9
Fab academy 2012 output devices (Apr11) STUDENT: WALTER HECTOR GONZALES ARNAO UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE ARQUITECTURA, URBANISMO

Output devices(apr11)

Embed Size (px)

Citation preview

Page 1: Output devices(apr11)

Fab academy 2012

output devices (Apr11)STUDENT: WALTER HECTOR GONZALES ARNAO

UNIVERSIDAD NACIONAL DE INGENIERÍAFACULTAD DE ARQUITECTURA, URBANISMO Y ARTES

Page 2: Output devices(apr11)

Fab academy

summary This week we worked on the board H-bridge (H-br). The exercise consists in driving the motor by making their movementwill use the code that was copied from original code: http://fab.cba.mit.edu/classes/output_device/H-bridge.H-brige.44.png

CLASS 12: output devices (Apr11)

UNIVERSIDAD NACIONAL DE INGENIERÍAFACULTAD DE ARQUITECTURA, URBANISMO Y ARTES

Page 3: Output devices(apr11)

Fab academy

FIRST STEP. WILL WORK WITH THE PAST YEAR BOART CLASS 12: output devices (Apr11)

UNIVERSIDAD NACIONAL DE INGENIERÍAFACULTAD DE ARQUITECTURA, URBANISMO Y ARTES

Page 4: Output devices(apr11)

Fab academy

STEP 2. WILL WORK WITH THE PAST YEAR BOART CLASS 12: output devices (Apr11)

UNIVERSIDAD NACIONAL DE INGENIERÍAFACULTAD DE ARQUITECTURA, URBANISMO Y ARTES

Page 5: Output devices(apr11)

Fab academy2012STEP 3. RESPONDIA NOT BECAUSE THE ERROR WAS ON THE

CARD THAT TRACKS missing that will link the PUSH CLASS 12: output devices (Apr11)

UNIVERSIDAD NACIONAL DE INGENIERÍAFACULTAD DE ARQUITECTURA, URBANISMO Y ARTES

Page 6: Output devices(apr11)

Fab academy2012STEP 4. PRESENTED PROBLEMS TO FIND THE FILES to run in

BOART, BUT AT THE END OF PLACING PROPERLY, LET runCLASS 12: output devices (Apr11)

UNIVERSIDAD NACIONAL DE INGENIERÍAFACULTAD DE ARQUITECTURA, URBANISMO Y ARTES

Page 7: Output devices(apr11)

Fab academy2012STEP 5. upon completion of the construction of the card

FAB ISP is installed next to the H-br, to Acknowledge the code. in this case work in Ubuntu. CLASS 12: output devices (Apr11)

UNIVERSIDAD NACIONAL DE INGENIERÍAFACULTAD DE ARQUITECTURA, URBANISMO Y ARTES

H-bridge

Page 8: Output devices(apr11)

Fab academy2012STEP 6. RESPONDIA NOT BECAUSE THE ERROR WAS ON THE

CARD THAT TRACKS missing that will link the PUSH CLASS 12: output devices (Apr11)

UNIVERSIDAD NACIONAL DE INGENIERÍAFACULTAD DE ARQUITECTURA, URBANISMO Y ARTES

Page 9: Output devices(apr11)

Fab academy2012STEP 7.SE turned on the LET

CLASS 12: output devices (Apr11) UNIVERSIDAD NACIONAL DE INGENIERÍAFACULTAD DE ARQUITECTURA, URBANISMO Y ARTES

Conclusions.conclusions1. The construction of the boart H-bridge with is the easy part. All information take it from the tutorials 2. se tiene que tener cuidado con la sintaxis porque las mayusculas y la ubicacion es importante para que el procedimiento se elecute .3. I asked for help to our colleagues, for the programming, the support was Roberto.