17
On Schedule with the Last Planner System Workshop Become certified by LCI-Canada as a Lean Project Coordinator [email protected] or more info www.leanlab.ca

On schedule with the Last Planner System

Embed Size (px)

Citation preview

Page 1: On schedule with the Last Planner System

On Schedule with the Last Planner System Workshop

Become certified by LCI-Canada as a Lean Project Coordinator

[email protected] or more info www.leanlab.ca

Page 2: On schedule with the Last Planner System

Traditional Lean Project Delivery

Over Budget, Late NetZero, Early Completion

Page 3: On schedule with the Last Planner System

Lean Design Workshop Part 1

1. Business Case• Busted Budgets, Broken Schedules• Inefficiency & Bad Behavior• There is a Better Way

2. How Lean Creates Value• Customer • Solve Problems/Eliminate Waste• Create Flow

Page 4: On schedule with the Last Planner System

TEAM

Page 5: On schedule with the Last Planner System

Moneyball

What does Beane know about TEAMS

Billy Beane Keynote at LCI San Francisco

Page 6: On schedule with the Last Planner System

Not a Team

It takes a TEAM to deliver a WOW Project

Team

Page 7: On schedule with the Last Planner System
Page 8: On schedule with the Last Planner System

Lean Design Workshop Part 2 1. Getting Started with the Last Planner System

• Assemble the TEAM• Define the Milestones• Commit to the Schedule

2. Last Planner System• Develop a Plan• Collaborate • Commit Design to Target

3. Commitment Tools• Pull Planning• 6 Week Look Ahead (Constraints) • Weekly and Daily Coordination• Checklists

Page 9: On schedule with the Last Planner System

Design with DISCIPLINE

ValueDesign

Page 10: On schedule with the Last Planner System

Plan with DISCIPLINE

Page 11: On schedule with the Last Planner System

Manage PRODUCTION

Page 12: On schedule with the Last Planner System

Stop to fix PROBLEMS

JIDOKA

Page 13: On schedule with the Last Planner System

University of Winnipeg Science Complex& Richardson College for the Environment

Integrate Team & Systems

Page 14: On schedule with the Last Planner System

BOOT Camp Okanagan College

Page 15: On schedule with the Last Planner System

Boot Camp Objectives

• Last Planner System (LPS) is a Production Control System• We Learn LPS a hands on simulation (Villego)• Main Learning Objectives

• Understand Last Planner System • How to get work to Flow • How to collaborate as a TEAM

Page 16: On schedule with the Last Planner System

Getting Started• Short Introduction• Name • Why you’re here?• Your best day Ever!

• Teams 1,2,3 • Select a CM• Establish Team Roles, Get your Hats On • Let’s Get Started

Page 17: On schedule with the Last Planner System

On Schedule with Lean Construction

Hey you Made it to the End!

Let us know what you think about taking this or other Lean Lab Workshops

[email protected] or more info www.leanlab.ca