Head of the Republic of Buryatia– Prime Minister of the Republic of BuryatiaVyacheslav V. Nagovitcin
The Republic of Buryatia now is a region of dynamic development of industrial potential and favorable investment climate that makes it one of the most attractive regions of Russia.
In order to achieve the strategic goal of development of our Republic - that is improvement of living standards and quality of life of the population - we aim at creation of competitive economy, development and modernization of production, transport and social infrastructure, forming of large industrial infrastructure complexes. We create the Baikal Haven Tourism & Recreation Zone as well as regional zones of economicfavor.
Buryatia has all conditions for development of investment cooperation. These are its advantageous transport and geographic position in relation to domestic and foreign markets, rich and highly explored mineral resources base, vast tourism and recreation resources, strategic reserve of pure drinking water, and high scientific, labor and cultural potential.
The Republic of Buryatia is open for implementation of new significant economic and social projects. We are constantly working at arrangement of the most favorable, beneficial and comfortable conditions for business development and attraction of potential investors. I would like to invite you to take a closer look at our Republic. I wish you rewarding work, effective mutually beneficial cooperation with the Republic of Buryatia and success to your business!
The Deputy Chair of the Government of the Republic of Buryatia for economic development, the Investments Officer of the Republic of Buryatia
Alexander E. ChepikNowadays the Republic of Buryatia is one of the most fast-growing regions of Russia. All the measures of government support to
market players have become a kind of accelerator for omnidirectional development of the Republic.The Board of Investment Activity is affiliated with the Head of the Republic Buryatia, the institution of the Investment Officer of the
Republic of Buryatia was introduced, and the Fund for regional development of the Republic of Buryatia was established. The Republic of Buryatia supports investors intending to put up money for its capital investment projects. The Government of the Republic of Buryatia constantly works at arrangement of the most favorable, beneficial and comfortable conditions for business development.
All that facilitates reduction of the way of an investor to solving of specific problems depending on thestate authorities.
Minister of Economy of the Republic of BuryatiaZandra G. Sangadiev
For the Government of Buryatia support of investors is one of the priority areas of development of social and economicpotential of the region. Legal, infrastructural and informational framework for attraction of investors, as well as the administrative and financial tools of investment support were created in the Republic.
In particular, the laws focused on investment support were passed. Thus, the Law of the Republic of Buryatia «On the government support for investment activity in the Republic of Buryatia» provides seven forms of the government support including financial and property government support for organizations entered into the investment agreement implementing investment projects.
Welcome to the Republic of Buryatia! 3
Republic of Buryatia
RUSSIARepublic of Buryatia
Mongolia
China
Ulan-Ude
Kazakhstan
Lake
Baika
l
Germany
TurkeySpain
CONTENTS:
BURYATIA - TERRITORY INVESTMENT 6
TRANSPORT AND LOGISTICS SECTOR
MINERAL RESOURCES SECTOR
8
24
AGRO-INDUSTRIAL SECTOR 48
INDUSTRY AND RESIDENTIAL CONSTRUCTION 70
TOURISM AND RECREATION SECTOR 92
FUND FOR REGIONAL DEVELOPMENT 126
GENERAL INFORMATION ABOUT THE REPUBLIC OF BURYATIA:• Area - 351 300 km2
• Population - 978.6 thousand people• Administrative center - the city of Ulan-Ude
1,100 MWGusinoozyorskaya TPP (Termal Power Plant)
7
Р258
Р258
А340
А164
Р436
Р437Р4
38
148 МWCHPP-1 (Central Heating
and Power Plant)
М55
А165
А164
Р436
Р437Р4
38
The distance from Ulan-Ude:• Moscow - 5631 km• Beijing - 2013 km• Ulan - Bator - 584 km• Seoul - 2200 km• Tokyo - 3115 km
BURYATIA - TERRITORY INVESTMENT
• Guaranteedsupport of the Government of the Republic of Buryatia
• Up-to-datelegislative framework
• Investment projects support based on “one stop” principle
• Effective development institutions
• Full set of financial instruments
Favorable investment policy:The Baikal-Amur Railway
20%of the world’s fresh
water reserve
Lake
Baika
l
Logistics:• Р-258 Moscow-Vladivostok• А-340 Ulan-Ude - Kyakhta - Ulaanbaatar• The Trans-Siberian Railway• The Baikal-Amur Railway• International Airport «Baikal» in Ulan-
Ude
railroad
federal highways
Ulan-Ude
TYVA
IRKUTSK REGION
Trans-Baikal Territory
MONGOLIA
Euro-Asian transport corridors 10
The automobile tourism cluster “Kyakhta” 12
The production and logistic center in Gusinoozersk town
14
Setting-up of an international trans-asian logistic company in Gusonoozyorsk
16
logistics center, station «sulfate» 18
The automobile tourist cluster “Baykalskiy” 20
Logistic center in Ulan-Ude 22
INVESTMENTS PROPOSALS OF THE REPUBLIC OF BURYATIA
Transport and logistics sector
Ulan-Ude
UlaanbaatarPeking
Moscow
1009289,2
83,5
59,3
39,5
55,9
40,328,7
Moscow
Ulan-UdeUlaanbaatar
Peking Tokyo
NovosibirskRotterdam
DalianTitle Distance
Peking - Ulaanbaatar - Ulan-Ude - Moscow 9 500 km 12 days
The Trans-Siberian Railway 11 000 km 14 days
Northern Sea Route 13 500 km 35 daysSouth Sea Route 20 700 km 49 days
EURO-ASIAN TRANSPORT CORRIDORS
Usage of the international transport corridor for cargo carriage through Buryatia along the route «Moscow - Ulan-Ude - Kyakhta - Ulan Bator - Beijing» allows to reduce time of delivery up to 12 days. Goods turnover between Russia and
China(bln. U.S. dollars)
2015201420132012201120102009200820072006
The relevance of establishment of logistics centers in the Republic of Buryatia is based on the feasibility of use of the transit and transport potential of the Republic in the context of stable growth of the goods turnover and cargo carriage between Russia and China, the countries of the Asia-Pacific Region.
Factors of development of cargo carriage through the transport corridor
Construction and reconstruction of the Zamyn-Uud - Ulan-Bator - Altan-Bulak motorway that was opened for traffic in 2014.
Expansion of the road border crossing Zamyn-Uud from the side of Mongolia on the border with China.The reconstruction of the multiway road border crossing «Kyakhta» that allows to increase its capacity up to 1200 vehicles per day.Completion date is 2015.
Reconstruction and expansion of the Ulan-Ude – Kyakhtamotorway. Work performance period is 2012-2020.
88,2
Construction and reconstruction of the Beijing - Zamyn-Uud(China) motorway
Construction of the Zamyn-Uud - Atan-Bulak - Kyakhta (Mongolia) motorway
Construction of the Kyakhta - Ulan-Ude (Russia) motorway
10 11
Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
Altan-Bulak
The multiway road border crossing «Kyakhta»
Offered vacant lots Highway Electrical sub-station
TIC – to $ 30 mln.
А340
А340
THE AUTOMOBILE TOURISM CLUSTER “KYAKHTA”
Irkutsk
Mongolia
lake Baik
alKyakhta Naushki
It is proposed to implement the investment projects of development and operation of transport and logistics complexes located on two land plots 12 and 19 ha in area in the territory of the automobile tourist cluster “Kyakhta” and bordering with the multiway road border crossing «Kyakhta».
Service station for trucksOpen air parking for trucks
Cargo terminal including temporary storage warehouses
Tran
spor
t and
logi
stic
s sec
tor
Ulan-Ude
Station «Naushki»35 km
Ulan-Ude224 km
Kyahta
12 hectares19 hectares
12 13MONGOLIARUSSIA
Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
Offered vacant lots Electrical sub-stationRailroadHighway
Projected railway branch
TIC – to $ 10 mln.
TIC – to $ 10 mln.
logistics center
The production and logistics center
Goosenoe lake
Ulan-U
de12
5 km
Gusinoozyorsk
1,100 MWGusinoozyorskaya TPP (Termal Power Plant)
10 hectares
30 hectares
station Zagustay
THE PRODUCTION AND LOGISTIC CENTER IN GUSINOOZERSK
Irkutsk
Mongolia
lake Baik
al
It is proposed to implement the project of production and logistic centers with reloading and container yard within the territory of Gusinoozyorsk nearby Zagustay railway station.
Two plots with total area of 40 ha , nearby the Ulan-Ude – Naushkirailway were prepared for the construction purposes.
There is a thermal power plant with a capacity of 1100MW within the territory of Gusinoozyorsk and free capacity for setting-up of power-consuming industries is available.
Loading yards
The production and logistics centers
Gusinoozyorsk
Tran
spor
t and
logi
stic
s sec
tor
Ulan-Ude
14 15
Offered vacant lots Electrical sub-stationRailroadHighway
Projected railway branch
TIC – to $ 10 mln.
TIC – to $ 10 mln.
logistics center
The production and logistics center
Goosenoe lake
Ulan-U
de12
5 km
Gusinoozyorsk
1,100 MWGusinoozyorskaya TPP (Termal Power Plant)
10 hectares
30 hectares
station Zagustay
Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
SETTING-UP OF AN INTERNATIONAL TRANS-ASIAN LOGISTIC COMPANY IN GUSINOOZYORSK
Irkutsk
Mongolia
lake Baik
al
Setting-up of an international trans-asian logistics company within the territory of the industrial special economic zone in Gusinoozyorsk nearby the railway station Zagustay is proposed for joint implementation with the project initiator (OJSC «ANMET»).
Investment area - 146 hectares.Implementation period: 2012 - 2016 years.Indicators: TIC – $ 56 mln.Trucking - 820 thousand tons per yearThe number of vehicles - 400 cars with trailers, 100 units
of machinery
Gusinoozyorsk
Tran
spor
t and
logi
stic
s sec
tor
Ulan-Ude Projected railway branch
Offered vacant lotsRailroadHighway
Ulan-Ude
125 km
Gusinoozyorsk
1,100 MWGusinoozyorskaya TPP (Termal Power Plant)
146 hectare
station Zagustay
Zone of economic favor
TIC – to $ 56 mln.
16 17
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
Naushki
139 km
Gusinoozyorskaya TPP, 9 km
TIC – to $ 10 mln
«Tahoy»,1 km
LOGISTICS CENTER, STATION «SULFATE»
Irkutsk
Ulan-Ude
Mongolia
lake Baik
al
Sulfate station
It is proposed to implement the project of multimode container and reloading yard in the territory of the village ofof Tokhoy nearby Sulfat railway station.
Free plot area is 20 ha. The plot is situated along the Ulan-Ude – Naushkirailway.
The Gusinoozyorskaya TPP (Termal Power Plant) with a capacity of 1100 MW is located 9 km from the proposedplot .
logistics centerMultimode container and reloading yards
Sulfate station
Tran
spor
t and
logi
stic
s sec
tor
logistics center
village Tohoy
Offered vacant lots Highway Electrical sub-station
Ulan-Ude
116 km
20 hectares
Lake Solenoe
Projected railway branch
Sulfate station
TIC – to $ 14 mln
Railroad
18 19
А165
Р258
Р441
Р258
Р258
А164
А340
Р440
THE AUTOMOBILE TOURIST CLUSTER “BAYKALSKIY”
Irkutsk
Mongolia
lake Baik
al
It is proposed to construct a service station for trucks and cars.
The service station for passenger cars 700 m2 in area as well as the service station for heavy vehicles, tourist coaches, camping cars 3700 m2 in area.
Warehouse complex including trading facilities and temporary storage warehouses with different storage conditions.
Warehouse complex
Parking
Lower Ivolga
Tran
spor
t and
logi
stic
s sec
tor
Service station
Ulan-Ude
35/10 КW
10/04 КW 2Х630,4 U.
А340
А340
Р258
Р258
village NishayaNur-Selenie
village
Offered vacant lots Highway Electrical sub-station
20 hectares
Ulan
-Ude
2 km
Railroad, 9 km
Airport «Baikal», 3 km
TIC – to $ 10 mln.
20 21
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
LOGISTIC CENTER IN ULAN-UDEIrkutsk
Ulan-Ude
Mongolia
lake Baik
al
It is proposed to implement the project of setting-up of industrial and logistic center and cargo terminal within the territory of Ulan-Ude nearby Baikal airport.
The total area of 24 hectares of vacant land.
Multimode container and reloading yards
Tran
spor
t and
logi
stic
s sec
tor
Industrial and logistic centers
+
Highway Electrical sub-station
TIC – to $ 10 mln Ulan-Ude
Airport «Baikal»
22 23
INVESTMENTS PROPOSALS OF THE REPUBLIC OF BURYATIA
Mineral resources sector
Share of mineral resources of the Republic of Buryatia in the national mineral resources
26
Investments proposals, unlicensed stock
27
Mukhalskoye deposit Al2O3, Na2CO3, K2O 28
Vitimkonskoye ore field TiO2, FeO, V2O5
29
Mokhovoye deposit Sn 30
Synnyrskoye potassium-alumina deposit (Kalyumny site)
31
Chayskoye deposit Ni, Cu 32
Malo-Oynogorskoye deposit W, Mo
33
Dovatkinskoye polimetallic ore field
34
Chulbonskoye high-purity raw quartz deposit
35
Ozyorninskiy ore cluster 36
Soukhusan deposit Fe 38
Egitinskoye deposit CaF2 39
Kharanurskoye deposit P2O5 40
Aiktinskoye and Bolaiktinskoye raw cement deposits
41
Mukhor-talinskoye deposit, perlite and zeolite
42
Facing stones 43
Common minerals 44
Basalt 45
Mineral springs 46
Min
eral
reso
urce
s sec
tor SHARE OF MINERAL RESOURSES OF THE REPUBLIC OF
BURYATIA IN THE NATIONAL MINERAL RESOURSES
RUSSIA
Buryatia
90%
nephritis fluorite asbestos apatite
16% 15% 13%
nonmetals
Zn Mo Pb W U
48%
32%24%
20%10%
metals
Cu, NiTi, Fe, VSn
quartz
Al2O3, Na2CO3, K2O
Fe, Cu, Mn
FeZn, Pb
fluorite
W, Mo
PP
INVESTMENT PROPOSALS UNLICENSED STOCK
lake B
aikal
Ulan-Ude
Al2O3, K2O
26 27
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
Mukhalskoye deposit
Ust-Dzhilinda
Min
eral
reso
urce
s sec
tor
28
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
29
№ Data Alumina Cement Na2CO3 Potash1 Period of coverage, years 312 Stock С1+С2, mln. t. ore 427,43 resources Р1, mln. t. ore 273,14 Production output, th. t. per year 650 3 300 454 2805 selling price, $/t. 214 109 174 6866 cost of production, $ mln. 138 359 79 1927 Capex, $ mln. 9708 Specific production costs per ton of ore, $/t 389 Net present value (NPV), $ mln. 632
10 Internal rate of return, % 2011 Capital investments payback period, years 6,6
Electrical transmission line (110 Kw), 75 km
MUKHALSKOYE DEPOSIT Al2O3, Na2CO3, K2O
Ulan-Ude380 km
CONTENTS:Al2O3 -25,1 %K2O - 4,2 %Na2O - 10,4 %
№ Data TiO2 FeO V2O5
1 Resources P2 -ore, mln. t. 1 097
2 Resources P2 , mln. t. 78 219 1,37
3 Content in the ore, % 7,1 20 0,1254 Annual output: for the ore, mln. t. 205 Annual output, th. t. 1422 4 000 256 DPP, years 6,37 Return on investments, % 238 Approximate volume of investments, $ mln. 179
Vitimkonskoye ore field
Electrical transmission line (110 Кw) 30 km
VITIMKONSKOYE ORE FIELD TiO2, FeO, V2O5
Irokinda
IRKUTSK REGION
ZABAIKALSKIYREGION
REPUBLIC OF BURYATIA
The project provides for geological exploration works, development of Magnitny prospective area, construction of mining-and-processing works
Ulan-Ude700 km
Taksimo
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
№ Reserves category
Ore reserves,
th. t.
The average content, % Stocks of metal, th. t.
Sn Cu FeO Fe2O3 Sn Cu FeO Fe2O31 С2 1 105,53 1,146 0,412 7,254 11,548 12,66 4,55 80,31 127,672 Р1 1 105,53 12,66 4,55 80,31 127,673 Р2 308,48 5,53 0,78 30,45 66,174 In all: 2 519,54 30,85 9,88 191,07 321,51
Новый Уоян
№ Data Ore Cement K2O Al2O31 Approximate volume of investments, $ mln. 13532 Output, th. t. /year - 3 300 1 820 6503 Stock С2, mln. t. 679 - 123 1524 Resources Р1, mln. t. 1 850 - 331 4145 Content, % - - 17-18 22-236 DPP, years 5,87 Return on investments, % 41
Min
eral
reso
urce
s sec
tor
30
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
31
MOKHOVOYE DEPOSIT Sn
MOKHOVOYE DEPOSIT Sn
Electrical transmission line (110 ), 15 km
Irokinda
IRKUTSKY REGION
ZABAYKALSKY REGION
REPUBLIC OF BURYATIA
Ulan-Ude700 km
TaksimoNovy Uoyan
Severobaikalsk
Nizhneangarsk
Synnyrskoye deposit
Electrical transmission line (220 kW), 80 km
SYNNYRSKOYE POTASSIUM-ALUMINA DEPOSIT (KALYUMNY SITE)
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
Novy Uoyan
Severobaikalsk
Chayskoye deposit
Electrical transmission line (220 kW), 45 km
№ Data Ni Cu Co1 Annual output ore , th. t. 2 0002 Stock С2 of ore, th. t. 51 1003 Stock С2, th. t. 260 86 10,74 Resources, th. t. 800 270 335 Content, % 5,58 1,7 0,19
CHAYSKOYE DEPOSIT Ni, Cu MALO-OYNOGORSKOYE DEPOSIT W, Mo
Annual production, t/year: Ore - 12 mln.Molybdenum concentrate – 8 490;Tungstic anhydride – 2 543; Pyrite concentrate – 178 000;Acid ammonium molibdate – 159.
Min
eral
reso
urce
s sec
tor
32
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
33
Nizhneangarsk
№ Data Ore Mo WO3 S Re1 Approximate volume of investments, $ mln. 502 Stock А+B+C1+C2, th. t. 305 014 154 922 122 602 4 790 2,53 Non-commercial reserves, th. t. 46 309 8 993 11 558 764 Resources Р1, th. t. 67,3 51,45 Content, % 0,0666 Discounted payback period, years 47 Return on investments, % 36
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
Maila village
Khorinsk
Dovatkinskoye deposit
DOVATKINSKOYE POLIMETALLIC ORE FIELD
Ulan-Ude165 km
№ Data Ore Pb Zn Cd Ag Lead concentrate
Zinc concentrate
1Approximate volume of
investments, $ mln.29
2 Stock C1+C2,th. t. 1 720,7 83,9 123 549,2 230,5
3 Resources Р1+Р2,th. t. 23 225,3 850,5 1 397,1 5 382,82 2 913,5
4 Annual output,th. t. 300 10,2 16,4 28,7 16,9 32,7
5 Discounted payback period, years 4,2
6 Return on investments 39 %
Electrical transmission line (110 kW), 42 km
CHULBONSKOYE HIGH-PURITY RAW QUARTZ DEPOSIT
Sakhuli
Kurumkan
CHULBONSKOYE HIGH-PURITY
Electrical transmission line (220 kW), 110 km
Ulan-Ude165 km
It is envisaged the development of a deposit, production of quartz concentrate, high-quality refined silicon, multisilicon,and photoelectric systems.
THE LARGEST DEPOSIT
Quartz content from 99.96 to 99.98%
Light transmission coefficient 30-60%
Annual output: • quartz grit – 5 000 t.; • metallulgical refined silicon – 18 000 t.;• quartz crucibles – 18 pcs. • multisilicon – 10 000 t.• Photoelectric systems – 200 MW.
Min
eral
reso
urce
s sec
tor
34
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
35
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
Ulzytuyskoye
SolongOktyabrskoye
Mayskoye
Ozyorny town
Yuzhno-Arishinskoye
Ozyornoye
Severno-Gurvunurskoye
Gurvunurskoye
ArishinskoyeGunduyskoye
Turkulskoye Zvyozdnoye
Ozyorninskiy ore cluster
OZYORNINSKIY ORE CLUSTER
Distance to the city of Ulan-Ude - 300 km.
Distance to the nearest railway station – 160 km.
Routed to the Ozyorny deposit 110 kW transmission line and road paved.
110 kW transmission line also runs along the road Ulan-Ude - Bagdarin.
№ Deposit MineralsStock and inferred resources
(th. t.) Contentstock resources
1 Arishinskoye Cu, Fe Ore C2 – 134 841,3Fe – 43 037; Cu – 280,2 Ore -134 841,0 Fe – 34,64%
Cu – 0,18%
2 Gunduyskoye Сu, BaSO4 copper barytic
Ore С2 – 14 192,0 BaSO4 – 4 531,0 Cu- 78,7
Ore Р1 -7 723,0Ва- 2 411,0 Сu – 39,0
Ba- 32,46%Cu-0,59%
3 Gurvunurskoye Iron-ore Ore С1 - 23 333,1 Р1 – 96 500,0 Fe – 35,89%4 Dabkharskoye Fluorite Ore С2 -826,0; СаF2 – 315,0 Ore P1 - 1 700,0 До 82,63%
5 Oktyabrskoye Iron-manganese С2 -5 961,0Mg – 589,0 Fe – 1 950,0
Р1 – 527,0Mg – 49,0 Fe – 202,0
Mg-9,9%Fe- 32,7%
6 Osenneye Fluorite С2- 1 714,0CaF2 – 442,0
Р1- 355,0CaF2 – 106,5 30%
7 Solong MagnetiteOre С2-117 846,8; Fe – 46 313,0Boric ore– 6 600,0; B2O3- 379,5
Zn – 260,2; Mb – 10,8P1 – 150 000,0
Fe – 39.32%B2O3 – 6,28%
Zn – 0,3 %Mb -0,01%
8 Souhusan Iron-ore C2 -67 000,0; Fe – 22 000,0 Fe - 49,33%
9 Turkulskoye Copper barytic , Fe
Ore (Cu Ba)C2 - 10 268; Cu – 57BaSO4 – 1 557,0; Ore Fe C2- 96 500,0
Fe – 27 000,0
Cu- 0,56%BaSO4 – 15,66%
Fe – 27,2%
10 Ulzutuyskoe Lead-zinc С2 – 16 872,7Zn – 509,4; Pb - 52,2
Zn – 4,23%Pb - 0,61%
10 Ulzytuyskoye Свинцово-цин-ковое
С2 – 16 872,7Zn – 509,4; Pb - 52,2
Zn – 4,23%Pb - 0,61%
Min
eral
reso
urce
s sec
tor
36 37
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
SOUKHUSAN DEPOSIT Fe
Sosnovo-Ozyorsk
Electrical transmission line (110 kW), 35 km
Ulan-Ude320 km
SOUKHUSAN deposit
№ Data1 Stock: С1+C2 , th. t. 67 0002 Prognosticresources P1, thousand t. 300 0003 Content Fe 49,3%4 CAPEX , $ mln. 575 Annual cast iron production, th. t. 884,1
№ Data1 Stock С1, th. t. 3 9222 Stock С2, th. t. 445,83 Prognostic resources of ore cluster, th. t. of ore 5 8004 Content, % 53,3
Сосново-ОзерскEgitinskoye deposit
Ulan-Ude250 km
Min
eral
reso
urce
s sec
tor
38
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
39
Sosnovo-Ozyorsk
EGITINSKOYE DEPOSIT CaF2
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
Sorok
Kharanurskoye deposit
Electrical transmission line (35 kW), 17 km
Ulan-Ude470 km
№ Data Ore P2O51 Annual phosphorite meal production, th. t. 3002 Common stock С1, th. t. 300 0003 Easy-to-extract secondary rock phosphate reserve C1, thousand t. 3 292,5 5884 Easy-to-extract secondary rock phosphate reserve C2, thousand t 652,6 107,35 Average content, % 17,96 Forecast resourses, th. t. 84 000 15 3007 Discounted payback period, years 3,48 Assessment of investments profitability, % 32,49 Approximate volume of investments, $ mln. 34
Taksimo
Aiktinskoye deposit
Electrical transmission line (220 kW), 24 km
Ulan-Ude700 km
The deposits are developed for raw materials base for projected cement plant with a capacity of 2 mln.t. of cement per year. The Aiktinskoye and Bolaiktinskoye deposits’ balance reserves of limestone and siltstone for portland cement production by dry mix process for open mining were approved by the State Committee for mineral reservesof the USSR as of 01.06.1989.
Bolaiktinskoye deposit
Min
eral
reso
urce
s sec
tor
40
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
41
KHARANURSKOYE DEPOSIT P2O5
№ DataAiktinskoye deposit Bolaiktinskoye deposit
Limestones Limestones Siltstones1 Stock А, th. t. 46 668 - -2 Stock В, th. t. 37 950 - 12 5313 Stock С1, th. t. 65 881 27 185 44 9874 Reserves C2 outside the project quarries, th.t. 667 335 - -
AIKTINSKOYE AND BOLAIKTINSKOYE RAW CEMENT DEPOSITS
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
Min
eral
reso
urce
s sec
tor
42
ChitaIrkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
RomanivkaOrlik
Ulan-Ude
43
MUKHOR-TALINSKOYE DEPOSIT, PERLITE AND ZEOLITE
Reserves and resources of zeolitized rock 169,5 mln t., including:
Reserves C2 – 63,7 mln.t., P1 – 105,8 mln.t.
Required basic investments amount – $ 14 mln.
• PRODUCTION USE:• Zeolites of market grades (0-1 mm, 1-3 mm, 3-5 mm, > 5 mm) for industries, agriculture, environment protection (1st
stage – up to 20 th. t./year)• Perlites of market grades for construction enterprises (1st stage - up to 25 th. m3/year)• Expanded perlite (sand and macadam)produced by using of the mobile facilities of Ukrainian Research and Development
Institute on construction materials and products (Ukr NIISMI);• Cementless lime-perlitic and lime-zeolitic binders;• Wall blocks with expanded perlite;• Sand-lime bricks with zeolitic and perlitic components;• Light porous materials, such as sponge glass, vitrophire, agroperlite;• Organomineral fertilizer based on poultry-breeding biowaste • and natural zeolites;• Organomineral fertilizer based on urban waste water sludge and natural zeolites;• Zeolite-mineral fertilizer based on natural zeolites and nitrogen-containing substances -
ammonium nitrate, carbamide;• Household and industrial filters with natural zeolites for natural and waste water
purification (after-purification);• Mineral dietary supplements, premixes, preparations, food supplements, deodorants,
fillings, substrates for animal breeding, veterinary, agriculture, vegetable growing, household activities;
FACING STONES
Located in the Pribaikalsliy district 47 km north-west of Ulan-Ude on the right bank of the Selenga river. The nearest railway stations are Tataurovo (7 km) on the left bank of the river Selenga and the Mostovoy passing place (12 km) – on the right bank. The deposit is connected by the ferry line across the Selenga river. On the right bank of the Selenga river the Ulan-Ude – Shergino crushed-rock road passes in the vicinity to the deposit. The deposit is connected with the administrative center of the Pribaikalskiy district – the village of Tataurovo (24 km) as well as with the village of Koma (6,5 km) and Ostrozhskoye (6 km) by dirt road suitable for all-year-round traffic.
1. Ostrozhskoye deposit
Located in the territory of Bichurskiy district, on the left bank of the river Ara-Kiret, 16 km south-west of the village of Bichury, 10 km south of the village of Ara-kiret. The deposit is connected with the nearest localities Ara-Kiret, Elan and with the Ulan-Ude – Bichura – Kudara motorway by trafficable dirt roads. Was explored by the production geological association “Buryatgeologia” (Reutova, 1980).
2. Ara-Kiretskoye deposit
Located in the territory of Dzhidinskiy district, 10 km north-east of the Dzhida railway station, 2.5 km north-west of the Butikhinskiy way station.Based on the data available, the trachyandesites are recommended for the application in construction.
3. Butikhinskoye deposit
2
1
3
Decorativeness level 10-11COMMERCIAL RESERVES:facing slabs B + C1 – 142 th.m2
Macadam for roads and concrete B + C1 – 515 th.m2
4. Doschatoye deposit
Min
eral
reso
urce
s sec
tor
44
COMMON MINERALS
32 DEPOSITS
А+В+С1 - 709 861 th. t.
limestone
55 DEPOSITS
А+В+С1 - 55 521 th. t.
Brick and tile raw materials
39 DEPOSITS
А+В+С1 - 152 645 th. m3
Sand and gravel mix
24 DEPOSITS
А+В+С1 - 12 270 th. m3
Sapropel
BASALT
Commercial reserves: А+В+С1 - 2 447 th. m3
1.Ilyushkin klyuch deposit
Commercial reserves:А+В+С1 - 3 822 th. m3
2. Zandinskoye deposit
1Chita
Irkutsk
Zakamensk
Kyakhta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Basalt fiber
2
45
1
2
3
4
5
12
89
11
7
10
Min
eral
reso
urce
s sec
tor
46
MINERAL SPRINGS
District Spring name1. North-Baikal district(thermal waters)
Spring Goudzhekit, 6 l/s Spring Dzelinda, 22 l/sSpring Irkaninskiy, 5 l/s
2. Kurumkan area(thermal waters)
Spring Kuchiger, 10 l/s Spring Alla, 10 l/sSpring Umkhey, 30 l/s Spring Garga, 5 l/s
3. Muyskiy district (thermal waters) Spring Tolmachevskiy, 15 l/s Spring Muyskiy, 15 l/s4. Bauntovskiy district (thermal waters) Spring Bauntovskiy, 10-12 l/s
5. Barguzinskiy district (thermal waters) Spring Tolstikhinskiy, 6 l/s
6. Okinskiy district(Cold water) Spring Zhoygan, 1 l/s(Thermal water) Spring Khoyto-Gol, 13 l/s7. Tunkinskiy district (thermal water) Spring Tunkinskiy, 6.7 l/s
8. Ivolginskiy district(Cold water)Spring Arshan UtaBulag, 1-3 l/s
Spring Khalyutinskiy, 10 l/s9. Kabanskiy district (thermal water) Spring Zagza, 2 l/s10. Bichurskiy district (Cold water) Spring Shibertuyskiy, 100 l/s11. Zakamenskiy district (thermal water) Spring Engorboyskiy arshan 2 l/s12. Pribaykalskiy district Spring Pitatelevskiy, 3.13 l/s
The Republic of Buryatia is rich in unique mineral springs (more than 360 springs).
The main indications for therapy are:• diseases of the circulatory system;• diseases of the nervous system • diseases of digestive organs;• diseases of genitourinary system;• endocrine diseases;• metabolic disorders;• skin disease;• diseases of musculoskeletal system;• gynecological diseases;• pediatrics.
1
2
3
4
5
12
89
11
7
10
Kurumkanskydistrict
Severo-baikalskiydistrict
Bauntovskiy district
Barguzinskiy district
Okinskiy district
Tunkinskiy district
Muyskiy district
Bichurskiy district
Zakamenskiy district
Kabanskiy d
istric
t
Pribaykalskiy district6 lak
e Baik
al
Ulan-Ude
Ivolginskiy
district
47
Agricultural park “Ilkinskiy”: 50
Poultry farm 52
Commercial dairy farm 53
Greenhouse facility 54
Vegetable store and vegetable processing shop 55
Goat farm 56
Biogas station with disposal facilities, boiler station, electrical sub-station, water intake facilities
57
Construction of greenhouse complex in Gusinoozyorsk 58
Commercial dairy farm of 1000 animal units in the village of Zagustay 60
Construction of the fattening complex for 2000 cattele unitsin the village of the ust-altasha and the village of Tsolga
62
Fattening complex for 3000 cattle units in the village of of Nizhniy Torey 64
Construction of the fattening complex for 1000 cattle units in the village of of Dyrestuy of the Dzhidinskiy district
66
Construction of the fattening complex for 1000 cattle units in the village of of Novaya Bryan of the Zaigraevskiy district
68
INVESTMENTS PROPOSALS OF THE REPUBLIC OF BURYATIA
Agro-industrial sector
Objects of the agricultural park “Ilkinskiy”
№ name Land area1 Poultry farm 36,7 hectares2 Commercial dairy farm 13,6 hectares3 Vegetable store 9,8 hectares4 Greenhouse facility 18,4 hectares5 Goat farm 7 hectares
6 Vegetable processing shop 2,9 hectares7 Biogas station with disposal facilities, boiler station, electricalsub-station 12 hectares8 Water intake facilities 6,3 hectares
9 Farm machinery production and service integrated plant with trading facility and trading pavilion 10,08 hectares
50
Agro
-indu
stria
l sec
tor
AGRICULTURAL PARK “ILKINSKIY”
lake Baikal
Р258
Р258
Р258
А340
Ulan-Ude
Investment site the Agricultural park “Ilkinskiy” in the territory of the rural village Ilkinskoye of the Zaigraevskiy district. Total project cost $ 96 mln.
Ilka
Offered vacant lots Electrical sub-stationRailroadHighway
Ulan-Ude84 km
Ilka station
150 hectare
1
2
39
8
4
5
Site plan of the Agricultural park “Ilkinskiy”
6
7
51
Agro
-indu
stria
l sec
tor
AGRICULTURAL PARK “ILKINSKIY”:POULTRY FARMProject cost – $ 30 mln.Area – 36,7 hectareEgg production capacity – 1.25 mln. p/yearMeat production capacity – 5000 t. per yearPbP – 7,5 yearsIRR – 26,5%AARR – 18%Payback – 5,6 years
1 – poultry house for 1000 purebred hens;2 –hatcheries for 50 thousand chicks;3 – poultry houses for laying hens of breeding stock;4, 27 – bedding storage; 5 –parking boxes; 6 – car wash; 7 – petrol station;
8 – service buildings suite with sanitary inspection room for eggs and poultry containers; 9 - autoweight; 10 - administrative and amenity building with control room; 11 – slaughterhouse, packing department, 12 –hatcheriesfor chicks feed for 36 thousands bird places; 13 - egg-handling plant for 140 – 160 thousand eggs per shift;14 – feed room; 15 – feedstuff store for 1000 t.; 16 – silage store; 17 – root vegetables store; 18 – brigade house for 10 persons; 19 – tuber corps store; 20 – veterinary; 21 – poultries for chicks of breeding stock for 12 thousand animal units; 23 –electrical substations; 24 – acclimatizators for 12-15 thousand youngsters; 25 – solarium; 26 - brigade house for 25 persons; 27 – hatchery.
24 2625
271
21
223
26
323
18
18
22
45
8910
6713
1415
161719
12 11
20
AGRICULTURAL PARK “ILKINSKIY”:COMMERCIAL DAIRY FARM
123
4
6
7 85
5
5
5
5
5
5
5
Project cost – $ 7 mln.Area – 13,6 hectaresProduction capacity – 3 500 t. per yearPbP – 3,8 yearsIRR – 61%
1 – muck storage;2 – hay and chaff storage; 3 – silostorage; 4 – auxiliary department, machinery storage and
maintenance, feed room with hoppers; 5 – cow sheds; 6 – administration, sanitation unit; 7 – truck scales; 8 – sanitary inspection station and farmerhouse..
52 53
Agro
-indu
stria
l sec
tor
AGRICULTURAL PARK “ILKINSKIY”:GREENHOUSE FACILITY
Construction of multispan greenhouses is proposed.Project cost – $ 32 mln.;Area – 18,4 ha;Production capacity – 10 000 t. per year.
1 – multispan greenhouse;2 – production department;3 – gate house, administration unit.
2 311
11
1111
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
AGRICULTURAL PARK “ILKINSKIY”:VEGETABLE STORE AND VEGETABLE PROCESSING DEPARTMENT
Construction of 8 vegetable stores 12x105 m in size is proposed.
Peeling and packing of fresh vegetables as well as advanced processing – fermentation, conservation – are to be performed at the vegetable processing shop.
Project cost – $ 5,5 and 3,5 mln.;Area – 9,8 ha и 2,9 ha;Production capacity – 64 000 t. per year;PbP – 1,6 years;IRR – 28,7%.
1 – auxiliary building; 2 – vegetable store; 3 – gate house, administration unit..
1
2 3
2
2
2
2
2
2
2
54 55
AGRICULTURAL PARK “ILKINSKIY”:BIOGAS STATION WITH DISPOSAL FACILITIES, BOILER STATION, ELECTRICAL SUB-STATION, WATER INTAKE FACILITIES
Agro
-indu
stria
l sec
tor
Project cost — $ 5 mln;Area - 7 ha;Production capacity 4000 t per year;IRR – 82,76 %;AARR – 44,09 %;Payback – 2,6 years.
Proposed layout:-production shop;-5 stabling farms for 2500 goats; -administration building.
AGRICULTURAL PARK “ILKINSKIY”:GOAT FARM.
1-buildings for goats handling2-feedstuff stores;3-production department;4-gate house, administration
unit.
7 7
1
1
Project cost $ 13,5 mln;Area 12 ha;IRR – 17,01 %;AARR – 15,34 %;Payback – 6,6 years. Advantages of biogas station:
- Independence from increasing rates as well as from possible gas and electric power supply disruption;
- Simultaneous availability of multiple energy: electric power, heating, gas, motor fuel;
-Complete resolving of the problem of organic recycling with its division into pure water, biohumus and mineral fertilizers rich in nitric and phosphoric components. 1
1 12
8 543
6
1 – biogas unit;2 – electricalsubstation;3 – gate house, administration unit; 4 - fertilizers production shop;
5 – storage yard; 6 – disposal facilities;
7 – absorption fields;; 8 – boiler station.
56 57
Greenhouse complex58
Offered vacant lots Electrical sub-stationRailroadHighway
lake Gusinoe
Ulan-U
de12
5 km
Gusinoozyorsk
Gusinoozyorskaya TPP (Thermal Power Plant)Capacity 1100 MW
20 hectaresRequired systems for commercial greenhouses:• Drop irrigation system;• Environmental system;• Carbon dioxide fertilization system;• Curtain system;• Drain return and check system; • Greenhouse heating system;• Air ventilation system;• Power supply system.
58
Agro
-indu
stria
l sec
tor CONSTRUCTION OF GREENHOUSE
COMPLEX IN GUSINOOZYORSKGreenhouse complex for growing of hydroponic
vegetables.Area (available) – 10 haThe total land area – 20 haProduction capacity – 10 000 t. per yearProject cost – $ 25 mln.PbP – 5 years
Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
Irkutsk
Mongolia
lake Baik
al
Gusinoozyorsk
Ulan-Ude
ADMINISTRATIVE BUILDING
WAREHOUSES
GREENHOUSE FACILITIES
59
60
Agro
-indu
stria
l sec
tor COMMERCIAL DAIRY FARM FOR 1000 ANIMAL
UNITS IN THE VILLAGE OF ZAGUSTAYCommercial high-tech production dairy farm for 1000
animal units in the village of Zagustay of the Kizhinginskiy district.
The total land area – 2 500 ha (expandable 10 000 ha).Production capacity – 5 600 t. per yearProject cost – $ 9 mlnNPV – $ 1,4 mlnPbP – 8,8 years
lake Baikal
Zagustay
MILKING ROOM
COW SHEDSCALF SHEDS
Р258Р258
Р258
А340
Ulan-Ude
ARTIFICIAL INSEMINATION CENTER
MATERNITY BARN
VETERINARY STATION
GARAGE AND VEHICLE REPAIR SHOP
SILAGE PIT
ADMINISTRATION BUILDING
Offered vacant lots Electrical sub-stationHighway
the lake Sagan-Thorom
Ulan-Ude187 km
2 500 haCOMMERCIAL DAIRY FARM:• 2 cow sheds for 500 animal units
each;• 2 calf sheds for 1 154 animal units;• Maternity barn for 68 animal units;• Milking room 2 x 20 (Europarallel);• Veterinary station;• Artificial insemination center;
The village of Zagustay
Auxiliary production facilities:• Barn floor, feed processing shop
and feedstuff store;• Silage pit;• Garage and vehicle repair shop;• Administration building;• Muck storage tanks;• Biogas unit.
61
Ust’-Sukhara
Tsolginskoye municipality
Zurgan-Debe
Ust’-Altasha
Balta Tsolga
Khaya
Gashey
62
Agro
-indu
stria
l sec
tor CONSTRUCTION OF THE FATTENING COMPLEX FOR
2000 CATTLE UNITSIN THE VILLAGE OF OFS UST’-ALTASHA AND TSOLGA
The total area of farmland – 5770 haProject cost – $ 13 mln.NPV – $ 1.4 mln.PbP – 8 yearsIRR – 13,1 %
lake Baikal
Р258Р258
Р258
А340
Ulan-Ude
TsolgaSTORAGES
FEED YARD
HAY AND SILAGE PITS
pasture arable land
1730 hectares
660,0 hectares
178 hectares
130 hectares
3072 hectares
63
Feedlots (top view)
Agro
-indu
stria
l sec
tor
FATTENING COMPLEX FOR 3000 CATTLE UNITS IN THE VILLAGE OF NIZHNIY TOREY
Livestock breeding complex for cattle feed and raising for 3000 cattle units, rural village “Nizhnetoreyskoye” in the village of Nizhniy Torey of the Dzhidinskiy district.
Project cost — $ 10 mln.РВР - 8 years Land areas - 11000 ha Production capacity - 6000 t per year
MUCK STORAGE
LOAFING FEED YARD
CATTLE FATTERING BUILDING FOR 230 ANIMAL UNITS
Feedlot layout
Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
Irkutsk
Mongolia
lake Baik
al
Village Nizhniy Torey
Ulan-Ude
HEIFER FARM FOR 360 ANIMAL UNITS
HAY PIT
HAY AND CHAFF LAND STORAGE YARD
AGRICULTURAL VEHICLES SHED
HAY AND CHAFF STORAGE YARD
64
• open feed yards• own • fodder in stock• products processing management• government support
Setting-up of beef and breeding stock-rearing farm:
Village Nizhniy Torey
Ulan-Ude
Auxiliary production facilities:• Barn floor, feed processing shop
and feedstuff store• Silage pit• Garage and vehicle repair shop• Administration building• Muck storage tanks and biogas unit
272 km.
Land boundaries
65
CONSTRUCTION FATTENING COMPLEX ON 1,000 HEAD OF CATTLE IN THE VILLAGE DYRESTUY DZHIDA DISTRICT
Necessary investments, $ mln. 7 Area, ha 1500,5
Category of land Agricultural land
Possibility of extension Available The distance to a highway, km 2 The distance to a railway station, km 5 The distance to an airport, km 230 The distance to the nearest residential area, km
2
Labor resources, persons 1246 Agreed discounting rate, - D,% 2,85 Net present value – NPV, $ mln. 1,4 Internal rate of return – IRR, % 8,08 Pay-back period – PBP, years 7,75
Land areasAg
ro-in
dust
rial s
ecto
r
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
Р440
lake Baik
al
Irkutsk
Mongolia
Ulan-Ude
Dzhida
А340
Dyrestuy
RailroadHighway
nomad camp Dyrestuy
the village of of Zarubino
331,3 hectares
362,6 hectares
806,6 hectares
• open feed yards• own fodder in stock• government support• products processing
management
Setting-up of beef and breeding stock-rearing farm:
Ulan-Ude230 km
66 67
CONSTRUCTION FATTENING COMPLEX BY 1000 HEAD OF CATTLE IN NEW BRJAN ZAIGRAEVSKY DISTRICT
Necessary investments , $ mln. 7Area, ha 3220Category of land Agricultural landPossibility of extension Available The distance to a highway, km 0,5 km The distance to a railway station, km 5 km The distance to an airport, km 70 km
The distance to the nearest residential area, km
2 km
Labor resources, persons 4431 Agreed discounting rate, - D,% 2,85
Net present value – NPV, $ mln. 1,4 Internal rate of return – IRR, % 8,08 Pay-back period – PBP, years 7,7
agro
-indu
stria
l sec
tor
lake Baikal
Р258
Р258
Р258
А340
Ulan-Ude
the village of Novaya Bryan
Offered vacant lots
the village of Novaya Bryan
RailroadHighway
68 69
Comprehensive residential development in Ulan-Ude 72
Research park “Biotekhnopolis” 74
The zone of economic favor in Ulan-Ude 78
The industrial zone of economic favor in Gusinoozyorsk 80
Farm machinery production in the agricultural park “Ilkinskiy” 82
Construction of industrial and logistic center, Sulfat railway station 84
Industrial park in Ulan-Ude 86
Construction of cement plant 88
Ceramic bricks production plant 90
INVESTMENT PROPOSALS OF THE REPUBLIC OF BURYATIA
Industry and residential construction
South-Eastern district of Ulan-Ude
South-West district of Ulan-Ude
COMPREHENSIVE RESIDENTIAL DEVELOPMENT IN ULAN-UDE
Indu
stry
and
resid
entia
l con
stru
ctio
n
А165
М55
М55
М55
А164
А165
Р440 А340
Р258
Р441
Р258
Р258
А164
А340
Р440
lake Baik
al
Irkutsk
Mongolia
Ulan-UdeQuarter 115 116
Area of land,hectares 20,4 26,8Residential area, m2 116,744 146 398
Office and commercial area, m2 3 509 4 610Kindergarten, locations 140 200
School, locations 700The volume of investments,
$ thousand 80 000 101 000
Quarter 140 6 146 а 146 б 148 a 148 бArea of land,hectares 21,3 19 20,3 17,7 17,5Residential area, m2 110 813 98 848 105 611 110 501 109 253
Office and commercial area, m2 3 664 3 268 3 492 3 044 3 010
Kindergarten, locations 140 130 140 140 140School, locations 1400
The volume of investments, $ thousand 75 500 68 000 72 000 73 500 73 000
Airport «Baikal»
Railway station
South-Eastern district of Ulan-Ude(140b; 146a,b; 148a,b quarters)
Offered vacant lots
47,2 hectares
Highway
Ulan-ude
Railroad
South-West district of Ulan-Ude(115, 116 quarters)
95,8 hectares
72 73
Biotekhnopolis
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
lake Baik
al
Indu
stry
and
resid
entia
l con
stru
ctio
nRESEARCH PARK “BIOTEKHNOPOLIS”
Irkutsk
Mongolia
Ulan-Ude
74
We invite you to become a resident of the “Biotekhnopolis” high tech research park being created in Ulan-Ude.
The priority sectors of the research park are:• information technology and software;• Energy efficiency and energy saving;• Biopharmaceutical and medical technologies.• The research park project is initiated by the
Government of the Republic of Buryatia and the Buryat scientific center ofthe Russian Academy of Sciences, Siberian branch.
The site for the research park development is located in the south-east part of Ulan-Ude, in the zone of economic favor.The land plot area is 21 ha.
1
23
45
1. Residential complex2. Data-center3. Production building
4. Multifunctional center5. Medical high technology center
Starting up of production in this territory the companies for 5 years will enjoy the following tax reliefs: property tax and land tax exemption, reduced corporate tax rate.
75
Multifunctional center Production building
Indu
stry
and
resid
entia
l con
stru
ctio
n
Construction of the first start-up facility of the research park is funded from the federal and regional budgets.Businesses will be located at a site of 31600 m2 in area:• medical hightechnology center (6600 m2);• production premises (9000 m2);• data-center (8000 m2);• multifunctional service center for the research park residents;• business-incubator.
We invite pharmaceutical enterprises, medical device and equipment manufacturers, as well as energy-saving goods manufacturers to start up their production in the research park.We also welcome companies working in the field of alternative energy and information technology. The enterprises will be provided with production shops, laboratories, warehouse, office and amenity premises.
Biotechnopolis
Medical hightechnology centerData-center
76 77
Electric power supply
Available capacity of the transformer substation “Stroitelnaya” 35/10 12.6 MVA
Including free capacity 11.2 MVA
Wastewater disposal.Wastewater disposal is performed through a free-flow tank to the
municipal sewerage, the networks length – 8000 meters.
Heating supply Available capacity Boiler house with 4 boilers, with nominal capacity of 4x13,3MMkcal/hr,
including free capacity 3 reserve boilers,with a capacity of about 50 MMkcal/hr
Transport availabilityRailwayembankment (9.8 km). Dirt road (900 meters).
It is possible that access roads (900 meters of automobile road) will be built and railways will be restored (7,8 km).
Watersupply
Available capacity 5 artesial water wells with total well yield 47,5 m3/hour
Including free capacity 4 reserved water wells with total capacity of 40 m3s per hour
Legend:
BiotechnopolisRailway (embankment) Boiler stationWater intake facilities (5 water supply wells)Water conduitWater conduit (project)SanitationSanitation (project)Power line (project)Heating lineHeating line (project)Electric power supplyExisting
Transformer substation 35\10KW
Transformer substation 220\10 (project)
А B
CD
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
EXISTING INFRASTRUCTURE
lake Baik
al
Indu
stry
and
resid
entia
l con
stru
ctio
n THE ZONE OF ECONOMIC FAVOR IN ULAN-UDE
Irkutsk
Mongolia
Ulan-Ude
Offered vacant lots Distributed sitesZone of economic favor
Privileges provided to residents of the zone of economic favor for 5 years:
• Reduced land rental (from 3 cent / 1 m2 per year)
• Property tax exemption• Land tax exemption• Reduction of corporate tax rate
ABCD outline
25 hectares
8 hectares
20 hectares
20 hectare
78 79
Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
THE INDUSTRIAL ZONE OF ECONOMIC FAVOR IN GUSINOOZYORSK
Irkutsk
Mongolia
lake Baik
al The projects of the building materials production, processing industry and assembling in the territory of the industrial zone of economic favor in Gusinoozyorsk nearby Zagustay railway station are proposed.
The investment site №1 (free and clear of any claims from third parties) 52 ha in area for industrial production development.
The investment site №2 (free and clear of any claims from third parties) 100 ha in area for realization of a project for the formation of industrial production of construction materials with total investment up to $ 10 mln.
Gusinoozyorsk
Indu
stry
and
resid
entia
l con
stru
ctio
n
Ulan-Ude
THE CONSTRUCTION OF A HYDROCARBONS DEEP CONVERSION PLANT
THE CONSTRUCTION OF A BUILDING MATERIALS PRODUCTION PLANT
Offered vacant lots
Site №2100 hectares
Railroad
Highway
Ulan-Ude
125 km
Gusinoozyorsk
Gusinoozyorskaya TPP (Thermal Power Plant)Capacity 1100 MW
Site №1 52 hectares
Zagustay station
Distributed sitesZone of economic favor
TIC – $ 10 mln
80 81
Indu
stry
and
resid
entia
l con
stru
ctio
n FARM MACHINERY PRODUCTION IN THE AGRICULTURAL PARK “ILKINSKIY”
lake Baikal
IlkaР258
Р258
Р258
А340
Ulan-Ude
The project for organization of small farm mechanization assembling, repair, maintenance of the machinery and equipment for agriculture and forestry.
The market: the Republic of Buryatia, Irkutsk Region, Transbaikalia territory, Krasnoyarsk Territory, and other regions of Siberia and the Far East, in the long term – the opportunities to export to Mongolia.
• The buyers of the farm machinery are entitled to a compensation for a share of the cost of high tech machinery and equipment.
GOVERNMENT SUPPORT MEASURES
82
Offered vacant lotsElectrical sub-stationRailroad
Highway
Ulan-Ude84 km
Ilka station
150 ha
10,08 ha
83
11 3
42
Site Plan1 – administrative and amenity building;3 – production shop; 4 – trading pavilion; 2 – the site for fairs and public events.
4
4444
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
CONSTRUCTION OF INDUSTRIAL AND LOGISTIC CENTER, SULFAT RAILWAY STATION
Irkutsk
Ulan-Ude
Mongolia
lake Baik
al
It is proposed to implement the project of industrial and logistics center construction in the territory of the village of Tokhoy nearby Sulfat railway station.Free plot area is 28 ha. The plot is situated along the Ulan-Ude – Naushki railway.
Gusinoozyorskaya TPP (Termal Power Plant) is 9 km from the proposed plot.
Multimode container and reloading yards
Sulfat railway station
Indu
stry
and
resid
entia
l con
stru
ctio
n
The production and logistics center
Naushki
139 km
Gusinoozyorskaya TPP (Thermal Power Plant)
9 km
Railroad
TIC – to $ 10 mln
“Tokhoy” transformer
substation 1 km
The village of Tokhoy
Offered vacant lotsHighway
Electrical sub-station
Ulan-Ude
116 km
28 hectares
lake Solenoe
Projected railway branch
Sulfat railway station
TIC – to $ 10 mln
84 85
Airport «Baikal»
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
It is planned the creation of the building materials production cluster with the development center of high construction technologies.
The site of the industrial park has a number of advantages:
• near the park is a railroad «Moscow — Ulan-Bator — Beijing» (1 km);
• federal highway «Р258 Moscow — Vladivostok» (10 km);
• the proximity to the key market (Ulan-Ude)
lake Baik
al
Indu
stry
and
resid
entia
l con
stru
ctio
nINDUSTRIAL PARK IN ULAN-UDE
Irkutsk
Mongolia
Ulan-Ude
The services for the industrial park residents
• provision of production areas;• provision of office premises;• provision of design services;• equipment maintenance engineering Services;• additional services (security, legal, IT services).
The residents are offered the entire complex of logistic service:
• truck parking;• warehouses;• the rolling stock of freight rail cars with 4 rail tracks;• storage yard;• the services of the logistics center for registration, shipment and
receipt of cargo.
Offered vacant lots Highway
Ulan-Ude
Railroad
The site has all the necessary infrastructure:The total area of the park – 15 hectareArea Offices and business premises – 5 000 m2.Area of industrial building – 25 000 m2
Water supply – 350 m3 per dayElectricity power - 1,8 MegawattDistance to the highway «P258» – 10 kmDistance to railway station – 1 km
Railway station
15 hectaresProduction shops
Material handling cranes
Administration building
Finished goods warehouse
Parking86 87
Barun-Toreyskoye limestones deposit, C1 reserves ≈ 25,717 thousandt.
Toreyskoye limestone deposit, C1 and C2 reserves ≈ 40,000 thousand t.
Barun-Sarastuyskoye limestones deposit, C1 reserves ≈ 63,932 thousand t.
Barun-Alsagskoye limestones deposit, C1 reserves ≈ 22,214 thousand t.
The chemical composition in respect to the content of CaO > 50% and MgO > 2% in the deposits
Indu
stry
and
resid
entia
l con
stru
ctio
n CONSTRUCTION OF CEMENT PLANT
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
Р440
lake Baik
al
Irkutsk
Mongolia
Ulan-Ude
Jida
The project involves the construction of a cement plant.
There are large limestone deposits in the Republic of Buryatia providing the raw material for cement production. Total reserve equals to 150 000 – 200 000 th. t.
А340
88
Jida
Offered vacant lots Highway
Ulan-Ude240 km
Р440deposit of limestone
Mongolia88 89
Indu
stry
and
resid
entia
l con
stru
ctio
n CERAMIC BRICKS PRODUCTION PLANT
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
Р440
lake Baik
al
Irkutsk
Mongolia
Ulan-Ude
Orongoy
The projectinvolves the construction of a ceramic bricks production plant with a capacity up to 60 mln.units per year.
Land plot for the construction of the plant is 60 km from Ulan-Ude, close to the Moscow – Ulan-Ude – Ulan-Bator – Beijing railway and the Ulan-Ude – Ulan-Bator motorway.
The clay deposit (the stocks of 1427 thousand m3) is located 10 km from the plot.
There is a technical capability for power supply connection, capability for well drilling.
The indicators of economic efficiency of the projectThe volume of investments $ 14,5 mln.
NPV $ 1,1 mln.IRR 13 %PBP 4,68 years
DPBP 4,62 years
Profitability of the investment project 6,54 %
90
А340
20 hectares
Orongoy
Offered vacant lots HighwayRailroad
Ulan-Ude
60 km
91
INVESTMENTS PROPOSALS OF THE REPUBLIC OF BURYATIA
Tourism and Recreation Sector
The Baikal Haven special economic zone 94
The site “Gora Bychya” 96
The tourist and recreational cluster “Podlemorye”, the site “Zarechye” 98
Key development indicators of the tourist and recreational cluster “Podlemorye” 100
The automobile tourist cluster “Baykalskiy” 102
Infrastructure and key indicatorsof the automobile tourist cluster “Baykalskiy” 104
The automobile tourist cluster “Tunkinskaya dolina” 106
Infrastructure and key indicatorsof the automobile tourist cluster “Tunkinskaya dolina” 108
The automobile tourism cluster “Kyakhta” 110
Infrastructure and key indicatorsof the automobile tourist cluster “Kyakhta” 112
“Adrenalin” (the alpine ski resort on Orlinaya mountain) 114
Infrastructure and key featuresof the park “Adrenalin” 116
Development of the medical recreational complex “Ilyinka SPA” 118
Sports and health complex at Lake Baikal in the Enkheluk village 120
Key indicators of the project in the Enkheluk village 122
А340
Р258
The Baikal Haven special economic tourism and recreation zone
The sites of the first stage of development:• Turka• Peski
The sites of the second stage of development:• Goryachinsk village (460,9 ha)• the Bychya mountain (2341 ha)• Bay Bezymyannya (422 ha)
Ulan-Ude110 km
the site «Turka»
ADVANTAGES:
Provision of the investment site with utility infrastructure
Provision of tax benefits and state guarantees of the Republic of Buryatia;
The capability of buyout of the land plots by the owners of the facilities.
№ Specialty A year-round world class resort
1 Term of existence 49 years2 Area 5 areas - 3658 ha3 Arrivals per year 1 000 000 peoples4 Locations 22 000lake Baika
l
THE BAIKAL HAVEN SPECIAL ECONOMIC ZONE
Ulan-Ude
TurkaPeski
the Bychya mountain (1771 м.)
Bay Bezymyannaya
Tour
ism a
nd R
ecre
atio
n Se
ctor
Goryachinsk
94
Bay Bezymyannaya
Goryachinsk
PeskiTurka
Gremyachinsk
Bychya mountain (1771 m.)
lake Baikal
lake Kotokel
95
lake Baikal
Ulan-Ude
А340
Р258
the Bychya mountain (1771 м.)
96
Legend:The zone for the ski runs widening The optimal zone for ski runs
slopeslighting pointFreerideProfile cross-country
SKI SLOPES
lake Baikal
the Bychya mountain
the lake Bychye
THE BAIKAL HAVEN SPECIAL ECONOMIC ZONETHE SITE “GORA BYCHYA”
• 7 lifts;• 16 runs the length of 28,77 km;• Snowmaking system;• 10 000 holidaymakers;• The resort town with shopping,
entertainment, and sports centers.
Tour
ism a
nd R
ecre
atio
n Se
ctor
Economic indicators:IC – $ 213,5 mln;SR – $ 66,5 mln;ROS – 65%;ROI – 22%;
Types of recreation and entertainment:• Alpine and cross-country skiing,
freestyle, mogul skiing, ski-cross;• Tubing, halfpipe, skiing slopestyle,
freeride skiing;• Toboggan, mountain bike,
skateboard, 97the Bychya mountain
А340
Р258
lake Baik
al
• Health-improving and family vacation with children;• Romantic yacht tours, cruise for married couples without
children seeking a different vacation experience;• Event tourism;• Beach vacations;• Year-round weekend tourism;
• Outdoor activity and extreme tourism for trained persons and sportsmen;
• Ecotourism – for those who desire to spend time in the countryside with small physical activity;
• Business tourism; (MICE).
TOURIST OFFER:
OFFERS FREE SITES: 1. The forested plot 2,9628 ha in area is located 1,250 m north-west from the Zarechye village, to the north of the complex of
buildings on the right side of the projected haven, bordering with the Lake Baikal coast line.2. The forested plot 1,6277 ha in area is located 1,300 m north-west from the Zarechye village, to the north of the complex of
buildings on the right side of the projected haven, bordering with the Lake Baikal coast line.3. The treeless plot 2,3408 ha in area is located 1,500 m north-west from the Zarechye village4. The treeless plot of the coast line of Lake Baikal nearby Cape Sukhinskiy, 2,3128 ha
12
3
4
10
The layout chart of the tourist and recreational cluster “Podlemorye” in the planned structure of the rural village municipality of Sukhinskoye
Ulan-Ude180 km
Railroad, 84 kmstation Selenga
1. The guest center “Tengri” 2. Family boarding house3. Tourist complex4. Beach area “Baikalskie peski”5. Reserve area6. Golf club “Golfstrim”7. Hotel and entertainment complex “Zarechye”8. Waste recycling station9. Disposal facilities10.Water intake facilities
Tour
ism a
nd R
ecre
atio
n Se
ctor
THE TOURIST AND RECREATIONAL CLUSTER “PODLEMORYE”, THE SITE “ZARECHYE”
Zarechye
Ulan-Ude
The site “Zarechye”
The site “Sukhaya”
The site“Enkheluk”
The total area of the cluster – 139,52 ha
lake Baikal
1
The village of of Zarechye
The village of of Sukhaya
Offered vacant lots Electrical sub-stationHighway
lake Baikal
Harbor
Water intake facilities
Water intake facilities
2
4
3 10
5
610
10
8
7
8 998 99
Total volume of investments — $ 137 mln, including:- $ 46,5 mln. — government investments in engineering and transport infrastructure
- $ 90,5 mln. — private investments in tourism facilities№ Title Capacity1 Area of claster 139,5 ha2 Area of tourist and service infrastructure 64,5 th. m2
3 Capacity hotels 1400 locations4 Increase in employment to 2500 jobs5 Increased flow of tourists to 450 th. people per year6 Project implementation period 2013-2017 years
7 Construction of overhead power lines ВЛ-35 kW with substation 35/10 kW;hvl-10 kW ; vl-0,4 kW
8 Construction of the transfer station with elements of separate waste collection 10 t. per year
9
Construction of treatment facilities, including installation works, construction and laying of sewer with sewage pumping stations, installation and commissioning of sewerage systems, drainage; construction and installation of sewage treatment plants.
500 m3/day
10 Construction of intake structures 2 buildings m3/day11 Construction of internal paved roads 30 km long, 4 category 30 km12 Work on bank protection 5000 m2
SCHEME OF ENGINEERING SUPPORT TRC “PODLEMORYE”To
urism
and
Rec
reat
ion
Sect
or KEY DEVELOPMENT INDICATORS OF THE TOURIST AND
RECREATIONAL CLUSTER “PODLEMORYE”
The site“Enkheluk”
The site “Sukhaya”
The site “Zarechye”
lake BaikalEXPLICATION
The site “Sukhaya”1. ТFamily boarding house – 1,68 ha2. Tourist complex – 9,1525 ha3. The guest center “Tengri” – 0,2247
ha4. Haven – 11,4 ha5. Reserve area – 10,2 ha
The site “Zarechye”
1. Tourist complex – 23,7 ha2. Hotel and entertainment complex
– 4,2 ha3. Golf club “Golfstrim” – 2,2 ha
The site“Enkheluk”1. Tourist camp “Enkheluk” – 4,7 ha2. Guest house – 0,27 ha3. Guest house “Sakura” – 0,25 ha4. Guest house – 0,26 ha5. Guest house “Baikalskiy dvorik” –
0,25 ha6. Capm “Teremki” – 0,3 ha7. Tourist complex – 7,5 ha
Legend:
Inhabited areasSpecially protected natural areasForest reserve landsAgricultural areasFacilities ofthe tourist and recreational cluster “Podlemorye”Projected havensDisposal facilitiesWaste transfer station Voltage transformer substation;Electrical transmission line VL – 35 kW
101100
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
The Lower Ivolga village
Nur-Selenie village
Ulan
-Ude
2 km
Railroad, 9 km
Airport «Baikal», 3 km
Ivolginsky datsan, 15 km
А340
Р258
Р258
Offered vacant lots HighwayDistributed sites
1.Hotel complex2. Fast food café3.Camping “Yurtochny gorodok”4. Laundry of 5 washing-machines5. Motel6. Café7. Hypermarket 8. Information center9. Water park10. Motel11. The theatre of folk art12. Recreational and entertainment center13. Summer café14. The outdoor area for playings and parties15.Shopping and entertainment center16. Fitness complexSPA-center17. Farm products mimimarket18. stable yard19. Service station20. Production and warehouse premises21. Automobile showroom22, 23. Truck parking;24, 25. Wholesale-retail trade warehousing complex26. Petrol station27. Camping sites, motel28. Water intake facilities29. Gas boiler house31. Electrical substation 35/10 kW32. Public toilet33. Stadium35. Police centre36. Administrative office37. Tea house38. Railway station39. Heated car parking41. The buildings on the sports area42. Sewerage pump station43. Waste transfer station 44. Gas storage holder
Tour
ism a
nd R
ecre
atio
n Se
ctor
THE AUTOMOBILE TOURIST CLUSTER “BAYKALSKIY”
Ulan-Ude
Irkutsk
Mongolia
lake Baik
al
The Lower Ivolga village
TOURIST OFFER:
PEAK SEASON:• sports tourism;• adventure tourism• automobile tourism• ecotourism.
OFF-SEASON OFFER:• business tourism;• cultural and educational tourism;• event tourism;• religious tourism;• active tourism.
The Buddhist monastic complex, the center of the Buddhist Traditional Sangha of Russia, historic and architectural monuments. The place of stay of the incorruptible relics of Pandito Khambo lama Itigelov.
1
2625
24
392019 22
2123
353929
44
28
43
18
31
234
5
6 42
323617 37
78
9 1112 14
1310
15
16
102 103
№ Title Capacity
1 Construction of the water conduit “Tapkhar – the automobile tourist cluster “Baykalskiy” 9,8 km
2 Construction of the electric power supply facilities. The total length is 7,35 km. Capacity of the electric substation is 6,3 MW
3 Construction of the heating supplysystem 6 km4 Construction of the gas boiler house 16 MW5 Construction of the wasrewater disposal line, 9,5 km
6 Construction of the on-site information, communication and computer network 6 km
7 Construction of internal automobile roads with parkings, the total length is 30 km8 Construction of sites for waste receptacles, 0,1 km9 Construction of street lighting, 6 km
10 Increase of the tourists flow to the region to 400 thousand people per year11 Increase of the total area of the tourism infrastructure facilities by 170,41 thousand m2
12 Increase of the total area of the hotel infrastructure facilities by 26,0 thousand sq. m .
13 Increase of the number of beds in group accommodation establishments to 1165 units
14 Increase of the number of workplaces to 1200
Total investment — $ 62,5 mln., including:government investments in engineering and transport infrastructure – $ 21,5 mln.;private investments in tourism facilities – $ 41 mln. Free land plots area is 206 ha. Free land plots area is
206 hectares
The sites 1 – 3: transport and logistics zone (bus station, camping sites and motels, fast food restaurants)The sites 4 – 9: mixed development zone (shopping, public catering, leisure and entertainment, and culture and educational facilities)
The sites 10-14: social and business zone (the center of exhibition and congress activities; multiplex cinema, food court, café and restaurant, bowling, fitness-club, billiard and shopping malls)The sites 15-25: recreation and sports zone (sport complex, water park, carting, entertainment park and equestrian center)
1 2
345
67
89 10
1112
131415
16
17
2118 19
20
2223
2425
INFRASTRUCTURE AND KEY INDICATORSOF THE AUTOMOBILE TOURIST CLUSTER “BAYKALSKIY”
Tour
ism a
nd R
ecre
atio
n Se
ctor
104 105
PETROL STATION
HALTING POINT
BATH-HEALTH COMPLEX
SERVICE STATION, PETROL STATION FOR TRUCKS
CAR WASH TRUCK PARKING
MOTEL CAFÉ
TRADING FACILITY WITH MARKET PLACE
HEATED CAR PARKING
site А- bath-health complex
site B- the tourist and recreational complex
site С- service station and convenience retailing
Disposal facilities
12
3
4 5710
1112
13
Tour
ism a
nd R
ecre
atio
n Se
ctor
THE AUTOMOBILE TOURIST CLUSTER “TUNKINSKAYA DOLINA”
lake Baikal
Р258
А164
Р258
Kyren
Total investment – $ 39,5 mln., including:government investments in engineering and transport
infrastructure – $ 13,5 mln.;private investments in tourism facilities – $ 26 mln.
Ulan-Ude430 kmMongolia
100 km
Railroad, 100 km
HighwayDistributed sites
Automobile tourist cluster “Tunkinskaya
dolina”
Irkutsk
MongoliaRepublic of
Buryatia
Irkutsk region
TOURIST OFFER:• Medical and health tourism based on thermal
water and mineral springs, spa-tourism;• Mountain hiking;• Religious tourism.
Offered vacant lots Electrical sub-station
11,2 hectares
Water intake facilities
1,2,3. Hotel complex4. Sport tourist complex5. Tourist complex6. Yurt complex7. Sports and health complex8. Culture and entertainment complex9. Tourist complex10. Hopping center11. Rental center12, 13, 14. Auto parts store, petrol station, car-wash, service station15. Motel
17
68
9
106 107
4
7 88
81 2
32 2
1
56
3
№ Title Capacity1 Free land plots area is 11,2 ha2 Tourist flow 300,000 arrivals3 NPV $ 14,5 mln.4 PbP 8 years5 Pi 1,37
6 The construction of the access road from the federal motorway to the automobile tourist cluster “Tunkinskaya dolina” 4 km
7 The construction of water intake facility and water supply system 1250 m3/day8 The construction of disposal facilities 2000 m3/day
9 The construction of electric power network system 10 kW, 0,4 kW andelectrical sub-station 400 kW 18 km
10 The construction of waste sorting station 10000 t. per year11 The construction of intraresort automobile road 2,5 km
1. PETROL STATION2. SERVICESTATION. CAR WASH.3. HEATEDCARPARKING
4. BUS STOP PAVILION5. MOTEL6. CAFÉ FOR 50 PERSONS
7. TRUCK PARKING8. TRADING FACILITY WITH MARKET PLACE
Type CodesBoundaries of the facilities of the automobile tourist clusterWater protection areaResidential areaService objects area
Outdoor activity area
Recreational areaUtility areaEngineering infrastructure area
Rural tourism area
Car service areaProjected building developmentProjected sidewalks, roads
Driveways and parkings;Public planting of greeneryThe territory for utility purpose
EXPLICATION
INFRASTRUCTURE AND KEY INDICATORSOF THE AUTOMOBILE TOURIST CLUSTER “TUNKINSKAYA DOLINA”
Tour
ism a
nd R
ecre
atio
n Se
ctor
SPECIFIC LAND USE LAYOUT AND FREE LAND PLOTS OF THE AUTOMOBILE TOURIST CLUSTER “TUNKINSKAYA DOLINA”
108 109
А
А
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
The cluster is perceived as the first reception point for tourists arriving in Russia, as well as the largest border crossing and customs point for freights imported in Russia from the countries of the Asia-Pacific Region.
The freight traffic coming through Mongolia is predicted to increase significantly due to the construction of the Ulan-Bator - Beijing motorway that has already been completed on the side of China.
lake Baik
al
Tour
ism a
nd R
ecre
atio
n Se
ctor
THE AUTOMOBILE TOURISM CLUSTER “KYAKHTA”
TOURIST OFFER:• Religious tourism (Buddhism in Russia);• Medical and health tourism (pelotherapy);• Cultural and educational tourism (Tea Road).
Irkutsk
Mongolia
Ulan-Ude
KyakhtaNaushki
Ulan-UdeIrkutsk
Ulaanbaatar
Peking
Krasnoyarsk
Russia
Mongolia
China
Offered vacant lotsHighway Electrical sub-station
MRBC «Kyakhta»
Altan-Bulak
RUSSIA
MONGOLIA
Station «Naushki»35 km
Ulan-Ude224 km
City Kyakhta
the site С12 ha
the site В19 ha
А340
А340
the site А1,34 га
110 111
№ Title Capacity1 Сonstruction of water intake and water supply system ATK «Kyakhta» 80,0 m3/h2 Construction of boiler and heating system 7,5 Gcal/h
3 Construction of substation 110/10 kW, Vl-6 kW (10 km.), VL-0,4 kW (3 km.) and 2-transforming substation 2 x 1000 kW. 4000 kW
4 Construction of sewer networks 3 km5 Construction of a telephone exchange and cable ducts 1500 phone numbers6 Construction of internal roads with parking and sidewalks 5 km7 The increase in tourist flow to 350 000 peoples per year8 The increase in the total area of facility tourist infrastructure by 92,5 th. m2
9 The increase in the total area of the hotel infrastructure by 25,5 th. m2
10 The increase of seats in collective accommodation facilities to 1020 11 The increase in jobs to 1000
INFRASTRUCTURE AND KEY INDICATORSOF THE AUTOMOBILE TOURIST CLUSTER “KYAKHTA”
Tour
ism a
nd R
ecre
atio
n Se
ctor
OFFERED VACANT LOTS (FIG. P.113)
• A. The flat grass covered plot (1,34 ha) with no bushes and trees, located within the city of Kyakhta,bordering to the north with the Ulan-Ude – Ulan-Bator federal road. Investors are proposed to develop shopping and social center in this plot (refer to fig.), which includes–along with shopping an catering facilities–multiplex cinema, bowling and billiard center, fitness center, children’s playing area, family entertainment complex with a shooting gallery, lasertag (Lasermaxx), gaming machines, etc.The proposed project is targeted at tourists and citizens of Kyakhta.
• B. The flat plot (19 ha), partially bushy, located within the city of Kyakhta at the 1st kilometer of the Kyakhta – Bichura motorway. Investors are proposed to develop customs and logistics terminal of the 1st category with “A”-class warehouse complex. The capacity of the terminal allows to store simultaneously more than 300 vehicles.
• C. The sloping grass covered plot (12 ha) with no bushes and trees located at the 2nd kilometer of the Kyakhta – Bichura motorway. Investors are proposed to develop a complex of ancillary services facilities (service station wih car parking, catering, hotel, insurance companies, etc).
2
34
5
6
1
1 – petrolstation; 2 –Shopping and entertainment complex; 5 – hotel and office complex; center; 3 – shopping mall; 4 – hotel Complex; 6 – open air parking.112 113
Airport «Baikal»
railway station
Adrenalin Park
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
The site is 10 km from the center of Ulan-Ude. The maximum natural elevation of the runs reaches to 924 meters, with the natural skiable elevation difference of 230-220 meters and the runs length up to 820 meters.
The maximum capacity of the complex – 6200 people per day.
lake Baik
al
Tour
ism a
nd R
ecre
atio
n Se
ctor
“ADRENALIN” (THE ALPINE SKI RESORT ON ORLINAYA MOUNTAIN)
Irkutsk
Mongolia
Ulan-Ude
SKI RESORT FACILITIES:• the complex of ski runs, toboggan runs and ski lifts;• service infrastructure (hotels, cafes, restaurants, shops);• baths spa-complex;• equestrian center;• service center;• day and night parkings.
Offered vacant lots
91 ha
Highway
114 115
№ Title Capacity1 The total area of the ski slopes 27,47 ha2 Ski runs length 6925 m3 Total chairlifts length 784 m4 Ski tows length 1358 m5 Unsupported ski lifts length 717 m6 Infrastructure development area 20,6 ha
7 Proposed ski area capacity in terms of Persons at One Time (PAOT) 1500 peoples
8 Simple pay-back period 7,62 years9 Net present value (NPV) $ 5,5 mln
10 Internal rate of return (IRR) 16,4 %11 Profitability index (PI) 1,1412 Modified internal rate of terurn (MIRR) 15 %13 Income reinvestment rate 14 %14 Investment cost discounting rate 14 %
INFRASTRUCTURE AND KEY FEATURES OF THE PARK “ADRENALIN”
Tour
ism a
nd R
ecre
atio
n Se
ctor
Total investments – $ 43,5 mln., including:• $ 2,5 mln. – investments in engineering infrastructure;• $ 41 mln. – investments in tourism and recreation facilities.
116 117
Tour
ism a
nd R
ecre
atio
n Se
ctor
Ulan-Ude60 km
lake Baikal
Ilyinka
Р258
Р258
Р258
А340
Ulan-Ude
TOURIST OFFER:• Medical and health tourism (treatment
of polyarthritis, diseases of the nervous system and others)
• Hippotherapy• Family recreation• Sports tourism• Mineral water spring
HighwayOffered vacant lots
The total land area 7,02 hectares
The site is situated nearby the bank of the Selenga river and shares a land border to the west with the working health resort “Ilyinka” of the Republican Exercise Therapy Centre.
The water well of the Pitatelevskoye thermal mineral water deposit (chloride-sulphate-sodium and sodium-calcium mineral water)
RailroadMineral water spring
DEVELOPMENT OF THE MEDICAL RECREATIONAL COMPLEX “ILYINKA SPA”
The volume of investments – $ 10 mln. Facility:• Hotel for 100 guests;• Bath building;• Sports complex;• Restaurants complex and
entertainment center.
118 119
Enkheluk
1 land plot 4,5 ha in area is offered to investors
TOURIST OFFER:• sports tourism;• business tourism;• beach and water tourism;• family recreational tourism.
Offered vacant lots Highway Electrical sub-station
Ulan-Ude170 km
Tour
ism a
nd R
ecre
atio
n Se
ctor
А340
Р258
SPORTS AND HEALTH COMPLEX AT LAKE BAIKAL IN THE ENKHELUK VILLAGE
Ulan-Ude
lake Baik
al
Enkheluk
“Enkheluk” means “calm, blessed” in Buryat. There are natural sand beaches at the sites proposed to investors.
The mountain slopes of the Morskoy ridge covered in mixed softwood forest appear in the vicinity of the proposed sites (the highest point of the ridge – the Davydov bald peak 1 707 meters high).
Asphalt road distance to Ulan-Ude – 170 km.
The Davydov bald peak lake Baikal
120 121
KEY INDICATORS OF THE PROJECT IN THE ENKHELUK VILLAGE
№ Title Capacity1 Development area 4000 m2
2 Total floor area 6200 m2
3 Construction volume 22 000 m3
4 Maximum tourist flow (on condition of full house) 90000 peoples/day in year5 Winter season occupancy 40% (22050 peoples/day)6 Summer season occupancy 85% (19550 peoples/day)7 Estimated cost of the project $ 5 mln.8 Construction period 9 months9 Payback period 84 months
10 The period of achievement of full project capacity 12 months11 NPV $ 330 th..12 Number of created workplaces 60 units
Tour
ism a
nd R
ecre
atio
n Se
ctor
• hotel with 80 rooms, three VIP cottages for 6 guests,three cottages for 8 guests, a motel for 32 guests and a camping for 54 guests – total accommodation for up to 250 guests;
• parking for 100 cars;• restaurant, bistro and open-air café for 300
persons;• conference hall for 100 persons;• concert venue;
• cimena-bar;• billiard room;• water sports center (gym, swimming-pool
(mini water park), fitness center, sauna, mini football and volleyball courts, tennis court, equipment rental);
• bath, barbeque area and bonfire site;• children’s playground; skatepark and
rollerdrom.
PROPOSED FACILITIES OF THE COMPLEX
122 123
FIVE DEVELOPMENT PRIORITY AREAS
Mineral resources sector
Agro-industrial sectorTourism and Recreation
Sector Transport and logistics sector
Establishment of the legal entity at the territiory of the Republic of Buryatia
Formation and providing of the land lot
Obtaining of engineering specifications for connection to utility networks
Obtaining of a building license and commissioning
Assistance in carrying out state expertise of design and estimates
Assistance in preparation of the necessary documents for obtaining state support
Industry and residential construction
Ulan-Ude
Ulaanbaatar
Peking
Moscow
Primary objectives:• development and promotion of the investment projects of the Republic of Buryatia;• attraction of investors for projects implementation in the territory of the Republic;• creation of favorable environment for investors supporting investment projects based on one stop approach.
FUND FOR REGIONAL DEVELOPMENT REPUBLIC BURYATIYA
Objective: attraction of investments to the economy of the Republic of Buryatia.
Founder: the Government of the Republic of Buryatia represented by the Ministry of Economy of the Republic of Buryatia.
The Fund for Regional Development of the Republic of Buryatia is an organization authorized by the Government of the Republic of Buryatia in the field of application of government investment policy seeking to attract investments to the economy of the Republic, create favorable environment for investors and business, and reduce the administrative barriers
Fund for Regional Development of the Republic of Buryatia provides support for investment projects and assists in the following tasks: