26
Royal Commission in Jubail RC Contract 098- C58

Environment, Health & Safety Monthly Report

  • View
    742

  • Download
    5

Embed Size (px)

DESCRIPTION

Monthly Report for Safety Environment and Health. all the activities regarding safe work are bring into presentation form. For power point slides please email me on [email protected]

Citation preview

Page 1: Environment, Health & Safety Monthly Report

Royal Commission in Jubail

RC Contract 098-C58

Page 2: Environment, Health & Safety Monthly Report

AZMEEL IN ASSOCIATION WITH

A.ABU NAYYAN & SAUDI TUMPANE

Page 3: Environment, Health & Safety Monthly Report
Page 4: Environment, Health & Safety Monthly Report

098-C58 EPC of JIC Cooling Plant EHS Report

098-C58

Page 5: Environment, Health & Safety Monthly Report

Month: May 2013 Jun 2013Accumulated man-hour: 379860 387770Days worked since project commenced: 689 696Accumulated man-day lost: 0 0Cumulative Accident Frequency Rate: 0 0

Safety is everyone’sResponsibility.

ALL are an important stakeholder !

SAFETY STATISTICS

098-C58

Page 6: Environment, Health & Safety Monthly Report

Pre Task Meeting

Pre task meeting for lifting activity Lifting cooling tower components

Safety consideration in Planning Stage – Participation in Pre-work meetings

098-C58

Page 7: Environment, Health & Safety Monthly Report

SAFETY INDUCTION TO NEW HIRE

INDUCTIONT

RAINING

Site Specific Safety Induction Current Month

No. of class 06

No. of Attendee 25

098-C58

Page 8: Environment, Health & Safety Monthly Report

SAFETY TRAINING

098-C58

Page 9: Environment, Health & Safety Monthly Report

Weekly Safety Toolbox Meeting

098-C58

Page 10: Environment, Health & Safety Monthly Report

SAFETY & HEALTH & ENVIRONMENTAL ASSURANCE

098-C58

Page 11: Environment, Health & Safety Monthly Report

FIRE SAFETY AND FIRE EXTINGUISHER

On lay down and Construction site fire prevention measures are taken with full standard. Fire extinguishers and sand buckets are installed in different areas of work according to their need.

098-C58

Page 12: Environment, Health & Safety Monthly Report

FIRE EXTINGUISHER RECORDArea: Laydown office and Construction Site 098-C58

Series No. TYPE BUILDING

No.001-5 POWDER ABC 5Nos of Fire Extinguisher are installed in 1st Azmeel office

No.006-9 POWDER ABC 4Nos of Fire Extinguishers are installed in RC Office

No.010 POWDER ABC With Smoking shelter at laydown area.

No.011 POWDER ABC Water shelter at laydown area

No.012-13 POWDER ABC 2nd Azmeel office (Accounts Section)

No.014 POWDER ABC Near the Toilet area

No.015 POWDER ABC One with Generator area at Laydown

No.016 POWDER ABC In Store main entrance

No.017 POWDER ABC Chemical Store

No.018 POWDER ABC Mosque

No.019 POWDER ABC Smoking Shelter at laydown area

No.020-21 POWDER ABC 2 Nos of Fire Extinguisher with Portable Generators

No.022-25 POWDER ABC Fire Point

098-C58

Page 13: Environment, Health & Safety Monthly Report

With Generator With Generator

With Portable GeneratorNear Latrine / Ablution area.

098-C58

Page 14: Environment, Health & Safety Monthly Report

098-C58 Project Site Office Entrance 098-C58 Project Site Office Exit

Azmeel Account Office EntranceAzmeel Account Office Exit

098-C58

Page 15: Environment, Health & Safety Monthly Report

Fire Point Construction Site Water / Rest Shelter

Smoking area Site Office Water / Rest Shelter Site Office

098-C58

Page 16: Environment, Health & Safety Monthly Report

BULLETIN BOARDThere is no doubt that safety in the workplace, legal compliance, and friendly working environments are key elements that employers must continually work to improve. An attractive, well organized safety bulletin board are placed in both construction site and at project office site to promote safety in the workplace.

098-C58

Page 17: Environment, Health & Safety Monthly Report

HOUSE KEEPINGWe value Housekeeping and its not just cleanliness. We are maintaining halls and floors free of slip and trip hazards; and removing of waste materials (e.g., paper, cardboard) and other fire hazards from work areas. We pay great attention to important details such as the layout of the whole workplace, aisle marking, the adequacy of storage facilities, and maintenance. Good housekeeping is also a basic part of accident and fire prevention.

098-C58

Page 18: Environment, Health & Safety Monthly Report

Good Examples

098-C58

Page 19: Environment, Health & Safety Monthly Report

Good Examples

098-C58

Page 20: Environment, Health & Safety Monthly Report

Good Examples

098-C58

Page 21: Environment, Health & Safety Monthly Report

Good Examples

098-C58

Page 22: Environment, Health & Safety Monthly Report

Good Examples

098-C58

Page 23: Environment, Health & Safety Monthly Report

Good Examples

098-C58

Page 24: Environment, Health & Safety Monthly Report

WASTE MANAGEMENTWe are deeply concerned with waste, our efforts are related to materials produced by human activity, and the process is generally undertaken to reduce their effect on health, the environment. Putting separate skips for different material and space for concrete washout.

098-C58

Page 25: Environment, Health & Safety Monthly Report

PEDESTRIAN/WALKWAYSPedestrian /walk ways are installed in both laydown and construction site for employees to lead them from site office / parking area to construction site. Walkways are increased inside the construction site to prevent the man and machine impediment.

098-C58

Page 26: Environment, Health & Safety Monthly Report

Thanks for watching!!

THE END

098-C58