Transcript
  • 8/12/2019 Tatton Cinema Development brief

    1/28

    PlanningBriefFormerTattonCinemaSite

    GatleyRoad,GatleyStockport

    PlanningPolicyUpdateFebruary2014

    StockportMetropolitanBoroughCouncil

    1

  • 8/12/2019 Tatton Cinema Development brief

    2/28

    FORMERTATTONCINEMASITE GATLEYROAD,GATELY,STOCKPORT

    1.0 OBJECTIVE

    1.1 Thepurposeofthisdocumentistoprovideaplanningbrieftoguidethefuturedevelopmentofthissite.ThebriefispreparedbytheEconomicDevelopment and Regeneration Service, Place Directorate, inconsultationwiththeDevelopmentManagementService.

    2.0 BACKGROUND

    2.1 LocationandContext(Plan1)The former Cinema site is located in the Centre of Gatley VillageConservation Area with access from Gatley Road (A560). It benefits

    from close proximity to local shops, community and leisure facilities.Tatton Cinema represents a classic example of a 1930s Cinema. Itcomprises shops on both sides of the imposing facade of the formerCinemaEntranceinthemiddle.TheCinemaclosedin2000.

    2.2 GatleyVillageConservationArea- DesignatedinDecember1979.ThisareaextendsalonglengthsofGatleyRoadandNorthendenRoadencompassing the whole of Church and Old Hall Road. It includesseveral attractively landscapedandhistoricallysignificantopenspacesin the village. There are houses, cottages and public houses built inGeorgianandVictorianperiodsalongwithanimpressiveParishChurchdating from 1881 and Cinema (auditorium demolished in 2003) and

    adjacent shops built in the 1930s and other properties of varyingcharacter.

    FrontagetoGatleyRoad

    2

  • 8/12/2019 Tatton Cinema Development brief

    3/28

  • 8/12/2019 Tatton Cinema Development brief

    4/28

    3.8 PlanningHistoryInrecentyears,threeplanningapplicationhavebeensubmittedtoandconsideredbytheCouncilforthesite:

    ApplicationDC04338:Planningpermissionwasgrantedonthe5 th

    June2002,whichhasnowexpired(referredtoinParagraph3.9);

    ApplicationDC041677:Planningpermissionwasrefused(referredtoinParagraph3.10);

    ApplicationDC041678:ConservationAreaConsentwasrefused(referredtoinParagraph3.10).

    Thedetailsoftheseapplicationscanbeviewedonlineat: www.stockport.gov.uk/planningdatabase

    3.9 The site obtained full planning permission granted on 5 June 2002,whichhassinceexpired,forchangeofuseoffrontofcinematoA1andA2, demolition of cinema auditorium and construction of 3 storeydetached building to provide 21 flats and associated parking. Theconsent was subject toa numberofplanning conditions including thefollowing:

    relating to upgrading of thesideand frontaccessroads toSMBCHighwaysadoptionstandards;

    provision of main surface and foul water sewers along the sideaccess road, which requires a Sewer Requisition from UnitedUtilities;

    Theseconditionsare necessary toensureanappropriatehighwayconstruction and safeaccess and egress to the new and existingpropertiesandsatisfactoryprovisionforsitedrainage.

    Appeals against the refusal of Planning Permission (DC041677) andrefusal of Conservation Area Consent (DC041678) were dismissed inApril2010forpartialdemolitionandreconstructionoftheformerTattonCinemafoyeranddemolitionandreconstructionofadjacenttwostoreyretailunits toprovide 377sqm retailunit (useclassA1),erectionof3storey, 44 bedroom care home (use class C2) on site of formerauditorium,alterationstohighway,provisionofaccess,carparkingandservicing,provisionoflandscapinganddevelopmentancillarythereto.

    3.11 The Inspectorconsideredtheproposal included insufficientcontinuoususableamenityspace,whichwouldharmthelivingconditionsoffuture

    occupiers. The Inspector accepted that a management plan thatrestricted theuseof thedeliverybay fortheproposedretailunitwouldbe likely to control noise and disturbance to adequately safeguardresidential amenity and environmental conditions. The appeal againstthe refusalof Conservation Area consent failed because theplanningappealwasdismissed.Therefore,demolitionwithoutagrantofplanningpermissionforthesitesappropriateredevelopmentwouldhaveresultedinagapsitethatwouldharmtheConservationArea.

    4

    http://www.stockport.gov.uk/planningdatabasehttp://www.stockport.gov.uk/planningdatabase
  • 8/12/2019 Tatton Cinema Development brief

    5/28

    3.12 PublicUtilities Allmainsservicesareavailabletothesitefromtheadjacenthighway,Gatley Road; details can be obtained from the appropriate statutoryutilityprovider.

    4.0 SITECONSTRAINTS

    4.1 Thesitehasbeenclearedafterthedemolitionofthecinemaauditorium.The existing side access road and front access road are in a poorconditionandwillneedtobemadeup,bythedeveloper,toStockportCouncilsadoptionconstructionstandards. Inaddition,asafepedestrianfootpath will be required to link to the existing pedestrian route toCambridgeRoad.Thesitewillalsorequirenewsurfaceandfoulwatersewerstoservethenewdevelopment.

    SideAccessroadfrom RearviewofTattonBuildingsGatleyRoad

    4.2 GroundConditionsThe Council is not aware of any abnormal ground conditions or any

    contaminationonthissitebutitwillbethedevelopersownresponsibilitytoconductadetailed groundsurvey toensurestructural safetyof thenewdevelopment.Thepresenceoffilledbasementorremainsoftheoldcinemastructurefoundationsarelikelyonthesite.

    4.3 AccessLimitationsTheonlyaccessavailableto thesite isviatheexistingprivateaccessway from Gatley Road, which will require upgrading to the CouncilsHighways adoption standards. No vehicular access from CambridgeRoadwillbepermitted.

    4.4 ExistingandAdjacentBuildings

    The buildingsalong thesouthern and western boundary aremainly 2storeyhighbrickbuiltwithflatroofanda3storeyhighCinemaentrancewith imposing Art-Deco facade which makes a positive contribution totheConservationArea.Thesitefrontageistoberetainedinanyfuturedevelopment proposals. The lay byarea in front of these buildings iscurrentlyusedforshorttermparking.

    5

  • 8/12/2019 Tatton Cinema Development brief

    6/28

    4.5 To the east, there are two off ice buildings, Gardale House andBossco,whichshareaccessfromtheprivateaccessroad.Theprivateaccessroadtotheeastsideiscurrentlyusedforparking.

    5.0 POLICYCONTEXT

    5.1 NationalPlanningPolicyFramework(published27thMarch2012)TheNPPFindicatesthatthefollowingusesareappropriateinprinciplewithincentres:

    5.2 Retail development (including warehouse clubs and factory outletcentres); leisure, entertainment facilities, themore intensive sport andrecreation uses (including cinemas, restaurants, drive-throughrestaurants, bars and pubs, night-clubs, casinos, health and fitnesscentres, indoorbowling centres, andbingo halls); offices; arts, cultureand tourism development (including theatres,museums, galleries andconcert halls,hotelsandconference facilities),commercial, community

    andresidentialdevelopment.

    5.3 TheNPPFrecognisesthattheaboveusescanplayanimportantroleinensuringthevitalityofcentres.

    5.4 StockportUDPReview(adopted31stMay2006)Thesite islocatedwithinaConservationAreaandwithinGatleyLargeLocalCentre,asdefinedontheProposalsMap.1-4TattonBuildingfallswithintheSecondaryShoppingFrontageofGatleyLargeLocalCentre.SavedUDPReviewPolicyPSD2.2 (Service uses in theTownCentre,District and Large Local Centres), indicates that a variety of uses areappropriate in principle, including alternative uses of retail units inSecondaryShopping Frontages (e.g.A2use, A3use,A4useandA5useand/orsomesuigenerisfacilities).

    5.5 AsatMay2013, 48% of theSecondaryShoppingFrontageat groundfloor level was in non-A1 use, within which there were 5 houses atChurch Road. Therefore, only a small proportion of the SecondaryShoppingFrontageinGatleyLargeLocalCentreisinresidentialuseatgroundfloorlevel.

    5.6 ItisconsideredthatthelandtotherearoftheTattonBuildingsdoesnotfallwithinthedefinedSecondaryShoppingFrontage.

    5.7 StockportCoreStrategyDPD(adoptedMarch2011)GatleyisaLargeLocalCentreasidentifiedinCoreStrategyCorePolicyCS6 (Safeguarding and strengthening the service centre hierarchy).PolicyCS6,amongstothermatters,seekstosafeguardthevitalityandviabilityof theboroughscentres andto safeguard residential amenity.Policy CS6 seeks a diversity of uses in the boroughs SecondaryFrontages of the types listed in paragraph5.2above.However, CoreStrategy Policy DMP AS-1 (The Vitality and Viability of Stockports

    6

  • 8/12/2019 Tatton Cinema Development brief

    7/28

    ServiceCentres)seekstolimitthelevelofresidentialuseandhotfoodtakeaways at ground floor level in Secondary Frontages to help toachievea balancedmixofnon-A1usesandto optimise the level andcoherence of active frontages in these key locations, therebycontributing to a quality shopping environment andcentre vitality andviability.

    5.8 Thefollowinguses,asdefinedintheSchedule totheTown&CountryPlanning (Use ClassesOrder) 1987 and its subsequent amendments,maybeconsideredacceptableatthesite,inaccordancewiththeNPPF,UDPReviewPolicyPSD2.2andtheCoreStrategy:

    AcceptableUses:A1: Shops(tonotexceed1,500sqmnetretailsalesarea)A2: Financial&ProfessionalServicesA3: RestaurantsandCafesA4: DrinkingEstablishmentsB1(a): Offices

    D1: Non-residentialInstitutions(includesclinics,healthcentres,crches,daynurseriesand non-residential educationandtrainingcentres)

    D2: Assembly and Leisure (includes cinemas, concert halls,bingo halls, dance halls, gymnasiums, other areas forindoor and outdoor sports or recreations not involvingmotorisedvehiclesorfirearms)

    C2: ResidentialInstitutions C3: Dwellinghouses SuiGeneris: Theatre,launderette

    DuetothelocationandimportanceofthesiteinGatleytheCouncilhas apreferenceforamixeddevelopmentincorporatingthefollowing: PreferredUses: A1: Shops(to not exceed 1,500sq m net retail sales area),

    puttingretailwithintheexistingbuildingtothefrontageC3: Dwelling houses, putting new residential development to

    therear

    Theusesconsideredunacceptableinthislocationare: UnacceptableUses: B2: GeneralIndustry B8: StorageorDistribution

    5.9 Any proposal at this site, including any proposals involving uses notincluded in the above list, will be considered on its merits and inaccordance with the criteria contained in this brief, in particular withregardtoaccessandeffectontheamenityofneighbouringuses.

    7

  • 8/12/2019 Tatton Cinema Development brief

    8/28

    6.0 GENERALDEVELOPMENTREQUIREMENTS

    6.1 StockportUnitaryDevelopmentPlanReview(May2006)AnydevelopmentatthesitewillberequiredtoaccordwiththerelevantsavedpoliciescontainedintheadoptedStockportUDPReview,in

    particular:

    HC1.1 DemolitionandTreeFellinginConservationAreas

    HC1.3 SpecialControlofDevelopmentinConservationAreas

    HC1.4 NewUsesforBuildingsinConservationAreas

    CDH1.3 CareandNursingHomes

    CDH1.6 Day-CareNurseries

    E1.2 LocationofNewBusinessPremisesandOffices

    6.2 GiventhesiteslocationwithinGatleyCentreConservationArea,anyplanningapplicationwillberequiredtobeaccompaniedbyaComprehensiveDesignAppraisalStatement. TheCouncilwillexpectdevelopmenttobedesignedtobehighqualitytothesatisfactionoftheLocalPlanningAuthorityandshallbeconstructedinaccordancewiththeBuildingRegulations.

    6.3 StockportCoreStrategyDPD(March2011)AnydevelopmentatthesitewillberequiredtoaccordwiththerelevantpoliciescontainedintheadoptedStockportCoreStrategyDPD,inparticular:

    CS1 Overarchingprinciples:Sustainabledevelopment

    addressinginequalitiesandclimatechange DMPSD-1 CreatingSustainableCommunities

    DMPSD-3 DeliveringtheEnergyOpportunitiesPlansNewDevelopment

    DMPSD-4 DistrictHeating(NetworkDevelopmentAreas)

    DMPSD-6 AdaptingtotheImpactsofClimateChange

    CS2 HousingProvision

    CS3 MixofHousing

    CS4 DistributionofHousing

    DMPH1 DesignofResidentialDevelopment

    DMPH2 HousingPhasing

    DMPH3 AffordableHousing CS5 AccesstoServices

    CS6 Safeguardingandstrengtheningtheservicecentrehierarchy

    DMPAS-1 TheVitalityandViabilityofStockportsservicecentres

    DMPAS-2 ImprovingIndoorSports,CommunityandEducationFacilitiesandtheirAccessibility

    CS7 AccommodatingEconomicDevelopment

    8

  • 8/12/2019 Tatton Cinema Development brief

    9/28

    DMPAED-5 Education,SkillsandTrainingProvision

    DMPAED-6EmploymentSitesOutsideProtectedEmploymentAreas

    CS8 SafeguardingandImprovingtheEnvironment

    DMPSIE-1 QualityPlaces

    DMPSIE-2 ProvisionofRecreationandAmenityOpenSpacein

    NewDevelopments DMPSIE-3 Protecting,Safeguardingandenhancingthe

    Environment

    DMPSIE-5 AviationFacilities,TelecommunicationsandotherBroadcastInfrastructure

    CS9 TransportandDevelopment

    CS10 AnEffectiveandSustainableTransportNetwork

    DMPT-1 TransportandDevelopment

    DMPT-2 ParkinginDevelopments

    DMPT-3 SafetyandCapacityontheHighwayNetwork

    6.4 SupplementaryPlanningGuidance(SPG)andSupplementaryPlanningDocuments(SPD)ThefollowingSPGsandSPDsareconsideredtoberelevanttousesthatareacceptableattheformerTattonCinemasite:

    DayCareNurseriesSPG

    DesignofResidentialDevelopmentSPD

    LocalEmploymentandTrainingBenefitsSPD

    RecreationalOpenSpaceProvisionandCommutedPaymentsSPG

    ShopfrontsandRelatedAdvertisementsSPG

    SustainableDesignandConstructionSPD(StockportsassociatedSustainabilityChecklistrequiredonmajordevelopmentsover1000sqm)

    SustainableTransportSPD

    TransportandHighwaysinResidentialAreasSPD

    6.5 OtherdesignguidanceOther design guidance specific to Stockport is available via:http://www.stockport.gov.uk/services/environment/planningbuilding/plann ingpolicy/policyguidance/policydesignguidance/Suchguidancecomprises:

    Recyclingandrefusecollectionservicesadesignguideforresidentialdevelopers;

    Informationon theDisabilityDiscrimination Act1995 (also refer to theEqualityAct2010);

    InformationonCrimeImpactStatements;and

    Guidanceforthoseconsideringwaysofprovidingfacilitiesforsmokers.

    LowCarbonDesignGuidanceandsampleenergystatementsarealsoavailableatwww.stockport.gov.uk/planningsustainabledevelopment

    9

    http://www.stockport.gov.uk/services/environment/planningbuilding/plannhttp://www.stockport.gov.uk/planningsustainabledevelopmenthttp://www.stockport.gov.uk/services/environment/planningbuilding/plannhttp://www.stockport.gov.uk/planningsustainabledevelopment
  • 8/12/2019 Tatton Cinema Development brief

    10/28

    6.6 ValidationChecklistChecklistsareprovidedtoassistinidentifyingalltheinformationrequirementsofaproposal.Theyalsohelptoreducedelayindeterminingplanningapplications.Furtherinformationaboutthesechecklistsisavailableat:http://www.stockport.gov.uk/services/environment/planningbuilding/plann

    ing/applyforpermission/validationchecklists

    7.0 DEVELOPMENTOPTIONS

    7.1 The redevelopment of the site has scope to significantly enhance avacant site. The site is within a sustainable and accessible location,situated close (approx.15m) to high frequency local public transportroutes to Manchester & Stockport Centres and just 215m away fromGatley Railway Station with frequent trains to and from PiccadillyRailwayStationinManchester.

    7.2 An in-fill development at this currently vacant site should add to thevitality of Gatley Large Local Centre, which is also a designatedConservationArea.

    7.3 The development of this site offers an opportunity for an imaginativedevelopmentinthisprominentlocation. StockportCouncilenvisages:

    Thedevelopmentofanacceptableuse(oruses)ontheclearedpartofthesite,asidentifiedinparagraph5.8above,possiblyaspartofamixedusedevelopment;

    Imaginative restoration and sympathetic rear extension of the TattonCinemabuilding;

    Integrationofthenewdevelopmentwiththeexisting2storeybuildingsadjoiningeithersideofthecinemaentrance;

    Development that relateswell to theexistingsurroundingdevelopmentand routes through and around it, which resolves any conflicts in acreativemanner;

    Safeguarding theexisting landscape features, especially mature treesalongthenorthernboundaryandenhancethelandscapequality;and

    Creationofaninnovativeandsensitivedevelopmentappropriateforthisimportant central site, which adds to the vitality of the centre andimprovesthestreetscenebyqualityhardandsoftlandscapefeaturesandstreetfurnitureappropriatetotheConservationArea.

    7.4 Non-ResidentialUsesNumerousnon-residentialusesareidentifiedaboveasbeingacceptableuses at this site. Core Strategy Policy DMP AS-1 (The Vitality andViabilityofStockportsServiceCentres)indicatesthatindividualA1useunits should not exceed 1,500sq m net retail sales area within LargeLocal Centres. Core Strategy Core Policy CS6 indicates that anyproposalsthatseektoprovideA1,A2,A3,A4,B1(a)and/orD2useintheboroughscentresaretobeprovidedatascalecommensuratewith

    10

    http://www.stockport.gov.uk/services/environment/planningbuilding/plannhttp://www.stockport.gov.uk/services/environment/planningbuilding/plann
  • 8/12/2019 Tatton Cinema Development brief

    11/28

    the scale, role and function of the centre and in a manner thatsafeguardscentresandresidentialamenityfromanyadverseimpacts.

    7.5 AppendicesA&Bprovidefurtherguidelines.

    7.6 Itisconsideredthattheunacceptableusesidentifiedabove(B2general

    industry&B8storageordistribution)wouldbeinappropriateatthissitebecause they would be likely to unacceptably adversely impact onresidentialamenityinthearea.

    7.7 ResidentialUseThe site meets the second spatial priority area for the distribution ofhousingwithintheboroughidentifiedinCoreStrategyCorePolicyCS4Distribution ofHousing.The site isaccessible tocommunity facilities,shopsandservices and achieves anaccessibility score ofaround68.ParticularlyrelevantplanningpoliciesforresidentialproposalsareCoreStrategypolicyCS3 Mix ofHousing,DMP H-1 Designof ResidentialDevelopmentandDMPH-3AffordableHousing.

    7.8 TheCouncilenvisagesahighdensityhousingdevelopmentonthissite,which would broadly reflect the massing of the auditorium buildingformerlyonthesite. Threestoreydevelopmentisconsequentlylikelytobe appropriate, the detail of which will be subject to discussion withStockportCouncil.

    7.9 AppendixCprovidesfurtherguidance.

    7.10 AffordableHousingGatleyspropertypricesareabovetheStockportaverage.CoreStrategyPolicyDMPH-3indicatesthatsubjecttoviability,StockportCouncilwillnegotiate to achieve30% affordablehousing where proposals involvetheprovisionof5dwellings(gross)ormoreandsitesof0.5hectaresormore.Theproportionofaffordablehousingrequiredshouldbereflectedinthecostofland.

    7.11 However, the relevant threshold and proportion of affordable housingapplicabletospecificsiteswillbedeterminedbycomparingStockportsaveragepropertypricewithpropertyprices inthe immediatelocalityofthesiteandthelikelysalespricesofthecompleteddwellings.

    7.12 In most areas, 75% of theaffordable housing provided bydevelopers

    shouldbeintermediatehousingforStockportresidentsonaverageandbelow average incomes. The remaining 25% should be social rentedhousing. Inareaswith aboveaverage propertypricesand aparticularlackofsocialrentedhousing,theaffordablehousingtenurespiltsoughtwillbe50%intermediatehousingand50%socialrentedhousing.Gatleyiscurrentlyconsideredtobeoneofthoseareas.

    11

  • 8/12/2019 Tatton Cinema Development brief

    12/28

    7.13 BuildinginContext Designofthedevelopmentshouldrespectitssettingandsurroundingsanditsrelationshiptoitsenvirons.Thescale,massingandheightofthedevelopment should be consistent with Core Strategy policies CS8,DMPH-1,DMPSIE-1,DMPSIE-3andDMPSIE-5.FurtheradvicecanbefoundinStockportCouncilsSPDsandSPGsidentifiedabove.

    7.14 Energy&CarbonEmissionsAllnewdevelopmentintheBoroughisrequiredtoconsiderenergyuseandcarbonemissions,andto showtheseconsiderationsin anEnergyStatement. Developments of more than 1000 sq m or more than 10dwellingshavetotakeintoaccountthecarbonreductiontargetslaidoutin Core Strategy Policy SD3 and detailed how they will be achievedwithin an appropriate Energy Statement. The Low Carbon DesignGuidanceandsampleenergystatementsofferassistancewithpreparinganenergystatementaswellasincorporatinglowcarbondesign.

    7.15 Materials

    Alterationsandextensionstotheexistingbuildingandanynewdevelopmentshouldensureexternalmaterialsareofgoodquality,hardwearingandvisuallysympatheticintermsofcolourandtexturetothecharacteroftheexistingbuildings.DetailsandmaterialsofexternalconstructionmustbeagreedinwritingbytheLocalPlanningAuthoritypriortocommencementofdevelopment,shouldPlanningPermissionbegrantedfordevelopmentatthesite.

    7.16 AccessVehicularandpedestrianaccesswillbegainedbyimprovingtheexistingprivateaccessroadalongtheeasternboundary,whichwillneed tobebuilt to highway adoption standards. A safe and secure pedestrianfootpathisrequiredtolinktothepedestrianroutetoCambridgeRoadandvehicularaccesstotheexistingbackalleywaytotheeastside.

    7.17 There isalso anopportunityto open access to the backof propertiesfacingGatleyRoadandOldHallRoadbothtoprovideoffstreetparkingwithintheirownrearyardsandrefuseservicecollectionfromtherear.

    SideAccessroadviewfromNorth RearviewofTattonBuildings

    12

  • 8/12/2019 Tatton Cinema Development brief

    13/28

    7.18 The front road to Tatton Buildings Block needs to be made up toHighways Adoption Standards along with any traffic managementmeasurestoimprovethesafetyandcontrolrandomparking.

    7.19 Development should address the needs of motorists along withotherroadandpublictransportusersbypromotingmoresustainabletransport

    choicepublictransport,cyclingandwalkingshallbeconvenienttousewith theaim to reduce theneed to travel by car. This wouldhelp toreduce congestion, pollution and promote walking and use of cyclingalong with the access needs of disabled persons as indicated in theNPPF and Core StrategyCorePolicies CS1andCS9. Thedevelopermay be required to make a contribution towards the costs ofinfrastructure to facilitate improvement to and promotion of walking,cyclingandpublictransportnetworks,inaccordancewithDMPolicyT-1intheCoreStrategyDPD.

    7.20 ParkingParking should be provided in accordance with the Councils parking

    standardsasexplainedintheattachedAppendicesA,B&C.

    7.21 Landscaping:InadditiontoretentionandprotectionofexistingmaturetreesalongtheNorthernboundary,asuitableschemeshowingbothhardandsoftlandscapingfeatureswillberequiredasanintegralpartofanydevelopment.DetailsofthelandscapingschememustbeagreedinwritingbytheLocalPlanningAuthoritypriortocommencementofdevelopment,shouldPlanningPermissionbegrantedfordevelopmentatthesite.

    7.22 SecurityStockport Council requires all planning applications for MajorDevelopmentstobeaccompaniedbyaCrimeImpactStatement.MajorDevelopmentincludesresidentialdevelopmentof10ormoreunitsandthe erection of buildings of 1000sq m or more floorspace for nonresidentialuse.

    7.23 The layout should take into account security and crime preventionmeasuresandadviceisavailablefromGreaterManchesterPoliceCrimePreventionDesignAdvisors.EarlyConsultationswillbeusefultoensurethatappropriatemeasuresareincludedintheproposals.

    7.24 TheSecureByDesignandSaferPlacesprinciplesshouldbereferredtoindesigninganyscheme,whichcouldbeusedasaguidefortheuseofthebuilding.Inparticular,areasofpublicaccessshouldbedesignedto allow natural surveillance through good visibility and incorporateeffectivelighting.

    13

  • 8/12/2019 Tatton Cinema Development brief

    14/28

    7.25 NoiseParticular regard should be had to Core Strategy Policy DMP SIE-3,which covers noise issues. The Party Walls and Floors in dwellingsshould have appropriate noise attenuation to comply with currentregulationsfortheamenityofthefutureandanyneighbouringresidents.

    7.26 ThesiteislocatedwithintheManchesterAirportSafeguardingZone.AnyproposalswillbesubjecttoconsiderationunderCoreStrategyPolicyDMPSIE-5AviationFacilities,TelecommunicationsandotherBroadcastInfrastructure,withbuildingheightrestrictedtolessthan45metres.

    8.0 CONTACTS

    8.1 Stockport Metropolitan Borough Council

    NicolaTurner

    HeadofEconomicDevelopment&Regeneration [email protected] Tel:01612181635

    AndyKippax HeadofStrategicHousing [email protected] Tel:01614744319

    RichardWood PlanningPolicyManager [email protected] Tel:01614744386

    AngieJukes Health&EnvironmentAdvisor(Energy) [email protected] Tel:01614744385

    DevelopmentManagement EmmaCurle DevelopmentTeamManager [email protected] Tel:01614743542

    PaulHartley ProfessionalSupport&ConservationManager [email protected] Tel:01614744563

    KevinBrooks SeniorEngineer [email protected] Tel:01614744905

    PippaBrown DesignSpecialist [email protected] Tel:01614743531

    14

  • 8/12/2019 Tatton Cinema Development brief

    15/28

    8.2 ServicesMain services are available in the existing highways. Detailedinformation of all services is available from the appropriate statutorybody.

    United UtilitiesDeveloperServices&PlanningTeam Waterenquiriesemail:[email protected]:[email protected]

    Electricity North WestTel:08001954141 Web:www.enwl.co.uk

    National GridSalesOrderProcessing POBox5516

    Wolverhampton WV19NZ Tel:08709039999 Web:www.nationalgrid.com/gasservices

    British Telecom PlcWeb:www.bt.com/ Tel:02073565000

    8.3 Information

    StockportUDPReviewwww.stockport.gov.uk/udp

    StockportCoreStrategyDPDwww.stockport.gov.uk/corestrategy

    Supplementary Planning Documents (SPDs) and Guidance(SPGs):www.stockport.gov.uk/spd

    GreaterManchesterPoliceCrimePreventionDesignAdvisorDesignforSecurityConsultancyBoyerStreetManchesterM160RETel:01618565928

    CommissionforArchitectureandtheBuiltEnvironment(CABE)

    DesignCouncilAngelBuilding407StJohnStreetLondonEC1V4ABTel:02074205200Email:[email protected]

    15

    mailto:[email protected]:[email protected]:///reader/full/www.enwl.co.ukhttp://www.nationalgrid.com/gasserviceshttp:///reader/full/www.bt.comhttp://www.stockport.gov.uk/udphttp://www.stockport.gov.uk/corestrategyhttp://www.stockport.gov.uk/spdmailto:[email protected]:[email protected]:///reader/full/www.enwl.co.ukhttp://www.nationalgrid.com/gasserviceshttp:///reader/full/www.bt.comhttp://www.stockport.gov.uk/udphttp://www.stockport.gov.uk/corestrategyhttp://www.stockport.gov.uk/spd
  • 8/12/2019 Tatton Cinema Development brief

    16/28

    9.0 APPENDICIESPlans 1,2&3AppendixA BusinessUseAppendixB RetailUseAppendixC Dwellinghouses

    16

  • 8/12/2019 Tatton Cinema Development brief

    17/28

    Plan1

    17

  • 8/12/2019 Tatton Cinema Development brief

    18/28

    Plan2

    18

  • 8/12/2019 Tatton Cinema Development brief

    19/28

    Plan3

    19

  • 8/12/2019 Tatton Cinema Development brief

    20/28

    PlanningBriefAppendixA

    1.0 B1- BUSINESSUSE

    1.1 OfficesotherthanA2usefallwithinuseclassB1(a)BusinessUse.

    1.2 DesignThepredominantheightofanybuildingsshouldnotexceed4storeysandthedevelopmentshouldsafeguardandenhance(wheresuitable)satisfactorylevelsofaccess,privacyandamenityforfuture,existingandneighbouringusersandresidents.

    1.3 ParkingProvisionAdequateparkingshallbeprovidedtothestandardscontainedintheUDPReview,whichrequirethefollowingforB1useoffices:

    Maximumgeneralparking

    provision

    1/30sqm

    Minimumdisabledpersonsparkingprovision

    1050sqm4(plus4%ofcarparkcapacityover31spaces)

    Minimumcycleparkingprovision 1/400sqm,min2Minimummotorcycleparkingprovision

    1400sqm1/1400sqm

    Notes:

    AllfloorareasGrossFloorArea(GFA)unlessotherwisestated.

    Where(plusx%ofcarparkcapacityoveryyspaces)isreferredtothefigureyyspacesexcludesdisabledprovision.

    PublicFloorArea(PFA)excludestoiletareas.

    Minimumparkingbaysize2.4mx4.8m(endaccess,ideally2.5mx5m),2x6m(kerbside),maximumbaysize3.0mx6.0m.

    MinimumdisabledparkingbaysizetocomplywithDepartmentforTransportguideInclusiveMobilityAGuidetoBestPracticeonAccesstoPedestrianandTransportInfrastructure2002,orinlinewiththemostrecentDepartmentforTransportguidance.

    Wheredisabledprovisionisreducedbecausenearbyonstreetorpubliccarparkprovisionisavailable,nearbyistakentomeanwithin50moftheentrancetothepremises.

    1.4 Thecarparkneedstobewelllitandsecureforitsusers.Ensuringthesafetyandsecurityofusersshouldnotcauseharmtothewiderenvironment,thecharacterofthebuildingoraccessibility.

    20

  • 8/12/2019 Tatton Cinema Development brief

    21/28

    1.5 Sufficientmanoeuvring,standingandunloadingspaceisrequiredwithinthesiteforthemaximumnumberofservicevehicleslikelytoservethedevelopmentatanytime.

    1.6 LandscapingBesides retaining and protecting mature existing trees within the

    boundary, a suitable scheme showing both hard and soft landscapefeatures appropriate to the development must be submitted to andapproved in writing with the Local Planning Authority prior tocommencementofdevelopment.

    1.7 MaterialsAlterations to theexisting building and any extensions should ensureexternal materials are of good quality, hard wearing and visuallysympathetic in terms of colour and texture to the character of theexisting buildings. The schedule of materials of external constructionmust be submitted to and approved in writing by the Local PlanningAuthoritypriortocommencementofdevelopment.

    21

  • 8/12/2019 Tatton Cinema Development brief

    22/28

    PlanningBriefAppendixB

    1.0 A1- RETAIL

    1.1 DesignRetaildevelopmentshouldcomplywiththeappropriateUDPReview

    policies,CoreStrategypoliciesandtheNPPFandtakeintoaccounttheShopfrontsandrelatedAdvertisementsSPG,LocalEmploymentandTrainingBenefitsSPD,SustainableDesignandConstructionSPDandSustainableTransportSPD.

    1.2 ParkingProvision:AdequateparkingshallbeprovidedtothestandardscontainedintheUDPReview,whichrequirethefollowingforA1useretail:

    Parking TypeofDevelopmentStandardsfor

    A1use(Shops)Retail900sqm

    GFA

    Non-foodretail>900sq

    mGFAMaximum

    generalparkingprovision

    1/25sqm 1/14sqm 1/20sqm

    Minimumdisabledparking

    provision

    500sqm3spaces

    4(plus4%ofcarpark

    capacityover56spaces)

    4(plus4%ofcarpark

    capacityover41spaces)

    Minimumcycle

    parkingprovision

    1/200sqm,min

    2

    1/200sqm 1/200sqm

    Minimummotorcycle

    parkingprovision

  • 8/12/2019 Tatton Cinema Development brief

    23/28

    Minimumparkingbaysize2.4mx4.8m(endaccess,ideally2.5mx5m),2x6m(kerbside),maximumbaysize3.0mx6.0m.

    MinimumdisabledparkingbaysizetocomplywithDepartmentforTransportguideInclusiveMobilityAGuidetoBestPracticeonAccesstoPedestrianandTransportInfrastructure2002,orinlinewiththemostrecentDepartmentforTransportguidance.

    Wheredisabledprovisionisreducedbecausenearbyonstreetorpubliccarparkprovisionisavailable,nearbyistakentomeanwithin50moftheentrancetothepremises.

    1.3 Thecarparkneedstobewelllitandsecureforitsusers.Ensuringthesafetyandsecurityofusersshouldnotcauseharmtothewiderenvironment,thecharacterofthebuildingoraccessibility.

    1.4 Sufficientmanoeuvring,standingandunloadingspaceisrequiredwithinthesiteforthemaximumnumberofservicevehicleslikelytoservethedevelopmentatanytime.

    1.4 LandscapingBesidesretainingandprotectingmatureexistingtreeswithinthe

    boundary, a suitable scheme showing both hard and soft landscapefeatures appropriate to the development should be submitted to andapproved in writing by the Local Planning Authority prior tocommencementofdevelopment.

    1.5 MaterialsAlterations to the existing building and any extensions should

    ensureexternalmaterialsareofgoodquality,hardwearingandvisuallysympathetic in terms of colour and texture to the character of the

    existing buildings. The schedule of materials must be submitted andapproved in writing by the Local Planning Authority prior tocommencementofdevelopment.

    23

  • 8/12/2019 Tatton Cinema Development brief

    24/28

    PlanningBriefAppendixC

    1.0 C3- DWELLINGHOUSES

    1.1 ResidentialUseResidentialdevelopment shouldcomplywith the UDPReviewpolicies,

    Core Strategy policies and theNPPF. Inaddition, proposals involvingthe provision of residential development should take into account theDesign of Residential Development SPD, Recreational Open SpaceProvision and Commuted Payments SPG, Sustainable Design andConstruction SPD, Sustainable TransportSPDand theTransport andHighwaysinResidentialAreasSPD.Thedevelopmentshouldbeamixof house types, size and design to bring variety whilst retaining anoverallcohesiveappearance. Thescale,massingandorientationofanyproperties should safeguard the amenity of the existing adjacentresidentialproperties.

    1.2 Density

    Stockport Council envisages a high density housing development ofpredominantly3 storeyshighon thissiteandanyadditionalheightwillbesubjecttodiscussionwithStockportCouncil.

    1.3 AffordableHousingGatleyspropertypricesareabovetheStockportaverage.CoreStrategyPolicyDMPH-3indicatesthatsubjecttoviability,StockportCouncilwillnegotiatetoachieve30%affordablehousingwhereproposalsinGatleyinvolve the provision of 5 dwellings (gross) or more and sites of 0.5hectaresormore.

    1.4 However, the relevant threshold and proportion of affordable housingapplicabletospecificsiteswillbedeterminedbycomparingStockportsaveragepropertypricewithpropertypricesin the immediate localityofthesiteandthelikelysalespricesofthecompleteddwellings.

    1.5 In mostareas, 75% of theaffordablehousing provided bydevelopersshouldbeintermediatehousingforStockportresidentsonaverageandbelow average incomes. The remaining 25% should be social rentedhousing. Inareaswith aboveaveragepropertypricesanda particularlackofsocialrentedhousing,theaffordablehousingtenurespiltsoughtwillbe50%intermediatehousingand50%socialrentedhousing.

    1.6 PrivacyDistancesThe Council encourages innovation and good design in newdevelopments, whilst ensuring satisfactory privacy and space aboutdwellings.TheCouncilsTheDesignofResidentialDevelopmentSPDsets out guidance on privacy distances and includes the followingminimumspacestandardsnormallyappliedbyStockportCouncil:

    DwellingHeight StandardFor 1-2 storey dwellings:

    24

  • 8/12/2019 Tatton Cinema Development brief

    25/28

    Between habitable room windowson the public or street side ofdwellings

    21metres

    Between habitable room windowson the private or rear side ofdwellings

    25metres

    Between habitable room windowsand a blank elevation, elevationwith non-habitable rooms or withhighlevelwindows

    12metres

    Between habitable room windowsand site boundary (with specialdesign, ground floor kitchenwindowsmaybeconsideredmoreflexibly)

    6metres

    For 3+ storeys: Add 3 metres per storey to theabovedistances

    Note:Thesedistancesmaybeincreasedtoaccommodatechangesinlevel.Habitable rooms includelounges, livingrooms,morning rooms,diningrooms,bedrooms,kitchens,playrooms,studies,conservatoriesand anyother rooms whereoccupants spend significantamountsoftime.

    1.8 RecreationandAmenityOpenSpaceResidential development shall be required to provide recreation andamenityinaccordancewithCoreStrategypolicyDMPSIE-2ProvisionofRecreationandAmenityOpenSpaceinNewDevelopmentsandtheRecreationalOpenSpaceProvisionandCommutedPaymentsSPG.

    Policy DMP SIE-2 provides the following guidelines for large newresidentialdevelopment:

    Where occupancy levels of 100 people or more are expected,openspaceatastandardof1.7haper1,000populationforformalrecreationand0.7haper1,000populationforchildrensplayandcasualrecreationshouldbeprovided;

    Where occupancy levels between 50 and 100 people areexpected,openspaceatastandardof0.7haper1,000populationfor childrensplay and casual recreationshouldbeprovided. Inaddition,acontributiontoformalrecreationspacewillberequired.

    Small new residential developments will be required to contribute

    towards theprovision of open space for formalandcasual recreationandchildrensplayinlocationswhichareaccessibletofutureoccupiers.Suchcontributionswillbefairlyandreasonablyrelatedinscaleandkindtothepermitteddevelopment.

    Asfaraspossible,theopenspaceshouldbewithinoradjacenttothenewdevelopmentandplayprovisionshouldinclude facilitiesbasedonthehierarchysetoutinthePlayFacilitiesTable.

    25

  • 8/12/2019 Tatton Cinema Development brief

    26/28

    However,provisionofsomeoralloftherecreationalopenspaceoffsiteorthroughcontributionstoimproveand/orexpandanexistingfacilityorcreate a new one will be permitted / required where the Council issatisfiedthatthereisnopracticalalternativeorthatitwouldbebettertodoso.

    1.9 AmenitySpaceProvisionThecontextandsettingofprivateamenityspaceshouldbeanintegralpartoftheoveralllayoutofaresidentialdevelopmentandbewellrelatedtothedwellingsserved. TheCouncilsstandardofprovisionrequiredissetoutintheDesignofResidentialDevelopmentSPD:

    DwellingSize Standard1bedflat Balcony area of 5sqm and / or

    adequately screened communalamenity space with minimumprovisionof18sqmperunit

    2+bedflat 35sqm communalamenityspaceper

    unitSmallfamilyhouse2/3beds 75sqm(50forterraced)preferably to

    therearoftheproperty4/5beds 100sqm

    Privacy and space requirements can be achieved through skilful andinnovativedesigntocreateamoreinterestingurbanform,providedthespaceprovidedcandemonstratetheappropriateprovision.

    1.10 MaterialsAlterations to theexisting building and any extensions should ensure

    external materials are of good quality, hard wearing and visuallysympathetic in terms of colour and texture to the character of thesurrounding area. The schedule of materials of external constructionmust be submitted to and approved in writing by the Local PlanningAuthoritypriortocommencementofdevelopment.

    1.11 AccessDevelopment should address the needs of motorists along with otherroadandpublictransportusersbypromotingmoresustainabletransportchoicepublictransport,cyclingandwalkingshallbeconvenienttousewith the aim to reduce the need to travel by car. This would help toreduce congestion, pollution and promote walking and use of cycling

    along with the access needs of disabled persons as indicated in theNPPFandCoreStrategyCorePoliciesCS1andCS9.

    1.12 ParkingParkingstandardsforC3DwellinghousesaresetoutinAppendix9 oftheUDPReviewandaresummarisedbelow:

    26

  • 8/12/2019 Tatton Cinema Development brief

    27/28

    TypeofDevelopment

    C3Dwellings

    Housing ShelteredHousing

    Maximumgeneral

    parkingprovision

    2/dwelling 1/3dwellings

    plus2perwardensdwelling

    Minimumdisabledparking

    provision

    Ifparkingreservedtoindividualdwellings1/dwellingtodisabledstandard.Ifparkingnotreservedtoindividual

    dwellingsminimum1/10dwellings.

    10%ofspacesto

    bedisabledstandard

    Minimumcycleparking

    provision

    Ifnogarage1inlockablestore Norequirement

    Minimummotorcycle

    parkingprovision

    Norequirement Norequirement

    Comments Ifparkingreservedtoindividualdwellingsdisabledprovisionincludedinmaximum

    provision.Ifparkingnotreservedtoindividualdwellingsdisabledprovisionis

    inadditiontomaximum.Maximumexcludesgarageswithin

    individualdwellingcurtilagesbutincludessharedaccessenclosedcarparks.

    -

    Notes:

    AllfloorareasGrossFloorArea(GFA)unlessotherwisestated.

    Where(plusx%ofcarparkcapacityoveryyspaces)isreferredtothefigureyyspacesexcludesdisabledprovision.

    PublicFloorArea(PFA)excludestoiletareas.

    Minimumparkingbaysize2.4mx4.8m(endaccess,ideally2.5mx5m),2x6m(kerbside),maximumbaysize3.0mx6.0m.

    MinimumdisabledparkingbaysizetocomplywithDepartmentforTransportguideInclusiveMobilityAGuidetoBestPracticeonAccesstoPedestrianandTransportInfrastructure2002,orinlinewiththemostrecentDepartmentforTransportguidance.

    Wheredisabledprovisionisreducedbecausenearbyonstreetorpubliccar park provision isavailable, nearby is taken tomeanwithin50moftheentrancetothepremises.

    1.13 Landscaping:

    27

  • 8/12/2019 Tatton Cinema Development brief

    28/28

    Besides retaining and protecting mature existing trees within theboundary, a suitable scheme showing both hard and soft landscapefeatures appropriate to the development must be submitted to andapproved in writing by the Local Planning Authority prior tocommencementofdevelopment.

    1.14 SecurityThe layout should take into account security and crime preventionmeasures included in NHBC recommendations BS8220 and adviceguidancefromtheGreaterManchesterPoliceCrimePreventionDesignAdvisor. Early Consultations will be useful to ensure that appropriatemeasuresareincludedintheproposals.

    The Secure By Design and Safer Places principles should beincorporatedinthedesignofthedevelopment.Inparticular,theareasofpublicaccessshouldbedesignedtoincludenaturalsurveillancethroughgoodvisibilityandincludeeffectivelighting.

    1.15 NoiseThePartyWallsandFloorsindwellingsshouldhaveappropriatednoiseattenuation to comply with current regulations for the amenity of theresidents.Where thesite isaffectedbyAircraftNoiseContours,noiseattenuationmeasuresarerequiredtocomplywithCoreStrategypolicyDMP SIE-3 Protecting, Safeguardingandenhancing the Environmentand the guidance contained in the NPPF. A minimum distance of 30metres shall be required from the operational railway track to anyhabitableroom.


Recommended