Page 1: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

PRE-INVESTMENT FEASIBILITY STUDY REPORT

(Fully Automatic Brick Plant with Tunnel Kiln & Tunnel Dryer)

Project Analysis

Fully Automatic Machine Made Clay Brick Manufacturing Factory Based on Tunnel Kiln

Firing System Production Capacity-150,000 Pcs/Day per day (45 Million per/Annum).

Page 2: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

PROJECT SUMMERY

4. Product-mix and production Capacity:

The project envisages setting up of a Auto Bricks Production Project at Mouza- Purbo Panch khati. JL no- 13 & 59, Goshairhat, Shariatepur, Bangladesh. After implementation of the project the product mix and the production capacity of the project based on the basis of 24 hours per day for kiln & Dryer operation and raw bricks production of 10 hours shift basis and 300 working days in a year at 100% capacity utilization will be as follows:

Sl. No.

Items/products Production Per Day

Price Per Pcs

Total Qnty Per Year Pcs

Amount “000”

01 Standard Hollow Bricks (Pcs) Size 10’’x 5’’x 3’’ 150000 9/= 45,000,000 405,000

Total 405,000

Section II

Technical Aspect

The project is for setting up a forming machine, tunnel dryer and Tunnel kiln brick factory with a new imported system machine. In this case, this factory has more competitive power with the operation has convenient and production lines design is simple and clean working conditions. The project has been designed to produce 1,50,000 PCs/day (raw material + forming machine + tunnel dryer + Tunnel kiln) with modern technology at Shariatepur district in Bangladesh. Quality of product meets Bangladesh’s standards. It is expected that the project will go into commercial operation after Twelve months from the day of designing technology equipment supplying contract.

Additional Advantage of Machine made Bricks 01. Machine made bricks: Fully automatic machine made bricks are more durable, stranger and good looking. These are uniformly burnt. Machine made bricks are getting favorite day

by day in and around all municipal areas as this manufacturing plant is environment friendly. It is found that the demand of such bricks are growing

faster for housing and industrial use.

02. Tunnel Dryer and Tunnel Kiln:

Tunnel Dryer and Tunnel Kiln are using for burnt and drying in ceramic tiles & sanitary ware factory. For uniformly & absolute burnt of bricks tunnel kiln and

dryer are using in the machine made bricks plant to get 100% efficiency in bricks production at stimulated time. Tunnel kiln and dryer will be used for various types of bricks & tiles drying and burning. It’s ensure durable stranger and good

Page 3: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

looking bricks and there will be no wastage of bricks that with cost effective and

environment friendly.

Recently formed Government’s industrial policy – to facilitate local industries Shariatepur will be the strategic location for any kind of industries and brick is one of the most essential items to build any kind of building either industries as well as residence and boundaries. 2.00 The proposal: The proposal envisages setting up of Auto Bricks Production Project at Mouza- Purbo

Panch Khati. Jl no- 13 & 59, Goshairhat, Shariatepur, Bangladesh. under the

name and style of SELF AUTO BRICKS LTD . Total fixed cost of the project has been

estimated at Tk. 4088.99 lac. The project has been equipped with brand new China

Origin machinery and equipment with some local machinery. The value of Foreign

machinery is USD 23,71,989 equivalent to taka taka 1992.47 lac and the value of local

machinery is taka 348.00 lac.

Technical knowhow:

The technical knowhow required for the smooth operation of the project is locally

available. Crash training and orientation program for both semi-skilled and unskilled

persons will be conducted by a qualified and well experience production manager with a

view to trained them into skilled hand as well as increase production efficiency.

Characteristic of Production Technology.

Generally production of brick and tiles is not very complicated. Howover, for producing

the high-quality product as varioustypesof tiles, it requires skill of workers,especially

when there are still a lot of manual production sections. Because this is a new

production domain for the company, the factory expects to produce only constructing

brick for local market in the first stage. In the second stage ( from the third year on

words). when the worker’s professional skill has been raised, the project will be

investedin more ternacotta products. Thare fore we design of convenient factory

systems here as most easy producing.

Production Line

Description of production tecnology:

Page 4: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

The clay exploited from the mine will be stored in the open air yard to be continuously

weathered are reserved for the production at least in three months and it is better form

3 to 9 months ( Because Bangladesh has low terrain flooded during the monsoon rainy

season)tare for the clayraw materials should be excauated and spread outon the groung

for same time. The proess is known a weathering and has an important effect on the

viscosily and strenght of the clay. the clay should be kept under open sky during the

initial period. this weathering process is intensitied thanks to such measures as watering

kneeding by means of machines like pay-roads and bulldozer.

The weathered clay will be transported trailer.Wich is pulled by tractors from the

reservation yard to the clay- containing house where the box feeder is installed. Here

the clay is stoved for at least one wheek. The clay will be supplied to box feeder by the

pay loader.

Mixed raw materials after quantitalively determined in the box feeder will be transfered

to rulling section by conveyar beside it a coat crusher will be installed and it is equipped

with belt conveyar to delivery required quantity coat to box feeder.

Than the clay will be passed through the roll crusher.

the roll crusher has the slit betwen the two rollers around 3-5mm. than the clay will be

moved to the double shaft mixer. Here the clay will be pugged and moisturs to reach

the moisture of forming. This section also aims to sperate such esetraneous matter as

grass, tree roots left inthe clay. She will mixed clay will come to pug sealer and de-airing

extrusion. Here the clay pugged one more time. Watering if the moisture dose not reach

the required level and comes to vacum chamber to such out the remained air

bubbles.The forming mosture fluctuates with in the interval 18-21%. After that the clay

will be extruded through the forming mould to get the desined shape and move to the

auto cutting machine to cut the brick in to intended lenght. When changing the

produced product, it is just needed to change the appropriate mould.

The semi product of the green brick after cutting will be transferred by a horizantal type

loading conveyar. Workers stay here will pick up the green brick and land on the kiln

cart. The cart after being fully loaded will be moved to the drying chamber. The carts

are pushed into the tunnel dryer thanks to the transfer car with pusher.

The heat supplied to drying chamber is withdrawn party from the colling zone of tunnel

kiln. The drying time is from 24 to 30 hours depending on product type. The dry cart

with green products in the drying tunnel after finising drying will be moved to the

loading line for kiln car where the dried green products will trunsfer loaded kiln cart. this

kiln carts waiting move to sub-dryer and the kiln carts to pass enter the tunnel kiln

thruogh a transfer line.

Page 5: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

After going out of the dryer the cart, the carts holding dried products with the moisture

of 10% will be move to the loading line for the kiln cart of tunnle kiln for arrangement.

And dried brick loading conveyar section. The kiln car carried dried brick with moisture

10% and will be move to sub-dryer and pass here when this moisture are reduce about

6 – 7% and will be moved to tunnel kiln by kiln transfer car and pushed in to tunnel kiln

by kiln hydraulic presher.

this tunnel kiln is 140-150m of lanth with top firing or cool firing system and

contonuously producing clay by kiln car with rail and running system. It can contain 52

kiln car, it composed three parts connection togather the pre-heating zone, firing zone

and cooling zone. As to cooling zone, it was devided in to rapid cooling zone and cooling

zone. highest firing temperature is 1000 C. firing time is 33 hours. the kiln car carrying

27,000 pcs /car after going out of the kiln will be moved to the rail road in order to wait

for the brick to be cooled off and unload. the products should be classified and be bound

and gather to the ware house or to storege yard so that delivering to customer.

Page 6: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

Diagram Chart of Production line

Raw materials from out side storage yard

Box Feeder

1st – 2nd Roll Crusher

Extrusion, Mixer / Double Shaft Filter Pug Mill

De – Airing Extruder

Slug Cutter, Colum Cutter

Green Brick Loading Seperator

Kiln Cart Loading Conveyar Belt

Drying Cart in to the Tunnel Dryer

Dried Brick Loading to Tunnel Kiln

Tunnel Kiln

Manual Product Selection & Paking Warehouse

Manual Unloading Dried Bricks

Page 7: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

III. Auxiliary units : Including Mechanic and electric reparing workshops. Duties of

the workshop : Small repairs for equipments, regular maintance and other repair on

electricity and plumbing. Major repair will be implemented by the companys electro-

mechanical workshop or by other factories workshop will be equipped with essential

equipment and instrument.

IV. Selection of technology equipment

Base of technology equipment selection:

• process of balance the material of the factory.

• Type of raw material will be used.

• Product structure

• Quality level of the product. According to offer of suppliers, analysis of

parameters, the tecnology equipment of this project is selected as follow as per

the enclosed table “List of equipment”

Page 8: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

METHOD OF TECHNOLOGY

Brick making is a very crucial and significant economic activity in Bangladesh since it is a developing country with a high construction sector growth. Despite being a crucial sector for the country, this sector is not formally recognized as an industry (Ministry of Industry'2010). The country's overwhelming dependence on bricks is due to scarcity of suitable alternative building materials to local climate at complete cost. Table 1.1 summarizes the main characteristics is tics of the brick sector in Bangladesh. Table 1.1 Snashot of Bangladesh's Brick sector 20122

Parameter Value Estimated total number of coal-fried kilns 4,860d Number of natural gas fired kilns 20 Annual brick production 17.24 billion Value of output Tk. 94.82 billion (US$ 1.35 billion) Coal Consumption 4.03 million tons Value of Coal Imported Tk. 26.18 billion (US$ 374 million) Fire Wood Consumption 1.9 million tons Emission CO2 9.81 million tons Clay Consumption 58.38 million tons Total Employment 1 million people Growth rate of the Construction Industry 5.6% Estimated growth rate next ten year 2-3% Contribution & GDP 1%

In Bangladesh uses four main types of kiln technologies as presented as FCK (Fixed Chimney Kilns), Bull's Trench Kilns (BTKS). Which nearly 95 percent of the Kilns, are very Polluting and relatively inefficient. The substantially cleaner gas-based Hoffmann Kiln and the slightly better coal-based zigzag kilns are already available, but represent just a few percent of the total. Substantially cleaner technologies like VSBK, H.H.K. and most advanced TUNNEL KILN technology has just entered in to the Brick market. Existing Bricks Kiln Technologies in Bangladesh (2009) Kiln type Number Percent of

Total Kiln Brick Production 24 (Bricks Billion)

Percent of Production

FCK ≤ 4500 92.21% 15.75 91.36% BTK N/A 0.00% - - Zigzag ≤ 150 3.07% 0.60 0.00% Hofmann (gas)

≤ 20 0.41% 0.24 3.48%

H.H.K. ≤ 10 0.20% 0.15 1.39% Others < 200 4.10% 0.50 0.87% Total ≤ 4880 100% 17.24 100%

Page 9: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

Some Brick Manufacturing Technologies in Bangladesh: 1. Fixed Chimney Kiln (FCK) The chimney in a fixed chimney kiln (FCK) as the name suggest is fixed and is approximately 130 ft. high. This tall chimney creates a stronger draft improving the combustion process and releases the flue gas at a height 130 ft. above the ground thus providing faster and better dispersion. The kiln has under grounded piping to divert the flue gas from anywhere in the kiln to the fixed chimney. The length of the kiln is same as that of the BTK but its width is greater to accommodate the underground piping. The FCK also has better in solution in the side walls, which reduces heat loss to the surroundings. The cost of constructing the chimney is Taka 12,00,000 (US$ 20,700) which is nearly 50% of the local cost of FCK. Bull's Trench Kiln (BTK) The Bull's Trench Kiln is essentially an ellipetical shaped dug out area in as opened field. The kiln is about 250 ft. long and 57ft. wide and has two 32ft. high moveable chimneys. The bottom and the side walls of the kiln are bined with bricks with the top open. San dried bricks are stacked in the kiln in an orderly fasion learing enough room for fuel stoking and air circulation. After arranging the bricks in the kiln is covered with fired bricks and pebbles. The bricks are fired from the top and the fine moves forward-towards the chimney. The air entrance opening (air hole) and the chimney are located at the two ends in such a way that combustion air is preheated by taking heat from the fired bricks and the green bricks to be fired are preheated by the flue gas on its way out of the chimney. The bricks are fined all around the kiln, which means the chimney and the air hole must be progressively moved forward, until at bricks in the trench are fired. The chimney are made of iron sheets and during a typical season of five months these need to be replaced two to three times because the corrosive the gases eat away the kiln every year because of which BTK's need to be constructed almost from scratch every year. Hebla or ZigZag: The hebla or zigzag kiln is rectangular in shape and measures 250 ft. by 80 ft. It has a 55 ft. high fixed chimney located on one side of the kiln. At the bottom of the chimney these is a flower, which draws the flue gas from the kiln and discharges in to the atmosphere. The kiln is divided in to 44 to 52 chambers, which are at separated from each other in such a way that the hot gaseo move in a zigzag path through the kiln. The zigzag kiln is reported to be 10-15% more fuel-efficient than the FCK. This kiln is expensive to construct and cost approximately the same as a FCK. There are about 30 such kiln in operation mainly in the comilla region. Present FCK owners are keen to convert to the zigzag technology if the department approve it as an acceptable technology. The construction is not easily available and expertise has to be procured from neighboring states on India. Hoffman Kiln: H.H.K. A Hoffman kiln is rectangular in shape and measures 300-400 ft by 60ft. Its construction and operation is very similar to the FCK. The pre dominant difference between the Hoffman kiln and the kiln described above is the fixed roof, which enables bricks to be fired throughout the year although during the rainy season, which is called off-season. The production decreases significantly because of rainy season; high humidity areas overproduce green bricks during the dry season and store them for the rainy season but to

Page 10: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

ad that adequate storage facility must be made available. Also for off-season production clay has to be stored, as harvesting of clay becomes impossible due to wide spread during the rainy season. The inside roof of the kiln is arched and has a fire brick lining on the inside surface. The thick walls of the kiln and good insulation heat loss to the surrounding. The chimney is 76 ft. high with a blower at the bottom. Green bricks are stacked in the kiln in more or loss the same fashion as that in the FCK. The bricks are fired from the top by introducing the fuel (Natural gas) in to the combustion zone through pipe-type burners. The burners are shifted for ward from section to section as the five progresses-fired bricks are unloaded at the back while greeb bricks are stacked in front of the firing zone. The flue gas is conveyed towards the chimney through a network of channels gust below the kiln. Five is controlled without the aid of any instrumentation or controllers by merely adjusting the gas flow rate and the opening and closing of dampers brated at selected point in the flue gas network. Opening and closing of dampers located at selected points in the flue gas network. Controlling the fine is the trickiest part of the whole operation. Since there is no in situational arrangement to learn the fining technique, several years of on the job training as an apprentice is needed to master the technique. Vertical Shaft Brick Kiln (VSBK) The vertical shaft kiln (VSBK) was first developed in china (November 1992, November 1994). The VSBK is fuel-efficient consuming 20 to 30% less fuel in comparison to the BTK and FCK. In addition the kiln is simple to construct and operate, making it ideal for rural areas. The VSBK regnies has been tested and proven to be successful in china. In India and Nepal it has enjoyed limited success. There was one effort to construct a VSBK in Bangladesh, but that was unsuccessful due to the lack of adequate technical and financial support and poor brick quality considering the incremental investment. In a VSBK, Bricks are stacked in a shaft measuring 1X1 m3 up to a height of 6.0 m. Green bricks are loaded from the top in batcheo of unloaded every 1.5 hours. The fining occures around the middle of the shaft. The kiln uses pulverized coal, which is loaded from the top along with the green bricks. The combustion air gets preheated to about 750 oC by taking up heat from the fired bricks. After combustion the hot flue gases move up through the unfired bricks and in the process preheat the bricks to be fired. The VSBK is a permanent structure and can produce bricks throughout the year. It has a life of 8 to 10 years with minimum maintenance. One VSBK can have multiple shefts and can be very economical in utilizing space. A VSBK with six shafts can have the capacity as that of a FCK but needs only 13% of the space of a FCK.

Page 11: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

TUNNEL KILN (B) Tunnel kiln technology was invented in Germany. This technology is most common in developed countries, since treit inventing tunnel kilns have now become highly automated and are for large production. Bricks move mechanically through a long stationary fine zone. They have minimal labour requirements but a very high capacity cost. They must be operated in continuous mode and require a guaranteed power supply through electricity or generator. Power supply through electricity or generator: Tunnel kiln is a long structure in which only the control portion is directly heated. Form the cool entrance. Brick is slowly transported through the kiln and its temperature is increased steadily as it approaches the control, hottest part of the kiln. From there, its transportation continues and the temperature is reduced until it exits the kiln at near room temperature. A continuous kiln is the most energy-efficient; beacous heat given off during cooling is recycled to pre-heat the incoming bricks. The Technology has the following advantages: 1. Continuous production, short production cycle 2. High jicled and superior quality brick production 3. Using counter-current principle of work, the high thermal efficiency, economical fuel consumption, it can save about 50%-60% energy compared to the old type kilns 4. The firing lime is relative by shorter. In other type kiln it require 3-5 days to complete the working cycle, while the tunnel kiln it takes about 30 hours to complete the working cycle 5. Save labour 50% - 60% less labour is required 6. The most of loading and unloading operation are outside the kiln with very convenient working was 7. Improved working condition and reduce labour intensity 8. Improve quality: The temperature of preheating zone, firing zone and cooling with three parts used to maintain a certain range, easy to grasp the firing rules, so the quality is better, less breakages. 9. Kilns and kiln structural are durable. It usually takes 5-7 years before repair. However the tunnel kiln construction materials and equipment needs a large investment 10. Generally applicable only to large volume production and the firing system which requires the same basic products, poor flexibility.

Page 12: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

( Production Capacity 3 lac per day

Page 13: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

Page 14: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

COMPARATIVE ANALYSIS OF CLEANER BRICK TECHNOLOGIES

A comprehensive Comparative Analysis on Alternative cleaner brick Kiln technologies in Bangladesh has been presented in Table 7.1. The comparative analysis was categorized based on the following key parameters: 1. 2. 3. 4. 5. Investment, Capital, Profitability

Production, Raw material and Output quality Energy Consumption GHG and particulate Emission Social Cost Benefit Table 7.1 : Comparative Analysis on cleaner brick kiln technologies in Bangladesh12

Parameter Baseline Alternatives

Fixed Chimney Kiln

Improved Zigzag (SD+GM)'

VSBK (two shaft

and Mechanized)

HHK` (50,000

bricks/day)

Tunnel Kiln

(200,000 bricks/day)

A. Investment, Capital, Profitability

1 Land 2.5 acres, of which I acre used round the

year

2.5 acres, of which I acre

used round the year

, 1.32 Acre 3.96 Acre 3 acre

2 Initial Investment Outlay

(in Tk million) 5 5.5 10-15 146 400

3 IRR (%) 40% 40% 30% 25% 25% 4 Pay back

period Years 2 2 2 4 4

B. Production, Raw material and Output u alit

5 Rated Annual Production Capacity

(Million brick/year) 4 4 4 15 60+

6 Production Period November

to A ril November

to April Round the

year Round the

year Round the

car

Parameter Baseline Alternatives

Fixed Chimney Kiln

Improved Zigzag (SD+GM)

VSBK (two shaft)

HHK (50,000

bricks/day)

Tunnel Kiln

(200,000 bricks/day

7 Raw Material a) Clay

100,000 cft/million bricks

100,000 pelt/million bricks

100,000 cft/million Bricks

100,000 cft/million bricks

b) Labor 150 (15% skilled, 15% semi- skilled)

150 (15% skilled, 15% semiskilled)

75(20% skilled Iabor,20%, semi skilled)

85 (27% skilled, 26°% semiskilled)

25

c) Electricity Not essential

Needed for the ID fan Not essential 180-250 kw 250-350

kw 12 Unless referenced otherwise data has to be considered taken from BUET (2007) 13 SD means Standard Design and GM means Good Management

14 HHK data has been sourced from Investment Feasibility Study, Investment Comparison Analysis 2010-2011, HHK CDM Project and from HHK entrepreneurs during Monitoring of the project. 15 Land requirements for different technologies: For a 2 shaft-VSBK 4 Bigha land is required. For HHK (50000 bricks/day) 12 bigha land is required and for HHK (100000 bricks/day) 15 Bigha land is required. 1 Acre=3.03 Bigha.

Page 15: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

Parameter

Baseline Fixed

Chimney Kiln

Alternatives Improved Zigzag

(SD+GM)

VSBK (two

shaft)

HHK (50,000

bricks/day)

Tunnel Kiln

(200,000 bricks/day)

d) Fuel Coal Pulverized Coal

Pulverized Coal

Pulverized Coal

Pulverized Coal

8 Brick types

1" class: 50%-55% Wastage:

3%-4%

1st class : 60%-65% Wastage: 3%-4%

1st class : 80%% Wastage: 3%-4%

1" class: 90% Wastage: 0%

1s' class 95% Wastage: 0%

9 Strength PSI less than 2500

less than 2500 4260 4500-6000' 4500-6000

10 Weight Kg 2.9 2.9 2.9 3.5 3.5

11 Volume 10 cubic cm 10 cubic cm 10 cubic

cm 12.5 cubic

cm 12.5 cubic

cm C. Energy Consumption

12 Fuel consumptio n (Coal)

Ton Per million Bricks

240 160-180 100-120

3 120-130 100-120

13 Specific

energy consumption

MJ/kg-brick 2.125 1.42' 1.06° 0.954 0.807

D. GHG and particulate Emission

14 Pollution Severe Pollution

10-50% less than FCK depending on

management

Least pollution

Least pollution

Least pollution

15 Particulate (mg/m3) 1000+ 270-3 007 500-

800 20.3" < 50

17 Equivalent to 300 Kg/ cm2 as stated in the website: http://w-u-w.vsbkindia.org//faq,htm is Based on BRTC, BUET Test report 19 Based on one pilot project in Savar, Dhaka and may not be representative of all VSBKs. z°

Calculated by the Authors

21 SEC for Zigzag is reported as 0.8-1.10 MJ/kg- bricks in Maithel (2003). More improved technology can be imported from Vietnam. 22 SEC for VSBK is reported as 0.7- 1.00 MJ/kg- bricks in Maithel (2003) 23 Maithel et al. (2002) for high draft kilns in India

24 Energy and Stack Emission Monitoring in Hybrid Hoffman Kiln (HHK) Type, December, 2008

Page 16: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

Parameter

Baseline Alternatives Fixed Chimney Kiln

Improved Zigzag (SD+GM)

VSBK (two shaft)

HHK (50,000 bricks/da

y)

Tunnel Kiln (200,000 bricks/day)

16

tco, emission per million bricks

582 388 291 315 291

17

Emission Reduction in tCO, per

million bricks''

180 291 372 421

E. Social Cost Benefit Analysis

18 No of

workers employed

150 150 753 85 15-25

19 Nature of employment

Round the Round the Round the Seasonal Seasonal year year year

21 Working Condition Very

poor Very poor Satisfactory Highly Satisfactory

Highly Satisfactory

25 Only emission due to coal consumption is considered. Calculation is made by the Authors

25 Calculated by the Authors

27 21 labors are directly employed in kiln production and rest of the labors are employed in green brick production through middlemen/labor contractors. Source: VSBK demonstration project in Sariatpur

Page 17: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

Training work After signing the technology equipment contract, local and foreign specialist will teach some qualified workers to establish the technology process of production and machinery operation. Mechanical and electric engineers will taught by specialists both theory and practice before commodity delivery so that they can get basic knowledge on equipment installation, maintenance and operation. During the time putting the factory into operation, local and foreign specialists will guide and train the cadres and workers on production sections until they manipulate skillfully and can operate themselves.

SCHEDULE OF CONTRACT EXECUTION

Description Months 1 2 3 4 5 6 7 8 9 10 11 12

Dispatch of drawing Construction of Tunnel kiln Construction of drying chamber Factory building and foundation Forming machine delivery Packing, inspection and shipment Ocean transportation and C & F Foundation for machinery Installation Commissioning and test-run Making to utility Trial Production

+ “0” stands for the date of the contract come into force. + Drawings:

- General layout - Machine foundation - Electricity, water, compressed air network - Drawings of gangways, support...under Buyer’s supply with cost estimate.

Page 18: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

TECHNICAL SPECIFICATION AND CAPACITY

2.1 Capacity:

z 30,000,000 pieces of clay bricks based on brick size 240 x 120 X 70 mm. z Base product of the contract: 240 x 120 x 70 mm, void 30%.

2.2 Product range:

Item Dimension, mm Description Fired W. kg Void 01 240×120×70 Hollow brick 2.6 30% 02 240×120×70 Solid brick 3.7 0% 03 240X120X240 Hollow block 6.2 50% 04 Other products to be defined.

The Supplier’s scope of supply does include also an unit (for beautifying the bricks unit please refer to Appendix 1.) which makes the decoration on three surfaces of chamfering treatment

2.3 Raw materials

z Clay laboratory tests are to be carried out. z Project data and supply can vary according to the test results. z In the case if another type of clay or sand is needed, the Purchaser has to check

and solve the problem.

2.4 Electric voltage z 380 Volts - 50 Hz

2.5 Fuel used

z Natural gas with P.C.I. 8,500 Kcal/m3. z Coal with P.C.I. 6,500 Kcal/kg, size of the coal has to be less than 50 mm. z The project is designed to adopt by coal which is to be mixed together with clay

or natural gas z The quantity of the supply of the burner system for natural gas shall be enough in

the case that if the kiln has to be arranged 100% by natural gas. 2.6 Work organization

Page 19: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

Description Preparation Production Drying Firing Working days a year 330 330 330 330 Working days a week 7 7 7 7 Working shift/day 1 1 3 3 Working hours/shift 10 10 8 8

Working hours/day 10 10 24 24

2.7 Compressed air: Pressure: 0.7 Mpa

2.8 Main economic data

Item

Description

Unit

Index

01

Production capacity

Piece/year

30,000,000 02 Clay consumption Cft/year Max. 2,100,000 03 Installed power KW about 1000 04 Production manpower Total about 55

2.9 Technological calculation

Please kindly refer to attached Appendix.2.1 for detail, final data and supply can be adjusted at the final design.

2.10 List of installed power of the plant equipment

Please kindly refer to attached Appendix.2.2 for detail, final data can be adjusted at the final design.

Page 20: Study on Auto Bricks Bangladesh Perspect

Annual 30 million common bricks production line

TECHNICAL SERVICE

1. In order to realize the smooth installation, commissioning and normal operation of the Contract equipment, the Supplier shall send their skilled, healthy and competent technical personnel and installation team to the Purchaser’s site for the technical service.

2. The Supplier’s personnel shall be responsible for technical instruction of the

equipment’s installation, commissioning, operation and maintenance, etc. The Supplier’s technical personnel shall also explain in detail to the Purchaser’s personnel of the equipment’s speciality, operation rules, maintenance ways and other points concerned, explain and solve the technical problems raised by the Purchaser’s personnel.

3. The Purchaser shall provide the Supplier’s technical personnel with convenient

working conditions and skilled workers to assist the site works. The Purchaser shall, before the arrival of the Supplier’s technical personnel, make all arrangement ready.

4. The starting date of the technical service by the Supplier’s technical personnel

shall be fixed by both sides through consultation according to the actual situation of the project.

5. The working time of the Supplier’s technical personnel shall be 48 hours, per man,

per week, i.e. 6 days per week and 8 hours per day.

6. The Purchaser shall bear all expenses for round trip air tickets for Supplier’s personnel; the Purchaser shall bear also lodging, food and local transportation for all the Supplier’s technical personnel during their stay at the project site.

7. The Supplier’s technical personnel shall observe the laws of Bangladesh and the

regulations of the Purchaser.

8. The Purchaser shall prepare 2 competent Chinese/English interpreters for finishing the cooperative work with the project-site technicians from supplier.

9. The Purchaser shall arrange 30 days in advance all qualified invitations to the

Supplier’s personnel and make sure that with the above mentioned invitation the Supplier shall have no problem to get the visa; and in case of prolongation of visa is needed, it will be the Purchaser’s expenses and responsibility.

10. Extra works and overtime works at the site will be charged, detailed standard are

to be agreed by both parties. When overtime work is needed, the Purchaser shall make accordingly his people and means to follow and coordinate.

Page 21: Study on Auto Bricks Bangladesh Perspect

21

NSTALLATION, COMMISSIONING AND ACCEPTANCE

1. Installation

Installation means t h e i n s t a l l a t i o n w o r k s , i n c l u d i n g a s s e m b l y , i n s t a l l a t i o n a n d connection of all equipment and materials of the Contracted Equipment.

2. Test-run

Test-run means to check the readiness for operation, adjustment, trial operation without load and with load on the individual units and the whole system after completion of the installation of the Contracted Equipment.

3. Acceptance Test

Acceptance Test means to examine if the performance of the Contracted Machines can reach 90% of the guaranteed parameters as stipulated in APPENDIX 2 to the Contract. If the results of the test show that 90% of the guaranteed parameters can be reached, the machinery shall then be accepted by the Purchaser.

If all the guaranteed figures specified in Appendix 2 to the Contract are fulfilled, a certificate of acceptance shall be signed by the representatives of both parties after the test in 4 (four) copies, 2 (two) copies per each party.

During the acceptance test the working log shall be made and signed by representatives of both parties. This record shall be part of the evidences used for the acceptance. The content of this record should include the following:

- Type of products - Quantity of the shift production - Quality data of the products

The acceptance test will last for 4 continuous working days i.e. it will work 48 + 48 hour for each product. At the work start the MACHINES has to be ready and full of good materials. Any stop not due to the reason caused by the Supplier’s machines, the time of stoppage will be deducted and the quantity of production will be reduced in proportion.

In detail, the type A) of product 240X120X70 mm (Void: 30%) to be tested for 48 hours (two working days, 2 shifts per workday for preparation and production);

In detail, the type B) of product 240X120X70 mm (Void: 0%) to be tested for 48 hours (two working days, 2 shifts per workday for preparation and production);

After completion of above procedure and the signing of the acceptance certificate, the product of

hollow block with size 240X120X240 mm (Void: 50%) could be tested.

In the case that for delays due to the Purchaser for more than 3 months, then the plant equipment

shall be regarded as has already been accepted by the Purchaser.

Page 22: Study on Auto Bricks Bangladesh Perspect

22

MARKETING ASPECTS

An Overview : Modern development process has come to produce rapid urban growth. Hence one of the objectives of planned development is to improve the physical conditioning of living such as housing and water supply. But as people aspire for comfort, rural community also needs to have access to such basic facilities of life. In fact poor countries have come to be regarded as rural slums and the rural urban migration is as attempt to escape it. The program of development of physical infrastructure covers both urban and rural communities in public and private sectors. The program consists of development of housing, office and commercial buildings, site development for private housing, office & commercial buildings, city roads etc. In the middle of the second plan rather a comprehensive approach was for the first time taken to bring development to the door of people and steam urban migration. This consisted of the Government policy decentralization of administration and acceleration of development activities at upzilla level. This policy will require creation of necessary physical infrastructures there within the framework of national physical plan and the demand for construction materials like bricks etc. 02. The Project: The Products of the project will be automatic bricks to be produced from local day. Automatic bricks have comparative advantage over hand made bricks in respect of unit price, size/ specification, quality etc. Automatic bricks having standard in size, smoothness in surface, bright in colour, hardness in strength and cheaper as compared to hand made bricks being produced by the brick fields situated in the rural areas. The initial cost of the type of the project, though high but the overhead working cost is less. As such, this type of project can supply bricks at relatively cheaper price. Furthermore, it can cater to the large volume of demand for bricks at a time when various government/private institutions/ organizations place orders. It may be mentioned here that some times various public works are interrupted due to shortage of bricks. This type of project of implemented may be able to solve this problem. 03. Uses and User of Bricks : Bricks are mainly used in constructing houses, roads and bridges. Bangladesh is a developing economy and from 1976 onwards the economy is striving forwards, in both public and private sectors, with the development of trade and industry and overall expansion of the economy, construction sector has also exhibition considerable growth. It has already been mentioned here that bricks are mostly used in the construction of houses apartments, roads and bridges, beside the private housing sector, the major users of bricks are the various Government, Semi-Government and autonomous organization of which the following deserve special mention. a) Public Work Department; b) Roads and Highways; c) Water and Power Development; d) Public Health Engineering; e) Rural Electrification Board; f) Pourashavas and Others; g) Zilla Parlshad (1) Thanas h) Titas Gas etc.

Page 23: Study on Auto Bricks Bangladesh Perspect

23

04. Demand analysis at Micro Level: Bricks are heavy in weight and cannot be transported easily and cheaply to any long distance; therefore, bricks are mostly locally produced and locally used. Only special bricks, like designed ceramic bricks are sometimes brought in from distant place. The Plant under consideration will be located at Goshairhat, Shariatepur, Bangladesh and is expected t o supply bricks to various parts of Dhaka, Barisal, Faridpur, Narayangonj, Shariatepur District. The demand for bricks depends on the number on additional brick built houses and the requirement of bricks in each additional brick built house. As per census 1991 total household in Dhaka Division Stood at 1404,054 of which about 50% has been assumed to be pucca houses. On the basis of the growth rate of 50% per annum, The projected number of pucca houses has been estimated and is shown in table - 1 Statistical YearBook of Bangladesh, 1998, Page - 45.

TABLE - 1

Year No. of House 1999 1017942 2000 1053043 2001 1088144 2002 1123245 2003 1158346 2004 1193447 2005 1228548

It appears from Table-1 that the additional number of pucca houses in Dhaka Divbision will raise from 35101 Nos. on an average per annum. Assuming that each pucca house requires about 40,000 bricks on as average, that total number of bricks to be required for the additional pucca houses has been worked out 140.40 crore. In additional to that demand for bricks in the private sector, huge demand for bricks come from that real estate developers for construction of multistoried apartment/commercial complexes. The apartment project was started in late 70's in Dhaka City. But in yearly 80's with the inception of Eastern Housing Ltd. the business started flourishing. Now this is a booming sector of the economy. A good number of real estate developers are now active in this business. During the last decade apartment project has got tremendous progress. World Bank estimated the demand for housing in urban areas of Dhaka,Chittagong, Rajshahi, Rangpur and Khulna for the period 1980 and 2000 as detailed in Table-11

Items 1980 2000 Demand of Housing Population No.of Housing Population No.of Housing

Dhaka 35 08 93 17 12 Chittagong 14 02 40 07 05 Khulna 07 01 23 04 03

Total 56 08 156 28 20 Bangladesh Urban Sector Memorandum, May, 1981, World Bank.

Page 24: Study on Auto Bricks Bangladesh Perspect

24

The Study shows that annually the number of houses required to be built in Dhaka comes to 60,000 units which is likely to be 12 items higher than the number of actual unit constituted per year, Assuming 40,000 Nos of Bricks per house the total number of bricks to be required for apartment project comes to 800.00 crore PCS. In additional to the residential household, various Government departments and agencies are using bricks Empirical observation reveals that their requirement for bricks would not exceed 10% of the bricks required by household. Hence the total requirement for bricks in both public and private sector would be as shown in Table -111

TABLE -111 Total Requirement of Bricks

Category

Demand in Million Nos.

Household 1404 Apartment 8000

Government 940 Total 10344

It appears from Table-111 that the annual requirement of bricks would be about 130,44 million Nos. 05. Existing Supply: At present the supply of bricks mostly comes from a bricks fields which produce bricks of inferior quality which are being sold at higher price. Due to non-existence of adequate number of automatic brick manufacturing plant in the area, the household users and the government and private institutional users are to use mostly this grade of brick to meet their demand. As such the brick fields will not be the competitor of automatic brick plant rather the automatic brick plant will have comparative advantage over fields in respect of quality and price. 06. Market Share: To what extent the proposed project will be able to win over the users by way of creating a market share for the product will depend on the efficiency of the sponsors to handle appropriate marketing strategies in the from of determination of product pricing, procurement of raw materials, maintenance of product quality, adoption of promotional measures etc. So long as the sponsors of the project will be able to adopt suitable and appropriate marketing strategies, it will create effective demand for the product. 07. Quality: Maintenance of quality of bricks is considered to be one of the determinants for the successful marketing of the product. To have better market, the quality of the product must be ensured; otherwise it may not be able to compete in the local market. The users/consumers for brick generally look forward to the following properties in bricks:

● proper size and thickness ; ● Bright Colour; ● Smoothness of surface ; ● Strength To maintain the above qualities, the project is required to be equipped with automatic machinery to be handled with.

Page 25: Study on Auto Bricks Bangladesh Perspect

25

The proposed side located Goshairhat under Shariatpur district. Spot/Project has connected by road to upozilla road and the well river communication which road the year all necessary carrying can be done. Presently in shariatpur district near about 50 FCK Bricks fields are oprating and 25 Core Bricks (app) Produced all the production are consumed and big demand of adjacent districs can not full fil. If the Padma Bridge work starts then heavy demand of bricks will go up. beside presently all the production can be market by river with low cost carrying to Chadpur, Noakhali, Barishal, Khulna, Dhaka, Narrayanganj, Keranigonj, greates faridpur Dristrict.

Page 26: Study on Auto Bricks Bangladesh Perspect

26

FINANCIAL ASPECT

A statement showing the forecast of earning which includes sales established cost of product and other cost is given the next page. The main assumptions are:-

a) The project will work 300 days in a year on the basis of 8 hours 3 (three)-shift operation per day in kiln operation and 10 hours one shift for raw bricks production.

b) The price of raw materials and finished goods has been calculated on the current price basis.

c) Store and spares for the project has been calculated at 0.50%, 1.00% & 1.50% for the 1st, 2nd & subsequent year on the machinery.

d) The cost of repair & maintenance for the project has been calculated at 0.50%, 1.00% & 1.50% for the 1st and 2nd & subsequent year on the machinery.

e) Rent, Tax, Insurance etc. for the project has been calculated 0.5% every year on the fixed cost.

f) In wage & salaries increment will be at 5% per year.

g) The capacity utilization has been assumed at 70%, 75% & 80% in the 1st, 2nd & subsequent year.

h) Depreciation has been calculated at the following rates:

- Building 5% - Machinery 10% - Furniture 20% - Transport 20% - Intangible assets 19% - Other items 20%