Tete Bayou Update & Mapping History P h arr Cana l Tete Bayou

Tete bayou openhousemeeting_021215

Embed Size (px)

Citation preview

Page 1: Tete bayou openhousemeeting_021215

Tete Bayou Update & Mapping

HistoryPh

arr C

anal

Tete Bayou

Page 2: Tete bayou openhousemeeting_021215

Hist

ory

Curr

ent

Effor

tFl

ood

Zone

sFl

oodw

ays

Deve

lop-

men

tTete Bayou Update & Mapping• Original Study Began January 2011 & Ended in March 2012

• Joint Venture Between Iberia Parish Gov’t & City of New Iberia

• Purposed of Original Study was to Reduce Flooding

• Original Study Consisted of:1) Topographic & Bathymetric Surveying2) Historical Data Collection3) Numerical Modeling4) Numerical Modeling Calibration & Validation5) Numerical Modeling Flood Reduction Alternatives

Page 3: Tete bayou openhousemeeting_021215

Hist

ory

Curr

ent

Effor

tFl

ood

Zone

sFl

oodw

ays

Deve

lop-

men

tTete Bayou Update & Mapping

Flood Reduction Alternatives

1) Clean Tete Bayou and Pharr Canal2) Scenario No. 1 + Widen Pharr Canal & Remove Spoil Banks3) Scenario No. 2 + Divert Flow From Tete Bayou to Bayou Teche

Through a Sub-surface Box Culvert System 4) Scenario No. 1 + Widen Pharr Canal5) Scenario No. 4 + Widen Tete Bayou6) Scenario No. 1 + Pump Stations7) Scenario No. 1 + Storage Areas

Page 4: Tete bayou openhousemeeting_021215

Hist

ory

Curr

ent

Effor

tFl

ood

Zone

sFl

oodw

ays

Deve

lop-

men

tTete Bayou Update & Mapping

Drainage Area = 27.8 SQ. MI.Channel Length = 10.3 MI.

Page 5: Tete bayou openhousemeeting_021215

Hist

ory

Curr

ent

Effor

tFl

ood

Zone

sFl

oodw

ays

Deve

lop-

men

tTete Bayou Update & Mapping

Storm Event Precipitation (in)2-Year, 24-Hour 4.8

5-Year, 24-Hour 6.5

10-Year, 24-Hour 7.8

25-Year, 24-Hour 9.6

50-Year, 24-Hour 11.1

100-Year, 24-Hour 12.6

500-Year, 24-Hour ≈16.0

December 30, 2006 5.0

July 14, 2014 4.4

Hurricane Lili (Oct 2002) 5.01

Hurricane Gustav (Sept 2008) 9.22

10.8 inches on 10/2 & 4.8 inches on 10/3/200220.5 inches on 8/31, 3.1 inches on 9/1, & 5.6 inches on

9/2/2008

Page 6: Tete bayou openhousemeeting_021215

Hist

ory

Curr

ent

Effor

tFl

ood

Zone

sFl

oodw

ays

Deve

lop-

men

tTete Bayou Update & Mapping

Crochet Rd

Belle Place Olivier Rd

Mullins Rd

Emile Verret Rd

-10

-5

0

5

10

15

010,00020,00030,00040,00050,00060,000

Elev

ation

(ft-N

AVD8

8)

Main Channel Distance (ft)

Drainage StructuresGround5 ft-NAVD88 Tailwater Elevation, 10-year Storm Event0 ft-NAVD88 Tailwater Elevation, 10-year Storm Event

Tailwater Sensitivity Analysis

Page 7: Tete bayou openhousemeeting_021215

Curr

ent

Effor

tFl

ood

Zone

sFl

oodw

ays

Deve

lop-

men

tTete Bayou Update & Mapping

Hist

ory

• Update Original Study (Emile Verret CON/SPAN, channel

cleaning/debris removal, Pharr Canal)

• Study FEMA Approximate Zone A

• Create BFEs

• Update FloodwayZONE AE: Areas subject to inundation by the 1-percent-annual-chance flood event determined by

detailed methods. Base Flood Elevations (BFEs) are shown. Mandatory flood insurance purchase requirements and floodplain management standards apply.

ZONE A: Areas subject to inundation by the 1-percent-annual-chance flood event generally determined using approximate methodologies. Because detailed hydraulic analyses have not been performed, no Base Flood Elevations (BFEs) or flood depths are shown. Mandatory flood insurance purchase requirements and floodplain management standards apply.

Page 8: Tete bayou openhousemeeting_021215

Curr

ent

Effor

tFl

ood

Zone

sFl

oodw

ays

Deve

lop-

men

tTete Bayou Update & Mapping

Hist

ory

December 2006 Storm Event (5.0 inches)

July 2014 Storm Event (4.4 inches)

Page 9: Tete bayou openhousemeeting_021215

Curr

ent

Effor

tFl

ood

Zone

sFl

oodw

ays

Deve

lop-

men

tTete Bayou Update & Mapping

Hist

ory

Crochet Rd

Belle Place Olivier Rd

Mullins Rd

Emile Verret Rd

-10

-5

0

5

10

15

010,00020,00030,00040,00050,00060,000

Elev

ation

(ft-N

AVD8

8)

Main Channel Distance (ft)

Drainage Structures

Ground

Existing Conditions WSE (100-yr Storm)

FEMA BFE

100-year Existing Conditions - FEMA BFE Comparison

Page 10: Tete bayou openhousemeeting_021215

Curr

ent

Effor

tFl

ood

Zone

sFl

oodw

ays

Deve

lop-

men

tTete Bayou Update & Mapping

Hist

ory

Crochet Rd

Belle Place Olivier Rd

Mullins Rd

Emile Verret Rd

-10

-5

0

5

10

15

010,00020,00030,00040,00050,00060,000

Elev

ation

(ft-N

AVD8

8)

Main Channel Distance (ft)

Drainage Structures

Ground

Existing Conditions WSE (Dec 2006 Storm)

December 2006 Highwater Marks

December 30, 2006 Existing Conditions - High Water Marks Comparison

Page 11: Tete bayou openhousemeeting_021215

Curr

ent

Effor

tFl

ood

Zone

sFl

oodw

ays

Deve

lop-

men

tTete Bayou Update & Mapping

Hist

ory

Page 12: Tete bayou openhousemeeting_021215

Floo

d Zo

nes

Floo

dway

sDe

velo

p-m

ent

Tete Bayou Update & MappingHi

stor

yCu

rren

t Eff

ort

EXISTING FEMA

Page 13: Tete bayou openhousemeeting_021215

Deve

lop-

men

tTete Bayou Update & Mapping

Hist

ory

Floo

d Zo

nes

Floo

dway

sCu

rren

t Eff

ort

PROPOSED FENSTERMAKER

Page 14: Tete bayou openhousemeeting_021215

Floo

d Zo

nes

Floo

dway

sDe

velo

p-m

ent

Tete Bayou Update & MappingHi

stor

yCu

rren

t Eff

ort

Page 15: Tete bayou openhousemeeting_021215

Floo

d Zo

nes

Floo

dway

sDe

velo

p-m

ent

Tete Bayou Update & MappingHi

stor

yCu

rren

t Eff

ort

Page 16: Tete bayou openhousemeeting_021215

Floo

d Zo

nes

Floo

dway

sDe

velo

p-m

ent

Tete Bayou Update & MappingHi

stor

yCu

rren

t Eff

ort