14
© 2012 VCE Company LLC, All rights reserved. WORKLOAD MOBILITY FOR VBLOCK SYSTEMS Tom Chatham

Workload Mobility for VBlock Systems

Embed Size (px)

Citation preview

  • 1. WORKLOAD MOBILITYFOR VBLOCK SYSTEMSTom Chatham 2012 VCE Company LLC, All rights reserved.

2. 2012 VCE Company LLC, All rights reserved. 2 3. 2012 VCE Company LLC, All rights reserved. 3 4. WHAT IF Your storage volumes were available in two sitessimultaneously? Your layer-2 network could span those two sitesseamlessly? You could perform maintenance without downtime? Your applications could failover between sitesautomatically? You could balance workloads across sites non-disruptively? 2012 VCE Company LLC, All rights reserved. 4 5. VBLOCK WITH VPLEX ACCESS ANYWHEREDistributed Virtual Volumes Hosts at both sites instantlyaccess Distributed VirtualVolume WRITEs are protected onstorage at both Site A and B READs are serviced fromVPLEX cache or local storage Loss of a storage array doesnot require a full site failover 2012 VCE Company LLC, All rights reserved. 5 6. SIMPLIFY DATA CENTER NETWORKINGWITH CISCO OTV 2012 VCE Company LLC, All rights reserved. 6 7. ENSURE APPLICATIONAVAILABILITY Get the business operationalagain faster after an outage Increased utilization of physicalresources across sites Failover of virtual machinesbetween sites in the event of asite disaster 2012 VCE Company LLC, All rights reserved. 7 8. MISSION CRITICAL WORKLOADPROTECTION VMware with VPLEX Metro Move applications seamlesslybetween sites to reduce the needfor planned outages due tomaintenance work onstorage, fabrics, servers or sites VCE solution architecture usingCisco Overlay TransportVirtualization to reduce impact ofrequired stretched IP subnetsbetween sites 2012 VCE Company LLC, All rights reserved. 8 9. LIVE DEMO TIME! VCE is demonstrating LIVE:Active workload distributed across two Vblock SystemsPower failure disaster of one Vblock systemVMware HA restart of Virtual Machines on the failed Vblock system in the EMC booth on the Vblock system in the VCE boothAll VMs resume operation with one site down! Head to the EMC Booth later today to see how we recover the failed Vblock systems! 2012 VCE Company LLC, All rights reserved.9 10. EPO POWER DOWN! 54321 2012 VCE Company LLC, All rights reserved.10 11. SOLUTION COMPONENTSEMC VPLEX FamilyInformation Mobility SolutionsVMwareVMotion VCE Workload Mobility Solution forWorkload & Vblock systemsInformation MobilityVblock systems 2012 VCE Company LLC, All rights reserved.11 12. 2012 VCE Company LLC, All rights reserved. 13. VISIT OUR DEMO PODS Demo Pod 1: Mission Critical Business Continuity Demo Pod 2: Desktop Virtualization Demo Pod 3: Vblock Management & Orchestration Demo Pod 4: Data Protection 2012 VCE Company LLC, All rights reserved. 13 14. GET CAUGHT AND WIN Wear your VCE button,t-shirt or laptop stickeron the show floor If our Prize Patrol findsyou, YOU WIN! Prizes include: iPad 3,Bose Soundlink,Starbucks Gift Cards and MORE! 2012 VCE Company LLC, All rights reserved. 14