NORTH SIDE PROGRAM COORDINATION WITH THE CITY OF SAN DIEGO March 08, 2013 – Presenter: Luis Alarcon

DEVELOPMENT of the SAN DIEGO INTERNATIONAL AIRPORT RCC AND ENABLING PROJECTS

2

North Side Overview

Relocate Portion of Blast Fence

Relocate Triturator

3

Washington Street

4

Interior Road and UtilitiesPermits: 04/15/2013

Permits: Public Access Water (potable/irrigation) Sewer Connection Traffic Loops

5

Easements

6

Utilities

7

Cross-Section ‘A’

8

Cross-Section ‘A’

9

Sassafras Intersection Improvements

10

Port Parking Lot

11

Fixed Base Operator (FBO)Permits: 05/01/2013 Permits:

Building Fire Approval Water (potable/irrigation)

12

FBO Site Plan

13

FBO Rendering

14

San Park 2/Pacific Highway Sidewalk and Landscaping

Permits: Interior Road Easements/Agreements

15

San Park 2 - Waterlines

16

Pacific Highway (Before)

17

Pacific Highway (After)

18

Rental Car Center (RCC)

Permits: Easements/Agreements

19

RCC

20

RCC

21

RCC Permit SchedulePermit/Document Plan/Document Date

City Issues Right-of-Way Permit 42-inch Storm Drain Relocation Plans 3/15/13

City records Dedication @ County 20' Drainage Easement Dedication 3/15/13

City records EMA @ County Encroachment Maintenance Agreement (EMA) 4/31/13*

City Issues Right-of-Way Permit Pedestrian Bridge Demolition Plans 8/15/13

City Issues Right-of-Way Permit Domestic Water Lateral Plans 8/15/13

Fire Marshall Approval Fire Circulation & Fire Hydrant Plan 8/15/13

Fire Marshall Approval Alternate Means & Methods Report for Fueling 8/15/13

No City Permit Required Pkg 1 - RCC Site, Civil, Grading, Utilities 8/15/13

City issues Building Permit Pkg 2 - RCC Foundation Plans 8/15/13

City records Vacation @ County Drainage Easement Vacation 9/30/13

City issues Building Permit Pkg 3 - RCC Superstructure 10/1/13

City issues Building Permit Pkg 4 - RCC Interior Finishes, Roof/ MEP 3/14/14

* Please note this date is dictated by the need to have the FBO site turned over to Landmark on May 1, 2013; the Rental Car Center does not need the EMA in place until 8/15/13 just prior to pulling the initial building permit for the foundations.

22

Terminal Link Road (TLR)

Permits: 06/17/2013 Permits: Building Right-of-Way Coastal Development

Permits: 08/01/2013

23

Triturator Water and Sewer Connection

24

Bus Route Overview

25

Palm Street Improvements

26

Harbor Drive Expansion

27

Harbor Drive Rendering at New Intersection

Plan

ning

Pha

se E

nd

Sche

mat

ic D

esig

n

60%

Pla

ns a

nd S

pecs

100%

Pla

ns a

nd

Spec

s

Adver

tise

men

t

Bid O

peni

ng

Board

Mee

ting

Not

ice

to

Proc

eed

(NTP

)

End

Const

ruct

ion

Terminal Link Road

North Side Interior Road & Utilities 6/04/12

5/7/13

4/15/1311/2/128/13/12 6/6/13 8/15/137/11/13 4/11/14

SanPark Pacific Highway North Parking Lot 6/15/12

4/12/13

3/15/139/21/128/20/12 5/14/13 7/11/136/6/13 1/7/14

10/01/12

1/2/1412/4/13n/a3/22/13 1/31/14 6/9/144/3/14 6/15/15

Enabling Projects Schedule

RCC O

PENS

Summer2015

Summer2015

Summer2015

3/8/13

6/10/135/26/13n/an/a 7/9/13 9/10/138/1/13 1/14/14

Summer2015

3/28/11

7/1/136/9/13n/a4/16/12 7/30/13 10/28/139/12/13 7/25/14

Summer2015

FBO Twy

Storm Drain

29

Action Items and Next StepsKeith Wilschetz