Transcript
Page 1: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over 100 so I shortened it to give you just a taste.

Please note that the timings for this presentation were different than they are here – there was a presenter who was clicking to the next slide when he was done speaking – here the slides are transitioning automatically, so you might not have enough time to read the entire slide.

So when you are ready, just click once to start.

THANK YOU FOR WATCHING – ROSE LAWLESS

Page 2: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

Project Goals

Your Company purchased 6.22 acres on Water Tower Road during the summer of 2007.

This will be the new home of the Your Operations Division.

Page 3: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

Project Goals

WHY OUR COMPANY, YOU ASK???

Our project goal is to take this location from the current condition of a vacant parcel with a preliminary plan, through design, specifications, site plan approval, permitting, bidding to the various trades, construction, obtaining a Certificate of Occupancy and moving YOU in to a beautiful new facility no later than August, 2009.This goal will be realized through the use of our firm which has the knowledge and proven experience to achieve this goal.

Page 4: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

Procedures

PHASE I –

SCHEMATIC DESIGN STUDIESPHASE II –

DESIGN DEVELOPMENTPHASE III –

CONSTRUCTION DOCUMENTSPHASE IV –

CONSTRUCTION

Page 5: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

Phase II – Design Development

Upon approval of Schematic Designs and owners authorization to proceed:

•Development of the concept•Finalize floor plans and elevations•Complete site plans

Page 6: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

AUTOCLAVED AERATED CONCRETE

+ + + = AAC

Cement water lime sand

Page 7: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

YOUR site

Page 8: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over
Page 9: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

Boynton Pump & Irrigation

Corporate Office/Distribution Facility

Location: Lake Park, Florida

Client: Boynton Pump and Irrigation

Designed By: MY COMPANY

Size: 40,000 S.F.

Features: This facility combines tilt wall construction and a USA Pre-engineered Metal Building System. It contains two (2) showrooms and distribution warehousing with truck docking facilities.

Steel Structure

during construction

COMPLETED PROJECT

Page 10: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

Technology - More GREEN!

GREENBUILDING

INSULATION

IMPACTWINDOWS

GALVANIZEDMETALROOF

LOW WATERUSE

PLUMBING

CARPET AND

FLOORINGMATERIALS

ENERGY STAR

PROGRAM

SHADE TREES

WHAT CAN WE DO TOMAKE YOURBUILDINGGREEN?

•HEBEL AUTOCLAVED AERATED CONCRETE

•INSULATED COMPOSITE WALL PANELS

•RECYCLED STEEL STRUCTURE

•REFLECTIVE WHITE METAL ROOF

•IMPACT WINDOWS

•CARPET AND FLOORING

•“ENERGY STAR” PRODUCTS

•PLUMBING

•SHADE TREES/IRRIGATION

•HIGH-EFFICIENCY LIGHTING

Page 11: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

RECYCLED STEEL

Steel is the most recycled material in North America, according to the Steel Recycling Institute.

More than 68 million tons are recycled each year. In fact, all new steel made in North America contains recycled steel.

Page 12: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

LANDSCAPING/IRRIGATION OPTIONS

Overflow rainfall is collected in silo-like cisterns and used to maintain landscaping. An on-site, constructed wetland and landscaped bioswales cleanse water from the parking area before it leaves the site.

Page 13: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

REFLECTIVE WHITE METAL ROOF

Page 14: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

REFLECTIVE WHITE METAL ROOF

Page 15: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

ENERGY EFFICIENT CARPET AND FLOORING

30,000 lbs of crumb rubber from tires A DAY are recycled.

10,000,000 pounds of tires are used per year to produce carpet and flooring.

Page 16: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

ENERGY STAR PROGRAM

Tax Deductions for Commercial Buildings:A tax deduction of up to $1.80 per square foot is available to owners or designers of new or existing commercial buildings that save at least 50% of the heating and cooling energy of a building that meets ASHRAE Standard 90.1-2001.

Page 17: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

HIGH EFFICIENCY ELECTRIC

Efficient Fluorescent Lighting

WANTED DEAD OR ALIVE. LOW EFFICIENCY HID LIGHTINGEarn Rewards Up To $140 Per HID Fixture

Page 18: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

Technology - More GREEN!WHAT CANSHADE TREESDO TO HELPSAVE ENERGY?

When shade trees cool a building, such that one unit of air conditioning energy is avoided, 5 to 10 units of primary energy are avoided at the power plant. 

Page 19: This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over

Thank you for watching and I hope to work with you in the very near future!

Click ESC key to exit.

Rose LawlessYour Office On Call


Recommended