10
“The need for learning” InHolland in the energy transition Ing Fred Gardner Campus Inholland Alkmaar EBA2014

Inholland - Fred Gardner

Embed Size (px)

DESCRIPTION

Presentation given Biomass Gasification Europe 2014 at the Conference of the European Biogas Association 2014.

Citation preview

Page 1: Inholland - Fred Gardner

“The need for learning” InHolland in the energy transition Ing Fred Gardner Campus Inholland Alkmaar EBA2014

Page 2: Inholland - Fred Gardner

Alkmaar Rotterdam Amsterdam Diemen The Hague

Haarlem Delft Dordrecht Hoofddorp

31.000 Students 2.700 Employees 83 Bachelor programs 6 Associate degrees 7 Master programs 28 Research groups

InH

olla

nd lo

catio

ns

Page 3: Inholland - Fred Gardner

Faculties

•  Faculty of Communication, Media & Music •  Faculty of Education, Learning & Philosophy •  Faculty of Engineering, Design & Computing •  Faculty of Health, Sports & Social Work •  Faculty of Marketing, Tourism & Leisure Management •  Faculty of Management, Finance & Law •  Faculty of Agriculture

Page 4: Inholland - Fred Gardner

Some facts and figures

31.000 Students 2.700 Employees 6 Main locations 83 Bachelor programmes 6 Associate degrees 7 Master programmes 28 Research groups 7 Faculties/3 support service departments

our first responsibility preparing/educating young people for their professional job

Page 5: Inholland - Fred Gardner

Information technology

Renewable energy

We live in vulnerable and fast changing world

Page 6: Inholland - Fred Gardner

Transition in the focus of the “Triple Helix”

Regional partnering and world wide cooperating The

need

for c

oope

ratio

n

Page 7: Inholland - Fred Gardner

Do not scale up to fast, learning takes time Cost reduces 15% by doubling production units

0,5$ 5$ 50$ 500$ 5000$ 50000$ 500000$ 5000000$

0,001$

0,1$

10$

1000$

&1$

1$

3$

5$

0,5$ 5$ 50$ 500$ 5000$ 50000$ 500000$ 5000000$ total%installed%[bilion%€]%

%cost/M

W%%[mio%€/M

W]%

installed%MW%

15$%$learning$curve$$<cost$as$fuc8on$of$installed$power$in$MW>$

cost/MW$ investment$Bilion$€$

market

Niche market

Learning curve for small units (ca. 100kW) The

need

for l

earn

ing

durin

g de

mon

stra

tion

and

test

ing

Page 8: Inholland - Fred Gardner

The need for learning

http://ec.europa.eu/research/energy/pdf/weto_final_report.pdf Red

uctio

n in

cos

t by

incr

ease

of k

now

-how

Biomass CHP

Page 9: Inholland - Fred Gardner

Campus Alkmaar and biomass gasification

- 16 bachelors -  3500 students

-  The programs we develop now,

-  Should fit the world in 2015 – 2025. -  Does biomass gasification fit in? -  Do students have an interest in this? -  How should we program this?

-  A new minor is being implemented for Biomass gasification.

-  Cooperation in INVESTA and the expertise centre

Page 10: Inholland - Fred Gardner

Happy learning ……