.92 0.91 1.00 1.21 1.10 1.00 0.82 1.00 0.99 0.95 53s PSF 1.019 0.92 0.91 1.00 1.21 1.10 1.00 0.85 1.00 1.02 0.97 54s PSF 1.048 0.92 0.91 1.00 1.28 1.10 1.00 0.87 1.00 1.05 0.99 55s PSF 1.077 0.92 0.91 1.00 1.28 1.10 1.00 0.90 1.00 1.08 1.00 55s PSF-HT 1.991 0.92 0.91 1.00 1.28 1.10 1.00 1.66 1.00 1.99 1.51 56s PSF 1.107 0.92 0.91 1.00 1.28 1.10 1.00 0.92 1.00 1.11 1.02 57s PSF 1.136 0.92 0.91 1.00 1.28 1.10 1.00 0.95 1.00 1.14 1.04 58s PSF 1.166 0.92 0.91 1.00 1.28 1.10 1.00 0.97 1.00 1.17 1.05 59s PSF 1.197 0.92 0.91 1.00 1.28 1.10 1.00 1.00 1.00 1.20 1.07 60s PSF 1.226 0.92 0.91 1.00 1.28 1.10 1.00 1.02 1.00 1.23 1.09 60s PSF-HT 2.270 0.92 0.91 1.00 1.28 1.10 1.00 1.89 1.00 2.27 1.66 61s PSF 1.258 0.92 0.91 1.06 1.28 1.10 1.00 1.05 1.00 1.03 1.03 62s PSF 1.288 0.92 0.91 1.06 1.28 1.10 1.00 1.07 1.00 1.06 1.04 63s PSF 1.320 0.92 0.91 1.06 1.28 1.10 1.00 1.10 1.00 1.08 1.06 64s PSF 1.351 0.92 0.91 1.06 1.28 1.10 1.00 1.13 1.00 1.11 1.07 65s PSF 1.383 0.92 0.91 1.06 1.28 1.10 1.00 1.15 1.00 1.14 1.09 66s PSF 1.415 0.92 0.91 1.06 1.28 1.10 1.00 1.18 1.00 1.16 1.11 67s PSF 1.449 0.92 0.91 1.06 1.28 1.10 1.00 1.21 1.00 1.19 1.12 68s PSF 1.480 0.92 0.91 1.06 1.28 1.10 1.00 1.23 1.00 1.22 1.14 69s PSF 1.506 0.92 0.91 1.06 1.28 1.10 1.00 1.25 1.00 1.24 1.15 70s PSF 1.538 0.92 0.91 1.06 1.28 1.10 1.00 1.28 1.00 1.26 1.17 71s PSF 1.571 0.92 0.91 1.06 1.28 1.10 1.00 1.31 1.00 1.29 1.18

Page 38: Sitra Norms 2010

34

Table B (contd…) Conversion factors for calculating standardised production up to ring frames

– Synthetic and blended yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

72s PSF 1.605 0.92 0.91 1.06 1.28 1.10 1.00 1.34 1.00 1.32 1.20 73s PSF 1.638 0.92 0.91 1.06 1.28 1.10 1.00 1.36 1.00 1.35 1.22 74s PSF 1.671 0.92 0.91 1.06 1.28 1.10 1.00 1.39 1.00 1.37 1.23 75s PSF 1.704 0.92 0.91 1.06 1.28 1.10 1.00 1.42 1.00 1.40 1.25 76s PSF 1.739 0.92 0.91 1.06 1.28 1.10 1.00 1.45 1.00 1.43 1.26 77s PSF 1.776 0.92 0.91 1.06 1.28 1.10 1.00 1.48 1.00 1.46 1.28 78s PSF 1.808 0.92 0.91 1.06 1.28 1.10 1.00 1.50 1.00 1.48 1.30 79s PSF 1.844 0.92 0.91 1.06 1.28 1.10 1.00 1.54 1.00 1.51 1.32 80s PSF 1.879 0.92 0.91 1.06 1.52 1.10 1.31 1.57 1.00 1.54 1.35 80s PSF-HT 3.473 0.92 0.91 1.06 1.52 1.10 1.31 2.89 1.00 2.85 2.13 10s VSF 0.127 0.92 0.91 1.00 0.93 0.71 0.87 0.32 0.71 0.23 0.48 11s VSF 0.146 0.92 0.91 1.00 0.93 0.71 0.87 0.36 0.71 0.26 0.50 12s VSF 0.165 0.92 0.91 1.00 0.93 0.71 0.87 0.41 0.71 0.29 0.53 13s VSF 0.179 0.92 0.91 1.00 0.93 0.71 0.87 0.45 0.71 0.32 0.54 14s VSF 0.199 0.92 0.91 1.00 0.93 0.71 0.87 0.33 0.71 0.36 0.52 15s VSF 0.212 0.92 0.91 1.00 0.93 0.71 0.87 0.35 0.71 0.38 0.54 16s VSF 0.233 0.92 0.91 1.00 0.93 0.71 0.87 0.39 0.71 0.42 0.56 17s VSF 0.254 0.92 0.91 1.00 0.93 0.71 0.87 0.42 0.71 0.45 0.58 18s VSF 0.277 0.92 0.91 1.00 0.93 0.71 0.87 0.46 0.71 0.49 0.60 19s VSF 0.300 0.92 0.91 1.00 0.93 0.71 1.00 0.50 0.77 0.54 0.65 20s VSF 0.294 0.92 0.91 1.00 0.93 0.71 1.00 0.49 0.77 0.35 0.58 20s VSF-HT 0.483 0.92 0.91 1.00 0.93 0.71 1.00 0.80 0.77 0.58 0.74 21s VSF 0.316 0.92 0.91 1.00 0.93 0.71 1.00 0.53 0.77 0.38 0.60 22s VSF 0.337 0.92 0.91 1.00 0.93 0.71 1.00 0.56 0.77 0.40 0.62 23s VSF 0.361 0.92 0.91 1.00 0.93 0.71 1.00 0.45 0.77 0.43 0.60 24s VSF 0.384 0.92 0.91 1.00 0.97 0.71 1.00 0.48 0.77 0.46 0.62 24s VSF-HT 0.631 0.92 0.91 1.00 0.97 0.71 1.00 0.79 0.77 0.75 0.79 25s VSF 0.407 0.92 0.91 1.00 0.97 0.71 1.00 0.51 0.77 0.49 0.63 26s VSF 0.431 0.92 0.91 1.00 0.97 0.71 1.00 0.54 0.77 0.52 0.65 27s VSF 0.456 0.92 0.91 1.00 0.97 0.71 1.00 0.57 0.77 0.55 0.67 28s VSF 0.482 0.92 0.91 1.00 0.97 0.71 1.00 0.60 0.77 0.58 0.69 29s VSF 0.508 0.92 0.91 1.00 0.97 0.71 1.00 0.63 0.77 0.61 0.71 30s VSF 0.503 0.92 0.91 1.00 0.97 0.67 1.00 0.63 0.91 0.60 0.73 30s VSF-HT 0.830 0.92 0.91 1.00 0.97 0.67 1.00 1.04 0.91 0.99 0.97 31s VSF 0.529 0.92 0.91 1.00 0.97 0.67 1.00 0.66 0.91 0.63 0.75 32s VSF 0.554 0.92 0.91 1.00 1.00 0.67 1.00 0.69 0.91 0.66 0.77 33s VSF 0.580 0.92 0.91 1.00 1.00 0.67 1.00 0.58 0.91 0.70 0.75 34s VSF 0.607 0.92 0.91 1.00 1.00 0.67 1.00 0.61 0.91 0.72 0.77 35s VSF 0.613 0.92 0.91 1.00 1.00 0.67 1.00 0.61 0.91 0.73 0.77 36s VSF 0.639 0.92 0.91 1.00 1.00 0.67 1.00 0.64 0.91 0.64 0.75

Page 39: Sitra Norms 2010

35

Table B (contd…) Conversion factors for calculating standardised production up to ring frames

– Synthetic and blended yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

37s VSF 0.666 0.92 0.91 1.00 1.00 0.67 1.00 0.67 0.91 0.67 0.76 38s VSF 0.693 0.92 0.91 1.00 1.00 0.67 1.00 0.69 0.91 0.69 0.78 39s VSF 0.721 0.92 0.91 1.00 1.00 0.67 1.00 0.72 0.91 0.72 0.80 40s VSF 0.727 0.92 0.91 1.00 1.00 0.86 1.00 0.73 0.91 0.73 0.81 40s VSF-HT 1.201 0.92 0.91 1.00 1.00 0.86 1.00 1.20 0.91 1.20 1.09 41s VSF 0.755 0.92 0.91 1.00 1.00 0.86 1.00 0.76 0.91 0.75 0.82 42s VSF 0.783 0.92 0.91 1.00 1.00 0.86 1.00 0.78 0.91 0.78 0.84 43s VSF 0.811 0.92 0.91 1.00 1.00 0.86 1.00 0.81 0.91 0.81 0.86 44s VSF 0.839 0.92 0.91 1.00 1.00 0.86 1.00 0.70 0.91 0.84 0.84 45s VSF 0.868 0.92 0.91 1.00 1.00 0.93 1.00 0.72 0.91 0.87 0.86 45s VSF-HT 1.432 0.92 0.91 1.00 1.00 0.93 1.00 1.19 0.91 1.43 1.17 46s VSF 0.892 0.92 0.91 1.00 1.00 0.93 1.00 0.74 0.91 0.89 0.87 47s VSF 0.922 0.92 0.91 1.00 1.00 0.93 1.00 0.77 0.91 0.92 0.89 48s VSF 0.952 0.92 0.91 1.00 1.21 0.93 1.00 0.79 0.91 0.95 0.91 49s VSF 0.981 0.92 0.91 1.00 1.21 0.93 1.00 0.82 0.91 0.98 0.92 50s VSF 1.012 0.92 0.91 1.00 1.21 1.10 1.00 0.84 0.91 1.01 0.95 50s VSF-HT 1.678 0.92 0.91 1.00 1.21 1.10 1.00 1.40 0.91 1.68 1.31 51s VSF 1.042 0.92 0.91 1.00 1.21 1.10 1.00 0.87 1.00 1.04 0.98 52s VSF 1.073 0.92 0.91 1.00 1.21 1.10 1.00 0.89 1.00 1.07 1.00 53s VSF 1.104 0.92 0.91 1.00 1.21 1.10 1.00 0.92 1.00 1.10 1.02 54s VSF 1.135 0.92 0.91 1.00 1.28 1.10 1.00 0.95 1.00 1.14 1.04 55s VSF 1.166 0.92 0.91 1.00 1.28 1.10 1.00 0.97 1.00 1.17 1.05 55s VSF-HT 1.935 0.92 0.91 1.00 1.28 1.10 1.00 1.61 1.00 1.93 1.48 56s VSF 1.199 0.92 0.91 1.00 1.28 1.10 1.00 1.00 1.00 1.20 1.07 57s VSF 1.232 0.92 0.91 1.00 1.28 1.10 1.00 1.03 1.00 1.23 1.09 58s VSF 1.264 0.92 0.91 1.00 1.28 1.10 1.00 1.05 1.00 1.26 1.11 59s VSF 1.297 0.92 0.91 1.00 1.28 1.10 1.00 1.08 1.00 1.30 1.12 60s VSF 1.330 0.92 0.91 1.00 1.28 1.10 1.00 1.11 1.00 1.33 1.14 60s VSF-HT 2.206 0.92 0.91 1.00 1.28 1.10 1.00 1.84 1.00 2.21 1.63 61s VSF 1.363 0.92 0.91 1.06 1.28 1.10 1.00 1.14 1.00 1.12 1.08 62s VSF 1.397 0.92 0.91 1.06 1.28 1.10 1.00 1.16 1.00 1.15 1.10 63s VSF 1.432 0.92 0.91 1.06 1.28 1.10 1.00 1.19 1.00 1.18 1.11 64s VSF 1.464 0.92 0.91 1.06 1.28 1.10 1.00 1.22 1.00 1.20 1.13 65s VSF 1.500 0.92 0.91 1.06 1.28 1.10 1.00 1.25 1.00 1.23 1.15 66s VSF 1.533 0.92 0.91 1.06 1.28 1.10 1.00 1.28 1.00 1.26 1.16 67s VSF 1.568 0.92 0.91 1.06 1.28 1.10 1.00 1.31 1.00 1.29 1.18 68s VSF 1.605 0.92 0.91 1.06 1.28 1.10 1.00 1.34 1.00 1.32 1.20 69s VSF 1.641 0.92 0.91 1.06 1.28 1.10 1.00 1.37 1.00 1.35 1.22 70s VSF 1.676 0.92 0.91 1.06 1.28 1.10 1.00 1.40 1.00 1.38 1.23 71s VSF 1.712 0.92 0.91 1.06 1.28 1.10 1.00 1.43 1.00 1.41 1.25

Page 40: Sitra Norms 2010

36

Table B (contd…) Conversion factors for calculating standardised production up to ring frames

– Synthetic and blended yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

72s VSF 1.739 0.92 0.91 1.06 1.28 1.10 1.00 1.45 1.00 1.43 1.26 73s VSF 1.776 0.92 0.91 1.06 1.28 1.10 1.00 1.48 1.00 1.46 1.28 74s VSF 1.811 0.92 0.91 1.06 1.28 1.10 1.00 1.51 1.00 1.49 1.30 75s VSF 1.850 0.92 0.91 1.06 1.28 1.10 1.00 1.54 1.00 1.52 1.32 76s VSF 1.885 0.92 0.91 1.06 1.28 1.10 1.00 1.57 1.00 1.55 1.34 77s VSF 1.925 0.92 0.91 1.06 1.28 1.10 1.00 1.60 1.00 1.58 1.36 78s VSF 1.959 0.92 0.91 1.06 1.28 1.10 1.00 1.63 1.00 1.61 1.37 79s VSF 1.998 0.92 0.91 1.06 1.28 1.10 1.00 1.67 1.00 1.64 1.39 80s VSF 2.035 0.92 0.91 1.06 1.52 1.10 1.31 1.69 1.00 1.67 1.43 80s VSF-HT 3.377 0.92 0.91 1.06 1.52 1.10 1.31 2.81 1.00 2.77 2.09 10s PC 0.146 1.30 1.30 1.33 0.93 0.76 0.87 0.37 0.71 0.26 0.53 11s PC 0.168 1.30 1.30 1.33 0.93 0.76 0.87 0.42 0.71 0.30 0.56 12s PC 0.177 1.30 1.30 1.33 0.93 0.76 0.87 0.44 0.71 0.31 0.57 13s PC 0.198 1.30 1.30 1.33 0.93 0.76 0.87 0.50 0.71 0.35 0.60 14s PC 0.221 1.30 1.30 1.33 0.93 0.76 0.87 0.37 0.71 0.40 0.58 14s PC-H 0.202 1.30 1.30 1.33 0.93 0.76 0.87 0.34 0.71 0.36 0.56 15s PC 0.244 1.30 1.30 1.33 0.93 0.76 0.87 0.41 0.71 0.44 0.60 16s PC 0.251 1.30 1.30 1.33 0.93 0.76 0.87 0.42 0.71 0.45 0.61 16s PC-H 0.245 1.30 1.30 1.33 0.93 0.76 0.87 0.41 0.71 0.44 0.60 17s PC 0.274 1.30 1.30 1.33 0.93 0.76 0.87 0.46 0.71 0.49 0.63 18s PC 0.298 1.30 1.30 1.33 0.93 0.76 0.87 0.50 0.71 0.53 0.66 18s PC-H 0.291 1.30 1.30 1.33 0.93 0.76 0.87 0.49 0.71 0.52 0.65 19s PC 0.323 1.30 1.30 1.33 0.93 0.76 1.00 0.54 0.77 0.58 0.70 20s PC 0.327 1.30 1.30 1.33 0.93 0.76 1.00 0.55 0.77 0.39 0.64 20s PC-H 0.319 1.30 1.30 1.33 0.93 0.76 1.00 0.53 0.77 0.38 0.64 21s PC 0.350 1.30 1.30 1.33 0.93 0.76 1.00 0.59 0.77 0.42 0.66 22s PC 0.376 1.30 1.30 1.33 0.93 0.76 1.00 0.63 0.77 0.45 0.68 23s PC 0.402 1.30 1.30 1.33 0.93 0.76 1.00 0.50 0.77 0.48 0.66 24s PC 0.428 1.30 1.30 1.33 0.97 0.76 1.00 0.53 0.77 0.51 0.68 24s PC-H 0.415 1.30 1.30 1.33 0.97 0.76 1.00 0.52 0.77 0.50 0.67 25s PC 0.453 1.30 1.30 1.33 0.97 0.76 1.00 0.57 0.77 0.54 0.70 26s PC 0.480 1.30 1.30 1.33 0.97 0.76 1.00 0.60 0.77 0.57 0.72 26s PC-H 0.468 1.30 1.30 1.33 0.97 0.76 1.00 0.59 0.77 0.56 0.71 27s PC 0.508 1.30 1.30 1.33 0.97 0.76 1.00 0.64 0.77 0.61 0.74 28s PC 0.537 1.30 1.30 1.33 0.97 0.76 1.00 0.67 0.77 0.64 0.76 29s PC 0.566 1.30 1.30 1.33 0.97 0.76 1.00 0.71 0.77 0.68 0.78 30s PC 0.595 1.30 1.30 1.33 0.97 0.64 1.00 0.74 0.91 0.71 0.83 30s PC-H 0.580 1.30 1.30 1.33 0.97 0.64 1.00 0.72 0.91 0.69 0.82 31s PC 0.625 1.30 1.30 1.33 0.97 0.64 1.00 0.78 0.91 0.75 0.85 32s PC 0.655 1.30 1.30 1.33 1.00 0.64 1.00 0.82 0.91 0.78 0.87

Page 41: Sitra Norms 2010

37

Table B (contd…) Conversion factors for calculating standardised production up to ring frames

– Synthetic and blended yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

33s PC 0.686 1.30 1.30 1.33 1.00 0.64 1.00 0.68 0.91 0.82 0.85 34s PC 0.696 1.30 1.30 1.33 1.00 0.64 1.00 0.69 0.91 0.83 0.86 34s PC-H 0.675 1.30 1.30 1.33 1.00 0.64 1.00 0.68 0.91 0.81 0.84 35s PC 0.723 1.30 1.30 1.33 1.00 0.64 1.00 0.72 0.91 0.86 0.88 36s PC 0.755 1.30 1.30 1.33 1.00 0.64 1.00 0.76 0.91 0.75 0.85 36s PC-H 0.735 1.30 1.30 1.33 1.00 0.64 1.00 0.73 0.91 0.73 0.83 37s PC 0.786 1.30 1.30 1.33 1.00 0.64 1.00 0.78 0.91 0.79 0.87 38s PC 0.819 1.30 1.30 1.33 1.00 0.64 1.00 0.82 0.91 0.82 0.88 38s PC-H 0.797 1.30 1.30 1.33 1.00 0.64 1.00 0.80 0.91 0.80 0.87 39s PC 0.851 1.30 1.30 1.33 1.00 0.64 1.00 0.85 0.91 0.85 0.90 40s PC 0.833 1.30 1.30 1.33 1.00 0.88 1.00 0.83 0.91 0.83 0.90 40s PC-H 0.810 1.30 1.30 1.33 1.00 0.88 1.00 0.81 0.91 0.81 0.89 41s PC 0.865 1.30 1.30 1.33 1.00 0.88 1.00 0.86 0.91 0.86 0.92 42s PC 0.897 1.30 1.30 1.33 1.00 0.88 1.00 0.90 0.91 0.90 0.94 43s PC 0.929 1.30 1.30 1.33 1.00 0.88 1.00 0.93 0.91 0.93 0.96 44s PC 0.962 1.30 1.30 1.33 1.00 0.88 1.00 0.80 0.91 0.96 0.94 45s PC 0.995 1.30 1.30 1.33 1.00 0.88 1.00 0.83 0.91 1.00 0.96 45s PC-H 0.962 1.30 1.30 1.33 1.00 0.88 1.00 0.80 0.91 0.96 0.94 46s PC 1.028 1.30 1.30 1.33 1.00 0.88 1.00 0.86 0.91 1.03 0.97 47s PC 1.062 1.30 1.30 1.33 1.00 0.88 1.00 0.88 0.91 1.06 0.99 48s PC 1.096 1.30 1.30 1.33 1.21 0.88 1.00 0.91 0.91 1.10 1.02 49s PC 1.130 1.30 1.30 1.33 1.21 0.88 1.00 0.94 0.91 1.13 1.03 50s PC 1.133 1.30 1.30 1.33 1.21 1.10 1.00 0.94 0.91 1.13 1.04 50s PC-HT 1.678 1.30 1.30 1.33 1.21 1.10 1.00 1.40 0.91 1.68 1.34 51s PC 1.166 1.30 1.30 1.33 1.21 1.10 1.00 0.97 1.00 1.17 1.08 52s PC 1.201 1.30 1.30 1.33 1.21 1.10 1.00 1.00 1.00 1.20 1.10 53s PC 1.236 1.30 1.30 1.33 1.21 1.10 1.00 1.03 1.00 1.24 1.12 54s PC 1.264 1.30 1.30 1.33 1.28 1.10 1.00 1.05 1.00 1.26 1.14 55s PC 1.300 1.30 1.30 1.33 1.28 1.10 1.00 1.08 1.00 1.30 1.16 55s PC-HT 1.935 1.30 1.30 1.33 1.28 1.10 1.00 1.61 1.00 1.93 1.51 56s PC 1.335 1.30 1.30 1.33 1.28 1.10 1.00 1.11 1.00 1.33 1.18 57s PC 1.371 1.30 1.30 1.33 1.28 1.10 1.00 1.14 1.00 1.37 1.20 58s PC 1.408 1.30 1.30 1.33 1.28 1.10 1.00 1.17 1.00 1.41 1.22 59s PC 1.443 1.30 1.30 1.33 1.28 1.10 1.00 1.20 1.00 1.44 1.24 60s PC 1.403 1.30 1.30 1.33 1.28 1.33 1.00 1.17 1.00 1.40 1.22 60s PC-H 1.361 1.30 1.30 1.33 1.28 1.33 1.00 1.14 1.00 1.36 1.20 60s PC-HT 2.089 1.30 1.30 1.33 1.28 1.33 1.00 1.74 1.00 2.09 1.60 61s PC 1.437 1.30 1.30 1.44 1.28 1.33 1.00 1.20 1.00 1.18 1.16 62s PC 1.474 1.30 1.30 1.44 1.28 1.33 1.00 1.23 1.00 1.21 1.18 62s PC-HT 2.193 1.30 1.30 1.44 1.28 1.33 1.00 1.83 1.00 1.80 1.53

Page 42: Sitra Norms 2010

38

Table B (contd…) Conversion factors for calculating standardised production up to ring frames

– Synthetic and blended yarns

Fly frame Ring frame Count Prodn./

spl.

Mixing attend-

ant

Blow room tenter

Card tenter

Draw frame tenter Tenter Doffer Tenter Doffer

Other opera-tives

Total

63s PC 1.508 1.30 1.30 1.44 1.28 1.33 1.00 1.26 1.00 1.24 1.19 64s PC 1.544 1.30 1.30 1.44 1.28 1.33 1.00 1.29 1.00 1.27 1.21 64s PC-HT 2.303 1.30 1.30 1.44 1.28 1.33 1.00 1.92 1.00 1.89 1.58 65s PC 1.582 1.30 1.30 1.44 1.28 1.33 1.00 1.32 1.00 1.30 1.23 66s PC 1.619 1.30 1.30 1.44 1.28 1.33 1.00 1.35 1.00 1.33 1.25

66s PC-HT 2.409 1.30 1.30 1.44 1.28 1.33 1.00 2.01 1.00 1.98 1.63 67s PC 1.656 1.30 1.30 1.44 1.28 1.33 1.00 1.38 1.00 1.36 1.26 68s PC 1.694 1.30 1.30 1.44 1.28 1.33 1.00 1.41 1.00 1.39 1.28 69s PC 1.728 1.30 1.30 1.44 1.28 1.33 1.00 1.44 1.00 1.42 1.30 70s PC 1.767 1.30 1.30 1.44 1.28 1.33 1.00 1.47 1.00 1.45 1.32

71s PC 1.805 1.30 1.30 1.44 1.28 1.33 1.00 1.50 1.00 1.48 1.34 72s PC 1.844 1.30 1.30 1.44 1.28 1.33 1.00 1.54 1.00 1.51 1.36 73s PC 1.882 1.30 1.30 1.44 1.28 1.33 1.00 1.57 1.00 1.55 1.38 74s PC 1.921 1.30 1.30 1.44 1.28 1.33 1.00 1.60 1.00 1.58 1.39 75s PC 1.959 1.30 1.30 1.44 1.28 1.33 1.00 1.63 1.00 1.61 1.41

76s PC 1.998 1.30 1.30 1.44 1.28 1.33 1.00 1.67 1.00 1.64 1.43 77s PC 2.039 1.30 1.30 1.44 1.28 1.33 1.00 1.70 1.00 1.67 1.45 78s PC 2.077 1.30 1.30 1.44 1.28 1.33 1.00 1.73 1.00 1.71 1.47 79s PC 2.121 1.30 1.30 1.44 1.28 1.33 1.00 1.77 1.00 1.74 1.49 80s PC 2.159 1.30 1.30 1.44 1.52 1.67 1.31 1.80 1.00 1.77 1.54

80s PC-H 2.085 1.30 1.30 1.44 1.52 1.67 1.31 1.74 1.00 1.71 1.51 81s PC 2.202 1.30 1.30 2.00 1.52 1.67 1.31 1.83 1.00 1.81 1.57 82s PC 2.242 1.30 1.30 2.00 1.52 1.67 1.31 1.87 1.00 1.84 1.59 83s PC 2.284 1.30 1.30 2.00 1.52 1.67 1.31 1.90 1.00 1.87 1.61 84s PC 2.323 1.30 1.30 2.00 1.52 1.67 1.31 1.94 1.00 1.91 1.63

84s PC-HT 3.441 1.30 1.30 2.00 1.52 1.67 1.31 2.86 1.00 2.83 2.18 85s PC 2.363 1.30 1.30 2.00 1.52 1.67 1.31 1.97 1.00 1.94 1.65 86s PC 2.409 1.30 1.30 2.00 1.52 1.67 1.31 2.01 1.00 1.98 1.67 87s PC 2.447 1.30 1.30 2.00 1.52 1.67 1.31 2.04 1.00 2.01 1.69 88s PC 2.491 1.30 1.30 2.00 1.52 1.67 1.31 2.07 1.00 2.05 1.71

89s PC 2.531 1.30 1.30 2.00 1.52 1.67 1.31 2.11 1.00 2.08 1.73 90s PC 2.578 1.30 1.30 2.00 1.52 1.67 1.31 2.15 1.00 2.12 1.76 91s PC 2.621 1.30 1.30 2.00 1.52 1.67 1.31 2.18 1.00 2.15 1.78 92s PC 2.666 1.30 1.30 2.00 1.52 1.67 1.31 2.22 1.00 2.19 1.80 93s PC 2.705 1.30 1.30 2.00 1.52 1.67 1.31 2.25 1.00 2.22 1.82

94s PC 2.753 1.30 1.30 2.00 1.52 1.67 1.31 2.29 1.00 2.26 1.84 95s PC 2.794 1.30 1.30 2.00 1.52 1.67 1.31 2.33 1.00 2.29 1.86 96s PC 2.838 1.30 1.30 2.00 1.55 1.67 1.31 2.36 1.00 2.33 1.88 97s PC 2.882 1.30 1.30 2.00 1.55 1.67 1.31 2.40 1.00 2.37 1.91 98s PC 2.928 1.30 1.30 2.00 1.55 1.67 1.31 2.44 1.00 2.41 1.93

99s PC 2.976 1.30 1.30 2.00 1.55 1.67 1.31 2.48 1.00 2.44 1.95 100s PC 3.016 1.30 1.30 2.00 1.55 1.67 1.31 2.51 1.00 2.48 1.97

Note: Other operatives include maintenance operatives, materials handlers, jobbers, etc. from blow room to ring frames.

Page 43: Sitra Norms 2010

39

Table C Drums per tenter, machine efficiency, production per tenter and

conversion factors for automatic cone winders

Count Drums/ tenter

Machine efficiency

(%)

Prodn./ tenter/ 8 hours

(kg)

Conversion factor Count Drums/

tenter

Machine efficiency

(%)

Prodn./ tenter/ 8 hours

(kg)

Conversion factor

6s 15 52 516 0.769 28s 40 77 437 0.909 2/6s 15 43 792 0.501 2/28s 30 84 663 0.598

7s 15 61 519 0.765 30s 40 75 397 1.000 8s 20 52 516 0.769 2/30s 40 81 796 0.499

2/8s 15 58 802 0.495 31s 40 77 394 1.007

9s 20 59 520 0.763 2/31s 40 84 799 0.497 10s 20 65 516 0.769 32s 40 77 382 1.039

2/10s 15 72 796 0.499 2/32s 40 85 783 0.507 12s 20 71 470 0.845 33s 40 77 370 1.072

2/12s 20 65 799 0.497 34s 40 78 364 1.090

13s 24 71 520 0.763 2/34s 40 85 737 0.539 14s 24 72 490 0.810 35s 50 70 397 1.000

2/14s 20 76 800 0.496 36s 50 72 397 1.000 15s 30 65 516 0.769 2/36s 40 86 704 0.564 16s 30 69 514 0.773 37s 50 74 397 1.000

2/16s 20 79 728 0.545 38s 50 76 397 1.000 17s 30 74 518 0.766 2/38s 50 82 795 0.499

2/17s 20 80 694 0.572 39s 50 78 397 1.000 18s 30 74 490 0.811 40s 50 80 397 1.000

2/18s 20 80 655 0.606 2/40s 50 86 792 0.501

20s 30 75 447 0.889 41s 60 68 395 1.005 2/20s 20 81 597 0.665 2/41s 50 86 773 0.514

21s 40 63 476 0.834 42s 60 70 397 1.000 2/21s 30 76 800 0.496 2/42s 50 86 755 0.526

22s 40 66 476 0.834 44s 60 74 401 0.991

2/22s 30 79 794 0.500 2/44s 50 87 729 0.545 23s 40 69 476 0.834 45s 60 75 397 1.000

2/23s 30 82 788 0.504 2/45s 50 87 713 0.557 24s 40 72 476 0.834 46s 60 77 399 0.996

2/24s 30 83 765 0.519 2/46s 50 87 697 0.570

25s 40 75 476 0.834 47s 60 79 400 0.992 2/25s 30 83 734 0.541 2/47s 60 85 800 0.496

26s 40 76 464 0.855 48s 60 80 397 1.000 2/26s 30 83 706 0.562 2/48s 60 86 792 0.501

27s 40 77 453 0.877 49s 60 81 394 1.008

Page 44: Sitra Norms 2010

40

Table C (contd…) Drums per tenter, machine efficiency, production per tenter and

conversion factors for automatic cone winders

Count Drums/ tenter

Machine efficiency

(%)

Prodn./ tenter/ 8 hours

(kg)

Conversion factor Count Drums/

tenter Machine efficiency

(%)

Prodn./ tenter/ 8 hours

(kg)

Conversion factor

50s 60 81 386 1.029 76s 90 82 358 1.109 2/50s 60 87 770 0.516 2/76s 90 89 777 0.511

52s 60 82 349 1.139 80s 90 85 352 1.127 2/52s 60 87 740 0.537 2/80s 90 90 746 0.532

54s 60 82 336 1.182 82s 90 85 344 1.155

2/54s 60 87 713 0.557 2/82s 90 90 728 0.545 55s 60 82 330 1.204 84s 90 85 336 1.183

2/55s 60 87 700 0.567 2/84s 90 90 711 0.559 56s 60 82 324 1.226 86s 90 85 328 1.211

2/56s 60 88 695 0.571 2/86s 90 90 694 0.572

57s 60 82 318 1.248 89s 90 85 317 1.253 58s 60 82 313 1.270 2/89s 90 90 671 0.592

2/58s 60 88 671 0.592 90s 90 85 313 1.267 59s 60 82 307 1.292 2/90s 90 90 663 0.598 60s 60 83 306 1.298 91s 120 74 360 1.104

2/60s 60 88 649 0.612 92s 120 74 356 1.116 61s 60 83 301 1.319 2/92s 120 83 798 0.497

2/61s 90 73 794 0.500 93s 120 75 357 1.113 62s 60 83 296 1.341 2/93s 120 84 799 0.497

2/62s 90 74 792 0.501 94s 120 76 358 1.110

63s 60 83 291 1.363 2/94s 120 85 800 0.496 64s 60 83 287 1.384 96s 120 78 359 1.105

2/64s 90 77 798 0.497 98s 120 79 357 1.114 65s 90 70 357 1.111 2/98s 120 88 794 0.500

2/65s 90 78 796 0.499 100s 120 81 358 1.108

66s 90 71 357 1.113 2/100s 120 90 796 0.499 2/66s 90 79 794 0.500 108s 120 85 348 1.140

70s 90 76 360 1.102 2/108s 120 91 745 0.533 2/70s 90 84 796 0.499 110s 120 85 342 1.162

72s 90 78 359 1.105 2/110s 120 91 732 0.543

2/72s 90 86 792 0.501 112s 120 85 336 1.183 74s 90 80 359 1.107 115s 120 85 327 1.214

2/74s 90 89 798 0.498 120s 120 85 313 1.267 75s 90 81 358 1.108 2/120s 120 92 678 0.585

2/75s 90 89 787 0.504 132s 120 86 288 1.378 Note: The above conversion factors are applicable to the corresponding combed yarns as well as man-

made fibres and blended yarns.

Page 45: Sitra Norms 2010

41

Table D Drums per tenter, machine efficiency, production per tenter and

conversion factors for conventional cone winders

Count Drums/ tenter

Machine efficiency

(%)

Prodn./ tenter/ 8 hours

(kg)

Conversion factor Count Drums/

tenter Machine efficiency

(%)

Prodn./ tenter/ 8 hours

(kg)

Conversion factor

6s 10 52 135 0.659 30s 24 73 91 0.978 2/6s 8 52 216 0.412 2/30s 20 82 170 0.524

7s 10 60 134 0.664 31s 24 75 91 0.978 8s 10 67 131 0.679 2/31s 24 74 179 0.497

2/8s 8 68 212 0.420 32s 24 77 90 0.989 10s 12 70 131 0.679 2/32s 24 76 178 0.500

2/10s 8 76 190 0.468 33s 24 79 90 0.989 12s 12 77 120 0.742 34s 24 80 88 1.011

2/12s 8 80 166 0.536 2/34s 24 79 174 0.511 14s 15 73 122 0.730 35s 24 81 87 1.023

2/14s 12 76 203 0.438 36s 24 81 84 1.060 15s 15 77 120 0.742 2/36s 24 81 168 0.530 16s 15 78 114 0.781 37s 30 67 85 1.047

2/16s 12 79 185 0.481 38s 30 68 84 1.060 17s 15 80 110 0.809 2/38s 30 74 182 0.489

2/17s 15 71 195 0.456 39s 30 70 84 1.060

18s 15 81 105 0.848 40s 30 76 89 1.000 2/18s 15 75 195 0.456 2/40s 30 77 180 0.494

20s 20 74 115 0.774 41s 30 77 88 1.011 2/20s 15 80 187 0.476 2/41s 30 79 180 0.494

21s 20 77 114 0.781 42s 30 79 88 1.011

2/21s 15 81 180 0.494 2/42s 30 81 180 0.494 22s 20 79 112 0.795 43s 30 80 87 1.023

2/22s 15 82 174 0.511 44s 30 81 86 1.035 23s 20 80 108 0.824 2/44s 30 82 174 0.511

2/23s 15 83 169 0.527 45s 30 82 85 1.047

24s 24 70 109 0.817 2/45s 30 82 170 0.524 2/24s 15 83 162 0.549 46s 30 83 84 1.060

25s 24 73 109 0.817 2/46s 30 83 169 0.527 2/25s 20 75 187 0.476 47s 30 83 83 1.072

26s 24 75 108 0.824 2/47s 30 83 165 0.539

2/26s 20 78 187 0.476 48s 30 83 81 1.099 27s 24 77 107 0.832 2/48s 30 83 162 0.549 28s 24 79 106 0.840 49s 30 84 80 1.113

2/28s 20 81 180 0.494 50s 30 84 79 1.127

Page 46: Sitra Norms 2010

42

Table D (contd�) Drums per tenter, machine efficiency, production per tenter and

conversion factors for conventional cone winders

Count Drums/ tenter

Machine efficiency

(%)

Prodn./ tenter/ 8 hours

(kg)

Conversion factor Count Drums/

tenter Machine efficiency

(%)

Prodn./ tenter/ 8 hours

(kg)

Conversion factor

2/50s 30 84 157 0.567 80s 40 85 66 1.348 52s 30 83 75 1.187 2/80s 40 86 134 0.664

2/52s 30 84 151 0.589 81s 40 85 65 1.369 54s 30 83 72 1.236 82s 40 85 65 1.369

2/54s 30 85 147 0.605 2/82s 40 86 131 0.679

55s 30 84 71 1.254 84s 40 85 63 1.413 2/55s 30 85 145 0.614 2/84s 40 87 129 0.690

56s 30 84 70 1.271 86s 40 85 62 1.435 2/56s 30 85 142 0.627 2/86s 40 87 126 0.706

58s 30 84 68 1.309 2/88s 40 87 123 0.724

2/58s 30 85 137 0.650 89s 40 85 60 1.483 60s 40 73 76 1.171 2/89s 40 87 122 0.730

2/60s 30 86 134 0.664 90s 40 86 60 1.483 61s 40 73 75 1.187 2/90s 40 87 121 0.736

2/61s 40 78 160 0.556 91s 40 86 59 1.508

62s 40 74 74 1.203 92s 40 86 58 1.534 2/62s 40 79 159 0.560 2/92s 40 88 119 0.748

63s 40 75 74 1.203 93s 40 86 58 1.534 64s 40 76 74 1.203 2/93s 40 88 118 0.754

2/64s 40 81 158 0.563 94s 40 86 57 1.561

65s 40 77 74 1.203 2/94s 40 88 117 0.761 2/65s 40 81 155 0.574 96s 40 86 56 1.589

66s 40 78 74 1.203 98s 40 86 55 1.618 2/66s 40 82 155 0.574 2/98s 40 88 112 0.795

70s 40 81 72 1.236 100s 60 69 65 1.369

2/70s 40 83 148 0.601 2/100s 40 88 110 0.809 72s 40 82 71 1.254 108s 60 72 62 1.435

2/72s 40 83 144 0.618 2/108s 40 88 102 0.873 73s 40 82 70 1.271 110s 60 73 62 1.435 74s 40 83 70 1.271 2/110s 40 88 100 0.890

2/74s 40 84 142 0.627 120s 60 77 60 1.483 75s 40 83 69 1.290 2/120s 40 88 91 0.978

2/75s 40 84 140 0.636 132s 60 82 58 1.534 76s 40 83 68 1.309

2/76s 40 84 138 0.645 Note: The above conversion factors are applicable to the corresponding combed yarns as well as man-

made fibres and blended yarns.

Page 47: Sitra Norms 2010

43

Count description

HT - Carded high twist

H - Carded hosiery

C - Combed

CH - Combed hosiery

C-HT - Combed - high twist

PV - Polyester viscose

PV-HT - Polyester viscose - high twist

PSF - Polyester staple fibre

PSF-HT - Polyester staple fibre - high twist

VSF - Viscose staple fibre

VSF-HT - Viscose staple fibre - high twist

PC - Polyester cotton carded

PC-H - Polyester cotton carded - hosiery

PC-HT - Polyester cotton carded - high twist

*****


Recommended