32
PreStressed Timber Limited – [email protected] Smart and Sustainable Buildings for New Zealand Dr. Tobias Smith General Manager, PreStressed Timber Ltd., Christchurch, New Zealand

Tobias Smith , GM, Prestressed Timber Ltd - Speaking at Seismics and the City 2015

Embed Size (px)

Citation preview

PreStressed Timber Limited – [email protected]

Smart and Sustainable Buildings for

New ZealandDr. Tobias Smith

General Manager, PreStressed Timber Ltd., Christchurch, New Zealand

PreStressed Timber Limited – [email protected]

The Christchurch Earthquake

Main quake:4 September 2010, 4.30am. M 7.1. No deaths www.all-geo.org

PreStressed Timber Limited – [email protected]

The Christchurch EarthquakeCENTRAL CITY AND NZS1170 SPECTRA

CLASS D DEEP OR SOFT SOIL

Larger Horizontal Components

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5

Period T(s)

SA

(T)

(g)

NZS1170 2500-yr Class D

NZS1170 500-yr Class D Deep orSoft Soil

CHHC_MaxH_FEB

CCCC_MaxH_FEB

CBGS_MaxH_FEB

REHS_MaxH_FEB

GM_Larger_FEB

Design spectrum1.0

0.5

1.5

0.0

Spe

ctra

l acc

eler

atio

n (

g)

0.0 1.0 2.0 3.0 4.0

Building period (s)

PreStressed Timber Limited – [email protected]

The Christchurch EarthquakeDamage to the city

PreStressed Timber Limited – [email protected]

What does Christchurch Look like now?

Courtesy of W. Y. Kam

PreStressed Timber Limited – [email protected]

Timber Structures in the CHCH EQWhat does Christchurch look like now?

Courtesy of W. Y. Kam

PreStressed Timber Limited – [email protected] of M. Taylor

PreStressed Timber Limited – [email protected]

Timber Structures in the CHCH EQWhat does Christchurch look like now?

Courtesy of M. Taylor

PreStressed Timber Limited – [email protected]

Current seismic design practiceOur current design choices

Earthquake engineering philosophy

Minor earthquake No damage

Moderate earthquake Repairable damage

Big earthquake No deaths, Damage is ok

Not good enough

Society wants more

PreStressed Timber Limited – [email protected]

Current seismic design practiceOur current design choices

This building displayed almost

prefect ‘good’ seismic behavior

Courtesy of S. Pampanin

Courtesy of S. Pampanin

PreStressed Timber Limited – [email protected]

Current seismic design practiceThis was our choice for Christchurch following a major earthquake

Repair is just too expensive,

and people are nervous about the results

Courtesy of A. Buchanan

Is this Smart? Or Sustainable?

PreStressed Timber Limited – [email protected]

We need to shift the goal postsUpdating our thinking to performance based design

Higher expectations of modern society ( “the three Ds”):

• No victims nor collapse (Deaths)

• Minimum level of damage or direct costs (Damage = Dollars)

• Minimum business interruption and recovering (indirect) costs (Downtime)

Courtesy of S. Pampanin

PreStressed Timber Limited – [email protected]

PREStressed – LAMinated Timber:

GLUe – LAMinated: GLULAM

CROSS-LAMinated: CROSS-LAM

Smith et al.

PreStressed Timber Limited – [email protected]

“Bill and Ben at 10” TVNZondemand

PreStressed Timber Limited – [email protected]

Pres-LamDamage Limiting System

(c/o Miss S. Nakaki) (Palermo et al. 2005)

• Originally conceived for reinforced concrete (PRESSS)

• Combination of post-tensioning cable and (in high siesmic areas) internal or external

reinforcing

• Separates ductility from material damage

PreStressed Timber Limited – [email protected]

Demolish

Repair

Pres-Lam – now that’s SmartDamage Limiting System

Pres-Lam changes the way in which a system remains following earthquake loading, replacing

damaged reinforcing following a major event

Courtesy of S. PampaninCourtesy of A. Buchanan

PreStressed Timber Limited – [email protected]

Testing of Pres-Lam SystemsWall systems

Pres-Lam walls with internal and external reinforcing.

Testing has also been performed on the transfer of forces within a Pres-Lam frame,

Economics of connections.

Sarti et al. Moroder et al.

PreStressed Timber Limited – [email protected]

Testing of Pres-Lam SystemsMoment Cross-Lam Stairwell

Dunbar et al.

PreStressed Timber Limited – [email protected]

Pres-Lam in PracticeThe first Pres-Lam Building in the World

Courtesy of A. Buchanan

Architect: Irving Smith Jack, Engineer: Aurecon

PreStressed Timber Limited – [email protected]

Pres-Lam in PracticeThe first Pres-Lam Building in the World

Photo: Irving Smith Jack Architects

Architect: Irving Smith Jack, Engineer: Aurecon

PreStressed Timber Limited – [email protected]

Pres-Lam in PracticeThe first Pres-Lam Auditorium in the World

Photo: Carterton District Council

Architect and Engineer: Opus International

PreStressed Timber Limited – [email protected]

Pres-Lam in PracticeA gravity dominated Pres-Lam Frame

Architect: Athfeild Architects, Engineer: Dunning Thornton Consultants

Photo: Trends Magazine NZ

Photo: Trends Magazine NZ

PreStressed Timber Limited – [email protected]

Pres-Lam in PracticeOther Examples of Pres-Lam

Concrete Columns,

Timber Beams and

Base Isolated

Cross-Lam Panels

incorporating

sections of LVL

Pres-Lam Frames only

Architect: Rick Proko, Engineer: Ruaumoko

Architect: Design Base, Engineer: Nelson Timber Solutions

Architect: Sheppard and Rout, Engineer: Kirk Roberts

PreStressed Timber Limited – [email protected]

Current Trends in Timber DesignThe World’s getting Taller

Reiulf Ramstad Arkitekter Asmgb ARCHITECTURE + DESIGN Equilibrium,

LMDG Ltd, BTY GroupSOM Skidmore Owings and Merrell

Norway Canada USA

Barentshus Tower Tall wood proposal Timber Tower Chicago

PreStressed Timber Limited – [email protected]

These aren’t just pipe dreams

55 m - 15 storey - All timber building – Pres-Lam walls

PreStressed Timber Limited – [email protected]

1. Time and cost of construction

2. Renewable resource

3. Carbon negative

4. Light weight

5. Lovely appearance

6. Excellent performance

Why is wood smart?

Re-building Christchurch

PreStressed Timber Limited – [email protected]

Half of national wood production is exported as logs

Is that smart?

Why not export pre-manufactured buildings?

Forestry in New Zealand

PreStressed Timber Limited – [email protected]

Exporting Kiwi Technology and Timber

A timber building

• Grown in New

Zealand

• Processed in New

Zealand

• Pre-fabricated in

New Zealand

• Ground broken in

Japan to be erected

in June

PreStressed Timber Limited – [email protected]

Conclusions

PreStressed Timber Limited – [email protected]

Conclusions

PreStressed Timber Limited – [email protected]

Conclusions

The more trees we plant, and grow,

and harvest, and use, and replant, the better

for our health, wealth, and a sustainable planet

PreStressed Timber Limited – [email protected]

Pres-Lam in PracticeThe Largest Pres-Lam Building

Photo: Conorboyd Photography

Architect and Engineer: Opus International