Suggest a technology based solution to check the Suggest a technology based solution to check the feasibility of a rooftop solar plant feasibility of a rooftop solar plant The Tata Power Challenge The Tata Power Challenge

Capgemini Super Techies Show Season 3 - The Tata Power Challenge

Embed Size (px)

DESCRIPTION

Suggest a technology based solution to check the feasibility of a rooftop solar plant

Citation preview

Page 1: Capgemini Super Techies Show Season 3 - The Tata Power Challenge

Suggest a technology based solution to check the feasibility of a Suggest a technology based solution to check the feasibility of a rooftop solar plantrooftop solar plant

The Tata Power ChallengeThe Tata Power Challenge

Page 2: Capgemini Super Techies Show Season 3 - The Tata Power Challenge

2Copyright © Capgemini 2014. All Rights Reserved

Capgemini Super Techies Show Season 3- Tata Power Challenge

The Facts

Tata Power is India’s largest integrated power company with a significant international presence

From fuel, logistics, generation and transmission to distribution, trading and exploration of various renewable sources of energy in India and globally, Tata Power now has a significant presence in the wind, solar, hydro and geothermal energy space

Their technology leadership is legendary, and they have demonstrated successful public–private partnerships in generation, transmission and distribution, including that of Tata Power Delhi Distribution Limited with Delhi Vidyut Board for distribution in North Delhi

Tata Power is one of the largest renewable energy players in India and has developed the country’s first 4000 MW Ultra Mega Power Project at Mundra (Gujarat) based on super-critical technology

While they have ambitious growth plans, they are committed to 'responsible growth'. They are doing all they can to carry forward their green legacy

Page 3: Capgemini Super Techies Show Season 3 - The Tata Power Challenge

3Copyright © Capgemini 2014. All Rights Reserved

Capgemini Super Techies Show Season 3- Tata Power Challenge

Background on Challenge

Energy generation from renewable sources is a major part of the overall generation at Tata Power

The Government of India and Tata Power intend to provide incentives to promote the usage of renewable energy and installation of roof-top solar panels

The power, hence generated, will be used by consumers, and additional power can be pumped back to the grid

Page 4: Capgemini Super Techies Show Season 3 - The Tata Power Challenge

4Copyright © Capgemini 2014. All Rights Reserved

Capgemini Super Techies Show Season 3- Tata Power Challenge

The Problem

There are multiple challenges in energy generation from renewable resources due to high investment, regulation, etc.

Feasibility checks pose a major challenge too

Generating energy from natural sources is dependent on multiple environmental factors and resource availability

Page 5: Capgemini Super Techies Show Season 3 - The Tata Power Challenge

5Copyright © Capgemini 2014. All Rights Reserved

Capgemini Super Techies Show Season 3- Tata Power Challenge

The Challenge Statement

Suggest a technology based solution to check the feasibility of a rooftop solar plant

Page 6: Capgemini Super Techies Show Season 3 - The Tata Power Challenge

6Copyright © Capgemini 2014. All Rights Reserved

Capgemini Super Techies Show Season 3- Tata Power Challenge

Important Points to Remember

The application should be platform-independent

It should involve optimal development costs

The solution should cover all aspects of location, size, cost, demand, etc.

Page 7: Capgemini Super Techies Show Season 3 - The Tata Power Challenge

7Copyright © Capgemini 2014. All Rights Reserved

Capgemini Super Techies Show Season 3- Tata Power Challenge

General Pointers

• Time allotted for solution presentation: Teams will be given 20 minutes for a detailed presentation to judges (off-camera) and 3 minutes for a high-level pitch (on-camera)

• Mentor consultation: - Call: Teams will have access to a 30-min audio call with a Capgemini expert; the

teams are expected to keep questions ready for the call in advance- Email: Additionally, teams can send one email with questions to the expert anytime

before the final solution submissionTip: Mentors will take at least 48 hours to revert; therefore, the earlier the questions are sent, the better

• CXO interaction: - Call: All teams will get to be part of a 30–45 min audio call with the CXO of Tata

Power; during the call, teams can direct questions pertaining to the challenge to the CXO

- Date and time of the call: To be confirmed

Page 8: Capgemini Super Techies Show Season 3 - The Tata Power Challenge

www.capgemini.com

The information contained in this presentation is proprietary.© 2014 Capgemini. All rights reserved. Rightshore® is a trademark belonging to Capgemini.

About Capgemini

With more than 130,000 people in over 40 countries, Capgemini is one of the world's foremost providers of consulting, technology and outsourcing services. The Group reported 2013 global revenues of EUR 10.1 billion.Together with its clients, Capgemini creates and delivers business and technology solutions that fit their needs and drive the results they want. A deeply multicultural organization, Capgemini has developed its own way of working, the Collaborative Business ExperienceTM, and draws on Rightshore ®, its worldwide delivery model.