Connecting Dwarka with the NH8, the Expressway

will bring Delhi and Gurgaon closer

Currently, only 2 roads of connectivity between

Delhi and Gurgaon-MG Road and the NH8

Not enough to tackle the heavily increasing traffic

of daily commuters between Delhi and Gurgaon

A whole new corridor of connectivity

With Dwarka Expressway, connectivity becomes

smoother, faster and so much easier!

IGI airport - a mere 2.5 kms away

Also bridges the gap between 16 new Residential

Sectors

A whole new corridor of connectivity

And this is how Gurgaon will soon look, when the

Expressway opens up

The changing face of Gurgaon

Planned around a world of opportunities and

development

Dwarka Expressway marks the beginning of a

golden era in real estate

Acts as a new channel of business and commerce

between Delhi and Gurgaon

World-class infrastructure and facilities to

transform lives of residents and investors

A catalyst of change and

development

A result of years of planning, research and

development by the best brains in real estate

Aided by experts and top professionals in the

Corporate and Government sector, a range of

exciting projects in the residential and commercial

space are already underway

Years of thought and planning

No more toll for commuters between Delhi and

Gurgaon!

No more delays and traffic jams at the toll gate on

NH8!

All thanks to the toll plaza moving beyond

Manesar shortly

No more toll! No more delays!

From power-shortage to power-surplus, Haryana’s

power supply improving massively

4 new power plants have been set up by the

Haryana Government

Power generation capacity of the state has

increased from 1587 MW to 5800 MW in the last 5

years

Power cuts are history

Reputed educational institutions flocking to areas

surrounding the Expressway

MatriKiran School under construction

Modern School opening a branch in Sector 91,

Gurgaon

Other well-known schools of Delhi are currently

looking to expand on this stretch

Exciting opportunities in Education

Nationally and internationally famous healthcare

organizations setting up branches around the

Dwarka Expressway

Reputed names in healthcare have/in process of

finalizing Dwarka Expressway as the location of

establishment

Boom in Healthcare

All this adds up to making the

Dwarka Expressway a new hub of

exciting developments in real estate

and the Golden Road!

18 kms long and 150 mtrs wide, with 60 mtrs of

greenery on both sides, the Dwarka Expressway

is 2x that of the NH8

14 kms out of the 18 kms is already constructed

The widest road in the NCR

Constructed means black-topped

and driveable

The double yellow

line indicates the

constructed

expressway

Dwarka Expressway

From Haryana

From Delhi

Gurgaon - Manesar Urban Complex

- 2025 AD

800 mtrs handed over to Indian Railways for

construction of Rail over-bridge, with HUDA paying

Railways Rs. 38 Crores in advance already (Expected

Completion Time: 16 months)

700 mtrs under various HUDA utilities such as HT

pillars and water works which HUDA is in the process

of shifting (Expected Completion Time: 6 months)

The balance 2.5 kms – has been resolved

The Expressway today: The

remaining 4 kms

On 30.9.2013, HUDA announced a rehabilitation

policy which was published in the Times of India

The latest on the 2.5 kms under

stay order

People with built up homes / structures are being

offered alternative plots in Sectors 110A and 37C

The plots on offer are of the same size as the

plots being taken over

HUDA has already acquired 145 acres in the

above 2 Sectors for this purpose

Only 15 acres required to re-settle all the

petitioners

As Per Policy Published on

30.09.13

Applicants had till 30.10.2013 to apply under

this policy

HUDA has received applications from 80% of

the residents on this stretch and is sorting them

out

All petitions expected to be resolved under this

process in the next 3-4 months

As Per Policy Published on

30.09.13

S.No

.

ChainageLength

Clear

Length

Status

Constructed

/ NOT

RemarksMonth of

Handing OverFrom To

1 0 468 468 Not Executed Built up Area -

2 468 750 282 282 Executed End of Dec 11

3 750 765 15 15 Executed May-13

4 765 900 135 135 Executed Dec-11

5 900 960 60 60 Executed May-13

6 960 2000 1040 1040 Executed End April 11

7 2000 2050 50 50 Executed End April 11

8 2050 2070 20 20 Executed

9 2070 2120 50 50 Clear WMM II Completed Mid August 13

10 2120 2170 50 Not Executed Stay on Land

11 2170 2260 90 90 Clear WMM II Completed Mid August 13

12 2260 3350 1090 1090 Executed End April 11

Actual availability of stretches

(As per Actual Site condition)

S.No.Chainage

LengthClear

Length

Status

Constructed/

NOT

RemarksMonth of

Handing OverFrom To

13 3350 3370 20 HSIIDC drain

14 3370 3400 30 30 Executed Jan-13

15 3400 3975 575 575 Executed Reliance SEZ land Jan-13

16 3975 4100 125 125 Executed Feb 12

17 4100 4300 200 200 Executed

18 4300 4315 15 Pataudi Road

19 4315 4425 110 110 Executed

20 4425 4500 75 75 Executed End April 11

21 4500 6620 2120 2120 Executed End April 11

22 6620 7800 1180Not

Executed/ROB

ROB, Padmini Factory,

stay on land

23 7800 8285 485 485 Executed Mid Sep 11

24 8285 8345 60 Not Executed HUDA water sump house

25 8345 8750 405 405 Executed Mid Sep 11

S.No.Chainage

LengthClear

Length

Status

Constructed/

NOT

RemarksMonth of

Handing OverFrom To

26 8750 8800 50One side

executedRHS stay on land

27 8800 9820 1020 1020 Executed Mid Oct 11

28 9820 9900 80 Not Executed STP Channel

29 9900 10800 900 900 ExecutedWater logged area

completed

Last week of Jan

13

30 10800 11700 900 900 Executed end April 11

31 11700 11760 60 60 Executed Mid Oct 11

32 11760 12850 1090 1090 Executed Mid Oct 11

33 12850 12900 50 50 Executed Feb-13

34 12900 13000 100 Not Executed Nipon Factory

35 13000 13060 60 60 Executed Feb-13

36 13060 13400 340 340 Executed Nov-11

37 13400 13520 120 120 Executed Nov-11

38 13520 13650 130 130 Executed Nov-11

39 13650 13700 50 50 ClearSlab approach is to be

coming

40 13700 13780 80

Slab culvert

over sewer

channel is in

progress by

another

contractor

Work is stopped from last

2 month i.e on 6th Sep

2013

41 13780 14320 540 540 Executed

42 14320 14900 580 580 Clear WMM 1st layer completed

43 14900 15300 400 Not Executed New Palam Vihar – R&R

44 15300 15600 300 Not Executed New Palam Vihar – R&R

45 15600 16000 400 Not Executed New Palam Vihar – R&R

46 16000 16740 740 Not Executed New Palam Vihar – R&R

47 16740 18035 1295 1295 Executed 01-Mar

18035 14092

Clear Stretch 14,092 mtrs.

S.No.

Chainage

LengthClear

Length

Status

Constructed/

NOT

RemarksMonth of

Handing OverFrom To

Dwarka Expressway: The Delhi

update

Thanks to DDA’s efforts, all issues related to land

acquisition on Delhi side, resolved

Remaining stretch of less than a Km to be ready

within the next 6 months

Dwarka Expressway: The Delhi

update

All land issues on Delhi side resolved

All issues pertaining to 2.5 kms on Gurgaon side

soon to be resolved (Expected Timeline –

January’2014)

Soon, no more obstacles preventing investing in

the Golden Road!

All obstacles soon to vanish

Strike while hot!

(Average rate per sq ft)

Some of the best and most trusted names in real

estate singling out the Dwarka Expressway as the

preferred location for various visionary projects

Residential or commercial, most of these projects

in full swing and nearing completion

Besides, the best developers are

building here

Glimpses of the Expressway

Glimpses of the Expressway

The golden road beckons

Members of:

Ethical Consulting Pvt. Ltd.

Corporate off: A24/21, DLF Phase-1,Gurgaon, Haryana

Ph No: 8860456000

Email: [email protected]

Branch Off: Delhi: F-7, 1st Floor, DDA Shopping Complex,

Mayur Vihar Ph-1, New Delhi-110091

Contact Person : Shekhar Pratap Singh

Email : [email protected]

Ph No: 011-47503631

Ranchi: C-127, Harmu Housing Colony, Ranchi

834002

Contact Person : Prashant Pandey

Email : [email protected]

Ph No: 0651-2244341

Patna: 301,Narayan Plaza,3rd Floor Opp.Luv Kush

Tower

Exhibition Road , Patna – 800001

Contact Person : Chandan

Email : [email protected]

Email: [email protected].

Website: www.ethicalwealth.in