Community Health Connections Electronic Health Records (EHR) Implementation

EHR Implementation Plan Presentation

Embed Size (px)

DESCRIPTION

Electronic Health Records Implementation Plan for a fictitious community clinic based on implementing MedSphere OpenVista.

Citation preview

Page 1: EHR Implementation Plan Presentation

Community Health Connections

Electronic Health Records (EHR)

Implementation

Page 2: EHR Implementation Plan Presentation

Individual Role

David Montanez Project Manager

Luis Perez Clinical Analyst

Keri Vogtmann Project Manager

Sarah Leake Clinical Analyst

Lynda Flower Clinical Analyst

Elizabeth Wellner PMS & Billing Analyst

Warren Goldberg Risk, Regulation & Stakeholder Analysis

Carmen Matthews Training Specialist

DeEtte Trubey Project Manager

Mona Naoum Project Coordinator

Ann Winclair Graphics Designer

Panel 1 – Introduction

2

Page 3: EHR Implementation Plan Presentation

Implementación del Sistéma de Records Médico ElectrónicoImplementing EHR

Beneficios en la implementación del EHR Los costos administrativos generales pueden

reducirse, Los errores de datos puede reducirse, y Los resultados adversos pueden ser más

rápidamente identificados

3

Page 4: EHR Implementation Plan Presentation

CHC Story

Founded 30 years Federally Qualified Health Center

3 Clinics Providing Adult Medicine, Women’s Health, Mental Health

& Pediatric services Mobile clinic for school programs

Laboratory (LAB), Pharmacy (PHM) & Radiology (RAD) at the 3 clinics

$1.6 million grant to implement & EHR & meet MU

4

Page 5: EHR Implementation Plan Presentation

EHR Benefits

Decreased charting/prescribing errors Improved work-flow

Immediate access to Radiology Lab results Patient charts

More satisfying work conditions for our employees

Freeing up space now used to store charts

5

Page 6: EHR Implementation Plan Presentation

Central Clinic Layout

6

Page 7: EHR Implementation Plan Presentation

West/East Clinic Layout

7

Page 8: EHR Implementation Plan Presentation

Scope & Deliverables

Develop Plan to install EHR System Must meet meaningful use Capable of information exchange with National Health

Information Network (NHIN) Use OpenVista

Realistic plan ready for review on 3/25/2010 Final Deliverables

Detailed Implementation Plan with narrative & supporting documents

Presentation of Implementation Plan for the Review Committee

8

Page 9: EHR Implementation Plan Presentation

Critical Success Factors

Full C-suite support Clinical champion - Chief Medical Officer will lead

the Implementation project EHR is a clinical project Organization is stable with quality improvement in

place We will achieve a positive return on investment in

an EHR

9

Page 10: EHR Implementation Plan Presentation

Assumptions & Constraints

Implementation project to begin March 30, 2010, clinic-by-clinic, using Plan Do Study Act (PDSA) process, & completed by February 2011

CHC is compliant with Federal & State regulations, including meaningful use

CONNECT Gateway will be used for patient access, Uniform Data System (UDS) reporting & updating the County Immunization Registry

Existing use of the Patient Electronic Care System (PECS) registry will migrate to the EHR

CHC has at least 30% patient volume enrolled in the Medicaid program

A train the trainer approach will be used to minimize vendor-related expenses

10

Page 11: EHR Implementation Plan Presentation

Individual Role

DeEtte Trubey Project Manager

Keri Vogtmann Project Manager Process

Kal Shenoy Project Manager Hardware

David Montanez Project Manager Software

Mona Naoum Project Coordinator

Ann Winclair Graphics Designer

Project Management Office

11

Page 12: EHR Implementation Plan Presentation

Process Team

Individual Role

Keri Vogtmann Project Manager

Luis Perez Clinical Analyst

Jean Frazier Clinical Analyst

Sarah Leake Clinical Analyst

Regina Pizarro Practice Management System (PMS) & Billing Analyst

Carmen Valladolid Meaningful Use Analyst

Elizabeth Wellner Practice Management System (PMS) & Billing Analyst

Linda Flower Clinical Analyst

Carmen Matthews Training Specialist

Eric Smith User Acceptance Testing (UAT) Analyst

12

Page 13: EHR Implementation Plan Presentation

Hardware Team

Individual Role

Kal Shenoy Project Manager

Chris Vu System Engineer

Michael Tegardine Network Engineer

Josie Aguinaldo Security Administrator

Ben de Rosales Jr. Software Engineer

Thomas Hoffman Service Desk Manager

Victor Cecena Desktop Manager

Mona Naoum Project Coordinator

13

Page 14: EHR Implementation Plan Presentation

Software Team

Individual Role

David Montanez Project Manager

Sheldon Penner Software/Database Engineer

Ras Desimone Software/Database Engineer

Laurelle Palmer Software/Database Engineer

Warren Goldberg Risk, Regulation & Stakeholder Analysis

Nga Anamosa Engineer Senior Analyst

Jacqueline A. Harris Process Analyst

14

Page 15: EHR Implementation Plan Presentation

Stakeholders

Management Board, Steering committee, Chief Medical Officer

Implementation team PM, Application & clinical specialist, process analysts & Consultants

IT Team Integration Architect, DB, Networking, System Admin, Application

Development Functional Departments

Clinical Team, Billing, Training, Medical records, quality, Pharmacy, Radiology & Libratory departments

External Patients, insurance companies, community volunteers, media,

Medsphere, government agencies; HHS, NHIN…..

15

Page 16: EHR Implementation Plan Presentation

Communication Plan

Purpose Vision What could happen Communication Methods

16

Page 17: EHR Implementation Plan Presentation

Communication Plan - Accountability

Type of Communication Responsible Stakeholder Communication Method

Community Clinic Marketing & Information Meaningful Use Compliance & PromotionPatient Care Improvement

Public Relations EmailWebsiteNewsletterPublic Service AnnouncementsGovernment Agencies

Communicating Key Project StatusAssuring Support for ProjectCompliance & RegulationsPress ReleasesIncentive & Recognition Programs

C Suite/Senior Management EmailAll-hands MeetingGovernment Agency Conferences

Project Status & ScheduleMaintain Organization Chart & ResponsibilitiesProject Milestones (Go/No Go)Issues & Resolutions

Project Manager EmailMeetingsProject Website

Implementation Advocate Healthcare Rules, PoliciesClinical Information

Clinicians EmailMeetingsVerbal communication

17

Page 18: EHR Implementation Plan Presentation

ComplianceRegulatory Level

Name Legal & Regulatory Requirements Description

Federal HIPAA Health Insurance Portability & Accountability Act of 1996 Privacy Rule & Security Rule

Federal PSQIA Patient Safety & Quality Improvement Act of 2005 Patient Safety Rule

Federal ARRA American Recovery & Reinvestment Act of 2009 Meaningful Use Reimbursement

Federal HITECH Health Information Technology for Economic & Clinical Health Act

Initial Set of Standards & Certification Criteria Interim Final RuleHHS Authority & Breach Notification Interim Final RuleCertification Programs – Notice of Proposed Rule (NPRM)State Health Information Exchange Cooperative Agreement ProgramHealth Information Technology Extension Program

Federal CFR Code of Federal Regulations Title 42 – Public Health Federal Office for Human Research Protections (OHRP) Compliance Oversight

State CCR California Code of Regulations Title 16, Title 17, & Title 22State CHSC California Health & Safety Code Access Laws on Health & Safety Regulations for

Health Facilities & Medical Services

National JC Joint Commission of 2004 Documentation & Medical Record Requirements

Federal FRCP Federal Rules of Civil Procedure Federal Rules of Admissibility & Electronic Discovery Civil Rule - 2006

State COAL California Office on Administration Law Additional Discovery Rules for Legal Records, both Paper & Electronic

18

Page 19: EHR Implementation Plan Presentation

Regulations CMS - Security/HIPAA

Strong organization culture of security: Documented processes to protect ePHI

Confidentiality, availability, integrity Training

All individuals are personally responsible with severe penalties

Roll-out, new hire training, refresher training Real-life case discussions in monthly department

meetings Top management priority

Talked about often Known organizational auditing

19

Page 20: EHR Implementation Plan Presentation

Security Standards

Administrative Security Officer ultimate responsibility Risk Analysis required Roles & privileges process including termination Business relationships

Physical Facility controls Media access Workstation access

Technical Audits Access control Transmission, firewall, virus security Remote access

20

Page 21: EHR Implementation Plan Presentation

Risk Analysis

Methodology

Full analysis in Implementation Plan

Higher Risk Areas Poor adoption rates Process improvements required Inappropriately used ePHI data Disaster recovery plans

Threat Prob Impact Plan Adequacy

1 Low Med > Plan 1

2 Med High > Plan 2

21

Page 22: EHR Implementation Plan Presentation

Current System State

22

Page 23: EHR Implementation Plan Presentation

Future System State

23

Page 24: EHR Implementation Plan Presentation

Medsphere OpenVista

EHR Software: OpenVista Leverage billions of dollars of VA software development Open source fosters software enhancements Close relationship with government officials for

meaningful use Local company resources Medshpere management understands “open source“

Track Record Hundreds of reference sites including ambulatory sites Proven & quick Stage 6 implementations

24

Page 25: EHR Implementation Plan Presentation

Implementation Schedule

25

Page 26: EHR Implementation Plan Presentation

Panel 2 - Workflow

Individual Role

Luis Perez Clinical Analyst

Jean Frazier Clinical Analyst

Keri Vogtmann Project Manager

Sarah Leake Clinical Analyst

Lynda Flower Clinical Analyst

Elizabeth Wellner PMS & Billing Analyst

Regina Pazarro PMS & Billing Analyst

Sheldon Penner Software/Database Engineer

26

Page 27: EHR Implementation Plan Presentation

Process Workflow

PatientRegistration

& Scheduling

PatientCare

&Health

Records

Billing&

Payment

27

Page 28: EHR Implementation Plan Presentation
Page 29: EHR Implementation Plan Presentation
Page 30: EHR Implementation Plan Presentation

Clinical Decision Support Tools

ORDER SET

30

Page 31: EHR Implementation Plan Presentation

• Improve patient safety

• Improve quality of care

• Identify drug-drug interactions

• Identify drug allergies

• Increase patient compliance

• Improve patient self-care

• Meet Meaningful Use

Clinical Decision Support Tools

31

Page 32: EHR Implementation Plan Presentation

Templates & Flowsheets

• Record & communicate care

• Create uniformity

• Ability to abstract data for research

32

Page 33: EHR Implementation Plan Presentation

Templates

• ADULT• Diabetes• Hypertension

• WOMEN• Initial History & Physical Exam• Trimester Assessments

• PEDIATRICS• Preventive Health• Upper Respiratory Infection

33

Page 34: EHR Implementation Plan Presentation

• ADULT• Asthma• Obesity

• WOMEN• Prenatal: blood pressure,

fetal heart tones, etc.• Preventive Care

• PEDIATRICS• Age-Specific: body

measurements, immunizations, developmental milestones

Flowsheets

34

Page 35: EHR Implementation Plan Presentation

• Increased patient satisfaction

• Timely access to current:• Medications• Lab results• Patient education

materials

• Email correspondence with physician

• Appointment requests

• Prescription refill requests

Patient Portal

35

Page 36: EHR Implementation Plan Presentation

• Modify post-EHR workflow as needed after go-live

• EHR clinical team• Learn the application• Assess what the system

lacks for our needs• Create gap analysis

Next Steps

36

Page 37: EHR Implementation Plan Presentation

• QUALITY ASSURANCE TEAM Metrics to track best practice protocols & business practices

• Practice protocols• Meeting hemoglobin A1C goals for

diabetics• Peak flows for asthmatics• Blood pressure control for hypertensive

patients

• Business practices• Patient wait times• Percentage of physician CPOE utilization

• Meet Meaningful Use criteria

Next Steps

37

Page 38: EHR Implementation Plan Presentation

CONTINUE RAND HEALTH’S

PATIENT SATISFACTION

QUESTIONNAIRE

18 questions completed after visit

• Paper option• New online kiosk option

Next Steps

38

Page 39: EHR Implementation Plan Presentation

Financial Process/Workflow

Front & Back Office Workflow Coordination Interoperability / Coding & Billing Integration Documentation Payer-specific Requirements

Processes E&M Calculator at point of care Data flow from system to system

39

Page 40: EHR Implementation Plan Presentation

PMS is utilized. - PSR schedules an appoint. - Demographics & Insurance info input into PMS

PSR performs tasks in PMS:- Convert master ID to a patient Medical record #.- Updates, Collects Deposit/Co-Pay & payer information. Posts in PMS- Scans ID & insurance card.

Patient is processed as per Adult patient Work-flow sheet.

Billing Workflow& Medical Records/Abstracting

Workflow - with EHRPractice Management System (PMS) in Place

• EOB scrutinized & if necessary chart is electronically pulled, notes sent

electronically. Bill resubmitted or adjustedBill reconciled A/R adjusted.

- End

Completes & confirms all provider orders then

Flags orders as completed in EHR

PS

RP

RO

VID

ER

BIL

LIN

GN

UR

SE

NO

Lab,

Rad

Pha

rm

Bill paid?

YES

Patient checks in with PSR to verify Insurance or self-pay.If Self pay referred to social workers, etc. for Financial assistance.

Using CPOE : - Orders & procedures are entered for auto processing into PMS - E&M calculator suggests OV level

Chart reviewed foraccuracy of codes &

Documentation.

Toward end of Patient encounter.

Review & approvesAbstracted &

Scanned itemsSigns off paper chart

Chart sent to Medical Records

Code for billing & diagnosis from the PIS, RIS & Pharmacy auto migrates to

PMS

- Bill generated & checked for accuracy - Electronically submitted to insurance or patient

Pat

ient

- List of Patients for next day is generated.

Med

ical

Rec

ord

s Add Pt name to “To be scanned”

Worklog

MR abstractor locatesRecord, scans, &

abstracts for NEXT DAY Patients.

- Patient records verified complete/approved. - Chart sent to long term storage.

Abstracted Chart sent to PSR at

Clinic.

• PSR Logs into PMS to review daily schedule.

• EHR automatically populated with schedule information.

40

Page 41: EHR Implementation Plan Presentation

Data Migration Strategy

The Challenge Pre-populate the EHR

with useful data day 1

145,000 annualpatient visits

Over 30+ years to be scanned & abstracted

41

Page 42: EHR Implementation Plan Presentation

Data Migration Strategy

Solution for Existing Electronic Data Mirth Connect integration engine to develop channels

between old & new databases Automate on-going data transfers: Updates, additions &

deletions Solution for Paper Records

Pre-Rollout: Migrate records of patients most likely to be seen soon

Post-Rollout: Migrate records on a “go-forward” basis – patient who make appointments or appear at the clinic

42

Page 43: EHR Implementation Plan Presentation

Data Migration Table

TYPE SOURCE METHOD TIMEFRAMEDemographics PMS Bulk HL7 Interface CurrentAppointments PMS Bulk HL7 Interface FutureAllergies Face Sheet Abstract ActiveMedications Face Sheet Bulk HL7 Interface / Abstract CurrentProblems Face sheet, PMS Bulk HL7 Interface

AbstractActive

Medical, surgical, family & social History

Chart Abstract Current

Measurements Chart Abstract Last 3 visitsLab resultsOutside Lab Lab, Chart Bulk HL7 Interface Last yearInside Lab Chart Bulk HL7 Interface Last yearProcedures PMS, chart Bulk HL7 Interface

AbstractLast year

Therapies Chart Abstract Last yearHistory & Physical Chart Scan LastVaccinations Immunization Registry, Chart Bulk HL7 Interface

AbstractLast given (includes all categories) Lifetime for children.

Progress notes Chart Scan Last 3 visitsPreventive & Health Screening

Chart, Lab Abstract all.Scan any abnormalities

5 years

Referrals Chart Abstract Active, allGoals Chart Abstract Last yearAdvance Directive Chart Abstract/scan CurrentPatient Education Chart Abstract Last yearFlow sheets Chart Scan Last yearConsultation/correspondence Chart Scan Last year / Active

43

Page 44: EHR Implementation Plan Presentation

Panel 3 - Hardware Operation Environment

Individual Role

Kal Shenoy Project Manager

Chris Vu Hardware Engineer

Michael Tegardine Network Engineer

Josie Aguinaldo Security Administrator

Ben de Rosales Jr. Software Engineer

Thomas Hoffman Service Desk Manager

Victor Cecena Desktop Manager

44

Page 45: EHR Implementation Plan Presentation

Implementation Strategy

Current environment Network, Servers/Storage Applications, operations

Upgrade plans Upgraded technical architecture Fiber Ring network Thin client deployments

45

Page 46: EHR Implementation Plan Presentation

Technical Architecture

46

Page 47: EHR Implementation Plan Presentation

Fiber Ring Topology

Current T-1 connectivity Legacy copper connectivity at 1.544 MPS

Fiber Ring Topology Providers: AT&T & Cox communications Why Cox

Supporting Health Care providers Discussion of data/fact gathering with Sharp IT, & Family Health IT

Fiber connectivity redundancy Dual connectivity from each router to Fiber ring

Access & Security-High Level Patient/PHR-Web Portal IT support & Physician VPN & RSA/Token security

47

Page 48: EHR Implementation Plan Presentation

48

Page 49: EHR Implementation Plan Presentation

Server Hardware - Location & Features

Location Store in special server rooms, Central & East clinic (backup) Server Rooms Features

Secure entrance Temperature controlled Redundant Power w/ Spike & Surge protection Monitoring – cameras, sensors Qualified staffs

Server Hardware Features Intel Xeon processor – multiple processor RAID with hot swappable HD Redundant connections – multiple Ethernet / fiber ports Tape backup system

49

Page 50: EHR Implementation Plan Presentation

Server Software - Operating &Application

Windows server 2008/R2 Standard, business,data center

Features of server Operating Systems Robust – even during hardware failure Multiple security features including firewalls &

intrusion detection Remote administration Extensive audit trail

Special features of application servers & database Cache Clustering Virtualization (VMware) for development, demo,

training, & QA Terminal services

50

Page 51: EHR Implementation Plan Presentation

Failover Clustering

Key Benefits Protects against data loss

& service interruptions Automates failover to reduced

downtime, lower complexity of disaster recovery plan

Reduces administrative overhead by automatically synchronize application & cluster changes, easier tokeep consistent than unclustered servers

Updating server without service interruption

51

Page 52: EHR Implementation Plan Presentation

Multi-site Clustering

Key Benefits Protects against loss of an entire

datacenter such as power outage, fire, hurricanes, floods, earthquakes, terrorisms

Automates failover to reduced downtime, lower complexity of disaster recovery plan

Reduces administrative overheadby automatically synchronize application & cluster changes, easier to keep consistent than unclustered servers

Updating server without service interruption

52

Page 53: EHR Implementation Plan Presentation

Terminal Services Benefits

Windows Server 2008/R2 Terminal Services gateway enables the creation of a scalable SSL-based remote

access solution Terminal Services Session Broker enable the creation of simple & effective Load-

balancing a terminal server farm

53

Page 54: EHR Implementation Plan Presentation

Software Installation

Environments Non-production

Development Quality Assurance (QA)/Test User Acceptance Testing (UAT) Demonstration Training

Production

54

Page 55: EHR Implementation Plan Presentation

Infrastructure - Security & Privacy

Password policy enhancements SSL Configuration Client Side certificates Audit Control Data Integrity HIPAA Compliant VPN Access – Two Factor Authentication

(RSA Token)

55

Page 56: EHR Implementation Plan Presentation

Remote Access

Provider can access EMR using VPNover the Internet

56

Page 57: EHR Implementation Plan Presentation

Workstation & Peripherals

Thin Client Stations Work Stations Laptops Monitors Carts Printers All-in-Ones Peripherals

57

Page 58: EHR Implementation Plan Presentation

Computer Operations

Service Support Service Desk

Incident Management Client Surveys

Service Delivery Service Level Management

Service Level Agreements Production Review Board

58

Page 59: EHR Implementation Plan Presentation

Panel 4 - Software Aspects

Individual Role

David Montanez Project Manager

Sheldon Penner Software/Database Engineer

Ras Desimone Software/Database Engineer

Laurelle Palmer Software/Database Engineer

Warren Goldberg Risk, Regulation & Stakeholder Analysis

Nga Anamosa Engineer Senior Analyst

Jacqueline A. Harris Process Analyst

Kal Shenoy Project Manager (Hardware)

59

Page 60: EHR Implementation Plan Presentation

Current System State

60

Page 61: EHR Implementation Plan Presentation

Future System State

61

Page 62: EHR Implementation Plan Presentation

Current Data Flow State

62

Page 63: EHR Implementation Plan Presentation

Future Data Flow State

63

Page 64: EHR Implementation Plan Presentation

OpenVista

Install OpenVista & InterSystems Cache Convert & migrate sample patient

data from PMS to OpenVista Support clinical team in system configuration

tasks Test activated features of OpenVista

& interface connections Test Health Information Exchange (HIE)

connections...

64

Page 65: EHR Implementation Plan Presentation

InterSystems Cache

OpenVista Database Selection

InterSystems Cache Proprietary software Extension of MUMPS Graphical User Interface

(GUI) interface Window, UNIX, Linux,

Mac OS X, & Open VMS server

High performance object database

Web gateways access to web browser interface

Rapid integration & development platform

GT.M Open Source MUMPS language MUMPS database Linux & Unix

operating system

65

Page 66: EHR Implementation Plan Presentation

OpenVista Database

Advantages/Features Benefits

24 x 7 support Provides high comfort level to high-risk businesses such as medical clinics

High performance - runs SQL 5x faster Uses multi-dimensional DB technology

Scalability Enterprise Cache Protocol increases app performance

VA uses it along with many other clinics & hospitals

Stable product, continuously supported & upgraded

On-line documentation & e-learning access Reduced cost to upgrade developer skills

Multidimensional storage, journaling mgt., lock mgt.

Tracks physical, logical DB updates; reduces conflicts between transactions trying to access same data

Tools to work with it exist Supports Java, EJB, VB, .Net, etc.

InterSystems Cache

66

Page 67: EHR Implementation Plan Presentation

Interoperability - Mirth & NHIN CONNECT

Add OpenVista outbound & inbound channels Admit, Discharge, Transfer, Scheduling, Financial Transaction

Create new inbound & outbound channels for Order Messages (ORM) & Order Results (ORU)

Create new outbound channel to National Health Information Network (NHIN) CONNECT Gateway

Create inbound & outbound Continuity of Care Record (CCR) & Continuity of Care Document (CCD)

Install Cache Java Database Driver for the Mirth database reader

Configure NHIN gateway connector in Mirth Test & deploy changes

67

Page 68: EHR Implementation Plan Presentation

Software Development

Implement Rapid Prototyping Fits well into PDSA philosophy

Application Lifecycle Management Microsoft Team Foundation Server 2010

OpenVista Patient Portal

68

Page 69: EHR Implementation Plan Presentation

Configuration Management

Framework Identification Control Reporting Audit

Benefits of Configuration Management Legal Obligations – Meaningful Use, HIPAA

Process & approach Software Configuration Management Team Foundation Server 2010 Configuration Management Database Definitive Media Library

69

Page 70: EHR Implementation Plan Presentation

Configuration Management

Manage changes to all Configuration Items in Production

Server & network components, Software programs, Signed contract documents, etc.

70

Page 71: EHR Implementation Plan Presentation

Downtime Procedures

GOAL CHC clinics remain operational during planned or

unplanned events Plan is created/approved by internal committee

METHOD Use approved paper methods to maintain workflow

during downtime All paper records must be “back-chartered” into

the electronic record in a timely fashion BOTTOM LINE

Ensure downtime episode does not pose a threat to patient safety & integrity of clinical practice

71

Page 72: EHR Implementation Plan Presentation

Panel 5 - UAT, Training & Go Live

Individual Role

Eric Smith UAT Analyst

Carmen Matthews Training Specialist

Nga Anamosa Engineer Senior Analyst

Laurelle Palmer Software/Database Engineer

Lynda Flower Clinical Analyst

Thomas Hoffman Service Desk Manager

DeEtte Trubey Project Manager

72

Page 73: EHR Implementation Plan Presentation

User Acceptance Testing (UAT)

Failure to conduct UAT will result in finding more problems after release.

UAT should confirm whether the software supports the existing business process, not whether or not the software works.

UAT will compare user expectation to actual results very early in the implementation.

User requirements that evolve during UAT will be part of the post-EHR implementation.

Key: Super-Users acceptance will influence community acceptance of the EHR.

Steps for UAT Run Test Cases Mock-go Live Super-Users sign-off , Go-No Date(readiness for go-live)

73

Page 74: EHR Implementation Plan Presentation

Training

Purpose (Why) Who, What, Where, How Effectiveness Afterwards – What’s Next

74

Page 75: EHR Implementation Plan Presentation

Training V1

75

Page 76: EHR Implementation Plan Presentation

Training V2

76

Page 77: EHR Implementation Plan Presentation

Project Monitoring & Control

Data to be collected & reviewed during the implementation Meaningful Use Financial Return on Investment Quality Measures Compliance Patient Satisfaction Surveys

Post Implementation Review Outstanding Issues Maintenance & Support

77

Page 78: EHR Implementation Plan Presentation

Panel 6 - Financial Impact

Individual Role

Keri Vogtmann Project Manager

Luis Perez Clinical Analyst

Carmen Valladolid Meaningful Use Analyst

Sarah Leake Clinical Analyst

78

Page 79: EHR Implementation Plan Presentation

Meaningful Use

Maximum Incentive Payment Amount for Medicaid Professionals

Cap on Net Average Allowable Costs, per the HITECH Act

85% Allowed for Eligible Professionals

Maximum Cumulative Incentive Over 6 - Year Period

$25,000 in Year 1 for most professionals$21,250

$10,000 in Years 2-6 for most professionals$8,500 $63,750

$16,667 in Year 1 for pediatricians with a minimum 20% patient volume, but less than 30% patient volume, Medicaid patients

$14,167

$6,667 in Years 2-6 for most professionals pediatricians with a minimum 20% patient volume, but less than 30% patient volume, Medicaid patients

$5,667 $42,500

79

Page 80: EHR Implementation Plan Presentation

Meaningful Use

Payment Scenarios for Medicaid EPs Who Begin Adoption in the First Year

Calendar Year Medicaid EPs who Begin Adoption in:

2011 2012 2013 2014 2015 2016

2011 $21,250

2012 $8,500 $21,250

2013 $8,500 $8,500 $21,250

2014 $8,500 $8,500 $8,500 $21,250

2015 $8,500 $8,500 $8,500 $8,500 $21,250

2016 $8,500 $8,500 $8,500 $8,500 $8,500 $21,250

2017 $8,500 $8,500 $8,500 $8,500 $8,500

2018 $8,500 $8,500 $8,500 $8,500

2019 $8,500 $8,500 $8,500

2020 $8,500 $8,500

2021 $8,500

Total$63,750 $63,750 $63,750 $63,750 $63,750 $63,750

80

Page 81: EHR Implementation Plan Presentation

Unpacking the “Meaningful Use” Requirements

Major Components of Meaningful Use Proposed Rule & Recommendations

Adoption Year Improve Quality, Safety & Efficiency

Engage Patients & Families

Improve Care Coordination

Improve Population & Public Health

Ensure Privacy & Security for PHI

Stage 1 (2011) Achieve 80% CPOE

75% electronic submission of eRx

Implement 5 clinical decision support rules

Report quality measures to CMS/State

Digitally Record Key patient data

Provide Patients with electronic copy & access to health information within mandated time

Provide clinical summaries for each office visit

Exchange key clinical information among authorized care providers

Perform medication reconciliation for 80% of all relevant encounters, transitions

Submit data to immunization registries

Provide electronic syndrome surveillance data

Exchange key clinical information among authorized care providers

Perform medication reconciliations for 80% of relevant care encounters, transitions

Stage 2 (2013) Use CPOE for all orders

Manage chronic conditions using patient lists & decision support

Provide clinical decision support at the point or care (e.g. alerts, reminders)

Ensure patient access to PHR populated with real time health data

Produce & share electronic summary care record

Reconcile medications between settings

Receive health alerts from public health agencies

Submit anonymized electronic syndrome surveillance data

Ensure compliance with HIPAA privacy regulations

Conduct or review a security risk analysis & implement security updates

Stage 3 (2015) Establish medical device interoperability

Develop multimedia support

Implement clinical decision support for national high priority conditions

Provide self-management tools

Enable electronic reporting on care experience

Access comprehensive patient data from all available sources

Use epidemiologic data

Share automated, real-time surveillance data

Provide on-request accounting of treatment, payment & operations disclosure to patients

81

Page 82: EHR Implementation Plan Presentation

Meaningful Use Stage 1

Health Outcomes Policy Priority Objectives MetricsCollaborative Teams Throughout Meaningful Use Stages

Improve quality, safety efficiency & reduce health disparities.

(Objectives 1-16)

CPOE; Drug-drug Interaction; Active problem list; e-RX; Active medication/allergy list; Demographics/vital signs & smoking status, incorporate lab test results into EHR, Generate lists of patients by specific conditions, Report ambulatory quality measures; Patient Reminders; 5 clinical decision support rules; Check insurance eligibility & submit claims electronically.

Recording of structured data, Attestation, Generation of Reports, Electronic submission/transmittal, patient reminders

Required percentage measures:50%, 75%, 80%

Physician & Nursing Staff, Medical Records Staff, Application Support Analyst, QU/MU Specialist

Engage patients & families

(Objectives 17-19)

Provide patient with copy of electronic health information & clinical summaries within federally mandated time limit

Access provided via patient portal or printed copy. Perform test of systems capability.

Required percentage measures: 10% & 80%

Mandated timeframes: 48 hrs., 96 hrs.

Physician & Nursing Staff, Medical Records Staff.

Improve care coordination

(Objectives 20-22)

Electronically exchange key clinical information among providers of care & patient authorized entities.

Medication reconciliation.

Medication reconciliation, clinical information exchange performed.

Perform test of systems capability.

Required percentage measure 80%.

Physician & Nursing Staff, Medical Records Staff.

Improve population & public health

(Objectives 23-24)

Submit electronic to immunization registries; Provide & transmit electronic surveillance data to public health agencies.

Submit & transmit electronically to registries.

Perform test of systems capability.

Physician & Nursing Staff, QA/MU specialist.

Ensure adequate privacy & security protection for PHI

(Objective 25)

Conduct & Review security risk analysis; Implement security updates as necessary; Ensure full compliance with HIPAA Privacy & Security Rules

Conduct or review security risk analysis & implement security updates as necessary.

Perform test of systems capability.

IT Support/Security Officer

Progress to Meeting Criteria

82

Page 83: EHR Implementation Plan Presentation

Procurement Plan

Initial Understanding: HW, SW team needs Defined process Potential suppliers Budget for investment

Vendor Evaluation Scorecard

Criteria & weights Technology, quality, responsiveness, delivery, business, environment

RFQs Delivery without negatively impacting go-live

Tracking Spending & Performance

Expenditure

Excellence

83

Page 84: EHR Implementation Plan Presentation

Major Expenditures

Hardware Capital Expense = $330K Servers WAN SAN Fiber ring Thin clients High speed copiers

Software Capital Expense (1st year) = $ 73K Elite licensing (80 to 115 users increase over 6 years)

84

Page 85: EHR Implementation Plan Presentation

Timing

Go-LiveOct 2010

TrainingNov-Dec 2010

Savings from ImplementationMar 2011

MU paymentsMay 2011

Increased demandDuring Year 2012

85

Page 86: EHR Implementation Plan Presentation

Benefits

MU Medicaid incentives ($3.5M) One time incentive 2011-2016

Transcription savings ($29K/mo) Increased number of visits:

Labor efficiencies ($38K/mo) Word of mouth

Riddance of flow charts, superbills, H&Ps, etc.& other administrative costs ($5-10K/mo)

Reduction of labor costs ($18K/mo) Reduction of storage expenses

86

Page 87: EHR Implementation Plan Presentation

Cost Drivers

Anticipate loss of productivity during training& initial deployment period

Hardware $330K Software

$73K first year $444K over 6 years

Staffing $4M over 6 years

87

Page 88: EHR Implementation Plan Presentation

Staffing Assumptions

Temporary 2 Trainers 2 Hardware Engineer Contractors 1 Contractor – OpenVista 4 Abstractors Backfill – MDs, RNPs, Nurses

Permanent 1 Process Analyst 2 Technologists 1 Meaningful Use Specialist

Providers Overtime Costs PSRs during training

88

Page 89: EHR Implementation Plan Presentation

Cost Breakdown

0

200

400

600

800

1000

1200

Thousands

Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

Staffing

Software

Hardware

89

Page 90: EHR Implementation Plan Presentation

Cost & Benefits

0

500

1000

1500

2000

2500

3000

3500

Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

Th

ou

san

ds

Benefits

MU

Costs

90

Page 91: EHR Implementation Plan Presentation

NPV Analysis

MU 100% MU80%

MU 60%

MU40%

8% $8.9M $8.7M $8.5M $8.2M

10% $7.8M $7.6M $7.4M $7.2M

12% $6.9M $6.7M $6.6M $6.4M

14% $6.1M $6.0M $5.8M $5.7M

16% $5.4M $5.3M $5.2M $5.1M

IRR 5.8% 5.5% 5.1% 4.7%

91

Page 92: EHR Implementation Plan Presentation

Cumulative Cash Flows

($2)

($1)

$0

$1

$2

$3

$4

$5

$6

$7

Millions

Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

Cum. CF

92

Page 93: EHR Implementation Plan Presentation

What It’s All About

93

Page 94: EHR Implementation Plan Presentation

Additional Questions

Thank You