SOLAR ROOFTOP PROJECTS
Primotech Energy Solution ( Solar Vertical)
•Primotech has three verticals-Solar,Led Solution & Energy consultancy services.
•Provides complete Solar EPC solutions.
•One of Largest independently owned solar roofing company in Delhi/Ncr
•Strong brand awareness and reputation.
•Diverse solar installation expertise .
•Registered Company Under Company Act. 1956.
•Energetic & Dynamic approach for Providing extraordinary benefits to our Clients.
•Strong Dealer Network across North India.
Minimum Requirement for solar Rooftop plants :
A southern orientation is ideal although, East and west facing roofs can still capture over 80% of the energy.
Minimize roof obstructions to maximize PV capacity and aesthetics as shading can significantly reduce energy production.
Plan for current and future landscaping, neighboring houses and roof “stick-ups”.
Approx. 100 sq. ft. of roof for every kW of PV capacity.
2.5 –5.0 kW for new homes depending size of home.
Need of grid connection for grid tied solar roof-top, net-metering is applicable where it is already enforced like Delhi, Gujarat, Andhra pradesh,kerala etc.
Major system components1. PV Module 2. Solar Charge Controller
1.
4. Battery 5. Load
3. Inverter
6.Monitoring system
Grid tied System
In grid tied systems, the system is interfaced with the state power grid.
Here, Solar takes the first priority to run the loads.
Second priority will be given to grid If the load exceeds the power
generated by solar or cloudy environment, system automatically switched
over to grid.
Third priority is given to DG sets which are much costlier than solar & grid
power, Grid tied system can also be configured without a battery bank.
Off-Grid System
Off Grid or stand-alone system refers to being independent of the state
grid. The design would support all the loads and sufficient back up would
be provided to cater the power needs under worst conditions.
One can go off-grid for low intensity loads. In other words, all equipment
having a power rating lesser than 500W can be taken off grid.
Hybrid and grid interactive System
Hybrid system is a smart system involving, solar, grid and diesel generator (DG). Here, Solar
takes the first priority to run the loads. Excess power generated will charge the battery
bank.
During night battery will support the loads till a safe battery voltage. System will switch
over to grid automatically below battery safe voltage. If GRID is not available and battery
has been discharged, PCU can command DG to start and supply power to the loads till Grid
or solar is restored.
Hybrid systems can also be configured as grid interactive systems where only solar and grid
are present. Here, the first priority is given to solar. Excess power generated will charge the
battery bank. During night battery will support the loads, till a safe battery voltage. System
will switch over to grid automatically below battery safe voltage. This would extend the
battery life and provide seamless power supply.
Schematic Diagram For Hybrid System
Site Survey
Phase-I
Energy Audit
Phase-II
Energy Audit Sample sheet
Energy Audit Formula sheet for Site survey
Electrical Appliances
Nature of appliances Watt Quantity TOTAL W USAGE OF HRS. TOTAL W CONSUMED
Fan 80 2 160 6 0.96
Tube light 36 8 288 9 2.592
A.C (1 tonn) 1750 1 1750 6 10.5
Laptop/Desktop 150 3 450 5 2.25
PRINTER 200 2 400 3 1.2
Refrigerator (180 L) 550 1 550 8 4.4
Colour T.V 150 2 300 5 1.5
Total load : 3.848 Kw Total Wattages (Kwh) 23.402
Load Segregation
Critical Loads:
A.C, PA System, Water pump for extinguisher, Submersible water pump ,
Inverter, Refrigerator, Heater , Kettle, Geyser,Lift
Non-critical loads :
Fan, C.F.L, Tubelight , Downlighters , Kent RO,LED Lights,Pole
light,Laptop,Desktop printer, Projectors, Cooler,Chimney
Phase-III
Installation & commissioning
Type-1 (M.S Base) Ankel fastner through chemical fixer
Type-2 (M.S Base) RCC & PCC
Phase-IV
Performance & Cost benefit
Analysis
25 Kw grid-tied system
25 Kw grid-tied system
Evaluation of production probability forecast:
Payback Period
TARGET CLIENTS :
Small,Medium & Large Industries
Homes & offices
Govt./Pvt. Hospitals
Educational Institutions & Schools
Commercial Buildings & Shopping malls
Hotels & Resorts
Scope of work : EPC Turnkey Solution
EPC solutions
Promoting:
Identifying location of appropriate project sites
Discussion with necessary authorities
Conducting basic processes for obtaining
licenses and procedural permits.
Engineering :
Suitability and estimation of production
Basic and detailed engineering
Conduct geological and topographical studies
Execute civil works design
Mechanical design and specs definition
Electrical LV/HV design and specs definition
Grid connection design and specs definition.
Procurement :
Qualified vendors portfolio
Invite for quotation
Supplier selection
Quality supervision and inspection at supplier
facilities
Deliveries follow up
Construction:
Project management
Planning and schedules/follow up
Coordination with customers
Quality contractor assurance
Commissioning:
Document and drawing of the executed project
Detailed quality review
Project set up
Project commissioning
Project handover to owner
Silver Start offers preventive and corrective
maintenance services for solar plants
Offers monthly reporting on generation and activities
Operation and Maintenance:
Silver Start offers preventive and corrective
maintenance services for solar plants
Offers monthly reporting on generation and activities
OUR ASSOCIATE PARTNERS:
PRASHANT SHARMA
E-mail : ([email protected])
Contact no : 9811166461
MAHESH KUMAR GUPTA –E-mail : [email protected])-Contact no : 9891129272
DANISH MOHD. TAHIR –
E-mail : ([email protected])
Contact no : 7053491500
Contact Us for any Query: