28
Build I Consolidate I Deliver

Cairn India Corporate Brochure | 2012

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Cairn India Corporate Brochure | 2012

Build I Consolidate I Deliver

Page 2: Cairn India Corporate Brochure | 2012

Message from the Chairman

Introducing Cairn India

This is Cairn

Producing Assets

Growth Journey

Asset Portfolio

World-class Resource Base

Application of Technology: Many Firsts

Cairn in Numbers

Competitive Advantage

Inclusive Growth Initiatives

HSEQ

Human Capital

1

5

7

9

10

12

15

16

18

19

21

23

24

Content

Page 3: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d 1C a i r n I n d i a L i m i t e d 1

Message from the Chairman

Our nation is heavily dependent on imports to meet the

growing demand for oil & gas. Every day, we import ~3.4

million barrels of crude oil. Such high dependence on imports

has its own adverse economic consequences; last year, our

nation spent more than US$ 400 million on oil imports per

day. With demand for oil & gas expected to increase further, it

is critical to address energy security concerns.

India has enormous hydrocarbon potential. It is imperative

to boost domestic oil & gas E&P activities. Conducive policy

framework, pricing reforms and application of new technology

and innovation can significantly reduce our dependence on

imports.

It is in this context that Cairn India’s contribution to nation’s

energy security should be evaluated.

In FY2012 crude oil production from the Rajasthan block

touched 175,000 barrels of oil per day. This was made possible

because Cairn India got requisite approval for higher crude

off-take from the Mangala field and the commencement of

production from the Bhagyam, Raageshwari and Saraswati

fields in Rajasthan block.

In less than three years since commencing production, Cairn

India reached a significant milestone of 100 million barrels

cumulative oil production from the Rajasthan operations.

In FY2012 Cairn India carried out a comprehensive review of

the resource potential in the Rajasthan block. The resource

base for the block is now estimated to be 7.3 billion barrels of

oil equivalent in-place – an increase of over 11%.

Navin AgarwalChairman

Page 4: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d2 C a i r n I n d i a L i m i t e d2

Page 5: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d 3C a i r n I n d i a L i m i t e d 3

The high exploration potential of the Block is evident from

the fact that more than 100 prospects and leads have been

identified. Ongoing exploration is an integral part of petroleum

operations in any block and also consistent with international

practice.

Cairn India believes that an expeditious execution of such

an exploration programme will create value, enhance energy

security for the nation and deliver significant additional

financial benefits for the Government.

Ravva and Cambay fields continue to create enduring value.

Thus, Cairn India’s world class assets continue to play a

significant role in enhancing our nation’s energy security and

contributing to the national exchequer. In a single year, Cairn

India reduced the nation’s oil import bill by ~US$ 6 billion and

contributed ~US$ 2.4 billion to the national exchequer.

Cairn India’s HSE vision is to be a “safe operator leading the

industry in safety standards and demonstrate top quartile

HSE performance among peers”. We continue to excel in HSE

performance and for the last three years achieved top quartile

performances among the global majors.

Cairn India is committed to the highest standards of CSR. It

is the Company’s conviction that business growth should

empower communities and create value for all stakeholders.

Looking forward, based on the revised estimates, the total

Rajasthan resource base now supports a potential production

of 300,000 barrels of oil per day, subject to approvals from

the Government of India and our joint venture partner, the

Oil and Natural Gas Corporation Limited (ONGC) and further

investments. Such a production level is equivalent to more

than ~35% of India’s current crude oil production, which will

help reduce the annual import bill by over US$ 10 billion and

contribute annual revenue of US$ 5 billion to the Government.

Following initial success in Sri Lanka, Cairn India is further

expanding its international footprint: we have now successfully

concluded a new acquisition in South Africa. This is a step

forward in achieving Cairn India’s strategic goal of growing its

resource base by acquiring exploration and appraisal assets not

only in India but also outside Indian sub-continent.

Page 6: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d4 C a i r n I n d i a L i m i t e dC a i r n I n d i a L i m i t e d4

Page 7: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d 5C a i r n I n d i a L i m i t e d 5

Introducing Cairn India

We discover the past to create a new future! We did it by

discovering oil and gas resources in Andhra Pradesh, Gujarat

and Rajasthan in India and in Sri Lanka. We did it by opening up

three frontier basins with over 40 discoveries; 25 in Rajasthan

alone. We want to do more in India and in other parts of the

world.

In a journey towards excellence that began in 1994 with 3,000

bopd operated production, we have now set our eyes and

evaluating the potential to produce 300,000 bopd from the

Rajasthan’s Barmer basin alone.

During this exciting journey, we have taken the Ravva

production to a peak level of 60,000 bopd, discoverd gas in

the west coast of India and delivered to market in 28 months,

made one of the largest onshore discovery in India by finding oil

in Barmer Basin in Rajasthan, built the world's longest heated

pipeline, produced 100 million barrels in just three years from

the Rajasthan block, successfully drilled the first Deepwater

exploration well in Sri Lanka and now farmed in an offshore

block in South Africa to explore.

This amazing journey has enriched our experience and has

been our key differentiator. I would list five and let you read

this brochure to find out more. At Cairn:

• Safetycomesfirstaswefirmlybelieveallliveshave

equal value

• Peopleaddvalueandmakeadifference

• OperationalExcellenceisawayoflife

• Useoftechnologyisactivelyencouraged

• Stakeholdersareourpartners&wewishtoemergeas

partner of choice

Today, this journey of value creation is undertaken in Cairn by

a multicultural talent pool of over 1,500 employees and our

vision is to emerge as the leading independent world class oil

& gas company.

Elango P

Page 8: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d6

• Become a global, world class E&P company

• Establish a diversified and sustainable portfolio

• Deliver long term value to host Governments, local

communities and stakeholders

• Pioneering energy and enriching lives

• Pioneering spirit, Teamwork, Respect and Ownership

• Innovative thinking and a "can do" attitude

• Commitment towards the communities

• Safeguard the environment

Vision and Core Values

C a i r n I n d i a L i m i t e d6

Page 9: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d 7

• Oneofthelargestindependentoilandgasexplorationand

production companies in India

• Amongsttop20globalindependentE&Pcompanies

• Marketcapitalisationof~US$12billion*

• TogetherwithitsJVpartnersaccountfor~25percentof

India’s crude oil production

• DiscoveredtheMangalafieldinBarmer,Rajasthanin2004;

largest onshore oil discovery in India in more than two

decades

• Opened3newfrontierbasinswithover40discoveries

including 25 in the Rajasthan block

• Over1billionbarrelsofreserves/resourcesbase

• Builtworld’slongest(~600kms)continuouslyheatedand

insulated pipeline

• Portfolioof10blocks-oneblockinRajasthan,twoonthe

west coast and five on the east coast of India and one each in

SriLankaandSouthAfrica**

• ThreeproducingassetsinIndia:RajasthanandCambayinthe

west and Ravva in the east

*October2012**Farm-inagreementsignedon16August2012;subjecttoSouthAfricanregulatoryapprovals

This isCairn

• Cairn Energy acquired Command Petroleum Ltd in 1996

• Became one of the first UK companies to invest in the Indian oil and gas sector

• CairnEnergysuccessfullyconcludedtheflotationofitsIndianbusinessinJanuary2007;heldthemajorityshareholdingin

Cairn India Limited

• August2010sawtheannouncementofashareholderleveltransactionbetweenCairnEnergyandVedantaResourcesplc

• TheVedantaGroupbecamethepromoterofCairnIndiainDecember2011

History

Page 10: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d8 C a i r n I n d i a L i m i t e d8

Page 11: Cairn India Corporate Brochure | 2012

Rajasthan (RJ-ON-90/1)

• Key assets in Rajasthan: The Mangala, Bhagyam and

Aishwariya (MBA) fields

• Block current production: ~175,000 bopd

• Raageshwari: Commenced production in March, 2012;

currently producing ~ 250 bopd

• Bhagyam:StartedproductioninJanuary,2012;producing

at ~ 25,000 bopd

• Saraswati: Began production in May, 2011 currently

producing ~250 bopd

• Throughnextfiscal(2013-14)planstospendUS$1.2bn

Ravva (PKGM-1), Andhra Pradesh

• 17th year of successful operations

• Produced more than double the initial estimates of crude oil

and natural gas

• Example of how technology can play a central role in

accessing new reserves

• Field direct operating cost one of the lowest amongst

Cairn’s peers

• Explorationdrillingplannedfor2013

Cambay (CB/OS-2), Gujarat

• Example of optimal asset utilisation

• Tolling and processing of ONGC’s North Tapti gas

• Application of advanced geophysical tools: Transformed the

block from a predominantly gas field to an oil field

• Advanced reservoir modelling studies resulted in incremental

recoverable volumes from the reservoir zones

• DrillingcampaignexpectedtocommenceinFY2013

Producing Assets

C a i r n I n d i a L i m i t e d 9

Page 12: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d1 0

1998-2011• Year1998:Ravvasatellitegasdiscoveries

• Year2000:Cambaydiscoveries-Lakshmi,Gauri,Ambe

• LakshmigasfieldDiscovery-to-productionin28months

• Ravva-3,700to35,000bopdin26months

• January2004:Mangala(Rajasthan,India)discovery,consideredtobethelargestonshoreoildiscoveryinIndiain

morethantwodecades

• January2007:CairnIndiaLimitedlistedontheBombayStockExchangeandtheNationalStockExchangeofIndia

• June2008:CairnawardedanexplorationlicencebytheSriLankagovernment

• August2009:CommencedproductionfromtheMangalafieldinRajasthan,India

• October2009:CompletedfinancingarrangementsforUS$1.6billiontofundtheRajasthanproject

• June2010:World’slongest(~600km)continuouslyheatedandinsulatedpipelineoperational

C a i r n I n d i a L i m i t e d1 0

Page 13: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d 1 1

Growth Journey

2012

C a i r n I n d i a L i m i t e d 1 1

• FY2012:Cairnbooked70mmboeasgrossprovedandprobablereservesfollowingpositiveresultsfrom

theEORpolymerpilotintheRajasthanblock

• June2012:Ravvafieldproducedmorethan249mmbblsofcrudeandsold309bcfofgas;morethan

doubletheinitialestimates

• June2012:Inlessthan3years,100millionbarrelscumulativeproductionfromRajasthan-reducedoil

importsby~US$9billionandcontributed~US$3billiontothenationalexchequer

• August2012:Signedafarm-inagreementwithPetroSAtoexploreintheOrangeBasin,westcoastof

SouthAfrica(subjecttoSouthAfricanregulatoryapprovals)

• October2012:Morethan40discoveriesintotalincluding25inRajasthan

Page 14: Cairn India Corporate Brochure | 2012

Signed a farm-in agreement with PetroSA

to explore hydrocarbons in August 2012.

The closure of the transaction is subject to

South African regulatory approvals

South Africa block

Asset Portfolio

SOUTH AFRICA

C a i r n I n d i a L i m i t e d12

Page 15: Cairn India Corporate Brochure | 2012

Operated Block Non-operated Block

KG-ONN-2003/1 block

Further appraisal drilling

in 2013

KG-OSN-2009/3 block

In exploration period

PR-OSN-2004/1 block

In exploration period

MB-DWN-2009/1 block

In exploration period

CB/OS-2 block

Drilling campaign

expected to commence

in FY2013

KG-DWN-98/2 block

In the process of

selling stake to ONGC,

ourJVpartner

PKGM-1 block

Exploration drilling

planned for 2013

Sri Lanka block

Exploration drilling

planned for mid 2013

as part of Phase II

programme

RJ-ON-90/1 block

Continue to assess

existing and new plays

to generate additional

prospects in the block

INDIA

C a i r n I n d i a L i m i t e d 1 3

Page 16: Cairn India Corporate Brochure | 2012

Rajasthan BlockDiscoveries

BHAGYAM

N-I-NORTH

SHAKTI

SHAKTI NE

N-I

NC WEST OIL & GAS

BHAGYAM SOUTH

MANGALA

MANGALA BARMER HILL

AISHWARIYA

N-E

VANDANA

VIJAYA

GS-V

SARASWATI CREST

SARASWATI

KAAMESHWARI

RAAGESHWARI OIL

SHAHEED TUKARAM OMBALE

RAAGESHWARI DEEP GAS

GUDA

OIL FIELDGAS FIELDOIL DISCOVERYGAS DISCOVERYOIL SHOWSOIL DISCOVERY & GAS SHOWS

DEVELOPMENT AREA 2Awarded November 2008

N-P

DEVELOPMENT AREA 3Awarded December 2008

KAAMESHWARI WEST-6 GAS

KAAMESHWARI WEST-3 GAS

KAAMESHWARI WEST-2 OIL

DEVELOPMENT AREA 1Awarded October 2004

0 5

KILOMETRES

10 20

BHAGYAM

N-I-NORTH

SHAKTI

SHAKTI NE

N-I

NC WEST OIL & GAS

BHAGYAM SOUTH

MANGALA

MANGALA BARMER HILL

AISHWARIYA

N-E

VANDANA

VIJAYA

GS-V

SARASWATI CREST

SARASWATI

KAAMESHWARI

RAAGESHWARI OIL

SHAHEED TUKARAM OMBALE

RAAGESHWARI DEEP GAS

GUDA

OIL FIELDGAS FIELDOIL DISCOVERYGAS DISCOVERYOIL SHOWSOIL DISCOVERY & GAS SHOWS

DEVELOPMENT AREA 2Awarded November 2008

N-P

DEVELOPMENT AREA 3Awarded December 2008

KAAMESHWARI WEST-6 GAS

KAAMESHWARI WEST-3 GAS

KAAMESHWARI WEST-2 OIL

DEVELOPMENT AREA 1Awarded October 2004

0 5

KILOMETRES

10 20

C a i r n I n d i a L i m i t e d1 4

Page 17: Cairn India Corporate Brochure | 2012

World-classResource Base

• Production potential: 300,000 bopd; represents ~35 per cent of India’s current domestic production

• Reduction in import bill: ~US$ 10 billion annually

• JVinvestments:~US$4.5billion;planstospendUS$1.2billionthroughnextfiscal(2013-14)

Potential from the Rajasthan block

Rajasthan Resource Potential (mm boe)Total

% increase from previous

RJ gross in-place resource

Expected UltimateRecovery

7,27811

1,73924

Note:

*Gross EUR Includes EOR potential of 300 mm boe

MBARS – Mangala, Bhagyam, Aishwariya, Raageshwari, Saraswati

Company upgraded the numbers as on 31 March, 2012

Under Development Future Development & Prospective Resource

2,168 3,100

1,044 (~48%)

165 (~8%)

2,010

Gross in-place

Gross EUR* Gross in-place

Gross EUR Gross in-place

Gross EUR

MB

AR

S*

BH

+19

Dis

c

EX

PLO

RA

TIO

N

530 (~17%)

C a i r n I n d i a L i m i t e d 1 5

Page 18: Cairn India Corporate Brochure | 2012

Application of Technology:Many Firsts

Drilling with casing technology in Offshore; also set the world

record for deepest 20” casing drilling

Deployment of Rotary steerable assemblies for ERD wells in the

Indian offshore; drilled first ERD well in shallow non consolidated

formations

Implemented Synthetic Based Mud in land projects in India

Executed Rotary steerable assemblies onshore in India

Introduced light weight cement slurries, jetting of the surface

conductors in deep water

Coiled tubing catenary for the first time anywhere in South East

Asia as well as the Middle East

E-line based tractor operations to provide conveyance in high

angle extended reach offshore wells

Retrofit sand screens through tubing on Inflatable plugs without

utilising rig in offshore

Straddle stimulation technology through a tele-coil for

production and injection wells

Straddle packer technology to stimulate a 2800 m horizontal

well in a single intervention

Mechanical Straddle packers to achieve conformance in EOR

wells and initiated polymer injection

Coiled tubing operation from offshore platform without utilising

a dedicated vessel

Drilling Services

Well Services

C a i r n I n d i a L i m i t e d16

Page 19: Cairn India Corporate Brochure | 2012

Well completion

Under-balance perforation using TCP guns

Installation of the Expandable Sand Screen

(ESS); first in the world

New Wellhead design for hot water

circulation and Artificial Lift

Inflow Control Devices (ICDs) deployment

in Deviated and Extended Reach wells

Sand control screen with integral SSD

design

State of the art high rate Progressive Cavity

Pumps (PCPs) of capacity upto 4,000 bopd

State of the art high rate Electric

Submersible Pumps (ESPs) on large scale

in India

HighrateJetPumpsinstalledincirculation

SSDs as artificial lift method

Enhanced Oil Recovery

Oil

rate

(b

op

d)

Time

Start of Polymer Injection

Water cut

Wat

er c

ut

(%)

Oil rate

Schematic illustrating success of polymer pilot; appreciable decline in

the water-cut following polymer injection with a simultaneous increase

in the oil rate.

Accordingly, the Company has booked 2P reserves of 70 mm boe. Going

forward, post Mangala implementation, we also intend to implement

chemical flooding in Bhagyam and Aishwariya fields. The current

assessment of the EOR resource base is more than 300 mm boe of

incremental recoverable oil from the MBA fields.

RTTS SAFETY JOINT

CROSSOVER

CROSSOVER

7” RTTS PACKER (TOP)

7” RTTS PACKER (BOTTOM)

VERTICAL SHOCK ABSORBER

2-7/8” EUE 6.4# PUP JOINT

2-7/8” DEBRIS SUB

2-7/8” EUE 11.65#PUP JOINT3 3/8” TDF AND DCI HOUSING

TCP SPACER

TCP SPACER

TCP SPACER

TCP GUNS - LOADED 6spf HMX DP

TCP GUNS - LOADED 6spf HMX DP

TCP GUNS- LOADED 18spf RDX BH

3 3/8” TDF AND DCI HOUSING

PORTED BULL PLUG

Innovative pipeline design and operation – use of Skin Effect Heat Management System to heat the pipeline for flow assurance of Rajasthan crude

SEHMS

C a i r n I n d i a L i m i t e d 17

Page 20: Cairn India Corporate Brochure | 2012

1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Cairn in Numbers

In t

ho

usa

nd

bar

rels

India’s Production with Cairn

& its JV partners

India’s Production without

Cairn & its JV partners

Source: BP Statistical Review of World Energy, June 2012

Import Savings per day due to

Cairn & its JV partners’ production

In t

ho

usa

nd

US

$

1100

1000

900

1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

800

700

600

500

18500

16500

14500

12500

10500

8500

6500

4500

2500

500

C a i r n I n d i a L i m i t e d1 8

Page 21: Cairn India Corporate Brochure | 2012

CompetitiveAdvantage

Pioneer in technology application

• Successanoutcomeofinnovativeapplicationof

technology

• World’slongestcontinuouslyheatedandinsulatedpipeline

• Enhancedoilrecoveryinearlystageoffieldlife

Resource Base and Management

• Continualincreaseinresourcebase

• PotentialresourcefortheRajasthanblockestimatedat7.3

bn boe in-place

• Prudentresourcemanagementstrategy;Ravvafield

increased crude oil production from an initial 3,700 bopd to

35,000 bopd in 26 months

Low cost operator

• Capabilitiestooperateassetsonaverycost-effective

basis

• FielddirectoperatingcostfortheRavvablockoneof

the lowest amongst Cairn’s peers

Project execution

• DevelopmentofRajasthanupstreamfacilities

• Constructionoftheworld’slongestheatedpipeline

• Inlessthanthreeyears,productionfromtheRajasthan

block crossed 100 million barrels

• IntheCambayBasin,commencednaturalgasproductionin

28 months following discovery

• Rajasthandiscoverytoproductioninfiveyears;asignificant

achievement given the characteristic of crude oil

Human Capital

• Successstoryaresultofexceptionaltalentand

“Can Do” spirit

• Over1,500“CanDoers”–diverseinternationalworkforce

• Unrelentingcommitment

C a i r n I n d i a L i m i t e d 1 9

Page 22: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d2 0 C a i r n I n d i a L i m i t e d2 0

Page 23: Cairn India Corporate Brochure | 2012

VocationalSkilltrainingforemployment

Support Enterprise Development

Cairn Enterprise Centre

• CommittedtothehigheststandardsofCorporateSocialResponsibility(CSR)

• Through3Rsideologyof‘Respect,RelationshipsandResponsibility’makes a difference in its area of operations

• CSRpolicyinlinewiththeGoI’svisionoffosteringinclusivegrowth

Health -MobileHealthVans

Education - Rural Library Programme I Science on Wheels

Economic Development - Dairy Development I Agri-advisory Services

Infrastructure Development - Solar Electrification for rural villages

Inclusive Growth

Initiatives

State-of-the-art ‘not for profit’ initiative for Skill Development

Strong linkage to employment

Cairn Centre of Excellence

Focus areas

C a i r n I n d i a L i m i t e d 2 1

Page 24: Cairn India Corporate Brochure | 2012

C a i r n I n d i a L i m i t e d2 2

Page 25: Cairn India Corporate Brochure | 2012

• Environment

Management System

(EMS) as per the ISO-

14001:2004 standard

• Conservation of Energy

• Carbon Management

Strategies

• Bio-diversity

• Global Reporting

Initiative

Environment

• Health, Safety and Environment (HSE) vision is to be a

“safe operator leading the industry in safety standards and

demonstrate top quartile HSE performance among peers”

• Committed to maintain highest HSE standards

• Corporate Responsibility Management System (CRMS) to

support the delivery of commitments

• Set new benchmarks in HSE practices

• Rajasthan, Suvali and Ravva operations certified for ISO

14001: 2004 standards

• Suvali and Ravva also certified for OHSAS 18001: 2007

• Adopted several international standards, processes and

procedures as part of HSE management system

HSEQ

• HSE Management of

the Contractors

• Occupational Health

• Cairn Observation

Programme

• Cairn Incident

Management System

• Installations in Barmer,

JaloreandRadhanpur

have been declared as

‘Prohibited Area’.

• Thar Falcons: Border

Home Guards for

Rajasthan Assets

• TheCB/OS-2blockcompletedmorethan10millionLTI-freehoursofoperations

• Rajasthan Upstream projects completed more than 10 million LTI-free hours of operations

• The Mangala development pipeline recorded more than five million LTI-free hours of operations

• For FY2012, the average uptime of processing and pipeline infrastructure facilities in Rajasthan has been more than 98 per cent;

similartotheCB/OS-2performance

Key performance highlights

Health and Safety Security

• HSEA Audits

• Asset Integrity Assurance

Surveys

• Project HSEQ Reviews

• Completion Assurance

Process

Quality and Assurance

C a i r n I n d i a L i m i t e d 2 3

Page 26: Cairn India Corporate Brochure | 2012

• Cairn prides in attracting, engaging and developing the best-

in-class talent and setting employees for success in a high

performance and high nurturance environment

• Success story a result of exceptional talent and the “Can-

Do” spirit; over 1,500 such “Can Doers”

• For FY2013 to date completed ~3,559 man-days of training;

2,151 functional competence building, 607 HSE and 801

behavioural training

• Key HR systems: Competency Management System and the

“Can-Do” behavioural competency framework

• Enhancing HR process capacities like Performance

Management and Induction Program

• Firm belief: Passion, participation and support of employees,

Cairn India continues to march ahead in its journey to

create value for the nation

Hea

dco

un

t

Hea

dco

un

t

Hea

dco

un

t

Functional/TechnicalTraining

Data as of FY ending March

HSE

Behavioural Training

IncreasingtalentbaseintheCompanyMan-daysspentindifferenttypesoftrainings

2010 2011 2012

1,352

1,318

1,399

4,329

812

800

HumanCapital

C a i r n I n d i a L i m i t e d2 4

Page 27: Cairn India Corporate Brochure | 2012
Page 28: Cairn India Corporate Brochure | 2012

Cairn India Limited3rd & 4th Floors, Vipul Plaza, Sun City Sector 54, Gurgaon 122 002, India+91 124 459 3000

www.cairnindia.com