9
SMED simulation

SMED Training

Embed Size (px)

Citation preview

SMED simulation

SMED simulation

Purpose:

Participants:

Duration:

Simulates die changeover on a very simple machine with the purpose to teach the 5 steps of SMED (Single Minute Exchange of Dies)

At least 3

2-3 hours

A. 1 wood base: 11 x 5-1/2 inchesB. 1 wood crossbar: 11 x 1 inchesC. 1wood square die “A”: 3 x 1-1/7 inchesD. 1 wood square die “B”: 2 x 1-1/7 inchesE. 1 wood square block: 1 x 1-1/7 inchesF. 1 round head bolt: 1/4 in - 20 x 2 inchesG. 1 t-handle screw: 1/4 in - 20 x 2 inches

Components

H. 1 thumb screw: 1/4 in – 20 x 1-1/2 inchesI. 1 technical measuring set: 6 piecesJ. 1 flare nut wrench: 5 piecesL. 2 thread rods: 6 in - 3/8 inchesM. 4 wing nuts: 3/8 inchesN. 6 hex nuts: 3/8 inchesO. 8 flat washers in different sizes

A

BC

D

E

F GH

I J

L

M

N

O

Procedure

a. Preparation

• Have a chronometer for time measurements

• Have a flipchart and post-its to track results during each iteration and include key notes during the simulation

• Have the tools over a table

b. Initial setup

Procedure

Raw material in production

Raw material for nextproduction

BaseDie in production

BarNuts

New die for next production

ThreadsThumb screw

Procedure

c. Alignment requirements

Requirement: same distance to these three sides

X

X

X

Procedure

c. Alignment requirements

Requirement: 5 mm

5mm

Rules of the simulation

d. Allocate roles to participantsThe simulation must have at least 3 participants with the following

functions:

e. Define goals for each step (iterations)In the end of each iteration the group creates suggestions for improvement and evaluation of the cost/benefit.

• 1 operator

• 1 quality controller

• 1 material handler

• 1 time keeper/flip chart person

• 1 video recording

SMED simulation steps

1: Measure the actual situation

2: Separate internal and external events

2: Convert internal to external events

3: Reduce internal events

4: Reduce external events