27
CHICAGO AVENUE SHERIDAN ROAD IMPROVEMENT ALTERNATIVES

Apw2 sheridan and chicago avenue presentation full 7.14.14

Embed Size (px)

DESCRIPTION

Improvement Alternatives

Citation preview

Page 1: Apw2 sheridan and chicago avenue presentation full 7.14.14

CHICAGO AVENUESHERIDAN ROAD IMPROVEMENTALTERNATIVES

Page 2: Apw2 sheridan and chicago avenue presentation full 7.14.14

BACKGROUNDCRASH ANALYSIS (2007 – 2012)

Total of 28 (8%) crashes involving a pedestrianTotal of 22 (6%) crashes involving a bicyclist

Majority (59%) of crashes:Turning (21%), Rear End (24%), Sideswipe (14%)

141 Total Crashes

212 Total Crashes

Chicago Ave (Grove St to Sheridan Rd)

Sheridan Rd(Chicago Ave to Isabella St)

• 17% of pedestrian crashes resulted in incapacitating injuries• 14% of bicyclist crashes resulted in incapacitating injuries• 2% of motorist crashes resulted in incapacitating injuries

Intersections with most crashes: • Lincoln St • Foster St• Church St• Davis St

Segments with most crashes:• Foster St to Chicago Ave• Church St to Davis St

1 fatality in the time period, which involved a pedestrian and 7 of the 12 incapacitating injuries involved pedestrians or cyclists

Page 3: Apw2 sheridan and chicago avenue presentation full 7.14.14

BACKGROUNDBICYCLE DATA (STRAVA)

DATA COLLECTED BY STRAVA GPS TRACKING PROGRAM.

ACCOUNTS FOR ~10% OF CYCLISTS IN THE AREA

SH

ER

IDA

N R

OA

D

June 1, 2013thru

May 31, 2014

Page 4: Apw2 sheridan and chicago avenue presentation full 7.14.14

AVERAGE OF BIKE COUNTS(DAILY) PERFORMED

10/2013 & 5/2014

NO. OF CYCLISTS ON ROAD= 295 (31%)

NO. OF CYCLISTS ON SIDEWALK = 653 (69%)

TOTAL NUMBER OF CYCLISTS = 948

BACKGROUNDBICYCLE DATA

Page 5: Apw2 sheridan and chicago avenue presentation full 7.14.14

DAILY PEDESTRIAN COUNT 5/2014

TOTAL NUMBER OF PEDESTRIANS= 9,164

BACKGROUNDPEDESTRIAN DATA

Page 6: Apw2 sheridan and chicago avenue presentation full 7.14.14

BACKGROUNDVEHICLE COUNTS (ADT)

SH

ERID

AN

RD

CENTRAL ST

LINCOLN ST

NOYES ST

FOSTER ST

RID

GE A

VE

CH

ICAG

O A

VE

SHERIDAN RD

12,000

14,000

15,000

17,000

NORTHWESTERN PLACE

18,000

7,000

11,000

Page 7: Apw2 sheridan and chicago avenue presentation full 7.14.14

BACKGROUNDFUNDING

• IDOT – $1.6 Million

• ITEP – $1.5 Million

• MFT – $950,000

• Northwestern University – TBD

Page 8: Apw2 sheridan and chicago avenue presentation full 7.14.14

TABLE OF CONTENTS

1. Chicago Avenue Corridor (Davis St to Church St)

2. Chicago Avenue Corridor (Church St to Sheridan Rd)

3. Sheridan Road Corridor (Chicago Ave to Central St)

4. Sheridan Road Corridor (Central St to Isabella St)

5. Corridor Amenities

6. New Traffic Signal at Sheridan Rd and Campus Dr

Page 9: Apw2 sheridan and chicago avenue presentation full 7.14.14

CHICAGO AVE – GROVE TO CHURCHEXISTING

*Grove St to Davis St will be resurfacing only

Page 10: Apw2 sheridan and chicago avenue presentation full 7.14.14

CHICAGO AVE – DAVIS TO CHURCH4 CAR LANES

2-WAY BIKE LANE WEST SIDEON-STREET WITH BIKE SIGNALS

Page 11: Apw2 sheridan and chicago avenue presentation full 7.14.14

CHICAGO AVE. – CHURCH TO SHERIDANEXISTING

Page 12: Apw2 sheridan and chicago avenue presentation full 7.14.14

2 LANES2-WAY PROTECTED BIKE LANE WEST SIDE

PARKING EAST SIDE

CHICAGO AVE – CHURCH TO SHERIDAN2 CAR LANES

2-WAY PROTECTED BIKE LANE WEST SIDEON AND OFF STREET WITH BIKE SIGNALS

Page 13: Apw2 sheridan and chicago avenue presentation full 7.14.14

BACKGROUNDEXISTING SIGNAL PHASING

Sheridan Phase Chicago Phase Pedestrian Phase

Sheridan/Chicago Intersection

Page 14: Apw2 sheridan and chicago avenue presentation full 7.14.14

BACKGROUNDOPTIONAL SIGNAL PHASING

Sheridan Phasewith 2-way bikes

Chicago Phasewith 2-way bikes

Pedestrian Phasewith NB bikes

Sheridan/Chicago Intersection

Page 15: Apw2 sheridan and chicago avenue presentation full 7.14.14

SHERIDAN RD - CHICAGO TO CENTRALEXISTING

Page 16: Apw2 sheridan and chicago avenue presentation full 7.14.14

SHERIDAN RD - CHICAGO TO CENTRAL4 LANES

EAST BIKE LANE(PARKWAY PATH)

Page 17: Apw2 sheridan and chicago avenue presentation full 7.14.14

SHERIDAN RD - CHICAGO TO CENTRAL4 LANES

WEST BIKE LANE(PARKWAY PATH)

Page 18: Apw2 sheridan and chicago avenue presentation full 7.14.14

SHERIDAN RD - CHICAGO TO CENTRALCOMBINATION 3 & 4 LANESRAISED (BUFFERED) BIKE LANES

Page 19: Apw2 sheridan and chicago avenue presentation full 7.14.14

SHERIDAN RD– CENTRAL TO INGLESIDEEXISTING

Page 20: Apw2 sheridan and chicago avenue presentation full 7.14.14

SHERIDAN RD– CENTRAL TO INGLESIDE2 LANES

BIKE LANES

*MINOR WIDENING EAST, NO TREE IMPACTS

Page 21: Apw2 sheridan and chicago avenue presentation full 7.14.14

SHERIDAN – INGLESIDE TO ISABELLAPROPOSED ROUTE

Page 22: Apw2 sheridan and chicago avenue presentation full 7.14.14

LOADING AND TRANSIT CONSOLIDATION DESIGNSSHERIDAN ROAD CORRIDOR

2 STOPS IN EACH DIRECTION; LOCATIONS TBD

Widen 14.5’

Widen 13.5’

ONE WAY CYCLE TRACK

TWO WAY CYCLE TRACK

Page 23: Apw2 sheridan and chicago avenue presentation full 7.14.14

MID-BLOCK CROSSING WITH PEDESTRIAN REFUGE ISLANDSHERIDAN ROAD CORRIDOR

2 - 3 LOCATIONS (TO BE DETERMINED)

Page 24: Apw2 sheridan and chicago avenue presentation full 7.14.14

INTERSECTION CORNER BIOSWALE

Page 25: Apw2 sheridan and chicago avenue presentation full 7.14.14

MID-BLOCK BIOSWALE

Page 26: Apw2 sheridan and chicago avenue presentation full 7.14.14

SHERIDAN RD AND CAMPUS DRPROPOSED TRAFFIC SIGNAL

SH

ER

IDA

N R

OA

D

CH

ICAG

O A

VEN

UE

CA

MPU

S D

R

SH

ER

IDA

N R

D

Page 27: Apw2 sheridan and chicago avenue presentation full 7.14.14

SHERIDAN ROAD OPTIONCOMPARATIVE ANALYSIS