Moving Windows Server Apps to the cloud in 3 Easy Steps

  • Published on
    11-May-2015

  • View
    1.590

  • Download
    2

Embed Size (px)

DESCRIPTION

AppZero and GoGrid show how quick and easy it is to move Windows server applications to the cloud.

Transcript

<ul><li>1.GoGrid &amp; AppZero Moving Windows Server Applications to theCloud in Three Easy Steps GoGrid and AppZero enable enterprises to move theirexisting mission critical applications to and from thecloud at the speed of the networkfast and easy 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 1 - May 09 </li></ul> <p>2. Webinar Highlights Introduction About AppZero About GoGrid Partnership Overview Benefits/Features Re-cap Q&amp;A 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 2 - May 09 3. Introduction Greg OConnor Pioneering the Virtual Application Appliance approach to simplifying application-lifecycle management, enabling application mobility to the cloud and enablesreduction of the infrastructure needed for your data center He was co-founderand president of Sonic Software, acquired in 2005 by Progress Software(PRGS). At Sonic, Greg O'Connor evangelized and created the EnterpriseService Bus (ESB) product category, which is generally accepted today as thefoundation for Service Oriented Architecture (SOA).Paul Lappas Paul is the VP of Engineering is a founding member of ServePath, the parentcompany of GoGrid. He has many years in the Internet Infrastructure businessworking for SaaS, Hosting, and IaaS services. 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 3 - May 09 4. Who is AppZero? Pioneering the virtual application appliance (VAA) approach to server-based application provisioning, AppZero encapsulates an application and its dependencies -- with zero OS components. The result is instant-on applications for cloud or datacenter.March Launch at DEMO 09 Best Business Application AppZero Computer World My Favorite Demo 09 Products PC Magazine Best of Demo 09 - Don Dodge on The Next Big Thing AppZero Even Your Grandma Can Run Enterprise IT - Cloud Ave April Cool Vendors in Cloud Computing Virtualization Power Panel Server-side application virtualization Trigence reborn as AppZero May Commercialize AppZero 4.0 Windows 2003/2008 May 10 Partnership with GoGrid 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 4 - May 09 5. The Evolution of DeploymentApp App AppApp App AppVirtual Machines Virtual Machines AppZeroAppZero App App AppAppApp AppOSOS OSOSOS OSOS OS Virtual Machine ESX Server ESX Server AppApp AppApplication OSOS Physical Server Physical ServerPhysical Server Physical ServerServer App Virtual MachinesHypervisor Vision VirtualizationPhysical Server Physical Server 2001 - 20152010-2025 Server Virtualization Virtual AppliancesConsolidationMobilityData Center 1.0 VM VAVMware JeOSPre - 2001XenVMWare VAAHyper-VRed Hat UNIX Windows ZeOS rPathAppZero Cohesive FT 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 5 - May 09 6. The Right Layer of Decoupling Server Virtualization Server App Virtualization Reduce the number of physical Reduces number of physical serversand virtual servers Reduce the infrastructure needed Reduce the infrastructure for your data center (power, cooling,needed for your data center battery backup, network switch (operating systems, anti-virus, ports, etc)management, back up etc) Ability to bring up new servers Ability to move and provision quicklyapplication quickly Overall, lower TCO of Overall, lower TCO of AppAppAppservers Virtual Machines applications AppZeroApp App App OS No change to OS/App OS OSOS Vastly simplified OS/App EconomicsManagementVirtual Machine ESX Server VMSprawl (OS+App) Role clarity # VM increase Sys admin Cost go up App owner Physical Server Physical Server 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 6 - May 09 7. What is a VAA? App.vaaApplication Application OSApp RegistryApp file systemRegistryFile systemA VAA is file that containspre-installed and preconfigured application andall of its dependencies but Zero OS 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 7 - May 09 8. VAA in the Data CenterServer Pool Life Cycle Action Network Storage Start: App 1App 1App 1.1 App 1.1 App 1.1 No Install/Config headaches App 2 App 2.1 Updates: Risk and Hassle free App 3App 3.1 App 3.1 Rollback:VAA Catalog Simple &amp; Easy RollbacksUtilization: Dynamic/flexiblePhysical or Virtual Consolidation: Standard OS Image(s)Optimizes resource utilizationAll exactly the same 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 8 - May 09 9. VAA with GoGrid Server PoolLife Cycle ActionCloud Storage Start: No Install/Config headachesApp 1App 1App 1.1 App 1.1 App 1.1Updates: App 2 App 2.1 Risk and Hassle freeApp 3App 3.1 App 3.1 Rollback: Simple &amp; Easy RollbacksVAA CatalogUtilization: Dynamic/flexibleConsolidation: Optimizes resource utilization 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 9 - May 09 10. What is State of Art Today? Do it by hand WikiMedia application example Install PHP Apahce MySQL Media Wiki Configure to work together PHP Apahce MySQL Media Wiki Reconfigure from existing configuration butchanged for the GoGrid environment PHP Apahce MySQL Media Wiki Move the application specific data Configuration/modifications The data in db Test Establish a time window do the move live data 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 10 - May 09 11. AppZero - Mobility1. Create a VAA 2. Move VAA3. Run VAA App 1 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 11 - May 09 12. AppZero Step 1 - CreateCreating a VAAWizard driven creation processCopies all files and relatedartifacts to application into 1 fileand compress it .vaa -1 self contained file: Programs Configuration files Registry entries Network address Machine name/id Services 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 12 - May 09 13. AppZero Step 2 - Move Copy the file to GoGrid 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 13 - May 09 14. AppZero Step 3 - Run Start 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 14 - May 09 15. Summary How to get to the Cloud 3 easy steps Create VAA from an App Move VAA to GoGrid Run VAA in the CloudNo changes to your application Reduce risk Save Money Time Future proof No Lock-in Be a Cloud pioneer Be a hero 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 15 - May 09 16. What is GoGrid? Windows &amp; LinuxFree f5 Load Balancing Servers in the Cloud Free Dedicated Public &amp; Web-based Portal &amp; Private Networks/IPs APIFree Support FULL root or Administrator access Connect via SSH or RDC 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 16 - May 09 17. Hardware in the Cloud Only GoGrid currently delivers Cloud Computing with: Real, contiguous blocks of static IP addresses Real VLANs (Public/Private) Persistent Storage Windows 2008 and SQL Server Included f5 enterprise-grade load balancing Support for hybrid cloud / dedicated GoGrid Cloud Connect PCI compliance with dedicated DB server Custom physical hardware managed or colocated AJAX GUI &amp; Open API standard specification for cloudcenters 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 17 - May 09 18. GoGrid Portal 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 18 - May 09 19. GoGrid = IaaSSaaS Software as a Service PaaS Platform as a Service IaaS Infrastructure as a Service 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 19 - May 09 20. The Cloud Pyramid Cloud Services economy is a pyramid Layers equate structure Building blocks: Infrastructure-as-a-Service (IaaS) Platform-as-a-Serice (PaaS) Applications (SaaS) Breadth vs. Niche 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 20 - May 09 21. Cloud Service Economy IaaS (Infrastructure) AWS, GoGrid PaaS (Platform) Google App Engine RightScale Force.com (Salesforce) SaaS (Application) Salesforce (CRM) Gmail (Mail) 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 21 - May 09 22. SummaryCapEx is dead!Demand your companies use the cloudGoGrid offers free trials: $100 Coupon code: AppZero 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 22 - May 09 23. Questions? ? 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 23 - May 09 24. Move your Application to the Cloud Go to http://zone.appzero.com/content/get-started-vaas Download MediaWiki VAA Run it locally Move to GoGrid Experience the power of application mobility Appzero Experience the GoGrid cloudFind a project to move to the cloud 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 24 - May 09 25. Contact Information GoGrid Contact Shane Spiegelman Business Development Email: shane@servepath.com Michael Sheehan Technology Evangelist for GoGrid &amp; ServePath Email: michael@gogrid.com AppZero Contact Greg OConnor CEO Email: GregO@appzero Mark Yohai VP or Sales and Business Development Email: myohia@appzero.com 2009 GoGrid / AppZero to the Cloud in Three Easy Steps - 25 - May 09 26. THANK YOU for attending GoGrid &amp; AppZeroMoving Windows Server Applications to the Cloud in Three Easy Steps 2009 GoGrid / AppZeroto the Cloud in Three Easy Steps - 26 - May 09 </p>