Some of the statements in this document may be deemed to be "forward-looking statements". Allstatements on in this document, other than statements of historical facts, that address events ordevelopments that management of the Company expects, are forward-looking statements. Althoughmanagement believes the expectations expressed in such forward-looking statements are based onreasonable assumptions, such statements are not guarantees of future performance, and actualresults or developments may differ materially from those in the forward-looking statements. TheCompany undertakes no obligation to update these forward-looking statements if management'sbeliefs, estimates or opinions, or other factors, should change. Factors that could cause actualresults to differ materially from those in forward-looking statements, include market prices,exploration and development successes, continued availability of capital and financing, and generaleconomic, market or business conditions. Please see the public filings of the Company atwww.sedar.com for further information.

1

Page 3: Skyharbour Resources Ltd. Investor Presentation

Skyharbour is a preeminent uranium and thorium exploration company focused in the prolific and high grade Athabasca Basinof Saskatchewan, Canada which is one of the most favourable mining jurisdictions to work in globally

Strong managerial/geological team with successful track record in uranium exploration; Skyharbour’s Head Geologist, Rick Kusmirski has over 40 years of experience in the Basin previously as Exploration Manager for Cameco and President/CEO of JNR Resources; successful in making numerous uranium discoveries including Maverick Zone and Fraser Lakes deposits

Skyharbour has acquired 100% of the highly prospective Falcon Point (previously called Way Lake) and Yurchison Lake Uranium Projects from Denison Mines totaling over 90,000 hectares on the east side of the Basin

Falcon Point property boasts shallow, NI 43-101 inferred mineral resource totaling 7.0 million pounds at an average grade of 0.03% U3O8 and 5.3 million pounds at an average grade of 0.023% ThO2 at JNR Fraser Lakes Zone B area, which is open along strike and at depth with robust high grade discovery potential

Skyharbour’s winter/spring 2015 drill program consisted of 1,278m in five holes and intersected highest grade mineralization found to date in deposit area (0.172% U3O8 and 0.112% ThO2 over 2.5 metres in hole FP-15-05); considered breakthrough towards identifying additional and higher grade uranium mineralization at shallow depths at Falcon Point Project

Hook Lake target area at north end of Falcon Point property yielded high grade uranium grab samples of up to 48% U3O8 in massive pitchblende vein exposed at surface; previous operators unable to definitively explain and locate the source

Skyharbour holds interest in the one of the largest land positions (approx. 127,495 hectares) strategically located to the south of Fission Uranium’s Patterson Lake South (“PLS”) high grade Triple R Deposit as well as NexGen Energy’s recent discovery at the Arrow target on their Rook 1 project in the southwestern flank of the Basin

Unique strategy to execute plan of making the next discovery in this region without substantial equity dilution to shareholders by forming a syndicate with 3 other companies (Western Athabasca Syndicate) to fund a $6 million exploration program over two years of which Skyharbour only has to pay for $1 million and is the operator of the project

Skyharbour and the Syndicate are rapidly advancing Preston Uranium Project using a similar refined exploratory methodology that led to the PLS and NexGen discoveries with additional exploration planned in summer of 2015

Skyharbour also holds 60% interest in Mann Lake Uranium Project SW of the McArthur River Mine and adjacent to ground where Cameco and International Enexco recently made a new high grade uranium discovery; International Enexco was subsequently acquired by Denison

Skyharbour has multiple value-drivers including Syndicate’s Preston project as well as its Falcon Point, Yurchison Lake and Mann Lake projects on the east side of the Basin; the company will also benefit from a turnaround in the uranium market

2

Page 4: Skyharbour Resources Ltd. Investor Presentation

*Prices as of August 5, 2015

3

Trading Symbol: SYH (TSX-V)Frankfurt Symbol:

US OTC Trading Symbol:SC1NSYHBF

Issued & Outstanding Shares: 88.0 millionFully Diluted: 153.4 million

Recent Share Price: $0.035Market Capitalization: $3.1 million

Page 5: Skyharbour Resources Ltd. Investor Presentation

Jordan Trimble, B.Sc., CFA: President & CEO, Director

Jordan Trimble is the President and Chief Executive Officer of Skyharbour Resources. Mr. Trimble holds a Bachelor of Science Degree with a Minor in Commerce from UBC and and he is a CFA® Charterholder. He has worked in the resource industry in various roles with numerous TSX Venture listed companies specializing in corporate finance and strategy, shareholder communications, marketing, deal structuring and capital raising. Mr. Trimble has an extensive network of institutional and retail investors as well as resource industry professionals bringing valuable relationships to the Company. He has appeared on BNN several times and has given presentations at numerous resource conferences across North America. Mr. Trimble has completed the Canadian Securities Course and Technical Analysis Course offered through CSI as well as several geology, exploration and mining courses.

Jim Pettit: Chairman of the Board, Director

Jim Pettit is the Chairman of the Board of Skyharbour. Mr. Pettit is currently serving as a Director on the Boards of several public resource companies and offers over 25 years of experience within the industry specializing in finance, corporate governance, management, and compliance. He specializes in the early stage development of private, as well as public companies.

Don C. Huston: Director

Has been associated with the mineral exploration industry for over 30 years and has extensive experience as a financier and in-field manager of mineral exploration projects in North America. He was born and raised in Red Lake, Ontario and spent 15 years as ageophysical contractor with C.D. Huston & Sons Ltd. as mineral exploration consultants in northern Ontario, Manitoba, and Saskatchewan.

Donald G. Myers: Director

Don Myers serves as a Director of Skyharbour Resources. He has 30 years of experience in public company management and corporate communications working with companies listed on the TSX Venture, NASDAQ, and Toronto Stock Exchanges. Mr. Myers’ background includes holding the position of Director and Officer of several Canadian public resource and technology companies listed on the TSX Venture Exchange.

Amanda Chow, CPA, CMA: Director

Amanda Chow serves as an independent Director of Skyharbour Resources. Ms. Chow is a Certified Management Accountant (CMA) and a graduate of Simon Fraser University where she earned her Bachelor of Business Administration degree. She began working with public companies in 1999.

4

Page 6: Skyharbour Resources Ltd. Investor Presentation

Richard Kusmirski, P.Geo., M.Sc.: Director, Head Technical Advisor, and Qualified Person

Rick Kusmirski, P.Geo., M.Sc., Director, Head Technical Advisor, and is the Qualified Person as defined by National Instrument 43-101.Mr. Kusmirski has over 40 years of exploration experience in North America and overseas, and has actively participated in the discovery of a number of uranium deposits. For several years, in his capacity as Exploration Manager, he directed Cameco Corporation's (TSX: CCO) uranium exploration projects in the Athabasca Basin. In 1999, Rick joined JNR Resources as VP Exploration and subsequently he directed the exploration program that led to the discovery of the Maverick Zone on the Moore Lake uranium project in the Athabasca Basin in Saskatchewan. Rick became JNR's President and CEO in January of 2001. In February of 2013, Denison Mines Corp. (TSX: DML) successfully acquired all of the outstanding shares of JNR by way of a friendly all-share take-over bid.

Thomas S. Drolet, B.Eng., M.Sc., DIC: Technical Advisor

Mr. Drolet is a uranium and nuclear industry specialist and principal of energy consultancy Drolet & Associates Energy Services Inc. Mr. Drolet has had a plus-40-year career in the energy sector, where he spent 26 years with Ontario Hydro in various engineering, research and operations functions. He went into international commercial work with Ontario Hydro International where he was named president and CEO in 1993. Mr. Drolet was then appointed managing director of American Electric Power Canada, and president of CanadianEnergy Opportunities Inc. He earned a bachelor's degree in chemical engineering from Royal Military College of Canada, a master of science degree in nuclear technology/chemical engineering, and a DIC from Imperial College, University of London, England.

Robert D. Marvin, P.Geo., CPG: Technical Advisor

Since 1979, Mr. Marvin has been involved in mineral exploration for and evaluation of gold, copper, zinc, and uranium deposits throughout the Americas as an employee and as an independent consultant. He graduated from the University of New Mexico with a Bachelor of Science degree in geology in 1984.

Tamás Bakacs, MBA: Advisor

Mr. Bakacs is an experienced and successful global resource fund manager. Following the completion of his MBA studies in 2004, Mr. Bakacs joined Baillie Gifford & Co. in Edinburgh, United Kingdom, where he became the global equities analyst for the firm’s flagship Long-Term Global Growth portfolio (FUM of $14 billion) covering mid- to large-cap equities in various markets. Subsequently, he was chosen to be the head of the firm's specialist Oil and Gas Energy sector group (FUM of $15 billion). Recently, Mr. Bakacs was aninvestment manager at Compass Asset Management JSC in Almaty, Kazakhstan (FUM of $250 million), a frontier emerging-markets-based hedge fund focusing on commodity-linked equity investments. Mr. Bakacs is currently a portfolio manager at ACCESS Fund Management Ltd., where he manages a junior-mining-focused commodity equity fund in Budapest, Hungary. Mr. Bakacs is a graduate of St. Francis College (BS, Accounting, 1999, Summa Cum Laude) and the University of California, Los Angeles (MBA, 2004).

5

Page 7: Skyharbour Resources Ltd. Investor Presentation

According to the World Nuclear Association in 2014 there were 435 nuclear reactors operating worldwide, 72 nuclear reactors under construction, 174 reactors in the planning stage and a further 299 reactors in the proposal stage

Global demand for electricity is expected to grow 76% by 2030 and nuclear energy will play an integral role in meeting this demand; nuclear energy is reliable, low cost, clean and it provides energy security

While long-term demand is steadily growing, uranium supply is the biggest variable in the supply-demand equation as there have been numerous recent mine shutdowns and development project deferrals due to depressed uranium prices

UxC has estimated existing mine production plus new planned and potential mine production will increase primary uranium supply from 132 million pounds in 2009 to 225 million pounds in 2020, falling short of expected demand of 255 million pounds per year

China and India have recently been moving to secure uranium supply:

“Canada's uranium reserves are among the largest in the world and we hope to cooperate with Canadian enterprises to complete the mission.” (Zhou Zhenxing, Chairman of CGN Uranium Resources, Dec 5, 2014)

Canadian Prime Minister Stephen Harper and Indian Prime Minister Narendra Modi unveiled a $350-million deal in April 2015 for Canada’s largest uranium producer, Cameco Corp., to supply 3,220 metric tonnes to power India’s reactors over the next five years

6

Page 8: Skyharbour Resources Ltd. Investor Presentation

Thorium is a naturally-occurring, radioactive element which was discovered in 1828 by the Swedish chemist Jons JakobBerzelius

Scientists believe thorium is key to developing a new generation of cleaner, safer nuclear power; thorium fuels can also breed fissile uranium-233 to be used in various kinds of nuclear reactors

Thorium oxide (ThO2) is relatively inert so it does not oxidise further, unlike UO2, and it has higher thermal conductivity and lower thermal expansion than UO2, as well as a much higher melting point; in nuclear fuel, fission gas release is much lower than in ThO2 than in UO2

7

Country TonnesIndia 846,000Brazil 632,000Australia 595,000USA 595,000Egypt 380,000Turkey 374,000Venezuela 300,000Canada 172,000Russia 155,000South Africa 148,000China 100,000Norway 87,000Greenland 86,000Finland 60,000Sweden 50,000Kazakhstan 50,000Other countries 1,725,000World total 6,355,000

Estimated World Thorium Resources Thorium fuel cycles offer attractive features, including lower levels of waste generation, less transuranic elements in that waste, and providing a diversification option for nuclear fuel supply; also, the use of thorium in most reactor types leads to extra safety margins

Particularly in a molten salt reactor, the equilibrium fuel cycle is expected to have relatively low radiotoxicity, being fission products only plus short-lived Pa-233, without transuranics

With large quantities of thorium resources and relatively little uranium, India has made utilization of thorium for large-scale energy production a major goal in its nuclear power program

The thorium fuel cycle offers energy security benefits in the long-term due to its potential for being a self-sustaining fuel without the need for fast neutron reactors; it is therefore an important and potentially viable technology that seems able to contribute to building credible, long-term nuclear energy scenarios

300 million kg of coal = 250 kg of uranium = 1 kg of thorium to achieve the same energy output

Page 9: Skyharbour Resources Ltd. Investor Presentation

Value of Uranium Grades Compared to Other Metals(Calculated in $US using metric tonnes and troy ounces in Nov., 2014)

1% U3O8 (Uranium) =

8

Metal Grade lbs/t $/unit Value/t

U3O8 1% 22 $45 / lb $990

Gold 26.5 g/t - $1160 /oz $990

Silver 1950 g/t - $15.75 / oz $990

Copper 14.7% 300 $3.06 / lb $990

Nickel 6.5% 148 $6.95 / lb $990

26.5 g/t Gold

1950 g/t Silver

14.7% Copper

6.5% Nickel

Page 10: Skyharbour Resources Ltd. Investor Presentation

The Athabasca Basin in Saskatchewan, Canada is an ancient sedimentary basin hosting the world's richest uranium deposits and mines

The basin produces just under 20% of the world’s primary uranium supply in a safe and favourable jurisdiction

9

2012 to 2014, Southwest Athabasca Basin: Patterson Lake South discovery made by Fission Uranium (TSX: FCU) The Arrow Prospect discovery made by NexGen Energy (TSX-V: NXE) on their Rook 1 Project

2008 to 2010, Eastern Flank of the Athabasca Basin: J-Zone discovery by Fission Uranium and KEPCO: indicated 306,831 tonnes at 1.52% U3O8 (10.2mm

lbs) and inferred 138,404 tonnes at 0.90% U3O8 (2.7mm lbs) Wheeler River – Phoenix Deposit being explored by Denison Mines (TSX: DML): Phoenix has indicated

152,400 tonnes at 15.6% U3O8 (52.3mm lbs) and inferred 11,600 tonnes at 29.8% U3O8 (7.6mm lbs)

Page 11: Skyharbour Resources Ltd. Investor Presentation

10

Page 12: Skyharbour Resources Ltd. Investor Presentation

11

Skyharbour has acquired from Denison Mines a 100% interest in the Falcon Point (previously Way Lake) Uranium Project comprised of 20 contiguous claims totaling 79,003 hectares located 55 km east of the Key Lake mine in northern Saskatchewan

In March of 2015, Skyharbour released an updated NI 43-101 mineral resource estimate for the Fraser Lakes Zone B deposit consisting of 6,960,681 pounds U3O8 inferred at an average grade of 0.03% U3O8 and 5,339,219 pounds ThO2 inferred at an average grade of 0.023% ThO2 within 10,354,926 tonnes using a cutoff grade of 0.01% U3O8

Geological and geochemical features show distinct similarities to high grade, basement-hosted deposits in the Athabasca Basin such as Eagle Point, Millennium, P-Patch and Roughrider

Exploration potential of broader 6 km by 7 km JNR Fraser Lakes target area considered exceptional, including resource expansion potential along strike and at depth at Zone B deposit

Page 13: Skyharbour Resources Ltd. Investor Presentation

12

Drilling to date at Falcon Point totals over 21,000m in 110 holes with over $12 million in previous exploration across six, near-surface target areas on the large property; robust exploration upside potential going forward

Years of exploration have culminated in an extensive geological database for the project area; recommended future work programs include defining additional resources at JNR Fraser Lakes Zone B uranium deposit as well as exploratory drilling on other high-potential targets

Skyharbour’s winter/spring 2015 drill program consisted of 1,278 metres in five holes and intersected highest grade mineralization found to date in deposit area (0.172% U3O8 and 0.112% ThO2 over 2.5 metres in hole FP-15-05); considered breakthrough towards identifying additional and higher grade uranium mineralization at shallow depths at Falcon Point Project

Similar to other notable high grade Basin deposits, the character of the uranium mineralization is changing at depth with the grade increasing which illustrates strong discovery potential going forward

The Hook Lake target area at north end of Way Lake property yielded high grade uranium grab samples of up to 48% U3O8 in massive pitchblende vein at surface; previous operators unable to definitively explain and locate the source

Page 14: Skyharbour Resources Ltd. Investor Presentation

13

Page 15: Skyharbour Resources Ltd. Investor Presentation

The Patterson Lake area is located in the southwestern Athabasca Basin region

The area has received escalating exploration attention and claim acquisition activity as a result of the shallow high-grade uranium discovery made by Fission Uranium and Alpha Minerals

14

Drill results at the expanding Fission discovery area include:

54.5m of 9.08% U3O8 including 21.5m of 21.76% U3O8 in hole PLS13-075 (R390E Zone)

Recent uranium discovery made by NexGen Energy in their first hole at the Arrow prospect on the Rook 1 Project

These discoveries demonstrate the potential for high grade uranium mineralization on the western side of the Athabasca Basin where significantly less exploration has been carried out compared to the eastern side

Page 16: Skyharbour Resources Ltd. Investor Presentation

Earn in option agreement between Skyharbour Resources (TSX-V: SYH), Rojo Resources (TSX-V: RJ), Athabasca Nuclear (TSX-V: ASC), and Noka Resources (TSX-V: NX)

Western Athabasca Syndicate property package includes one of the largest land packages in the Patterson Lake area totalling approx. 127,495 hectares strategically located to the south of the PLS high-grade discovery as well as the recent discovery made by NexGen at Rook 1

The collective efforts of the four partner companies forming the syndicate combine over 300 years of exploration and finance experience with focused technical expertise in Athabasca uranium exploration

Five geologically prospective uranium properties comprise the 25% earn-in agreement between the four companies; the properties were acquired for their proximity to the PLS discovery and interpreted favourable geology for the occurrence of PLS style uranium mineralization

The Western Athabasca Syndicate will be spending a minimum of $6,000,000 in combined exploration expenditures over two years; Skyharbour will fund $1,000,000 while the three partner companies will fund the remaining $5,000,000

Skyharbour is the operator for the Western Athabasca Syndicate project

Skyharbour’s management considers this the most cost-efficient and operationally-effective structure to conduct a large scale exploratory program while mitigating company-specific risk and equity dilution to shareholders

15

Page 17: Skyharbour Resources Ltd. Investor Presentation

127,495 hectares road-accessible property south of the PLS discovery and directly contiguous to claims held by Fission 3.0 and NexGen

A review of historic exploration data on Preston Property identified several potential areas for follow up; the property covers extension of NE-SW on-trend linears and mag features targeted by Fission at PLS

The combined geological team will explore utilizing proven, cost-efficient techniques that have led to numerous discoveries in the Athabasca Basin; primary target is high-grade, shallow uranium mineralization

Phase 1 of exploration at Preston included airborne geophysical surveys: EM survey succeeded in mapping over 300 km of interpreted graphitic-type basement conductors representing primary exploration targets; radiometric data has identified areas with elevated uranium counts which may indicate presence of radioactive boulder trains

16

The first-pass ground exploration at Preston, Phases 2-3, included boulder prospecting, radon and silt sampling, geochemical and radon soil sampling, geological mapping and prospecting, and biogeochemical sampling

The radon surveys successfully identified significant radon anomalies occurring as clusters and as discrete point anomalies; radon in water survey results were instrumental in identifying drill targets at the nearby PLS discovery and helped vector in on most of the high-grade zones

Fifteen potential drill target areas associated with eight highly prospective exploration corridors (similar to conductive corridors at PLS and at NexGen’s Arrow Prospect) were successfully delineated through the extensive 2013 summer/fall airborne geophysics and ground evaluation

Page 18: Skyharbour Resources Ltd. Investor Presentation

Gravity surveys identified 23 gravity low anomalies associated with high-potential corridors; gravity is a powerful tool in the Basin and was key mechanism for vectoring in on the recent discovery made by NexGenat Rook 1

In March, 2014 Skyharbour and Syndicate commenced inaugural diamond drill program consisting of approx. 2,000 metres of drilling

9 holes testing depths of 150-300m at 3 initial target areas; depth to the top of the target zone (top of basement rock) ranging from 10-50m

Anomalous radioactivity discovered in the drilling proximal to EM conductors and associated with gravity low anomalies created from strong hematite, chlorite and clay alteration of structurally disrupted lithologies; this is a mineralization halo and is common to many Athabasca Basin uranium deposits

Given the size of the property, exploration to date has only focused on approx. 40% the land package leaving significant exploration upside potential in untested areas

Approx. $4.2 million has been invested thus far by the Syndicate in exploration on the property between geophysical surveys, follow-up ground work and drilling

Extensive fieldwork carried out to date vectored in on 15 high-priority areas with similar geological features / exploratory indicators as those at nearby PLS and NexGen discoveries; numerous drill ready targets offering strong discovery potential; continue to value-add the project using a systematic and proven exploration methodology

17

Page 19: Skyharbour Resources Ltd. Investor Presentation

18

Skyharbour owns a 60% interest in the Mann Lake Uranium Project strategically located on the east side of the Athabasca Basin 25 km SW of Cameco’s McArthur River Mine and 15 km NE and along strike of Cameco's Millennium uranium deposit

The property is adjacent to the Mann Lake Joint Venture operated by Cameco (52.5%) with partners Denison (30%) and AREVA (17.5%); in March, 2014 a drill discovery was made by operator Cameco consisting of 2.31% eU3O8 over 5.1m including 10.92% eU3O8 over 0.4m

Skyharbour’s Mann Lake Uranium Project has seen over $3 million of previous exploration including recent geophysics and two diamond drill programs totaling 5,400m carried out in 2006 and 2008

One drill hole contained anomalous uranium up to 73.6 ppm over a 1.5m interval where background uranium values are commonly between 1 and 5 ppm

Skyharbour recently carried out a ground-based EM survey focused on a zone where a favourable, 2 km long aeromagnetic low coincides with possible basement conductor trends indicated by prior EM surveys; the survey was successful in confirming the presence of a broad, NE-SW trending corridor of conductive basement rocks which are probably graphitic metapelites

The Mann Lake Project boasts highly prospective geology and geochemistry, and a robust discovery potential with additional work recommended on several untested targets

Page 20: Skyharbour Resources Ltd. Investor Presentation

19

Skyharbour acquired from Denison Mines a 100% interest in the Yurchison Lake Uranium Project comprised of 4 claims totaling 12,660 hectares located 70 km southeast of the McArthur River uranium mine

At Yurchison Lake Project, prospecting near old trenches returned significant uranium (0.09% to 0.30% U3O8) and molybdenum (2,500 ppm to 6,400 ppm) mineralization in outcrop and float samples

Two holes drilled beneath historic trenches returned highly anomalous molybdenum values of up to 3,750 ppm and anomalous uranium values of up to 240 ppm

Strong discovery potential for basement hosted uranium mineralization as well as base metal mineralization

Page 21: Skyharbour Resources Ltd. Investor Presentation

Skyharbour has a portfolio of precious and base metal projects in the Red Lake district including a 24.5% interest in the Baird Gold Property and a 100% interest in the past producing South Bay copper-zinc mine

Goldcorp owns a 51% interest in the Baird Property where historical drilling in the 1980’s returned 172 g/t gold over 1.2 metres and more recent drilling in 2002 by Skyharbour returned 10 g/t gold over 1.0 metre

The past producing South Bay Mine, located on Skyharbour’s South Bay Project, produced approx. 1.6 million tons of 2.3% copper, 14.5% zinc and 3.5 oz/ton silver, and is a classic Archean Volcanic associated Massive Sulfide (VMS) deposit

Skyharbour has drill tested geophysical anomalies at South Bay and identified additional massive sulphide zones approximately 500 metres to the southwest of the former mine shaft

20

The general area of the discovery has all the characteristics of a base metal camp; typically a camp hosts a number of zinc-copper deposits with one or two larger deposits of 15 to 50 million tonnes and a range of much smaller deposits down to 0.5 million tonnes

The only significant deposit found to date is the South Bay Mine deposit and it is at the smaller end of the scale; this might suggest that larger deposits remain to be discovered.

Page 22: Skyharbour Resources Ltd. Investor Presentation

21

Company Shares Outstanding Recent Share Price Market Cap

Fission Uranium TSX: FCU 386.2 M $0.82 $316.7 M

NexGen EnergyTSX-V: NXE 253.4 M $0.75 $190.1 M

Fission 3.0TSX-V: FUU 178.1 M $0.09 $16.0 M

CanAlaska UraniumTSX-V: CVV 22.1 M $0.16 $3.5 M

Purepoint UraniumTSX-V: PTU 124.2 M $0.03 $3.7 M

Glenmark CapitalTSX-V: GLM 106.3 M $0.085 $9.0 M

Roughrider ExplorationTSX-V: REL 21.6 M $0.145 $3.1 M

Skyharbour ResourcesTSX-V: SYH 88.0 M $0.035 $3.1 M

*Prices as of August 5, 2015

Page 23: Skyharbour Resources Ltd. Investor Presentation

22

Skyharbour is a preeminent uranium and thorium exploration company focused in the prolific and high grade Athabasca Basinof Saskatchewan, Canada which is one of the most favourable mining jurisdictions to work in globally

Strong managerial/geological team with successful track record in uranium exploration; Skyharbour’s Head Geologist, Rick Kusmirski has over 40 years of experience in the Basin previously as Exploration Manager for Cameco and President/CEO of JNR Resources; successful in making numerous uranium discoveries including Maverick Zone and Fraser Lakes deposits

Skyharbour has acquired 100% of the highly prospective Falcon Point (previously called Way Lake) and Yurchison Lake Uranium Projects from Denison Mines totaling over 90,000 hectares on the east side of the Basin

Falcon Point property boasts shallow, NI 43-101 inferred mineral resource totaling 7.0 million pounds at an average grade of 0.03% U3O8 and 5.3 million pounds at an average grade of 0.023% ThO2 at JNR Fraser Lakes Zone B area, which is open along strike and at depth with robust high grade discovery potential

Skyharbour’s winter/spring 2015 drill program consisted of 1,278m in five holes and intersected highest grade mineralization found to date in deposit area (0.172% U3O8 and 0.112% ThO2 over 2.5 metres in hole FP-15-05); considered breakthrough towards identifying additional and higher grade uranium mineralization at shallow depths at Falcon Point Project

Hook Lake target area at north end of Falcon Point property yielded high grade uranium grab samples of up to 48% U3O8 in massive pitchblende vein exposed at surface; previous operators unable to definitively explain and locate the source

Skyharbour holds interest in a large land position (approx. 127,495 hectares) strategically located to the south of Fission Uranium’s Patterson Lake South (“PLS”) high grade Triple R Deposit as well as NexGen Energy’s recent discovery at the Arrow target on their Rook 1 project in the southwestern flank of the Basin

Unique strategy to execute plan of making the next discovery in this region without substantial equity dilution to shareholders by forming a syndicate with 3 other companies (Western Athabasca Syndicate) to fund a $6 million exploration program over two years of which Skyharbour only has to pay for $1 million and is the operator of the project

Skyharbour and the Syndicate are rapidly advancing Preston Uranium Project using a similar refined exploratory methodology that led to the PLS and NexGen discoveries with additional exploration planned in summer of 2015

Skyharbour also holds 60% interest in Mann Lake Uranium Project SW of the McArthur River Mine and adjacent to ground where Cameco and International Enexco recently made a new high grade uranium discovery; International Enexco was subsequently acquired by Denison

Skyharbour has multiple value-drivers including Syndicate’s Preston project as well as its Falcon Point, Yurchison Lake and Mann Lake projects on the east side of the Basin; the company will also benefit from a turnaround in the uranium market

Page 24: Skyharbour Resources Ltd. Investor Presentation

Contact: Jordan Trimble – President and CEO

Telephone: (604) 687-3376

Toll Free: (800) 567-8181

www.skyharbourltd.com

[email protected]

Suite 1610, 777 Dunsmuir Street

Vancouver, BC, V7Y 1K4, CanadaRichard Kusmirski, P.Geo., M.Sc. is the Qualified Person as defined by National Instrument 43-101 and has reviewed

and approved the technical information in this presentation.