11
FOSTERING PRODUCTIVE INNOVATIONS: INNOVATION CONSORTIA Astana, 2016 MINISTRY OF EDUCATION AND SCIENCE OF REPUBLIC OF KAZAKHSTAN

Innovation consortia kazakhstan_

Embed Size (px)

Citation preview

Page 1: Innovation consortia kazakhstan_

FOSTERING PRODUCTIVE INNOVATIONS:

INNOVATION CONSORTIA Astana, 2016

MINISTRY OF EDUCATION AND SCIENCE OF REPUBLIC OF KAZAKHSTAN

Page 2: Innovation consortia kazakhstan_

2

About the Project “Fostering productive innovation”

This Project is implemented by the Ministry of Educationand Science of Republic of Kazakhstan and the WorldBank.

Purpose of the Project – Foster the high-quality andactual research and development in Kazakhstan, aswell as measures for the development of humancapital.

Page 3: Innovation consortia kazakhstan_

Component 2 – Innovation Consortia

3

Sub-ComponentProductive Sector Consortia(24,7 mln. US dollars)

Objective: Promoting collaboration among existing scientific research institutes and design bureaus and scientific and engineering profile laboratories in Kazakhstan (i) in respect of research and development activities for purposes of improving the productive sectors, and (ii) in respect of

improving the livelihood of the population

Implementation timeline

2016 2017 2018 2019 2020

Preparation of contest documentation Work with the participants of the competitionMedia coverage

Up to 20 sustainableInnovation Consortia

Estimated start of the Grant Program

Sub-ComponentInclusive Innovation Consortia

(9,8 mln. US dollars)

Page 4: Innovation consortia kazakhstan_

Component 2 – Productive Sector Consortia

4

Goal:• Involving the private sector and capital in

research and innovation;• Long-term and stable partnerships between

business and science;• Conduction of high-level industrial research;• Creation of a high-level R&D results;• Commercialization and implementation of the

R&D results;• Attraction of industrial and science global

leaders.

Page 5: Innovation consortia kazakhstan_

Component 2 – Productive Sector Consortia

5

Priority areas:• Rational use of natural resources, water

resources, geology, processing, new materialsand technologies, safer products andconstructions;

• Power engineering, mechanical engineering;• Information, telecommunications and space

technology;• Life sciences and health.

Page 6: Innovation consortia kazakhstan_

Component 2 – Productive Sector Consortia

6

Consortia needs to meet following conditions:• Project should be implemented on the territory of

Kazakhstan;• Participation of a representative of Kazakhstani

Industry;• Participation of representatives of the science of

Kazakhstan;• Co-financing by the participants;• Not allowed - projects related to production and / or

trade of tobacco, alcoholic beverages, weapons andammunition, gambling and dual-use goods

• Meet the environmental requirements of the WorldBank

Page 7: Innovation consortia kazakhstan_

Component 2 – Inclusive Innovation Consortia

Goal:• Implement innovations to address socially

important problems to improve the standard ofliving;

• Creating consortia of inclusive innovations with asustainable business model.

Page 8: Innovation consortia kazakhstan_

Component 2 – Inclusive Innovation Consortia

Priority areas*:• introduction of affordable and available energy-saving technologies for rural areas;• introduction of accessible and affordable technology to provide the rural population

with clean drinking water;• innovative methods of business processes to enable disabled individuals to live a

normal life;• introduction of innovative low-cost solutions in the field of telemedicine and remote

diagnosis for rural and urban populations;• innovative business processes to stimulate entrepreneurship in rural areas;• innovative solutions in the field of food, security and agriculture;• innovative solutions in the field of public safety and health;• innovative solutions in the field of education.

* These examples do not limit the potential participants of IIC, as inclusive innovative solutions can have a broader meaning and application

Page 9: Innovation consortia kazakhstan_

Component 2 – Inclusive Innovation Consortia

Consortia needs to meet following conditions:• Project should be implemented on the territory of

Kazakhstan;• Participation of a representatives of Kazakhstan;• Scalability of the Project;• Not allowed - are projects related to

production and / or trade of tobacco,alcoholic beverages, weapons andammunition, gambling and dual-use goods

• Meet the environmental requirements of theWorld Bank

Page 10: Innovation consortia kazakhstan_

Component 2 – Innovation Consortia

Create consortia with Kazakhstani science and business organizations

Follow us on LinkedIn: www.linkedin.com/company/fostering-productive-innovations-project

Join our Linkedin Group: www.linkedin.com/groups/10322447

Page 11: Innovation consortia kazakhstan_

THANK YOU FOR ATTENTION

FPIP Project Management [email protected]

Tel. +7 7172 79 04 43Mob. +7 708 984 27 11Mob.+7 708 984 27 10

11