Laurinda Shaw

Woodside Energy (Myanmar) Pte Ltd

11 July 2016

တူးေဖာ္ ရွာေဖြျခင္း

Page 2: Woodside Energy (my)

This presentation contains forward looking statements that are subject to risk factors

associated with oil and gas businesses. It is believed that the expectations reflected in

these statements are reasonable but they may be affected by a variety of variables and

changes in underlying assumptions which could cause actual results or trends to differ

materially, including but not limited to: price fluctuations, actual demand, currency

fluctuations, drilling and production results, reserve estimates, loss of market, industry

competition, environmental risks, physical risks, legislative, fiscal and regulatory

developments, economic and financial market conditions in various countries and

regions, political risks, project delay or advancement, approvals and cost estimates.

All references to dollars, cents or $ in this presentation are to US currency, unless

otherwise stated.

References to “Woodside” may be references to Woodside Petroleum Ltd. or its

applicable subsidiaries.

Disclaimer and important notice

Naypyitaw workshop July 16 218 July 2016

Page 3: Woodside Energy (my)

က်ႏုုပ္တုုိ႕၏လုုပ္ငန္းကြင္းဆက္

Naypyitaw workshop July 16 318 July 2016

• ဆုုိက္စမစ္စူးစမ္းေလ့လာျခင္း• ေရနံတြင္းတူးရွာေဖြျခင္း

ဆည္းပူးျခင္းနွင့္ စူးစမ္ရွာေဖြျခင္း

•ေရနံတြင္းတူး ထုတ္လုပ္ျခင္း•စီမံကိန္းေပးေ၀ျခင္း•တည္ေဆာက္ျခင္း

ဖြ႕ံၿဖိဳးတုုိးတက္ျခင္း လုုပ္ငန္းေဆာင္ရြက္ျခင္း

• အေထာက္အပံ့ပစၥည္းမ်ား

ေစ်းကြက္တည္ေဆာက္ျခင္း

• သုုံးစြသူဲမ်ားအတြက္ပံ့ပိုုးျခင္း

Oil and Gas Lifecycle

ACQUIRE & EXPLORE

DEVELOP OPERATE MARKET

Page 4: Woodside Energy (my)

Woodside in Myanmar

Naypyitaw workshop July 16 418 July 2016

Block JVP’s Completed Activity ~ Commencement Planned Future Activities

A-7 WEM (operator)

BG E&P

MPEP

Marine Seismic

Seabed sampling

Mid Nov 2015 Flexibility to drill depending on

outcomes of seismic survey

AD-5 WEM (operator)

BG E&P

Marine Seismic Mid Nov 2015 Flexibility to drill depending on

outcomes of seismic survey

A-6 MPRL E&P

(Government liaison

operator)

WEM (operator save

in respect of

government liaison)

Total E&P

Exploration Drilling

Marine Seismic

December 2015

May 2016Planning to drill in 2017

AD-7 WEM (operator for

Deepwater drilling)

POSCO Daewoo

(operator for all other

activities)

Exploration Drilling

Marine Seismic

February 2016

March 2016Planning to drill in 2017

A4 BG E&P (operator)

(WEM, MPEP)

Marine Seismic

Seabed Sampling

Nov 2015

AD2 BG E&P (operator)

(WEM)

Marine Seismic

Seabed Sampling

Nov 2015

WEM – Woodside Energy (Myanmar) Pte LtdMPEP – Myanmar Petroleum Exploration & Production Company Limited (MPEP)BG E & P – BG Exploration and Production Myanmar

Page 5: Woodside Energy (my)

Social Understanding

Naypyitaw workshop July 16 518 July 2016

Page 6: Woodside Energy (my)

Environment Understanding

Naypyitaw workshop July 16 618 July 2016

Page 7: Woodside Energy (my)

ေရနံႏွင့္ဓာတ္ေငြ႕ဆုိင္ရာ လုပ္ငန္းမ်ား အေကာင္အထည္ေဖာ္ေဆာင္ရြက္ရန္ အနီးစပ္ဆံုး ၾကာခ်ိန္ကာလ

Naypyitaw workshop July 16 718 July 2016

Seismic

တူးေဖာ္ရွာေဖြျခင္း

Construction

လုပ္ငန္းလည္ပတ္ေဆာင္ရြက္ျခင္း

လမ်ား ႏွစ္မ်ား ဆယ္စုႏွစ္မ်ား

၃ ပတ္ မွ ၆ လ အထိ

၃ ႏွစ္ မွ ၅ ႏွစ္ အထိ

၁ လ မွ ၁၂ - ၁၈ လ အထိ

၂၀ ႏွစ္ အထက္

အနီးစပ္ဆံုး ကာလသတ္မွတ္ခ်က္

Page 8: Woodside Energy (my)

Environmental Aspects Offshore Drilling

Naypyitaw workshop July 16 818 July 2016

Page 9: Woodside Energy (my)

Stakeholder Engagement

Naypyitaw workshop July 16 918 July 2016

Page 10: Woodside Energy (my)

လုပ္ငန္းစဥ္မ်ားႏွင့္ EIA အစီအစဥ္ ေရးဆြျဲခင္း

Naypyitaw workshop July 16 1018 July 2016

လုပ္ငန္း စတင္လည္ပတ္ရန္

(အနီးစပ္ဆံုး ၾကာခ်ိန္ လမ်ား) အစီအစဥ္ ေရးဆြျဲခင္း

ပတ္၀န္းက်င္ သက္ေရာက္မႈအကဲျဖတ္ခ်က္ (အနီးစပ္ဆံုး ၾကာခ်ိန္ လမ်ား)

ေရနံတြင္းႏွင့္ တြင္းတူးစင္ အတြက္လုပ္ငန္းမ်ား လုပ္ေဆာင္ရန္

အစီအစဥ္ ေရးဆြျဲခင္းစတင္ရန္

EIA ေရးဆြျဲခင္းစတင္ရန္

EIA တင္သြင္းရန္ ပတ္၀န္းက်င္ဆုိင္ရာ

လုပ္ငန္းမ်ားအႀကိဳ

လုပ္ေဆာင္မႈစီစဥ္ျခင္း

ECC ရယူရန္လုပ္ငန္း အဆုိျပဳ

အစီရင္ခံစာတင္သြင္းရန္

Submit Terms of

Reference Report

$ $$$$$$$

၁၈ လ

ဆံုးျဖတ္ခ်က္ ခ်မွတ္ျခင္းအသိေပးရန္ လုပ္ငန္းစဥ္၊အခ်ိန္ သတ္မွတ္ျခင္း၊

အတည္ျပဳျခင္း

အခ်ိန္ယူေဆာင္ရြက္ရမည့္ကိစၥမ်ား လုပ္ေဆာင္ရန္

Page 11: Woodside Energy (my)

ACTIVITY ASSESSMENT

TIMING as per EIA

Procedure

(working days)

Project Proposal

Report

15

Terms of

Reference

Scoping Report

15

Environmental

Impact

Assessment

Report

90

Total Assessment

Time

120

Approximate EIA Timelines

Naypyitaw workshop July 16 1118 July 2016

Intra-governmental process and timing uncertainty

Page 12: Woodside Energy (my)

Woodside သည္ အရဲစြန္႔ရမႈကုိ အေျခခံသည့္ (risk based) နည္းလမ္းကုိအသုံးျ႔ပဳ၍ အကဲျဖတ္မႈမ်ား ေဆာင္ရြက္သည္။

စည္းကမ္းပုိင္းဆုိင္ရာ လုပ္ငန္းစဥ္သည္ အခ်ိန္သတ္မွတ္ခ်က္ႏွင့္အေၾကာင္းအရာမ်ား တိက်ရပါမည္။

အကဲျဖတ္ခ်က္မ်ားျပဳလုပ္သည့္ အဆင့္တုိင္းတြင္ အတည္ျပဳျခင္းလုပ္ငန္းစဥ္အပါအ၀င္ အျခားေသာ လုိအပ္ခ်က္မ်ားႏွင့္ စပ္လ်ဥ္းသည့္ ကိစၥရပ္မ်ားသည္ရွင္းလင္းမႈရိွရမည္။

နိဂံုးခ်ဳပ္

Naypyitaw workshop July 16 1218 July 2016