DIRECTIONAL DRILLING

“Directional drilling is defined as an art and science involving deflection of a well bore in a specified direction in order to reach a predetermined object below the surface of the earth”.

2

Page 3: Directional Drilling

APPLICATIONS OF DIRECTIONAL DRILLING

1. Multiple wells from single location.2. Inaccessible locations.3. Drilling to avoid geological problems.

• Fault drilling.• Salt dome drilling.

4. Side tracking and straightening.5. Relief well drilling.6. Controlling straight holes.7. Horizontal well.8. ERD well.9. Multilateral drilling.

3

Page 4: Directional Drilling

NON PETROLEUM APPLICATIONS

• Mining industry.

• Construction industry.

• Geo thermal engineering.

4

Page 5: Directional Drilling

MULTIPLE WELLS FROM SINGLE LOCATION

Optimum number of wells can be drilled from a single platform or artificial island. This greatly simplifies gathering systems and production techniques .

5

Page 6: Directional Drilling

6

Page 7: Directional Drilling

INACCESSIBLE LOCATIONS

If reservoir located under river beds, mountains, cities etc, this technique of directional drilling is used .

7

Page 8: Directional Drilling

8

Page 9: Directional Drilling

DRILLING TO AVOID GEOLOGICAL PROBLEMS

A. FAULT DRILLING: This eliminates the hazard of drilling a vertical well through steeply inclined fault plane which could slip and shear the casing.

9

Page 10: Directional Drilling

10

Page 11: Directional Drilling

B. SALT DOME DRILLING

To reach the producing formation which often lie underneath the over hanging cap of the dome, the well is first drilled at one side of the dome and is then deviated to producing zone to avoid drilling problems such as large washouts, lost circulation and corrosion .

11

Page 12: Directional Drilling

SALT DOME DRILLING

12

Page 13: Directional Drilling

SIDE TRACKING & STRAIGHTENING

It is used as remedial operation either to side track obstruction by deviating the well bore away from obstruction by deviating the well bore back to vertical by straightening out crooked holes.

13

Page 14: Directional Drilling

14

Page 15: Directional Drilling

RELIEF WELL DRILLING

The technique is applied to the drilling of relief wells so that mud may be pumped into the reservoir of the uncontrolled well.

15

Page 16: Directional Drilling

16

Page 17: Directional Drilling

ERD WELL

Advantages:1.Increased horizontal displacement from central platform.2. Increased penetration length of reservoir.3. Require less number of wells to develop a field. 4. Require less number of platforms to develop a field in offshore.

17

Page 18: Directional Drilling

ERD WELL

18

Page 19: Directional Drilling

19

Page 20: Directional Drilling

20

Page 21: Directional Drilling

HORIZONTAL WELLAdvantages:

1.Increasing the drainage area.2.Prevention of gas coning or water coning

problems.3.Increased penetration of the producing

formation.4.Increasing the efficiency of enhanced oil

recovery ( EOR ).5.Improving productivity in fractured

reservoirs by intersecting a numbers of vertical fractures.

21

Page 22: Directional Drilling

HORIZONTAL WELL

22

Page 23: Directional Drilling

MUTILATERAL DRILLING

23

Page 24: Directional Drilling

24

Page 25: Directional Drilling

Mutilateral. Drilling

Multilateral well has been defined as a well that has more than one horizontal or near horizontal laterals drilled from single site and connected back to a single well bore. Applications . Greater reservoir exposure. · Drain more than one reservoir. · Exploit irregular reservoirs efficiently. · Speed up reservoir drainage.

· 25

Page 26: Directional Drilling

Mutilateral. Drilling

· Reduction in drilling cost per unit length of the well bore contacting, the reservoir rock. · Ability to obtain a given length of horizontal well bore in reservoir where drag would perhaps limit the length of single horizontal well bore. · Reduction in number of slots and thus the number of production platforms.

26

Page 27: Directional Drilling

Reentering existing wells

27

Page 28: Directional Drilling

NON PETROLEUM APPLICATIONS

A. MINING INDUSTRY- Directional wells are used to produce methane gas that is contained in coal seams. - Methane presents a safety hazard and must be drained off before mining operations can begin.-In deep coal seams that are beyond the reach of conventional mining techniques, directional wells can be drilled for in situ gasification projects.

28

Page 29: Directional Drilling

NON PETROLEUM APPLICATIONS

A. MINING INDUSTRY

29

Page 30: Directional Drilling

B. CONSTRUCTION INDUSTRY

• A small diameter pilot hole is drilled in a smooth arc beneath the river until it immerges on the other side. This acts as a guide for the large diameter pipe forming the conduit.

• The hole is drilled through soft sediments about 40’ below the river bed. This techniques has been used to cross rivers up to 200’ wide.

30

Page 31: Directional Drilling

B. CONSTRUCTION INDUSTRY

31

Page 32: Directional Drilling

C.GEO THERMAL ENGINEERINGHigh geothermal gradient found in some

rocks( e.g. granite) can be harnessed to provide energy.

Extracting the heat from this rocks requires the drilling of injection and production wells.

32

Page 33: Directional Drilling

C.GEO THERMAL ENGINEERING

33

Page 34: Directional Drilling

34

Page 35: Directional Drilling

35

Page 36: Directional Drilling

36

Page 37: Directional Drilling

37

Page 38: Directional Drilling

AZIMUTH

38

Page 39: Directional Drilling

AZIMUTH

39

Page 40: Directional Drilling

QUADRANTS

40

Page 41: Directional Drilling

QUADRANTS

41

Page 42: Directional Drilling

A radius of 100ft is commonlyused as target zone depending on particular requirements e.g a relief well requires much smaller target in order to beeffective. Smaller the target,greater number of correction runs. So longer drilling time ,high drilling costs. So the target zone should be as largeas the geologist/reservoirengineer can allow. DD’s job is then to place the wellborewithin the target zone at minimum cost

42

Page 43: Directional Drilling

43

Page 44: Directional Drilling

TYPES OF WELL PROFILES a. L- TYPEb. S- TYPEc. J- TYPE

44

Page 45: Directional Drilling

TYPE I (BUILD AND HOLD OR ‘L’ TYPE) • This is the most common and simplest

profile for a directional well.• The well is drilled down vertically to KOP,

where the well is deviated to required inclination and further maintained to target.

• Shallow KOP selected to reduce inclination. • This profile can be applied where large

displacements are required at relatively shallow target depths.

• Under normal condition inclination should be 15 to 55°.

45

Page 46: Directional Drilling

46

Page 47: Directional Drilling

TYPE II (BUILD HOLD AND DROP OR ‘S’ TYPE)

•This profile is similar to type-I up to tangential section. Here the profile enters a drop of section where inclination is reduced and in some cases becomes vertical as it reaches the target.

•More torque and drag can be expected due to the additional bend.

•Used where target is deep but horizontal displacement is relatively small.

• It has also application when completing a well that intersect multiple producing zones.

•Drilling of relief well where it is necessary to run parallel to wild well

•Lease or target limitations.47

Page 48: Directional Drilling

48

Page 49: Directional Drilling

TYPE III (DEEP KICK OFF AND BUILD ‘J’ TYPE)• Initial deflection is started well below the surface and angle is built up to bottom.• It is used in particular situations like salt dome drilling, fault drilling and side- tracking or repositioning of target.• Disadvantages:

• Formation may be harder & less responsive to deflection.

• More tripping time to change BHA while deflecting.

• BUR is more difficult to control. 49

Page 50: Directional Drilling

50

Page 51: Directional Drilling

51

Page 52: Directional Drilling

52

Page 53: Directional Drilling

HORIZONTAL WELL PROFILES• HORIZONTAL WELLS ARE CATEGORIZED

BY THE RADIUS OF CURVATURE ADOPTED TO MAKE THE WELL HORIZONTAL. THEY ARE ALSO CLASSIFIED BY BUILD UP RATES WHICH IS INVERSELY PROPORTIONAL TO THE RADIUS OF CURVATURE: – LONG RADIUS– MEDIUM RADIUS– SHORT RADIUS– ULTRA SHORT RADIUS

53

Page 54: Directional Drilling

HORIZONTAL WELL TYPES

54

Page 55: Directional Drilling

BUILDUP SECTION BETWEEN 1°- 6°/100’ OR RADIUS LENGTH BETWEEN 1000’-5000’

• ADVANTAGES:-– EASIER AS CONVENTIONAL DOWNHOLE HARDWARE IS USED – PDM MAY NOT BE REQUIRED– LOWER DOG - LEG SEVERITY GIVES LESS TORQUE AND DRAG– LONGER LATERAL SECTIONS(3500’ TO 5000’) (1000M TO 1500M)– EXTENDED REACH FROM SURFACE LOCATIONS– ACCOMMODATES FULL LOGGING ALL COMPLETION METHODS

STIMULATION WORKOVER AND GASLIFT EQUIPMENT.• DISADVANTAGES:-

– LONG RADIUS NECESSITATES BIGGER RIG, TOP DRIVE, LARGER PUMPS AND GREATER MUD MANAGEMENT CAPABILITIES

– LONGER OPEN HOLE SECTIONS INCREASE RISK OF PIPE STICKING ,KICKS AND BOREHOLE DAMAGE

– LESS PRECISE CONTROL OVER T.V.D– LITTLE USE IN SMALL LEASES BECAUSE OF LONG

DISPLACEMENTS.

Long Radius

55

Page 56: Directional Drilling

HORIZONTAL WELL TYPES

56

Page 57: Directional Drilling

• BUILDUP SECTION BETWEEN 8°-20°/100’ OR RADIUS LENGTH BETWEEN 716’ TO 286’(218M TO 87M)

– ADVANTAGES:-• SUPERIOR IN PRECISION COMPARED TO LONG RADIUS• ACCOMMODATION OF NORMAL/SMALL SIZE M.W.D

TOOLS• ABLE TO DRILL LONG HORIZONTAL SECTION UPTO 5000’

– DISADVANTAGES:-• TORQUE AND DRAG HIGHER THAN LONG RADIUS • LIMITATION IN COMPLETION AND WORKOVER

OPERATIONS

Medium Radius

57

Page 58: Directional Drilling

HORIZONTAL WELL TYPES

58

Page 59: Directional Drilling

• Buildup section between 1°-3.5°/1’ and radius length between 57’ to 16’– Advantages:-

• Precise vertical placement of horizontal drain

• KOP below fluid contacts results less risk of poor isolation

– Disadvantages:-• Requires customized drilling equipment

• No control over bore hole azimuth (within 20°)

• Limited to open hole completion• No coring and logging services

Short Radius

59

Page 60: Directional Drilling

HORIZONTAL WELL TYPES

60

Page 61: Directional Drilling

61

Page 62: Directional Drilling

HORIZONTAL WELL TYPES

62

Page 63: Directional Drilling

DROPPING ROTARY ASSEMBLY

• Angle dropping principle is based on pendulum principle

• Placing a stabilizer above the point of tangency causes a reverse action and the assembly becomes an angle dropping assembly.

• The section of drill collars below the stabilizer bends and sags downwards due to pull of gravity, somewhat like the action of a pendulum. so this assembly is often called as pendulum assembly.

Page 64: Directional Drilling

The stabilizer is normally placed 30’, 60’ or 90’ above the bit. As the distance increases, more bend occurs and more drill collar weight forces the bit to the lower side of the hole resulting in increase of angle dropping rate.Tentative guideline30’: 0.25-.75°/100’60’: 0.5-1.25°/100’90’: 0.5-2.5°/100’Variables for dropping rate• Stiffer the drill collar, less the bending rate.• More the drift angle in the well, greater the dropping rate• Higher the WOB, lesser the angle drop rate• All the variables equal (drift angle, WOB etc., increase in rotary speed will result in increase in angle drop.The exact position of stabilizer depends on drill collar size and weight, hole diameter, inclination and WOB The is adjusted with subs and pony drill collars to increase or decrease the rate of drop

Page 65: Directional Drilling

HOLDING ASSEMBLY:

• Packed hole assemblies are used when it is necessary to keep angle and direction change to a minimum

• In directional wells, packed hole assemblies are used after the maximum drift angle is reached and it is desired to maintain the angle.

• The stiff rigid assembly fits closely in the hole and is held in place by multiple stabilizers.

• The stabilizers are normally placed at 0-10’-40’ or 0-10’-40-70’ above the bit.

• The rigidity and stiffness force the bha to remain in the same relative position.

• Its efficiency increases by increasing stiffness and rigidity

Page 66: Directional Drilling

Given set of conditions determining hole size, d/collar size, inclination, WOB, to lesser degree RPM , these two stabilizer systems will have greater build tendency from 4 to 1.

Page 67: Directional Drilling

Three stabilizer packed hole assemblies are designed to hold the bit on course. These assemblies may build or drop gradually due to local conditions and may be fine tuned by the use of under gauge stabilizers.