5 Things You Can Do NOW 5 Things You Can Do NOW to Calm Down Reactivity to Calm Down Reactivity Presented by: Ricky Smith, CMRP March 2011 Copyright 2011 Copyright 2011 GP GPAllied Allied March 2011

5 Things You Can Do Now To Calm Down Reactivity

Embed Size (px)

DESCRIPTION

Sometimes when your maintenance is reactive someone throws you a life line. This may be it. Check out these slides, you got to love the 5 simple ideas presented.

Citation preview

Page 1: 5 Things You Can Do Now To Calm Down Reactivity

5 Things You Can Do NOW5 Things You Can Do NOWto Calm Down Reactivityto Calm Down Reactivity

Presented by: Ricky Smith, CMRPMarch 2011

Copyright 2011 Copyright 2011 GPGPAlliedAllied

March 2011

Page 2: 5 Things You Can Do Now To Calm Down Reactivity

It isn’t what you know that will kill you, it h t d ’t k th t illwhat you don’t know that will

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 3: 5 Things You Can Do Now To Calm Down Reactivity

“Your system is perfectly designed to give you the results you get”y g

– W. Deming PhD

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 4: 5 Things You Can Do Now To Calm Down Reactivity

Reactive Maintenance Attributes• Ineffective or No Planning and Scheduling• PM Compliance has a wide variancePM Compliance has a wide variance• Performing PM on Equipment that continues

to breakdown• Overnight deliveries sit for weeks, months• Everyone works as hard as they can withEveryone works as hard as they can with

little if any movement seen toward proactive• Storeroom is Chaos (people standing in line (p p g

at 7:00am waiting on parts)

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 5: 5 Things You Can Do Now To Calm Down Reactivity

Do you want to be Proactive or Reactive?

Not enough hours in the day

Proactive ReactiveWe need to cut back on contractors

Proactive Reactive

Hurry and get those PMs doneHurry and get those PMs done

We need to stop ordering parts

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 6: 5 Things You Can Do Now To Calm Down Reactivity

World Class – What does it look like?

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 7: 5 Things You Can Do Now To Calm Down Reactivity

World Class Standards• PM Execution – 15%• PM Results – 15%• PdM Execution – 15%• PdM Results – 35%• Total Work “Planned” – 90%• Reactive Work – Less than 2%• Stock outs less than 2%• Stock-outs – less than 2%• Scheduled compliance by day/week – 85 to 90%• Failure Reporting, Analysis, Corrective ActionFailure Reporting, Analysis, Corrective Action

System in place and eliminating failures by changing maintenance strategy and equipment modificationsW k d l d i h ALL C d ID

Copyright 2011 Copyright 2011 GPGPAlliedAllied

• Work orders are closed out with ALL Codes ID

Page 8: 5 Things You Can Do Now To Calm Down Reactivity

Information you must know

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 9: 5 Things You Can Do Now To Calm Down Reactivity

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 10: 5 Things You Can Do Now To Calm Down Reactivity

Let’s start with the basics – Lessons Learned

• Maintenance – To Maintain• Maintenance Planning – parts staged/kitted, labor hours

estimated coordination identified step-by-step procedure withestimated, coordination identified, step-by-step procedure with specifications

• Maintenance Procedures – Repeatable, Effective ProceduresMean Time Between Failure The most basic measurement of• Mean Time Between Failure – The most basic measurement of equipment reliability

• Preventive Maintenance – To Prevent Failure• Condition Monitoring (aka, Predictive Maintenance)

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 11: 5 Things You Can Do Now To Calm Down Reactivity

What Is a Failure?“A functional failure is the inability of an item (or the equipment containing it) to meet a ( g )specified performance standard and is usually identified by an operator.”- F. Stanley Nowlan and Howard F. Heap, Reliability-Centered Maintenance, Department of Defense Report Number AD-A066-579, December 1978

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 12: 5 Things You Can Do Now To Calm Down Reactivity

What Is a Failure?“A potential failure is an identifiable physical condition which indicates a functional failure is i i t d i ll id tifi d bimminent and is usually identified by a Maintenance Technician using predictive or quantitative preventive maintenance ”quantitative preventive maintenance.- F. Stanley Nowlan and Howard F. Heap, Reliability-Centered Maintenance, Department of Defense Report Number AD-A066-579, December 1978

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 13: 5 Things You Can Do Now To Calm Down Reactivity

Failure Patterns

BathtubPattern A = 4%

Initial Break-in periodPattern D = 7%

W O tRandom

Pattern E = 14%

Time Time

Wear OutPattern B = 2%

Time Time

FatiguePattern C = 5% Infant Mortality

Pattern F = 68%

Age Related = 11% Random = 89%

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Source: John Moubray, Nowlan & Heap

Page 14: 5 Things You Can Do Now To Calm Down Reactivity

PF Curve

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 15: 5 Things You Can Do Now To Calm Down Reactivity

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 16: 5 Things You Can Do Now To Calm Down Reactivity

5 Things You Can Do NOW to Calm Down Reactivity5 Things You Can Do NOW to Calm Down Reactivity

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 17: 5 Things You Can Do Now To Calm Down Reactivity

Variation is Your Enemy - Causes• No Repeatable/Effective Procedures• Lack of Discipline in maintenance executionLack of Discipline in maintenance execution• The wrong maintenance approach to reliability• Production not operating the equipment toProduction not operating the equipment to

standard• PM Compliance is Too WidePM Compliance is Too Wide• Doing Too Much PM

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 18: 5 Things You Can Do Now To Calm Down Reactivity

Number 1 – Awareness of a Problem (baby steps)

• Track Self/Human Induced Failures• Set up a chart listing these failures and causes /Set up a chart listing these failures and causes /

No names or blaming• Establish an atmosphere of calmness but p

focused• Use Tool Box Training Sessionsg• Apply the “D” Word (Discipline)

“YOU CANNOT CHANGE AN ENVIRONMENT OVERNIGHT”

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 19: 5 Things You Can Do Now To Calm Down Reactivity

Tool Box Talk – Single Point Learning

Copyright 2011 Copyright 2011 [email protected]

Page 20: 5 Things You Can Do Now To Calm Down Reactivity

70 to 80% of Failures are Self / Human Induced

• Lubricating bearing improperly• Adding oil to a hydraulic reservoir with a bucket

and f nneland funnel• Over-tensioning V-Belts• Welding on Equipment• Use of Half Links on Chain Drives• Not having a procedure for rebuild of gearbox• Not using a torque wrenchNot using a torque wrench• PM Execution Variance is High

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 21: 5 Things You Can Do Now To Calm Down Reactivity

Number 1 - Identify Human Induced Failures• Identify and Post all Human Induced Failures• No judgment, solutions identified with yourNo judgment, solutions identified with your

crew at end of each week, 30 minute meeting

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 22: 5 Things You Can Do Now To Calm Down Reactivity

Variation Continues - A Deadly Killer

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 23: 5 Things You Can Do Now To Calm Down Reactivity

Number 2 – Reduce Variation in PM Compliance“C iti l A t O l ”“Critical Assets Only”

10% Rule of PM

2 28 282 2 28

10% Rule of PM

30 Day PM = Due in 3 daysy y

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 24: 5 Things You Can Do Now To Calm Down Reactivity

Number 3 – Break out crew • 20% of crew to emergencies• 20% to PMs• 20% to results from PM• 20% to Lubrication• 20% to Priority 2 – 3 work (backup for emergency

crew)

EM 2 PM 2EM -2 PM -2

PMR -2Pri. 2 -2

Lube -2

Pri. 2 2

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 25: 5 Things You Can Do Now To Calm Down Reactivity

Continuous Improvement – Failure Elimination

Copyright 2011 Copyright 2011 GPGPAlliedAllied

a

Page 26: 5 Things You Can Do Now To Calm Down Reactivity

Number 4 – Failure Identification/Elimination

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 27: 5 Things You Can Do Now To Calm Down Reactivity

Failure Elimination• Measure Mean Time Between Failure (MTBF)

(MTBF Users Guide)

• Post in the shopp• Talk to your maintenance techs• Ask for suggestions

• Measure EM vs PM Labor Hours

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 28: 5 Things You Can Do Now To Calm Down Reactivity

Number 5 - Perform a PM Evaluation

PM Task ActionRecommendation # of Tasks % of Tasks Man-Hours

RepresentedNon-Value Added (Delete) 1,640 8.2% 6,661

Reassign to Operator Care 1,380 6.9% 5,605Care , ,

Reassign to LubeRoute 2,856 14.3% 11,600

Replace with PdM 6,437 32.2% 28,222

Re-Engineer 5,200 26.0% 26,221

No ModificationsRequired 2,487 10.4% 8,987

Totals 20,000 100.0% 87,297

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 29: 5 Things You Can Do Now To Calm Down Reactivity

Example PM Task – No value (Delete)1. Check pump2. Check motor2. Check motor3. Check conduit

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 30: 5 Things You Can Do Now To Calm Down Reactivity

Labor Hours to Use for Proactive Work

PM Task ActionRecommendation # of Tasks % of Tasks Man-Hours

RepresentedNon-Value Added (Delete) 1,640 8.2% 6,661

Reassign to Operator Care 1,380 6.9% 5,605Care , ,

Reassign to LubeRoute 2,856 14.3% 11,6006 more Maintenance TechsReplace with PdM 6,437 32.2% 28,222

Re-Engineer 5,200 26.0% 26,221ONo ModificationsRequired 2,487 10.4% 8,987

Totals 20,000 100.0% 87,297

Iii

12,266

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 31: 5 Things You Can Do Now To Calm Down Reactivity

Questions“It is all about the Failure Modes”

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 32: 5 Things You Can Do Now To Calm Down Reactivity

Let’s Review• Number 1 - Identify Human Induced Failures• Number 2 - Reduce Variation in PM ComplianceNumber 2 Reduce Variation in PM Compliance• Number 3 - Break out crew • Number 4 - Failure EliminationNumber 4 Failure Elimination• Number 5 – Perform a PM Evaluation

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 33: 5 Things You Can Do Now To Calm Down Reactivity

Education - Options to Increase Effectiveness

1. Maintenance Tips – send me an email2. Up Coming Workshops in Charleston, SC Introduction to Condition Monitoring Planning and Scheduling Reliability Engineering Fundamentals Developing Effective Work Procedures Routine Equipment Care Routine Equipment Care RCM Blitz Root Cause AnalysisRoot Cause Analysis Leading Sustainable Change

3. Private Workshops are available

Copyright 2011 Copyright 2011 GPGPAlliedAllied

Page 34: 5 Things You Can Do Now To Calm Down Reactivity

Questions?Questions?

[email protected]

Copyright 2011 Copyright 2011 GPGPAlliedAllied