6-Sigma & Lean 101
A Lean-SS overview, not detailed presentation Introduction of Six-Sigma Tools – without stats
DMAIC process & tools associated with each phase Introduction of Lean Concepts
Identification of Waste Lean Improvements in Gemba (Workplace)
Sustainability Business Score Card
ISandR Services Presents -
ISandR@usa.com Copyright - ISandR Services and Accelper 2
“When you can measure what you are speaking about, and express it in numbers, you know something about it; but when you cannot measure it, when you cannot express it in numbers, your knowledge is of a meager and unsatisfactory kind….”William Thompson (Lord Kelvin), 1824-1907 “If you can't describe what you are doing as a process, you don't know what you're doing.”W. Edwards Deming, 1900-1993
6-Sigma & Lean 101Process Improvement – “Describe & Measure”
ISandR@usa.com Copyright - ISandR Services and Accelper 3
6-Sigma & Lean 101The Average and the Standard Deviation are Most Important
1)( 2
n
XxS
i
nxX i /)(
These metrics are important, but we will keep this simple
AVERAGE
STANDARD DEVIATION
ISandR@usa.com Copyright - ISandR Services and Accelper 4
6-Sigma & Lean 101Process Improvement – “The Family Vacation” Example Start with the end in mind – THE GOAL Analogy of the family vacation
Would you start with how to pack better? Where, What, Who - Destination, Activities, You &…? DEFINE
Activities, Accommodations, Alt Options, Where is Start Route - how far/long, transport vehicle MEASURE Cost of alternatives ANALYZE What to take - backpacks or suitcase ANALYZE What can be done better from last time IMPROVE
Stick to budget & plan CONTROL
ISandR@usa.com Copyright - ISandR Services and Accelper 5
6-Sigma & Lean 101What is 6-Sigma? A Short History
Improvement tools known for a LONG time Popularized by GE, Motorola, et al Collection of tools with standardize usage! About BEST in class About dramatic improvement – not stats ASQ – “80% of tools are not statistical” Process based on D M A I C
- Define - Measure - Analyze - Improve - Control
Presentation parallels book “Stat Free Six Sigma” – P. Gupta (Accelper)
ISandR@usa.com Copyright - ISandR Services and Accelper 6
6-Sigma & Lean 101What is the Significance of the Words “6-Sigma”?
What does “6-Sigma” imply? Process of 3 defective parts per million (3ppm) Depends on
Customers specified limits (Upper & Lower Bound) Average in the process (Average or Mean) Variability in the process (Standard Deviation)
Not all processes need to be 6-Sigma Capable
A process that meets customer specifications by providing consistent accurate results with no variation - near zero defects
Not all processes need to be 6-Sigma Capable
ISandR@usa.com Copyright - ISandR Services and Accelper 7
Process Capability
CpK = [ Closest Limit – X ] 3
Closest Limit – X
6-Sigma & Lean 101What is 6-Sigma? Statistics Concepts, Without Statistics
Good MeanGood Variability
“Higher ‘sigma’ is better to avoid quality escapes!”
Customer specifies
LL and UL
Low Limit
Hi Limit
Variation = 2
Mean = XExamples
Production – size & location of hole in a part
Service - preparation of tabloid content & distribution, early vs late
1 sigma ()½ width at ½ height
6
Good Capability
Distribution:GaussianRandomNormalError
The ProcessCharacterizing The Process
ISandR@usa.com Copyright - ISandR Services and Accelper 8
6-Sigma & Lean 101What Process Capability?
Good MeanGood Variability
Poor MeanGood Variability
Poor MeanPoor Variability
Good Capability Poor Capability Poor Capability
mean
variation
LL HL
This is previous slide
ISandR@usa.com Copyright - ISandR Services and Accelper 9
6-Sigma & Lean 101What Makes 6-Sigma Work?
When everyone understands the Cost of Poor Quality In / ext failures, inspection, testing, rework (calc $$s)
Align VOC and biz needs for big improvements S M A R T goals
Specific – why, what, when, who, where, finally how Measurable – which metrics: how much / many, B4 & after Attainable – have resources: attitudes, abilities, finances Realistic – challenging believable & achievable Timely* – reasonable duration to complete with urgency
Visible with Executive Management Support Employees encouraged to take risks (Deming, “Drive out fear”)
* Could be “Tangible” – can experience with senses makes it more realistic and measurable
ISandR@usa.com Copyright - ISandR Services and Accelper 10
The energy to overcome an existing culture, make improvements and sustain change takes
Organization A
Organization B
6-Sigma & Lean 101What makes 6-Sigma Work? Culture Change Response Curve
Present Time Future
Effo
rt/C
ost/R
esis
tanc
e
effort, time and money
The paths are different for each organization.
DM
A I
C
ISandR@usa.com Copyright - ISandR Services and Accelper 11
6-Sigma & Lean 101Customer Surveys – Voice Of the Customer (VOC)
Research on customer satisfaction: Determine what is quality [“Q is what the customer says it is”] Find out what competitors are doing [better] Define quality performance measures to identify defects [Pareto] Identify factors to give a competitive edge [SWOT] Identify urgent problems [low hanging fruit 1st with best ROI]
Use multiple instruments to ID customer satisfaction. The opportunity to collect misleading or useless information is possible with just one instrument.
Surveys, Focus Group, Face-to-face, (Dis)satisfaction cards, Competitive Shopping
- to gain information on - Stated Needs, Real Needs, Perceived Needs, Cultural/Unstated
Needs, Unintended Needs (Distinguish: Wants, Needs, Dissatisfiers)
ISandR@usa.com Copyright - ISandR Services and Accelper 12
6-Sigma & Lean 101 Customer Surveys - VOC
Feature/Process Satisfaction
Feat
ure
Impo
rtan
ceCustomer Response to Survey
LO HI
HI
Maintain Good Work & Performance
Maintain Current Status
Over-effort for little value
MUST Improve
Opportunity Being Lost
What was expected and experienced, what was the level of satisfaction and importance
ISandR@usa.com Copyright - ISandR Services and Accelper 13
6-Sigma & Lean 101
How to look for and improve the PROBLEMS
ISandR@usa.com Copyright - ISandR Services and Accelper 14
6-Sigma & Lean 101What is DMAIC?
Define – “the charter”: why do this (ROI / VOC), which process (Pareto), achieve what, measure what (errors, FTT), which resources, who’s involved, how to accomplish (brainstorm / fishbone), what is goal, when complete, what’s not included, …
Measure – specify info sources to measure, precision, frequency of measurement, instruments used to measure, …
Analyze – examine patterns, correlate dependent & independent variables (SIPOC / histograms / scatter-plots), root-cause, failure influence (FMEA-SOD), …
Improve – development of alternatives to reduce cost, variation, & waste or for faster delivery, …
Control – sustaining gains from project and maintaining process control
Define
Measure
Analyze
Improve
Control
ISandR@usa.com Copyright - ISandR Services and Accelper 15
Phase Tools Brief Description
D Project Priority Index PPI = (Benefit/Cost) X (Probability of Success/Time to complete in years)Time < .5Estimated Savings/Cost > 2.0Recommended PPI > 4.0
D Pareto A graphical tool to prioritize various defects to identify the most important one
D Process Map A graphical description of activities and decision points
D Kano's Analysis A graphical tool to identify customer critical requirements, including customers' `love to have' requirements
D SIPOC An excellent tabular capture of most of the process constraints
D CTQ Operational critical-to-quality characteristics related to the customer expectation
D Project Charter Project plan with clearly-defined goals and milestones
M Cost of Quality Breakdown of product or service cost related to appraisal, failures and prevention
M DPU A product measurement, which is a ratio of the number of defects observed per unit verified
M Yield The percent of process output with no error or defect.
A DPMO A process measurement, which is the DPU normalized to the product or process complexity
A Sigma Level A business measurement, estimated from DPMO, commonly used for benchmarking
A Average Typical performance
I Range Range of performance (maximum – minimum)
6-Sigma & Lean 101What are Tools Used with DMAIC?
Define Measure Analyze Improve
“Stat Free Six Sigma”, Gupta
ISandR@usa.com Copyright - ISandR Services and Accelper 16
Phase Tools Brief Description
I Standard Deviation More accurate estimate of performance range
I Statistical Thinking Ability to distinguish assignable causes from random causes of variation
I Root Cause Analysis Fishbone diagram consisting causes that produce effects - materials, machines, methods, man, nature, measurements
I FMEA Failure Mode and Effects Analysis for anticipating problems
I Scatter Plot Graphical display of relationship between output (dependent) and input (independent) variables
I Visual Regression Analysis Estimate of relationship between input and output variables
I Component Search To identify the defective part in an assembly by exchanging the questionable part between 'good' and 'bad' units
I Comparative Tests - Improving Means Evaluating significance of shift or change in the process means
I Comparative Tests - Improving Variance Ratio of variances between the current and reduced variances
I Full Factorial Experiment Evaluating various combinations of multiple variables to determine the right combination for best performance. Total combinations = level to the power variables (Lv, e.g., 23 = 8)
C Process Thinking (4P Model) A logical building block of the process management for achieving excellence. 4P => Prepare 4Ms, Perform Well, Perfect on target, Progress by reducing inconsistencies
C Management Review A review meeting led by the leader to ensure targeted performance is achieved and to identify necessary actions to sustain improved performance
C Control Chart Graphical tool to sustain normal (without known problems) behavior of the process
C Scorecard Measure of business performance for identifying new opportunities
Improve Control
6-Sigma & Lean 101What are Tools Used with DMAIC?
“Stat Free Six Sigma”, Gupta
ISandR@usa.com Copyright - ISandR Services and Accelper 17
6-Sigma & Lean 101Good Charter Components?
Business need - cost reduction, margin increase, government compliance or increased customer satisfaction.
Business advantage – ROI? - case should show the business need as dollars ($$s) to substantiate which project’s selection.
High-level project scope – sponsor’s vision of the project. Critical to success factors – ID project, team, deliverables,
schedule, what is needed for project success: scope, schedule, cost, or quality.
Project constraints, risks and assumptions – document these conjectures; revisit during project to see if these remain true.
Authority of the project manager – what is the responsibility of the project manager, to clarify their role assists with future decisions (controversial?) dealing with the stakeholders and organization.
Signatures – demonstrates management importance & supportExample of form to assist in
addressing items to consider
Constitution
Bill of Rights
Plans Change
ISandR@usa.com Copyright - ISandR Services and Accelper 18
Customer's Order Complaints *
Late 192
Defective 44
Rude CS 37
No call back 23
Wrong Item 72
Incomplete 101
Refund late 17
Wrong Price 15
No Gift Card 3
Missing item 2
Not New - Used 12
Never Received 7
6-Sigma & Lean 101DMAIC Tools – PARETO Ranking of Issues
Minitab
ExcelFigure out cost/benefit
ISandR@usa.com Copyright - ISandR Services and Accelper 19
6-Sigma & Lean 101Process Map (This is the “as is” also need the “proposed”)
Possibilities for improvement?
Loops and Many Crossings
Created with Visio
ORDER FULLFILLMENT SWIMLANE FLOWCHART
WAREHOUSE
ENGINEERING
SHIPPING & RECEIVING
CUSTOMER SERVICE
ACCOUNTING
ISandR@usa.com Copyright - ISandR Services and Accelper 20
6-Sigma & Lean 101What is SIPOC?
Reference DocsLibrary
MagazinesSuggested Adds & DeletesEditors
Educators & Trainers
Training Instructional
Info
Scholarly ReferencesResearchers
ConsultantsExercisesOriginal Written ManuscriptAuthors
LibrariesAlbum of Related workBinders
Web Whit PapersAbstractsElectronic DocsElectronics
Audio booksDVDs & CDsFigs & PhotosGraphics
BookclubsCliffnotesPaper
CustomersOutputsProcessInputsSuppliers
Reference DocsLibrary
MagazinesSuggested Adds & DeletesEditors
Educators & Trainers
Training Instructional
Info
Scholarly ReferencesResearchers
ConsultantsExercisesOriginal Written ManuscriptAuthors
LibrariesAlbum of Related workBinders
Web Whit PapersAbstractsElectronic DocsElectronics
Audio booksDVDs & CDsFigs & PhotosGraphics
BookclubsCliffnotesPaper
CustomersOutputsProcessInputsSuppliers
Shipment of Orders>
Process Distributor Orders
>
First Printing
Promotion
>
Publisher Approval & Printing Schedule
>Editor checks content
>
Graphics submits figures
and photos
>Authors submit content
Process for Publishing and Distribution of Scholarly Research and Textbook Materials
Shipment of Orders>
Process Distributor Orders
>
First Printing
Promotion
>
Publisher Approval & Printing Schedule
>Editor checks content
>
Graphics submits figures
and photos
>Authors submit content
Process for Publishing and Distribution of Scholarly Research and Textbook Materials
Look for relationships so Input improves stability in Output
Suppliers – individuals providing resources
Inputs – info, materials & Services
Process – value added transformation steps
Outputs – final product or service
Customers – entity finding value in output
ISandR@usa.com Copyright - ISandR Services and Accelper 21
6-Sigma & Lean 101What is SWOT?
Internal Characteristics to Business STRENGTH – list and find how to improve these WEAKNESSES – list and find how to minimize these
External Characteristics to Business (in Industry or with the Competition) OPPORTUNITIES – what can you take advantage of THREATS – what should you avoid
ISandR@usa.com Copyright - ISandR Services and Accelper 22
The “cost of quality” isn’t the price of creating a quality product or service. It’s the cost of NOT creating a quality product or service.
Prevention Costs - New product review, Quality planning, Supplier capability surveys, Process capability evaluations, Quality improvement team meetings, Quality improvement projects, Quality education and training, Appraisal Costs
Inspection Costs - measuring, evaluating or auditing products or services to assure conformance to quality standards and performance requirements; Incoming and source inspection/test of purchased material; In-process and final inspection/test; Product, process or service audits; Calibration of measuring and test equipment; Associated supplies and materials; Failure Costs
Internal Failure Costs - Failure costs occurring prior to delivery or shipment of the product, or the furnishing of a service, to the customer. Scrap, Rework, Re-inspection, Re-testing, Material review, Downgrading
External Failure Costs - Failure costs occurring after delivery or shipment of the product -- and during or after furnishing of a service -- to the customer. Processing customer complaints, Customer returns, Warranty claims, Product recalls
6-Sigma & Lean 101Cost of Quality
Prevention Costs
Inspection Costs
Internal Failure Costs
External Failure Costs
ISandR@usa.com Copyright - ISandR Services and Accelper 23
This is a way of analyzing problem and get to the root cause The effect is usually negative - a problem The problem should be specific and clearly stated The ideas are generated by using brainstorming (vocal or silent) Keep the group to asking themselves “what would cause the problem?” Keep attention on the effect of the problem – not criticism or how to fix The goal is to find as many sources for variation as possible that cause the
problem
6-Sigma & Lean 101Brainstorming – Fishbone / Cause-Effect / Ishikawa
Measurements
Methods
PM vs AMTemp
Shift
PreparationSeason Storage
Effect
Machine Man
Mother Nature Materials
RMAs
ISandR@usa.com Copyright - ISandR Services and Accelper 24
Cause of FailureControl for Failure
Potential Failure
Effect of FailureRisk AssessmentProbability of OccurrenceSeverityAbility to Detect
Risk Priority NumberCorrective Actions & Re-evaluation
Part Number & Function
6-Sigma & Lean 101FMEA – Failure Mode Effects Analysis
Determine what can go wrong, the severity, and how to avoid it
QCI – Indiana Quality Council
FMEA Number: This should be a log controlled number for tracking the document
The part number, name, or other descriptionThe design responsibility: Which department or group is responsible for
this design?The person responsible for FMEA preparationThe date the FMEA was prepared and any necessary revision levelThe subsystem or component part number getting detailed analysisThe component functionThe potential failure modeThe potential effect of failureThe potential cause of failureWhat are the current controls in place to prevent the cause from
occurring?O is the probability this failure mode will occur. This index is from 1 to 10
with 1 being virtually no chance and 10 being near certainty of occurrence.
S is the severity of the effect of the failure on the rest of the system if the failure occurs. Values are from 1 to 10. A value of 1 means the user will be unlikely to notice with a 10 meaning that the safety of the user is in jeopardy.
D is a measure of the effectiveness of the current controls to identify the potential weakness or failure prior to release to production. This index ranges from 1 to 10. A value of 1 means this will certainly be caught whereas a value of 10 indicates the design weakness would most certainly make it to final production without detection.
RPN The Risk Priority Number is the product of the indices from the previous three columns. RPN = O•S•D
The actions then are based upon what items either have the highest RPN and/or where the major safety issues are.
There is a column for actions to be taken to reduce the risk, a column for the responsibility and finally a column for the revised RPN once corrective action is implemented.
FMECA provides a disciplined approach for the engineering team to evaluate designs to ensure that all the possible failure modes have been taken into consideration.
ISandR@usa.com Copyright - ISandR Services and Accelper 25
6-Sigma & Lean 101Average, Standard Deviation, Max Value, Min Value in Data Sets
Active Cell
Average Standard Deviation
Maximum Minimum
ISandR@usa.com Copyright - ISandR Services and Accelper 26
6-Sigma & Lean 101Evaluating Data
Quantify what you want to improve and make decisions based on the data.
ISandR@usa.com Copyright - ISandR Services and Accelper 27
6-Sigma & Lean 101Comparative Tests - Improving Means & Variance - Visualization
Data
sample6sample5sample4sample3sample2sample1
2.0
1.8
1.6
1.4
1.2
1.0
6 Samples - Comparison of Means and Variation
Data
sample6sample5sample4sample3sample2sample1
2.0
1.8
1.6
1.4
1.2
1.0
1.457381.52912
1.68022
1.78123
1.47119 1.47366
6 Samples - Comparison of Means and Variation
Same MeanSame Vari(1)
Same MeanSame Vari
Diff MeanSame Vari(2)
Diff MeanSame Vari
Same MeanDiff Vari(3)
Same MeanDiff Vari
Use Methods to Visualize the Data to Make decisions EasierData RangeMeanMiddle 50% of Data
T-test for determining significant difference in Means
F-test for determining significant difference in Variance
ISandR@usa.com Copyright - ISandR Services and Accelper 28
6-Sigma & Lean 101Yield - Efficiency of the Process
100*Pr
Pr%oducedUnits
nitsDefectiveUoducedUnitsYield
%8.94100*50026500%
Yield
%Yield
oducedUnitstsObservedTotalDefecDPUUnitDefectsPer
Pr
106.50053
DPU
DPU
Defect per Million Opportunities (DPMO) - the number of ways a defect can occur. If each item could have 8 ways to fail (label, scratch, color, wrong info, performance,…) then
250,138000,106
8000,000,1*106.0
#000,000,1*
iveanBeDefectofWayUnitC
DPUDPMO
Rolled Throughput Yield (RTY) Yield Process 1 = .9
Yield Process 2 = .9
Yield Process 3 = .9
Yield Process 4 = .9 (.90)x(.90)x(.90)x(.90)= .656
65.6%
Y1 x Y1=0.90
Y2 x Y2=0.90
Y3 x Y3=0.90
Y4 Y4=0.90 Guess
These are formulas with examples from this table. Please
look at these offline.
most familiar for defect eval
What is overall yield in chain of processes?
ISandR@usa.com Copyright - ISandR Services and Accelper 29
6-Sigma & Lean 101 Scatter Plot – Visualize Process Data & Look for Trends
0
5
10
15
20
25
0 5 10 15 20 25
Independent Variable X
Dep
ende
nt V
aria
ble
Y
Y has equivalent response to X and similar variation along response curve
Y has varying response to X and different variation along response curve
What is different about processes?
y=f(x)
x
y
ISandR@usa.com Copyright - ISandR Services and Accelper 30
6-Sigma & Lean 101Control/Run Chart - Variable & Attribute - Track/React to Trends
UCL (3ϭ)
LCL (3ϭ)
Average & Range SPC Chart
17
19
21
23
25
27
29
31
Ave
rage
0
2
4
6
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29
Ran
ge
UCL
You would look into why these extremes happened
AttributeFraction Defective
Number Defective
Number of Defects
Percent Defective
VariableMedian & Range
Average & Range
Average & Std Deviation
Short Run Charts
Continuous
Discrete
Diameter of Hole
P.O. with Errors
ISandR@usa.com Copyright - ISandR Services and Accelper 31
6-Sigma & Lean 101Objectives of Design of Experiments (DOE)
DOE is a systematic approach to determine & optimize the response between process inputs & outputs (independent and dependent variables).
S & H and Delivery Time Part Size
The objective - optimize S&H of different part sizes for best delivery time.
DOE experiments do not change only one variable - variables can interact
Consider the interaction of temperature and wind velocity in the wind chill factor; more wind makes it feel colder and an engine requires the right amount of both gasoline and air to get the maximum performance.
The experiment that changes variables one-at-a-time (OAAT) requires more experiments and cannot evaluate interactions; it is inefficient at best.
PROCESS
ISandR@usa.com Copyright - ISandR Services and Accelper 32
868890929496
P1 P2 T1 T2
6-Sigma & Lean 101Two Factor DOE – Variable Influence
Plot the response.
RESULTP T YieldP1 T1 Y1P1 T2 Y2P2 T1 Y3P2 T2 Y4
INPUT
RESULTP T Yield50 25 9450 75 92
100 25 96100 75 88
INPUT
If you want to know the affects from two factors (i.e. temperature and pressure), then vary both T and P then record the results of the dependent variable (i.e. yield).
Don’t just change one factor at a time.Introduce terms, select levels, run experiment.
Change the pressure between 50 and 100 psi and the temperature between 25 and 75 degrees F; record the yield results.
Calculate the mean yield for each factor level
This experiment is with 2 levels of P & T with a yield result…It could be Internal vs External S&H with big vs small parts and delivery time result
Y@P1 = 93 Y@P2 = 92 Y@T1 = 95 Y@T2 = 90
From the main effects… pressure has lower influence on the yield, while temperature has a larger effect on the yield (more slope, more effect).
ISandR@usa.com Copyright - ISandR Services and Accelper 33
6-Sigma & Lean 101Two Factor DOE – Hi vs Lo Importance
OK. Some of you are saying… Wait a second! When P is changing so is T!? WHAT??????? EXAMPLE - Calculate the effect of P change.
Yield at P1 = (Result Y1) + (Result Y2)Yield at P2 = (Result Y3) + (Result Y4)
Yield at P1 = (P1 + T1) + (P1 + T2)Yield at P2 = (P2 + T1) + (P2 + T2)
Yield at P1 = (P1 + P1 ) + (T1 + T2) Yield at P2 = (P2 + P2 ) + (T2 + T2)
Yield at P1 = 2P1 + (T1 + T2) Yield at P2 = 2P2 + (T1 + T2)
or consider, the difference removes T effect(Yield at P1) - (Yield at P2) = 2P1 - 2P2
RESULTP T YieldP1 T1 Y1P1 T2 Y2P2 T1 Y3P2 T2 Y4
INPUT
RESULTP T Yield50 25 9450 75 92
100 25 96100 75 88
INPUT
REARRAGNING & REASSOCIATING
SIMPLIFYING
GRAPHICAL DEPICTION
SUBSTITUTING VARIABLES PRODUCING THOSE YIELDS
This is what is important!!!!T1 & T2 contribute the same amount to P1 or P2
Y@P1 Y@P2T1+T2 T1+T2
2P12P2
ISandR@usa.com Copyright - ISandR Services and Accelper 34
6-Sigma & Lean 101More Factorial Experiment Designs – 3 & 4 VariablesINPUT OUTPUT INPUT OUTPUT
A B C D Result1 Result2 A B C Result1 Result2
A1 B1 C1 D1 R1 R2 A1 B1 C1 R1 R2
A1 B1 C1 D2 R1 R2 A1 B1 C2 R1 R2
A1 B1 C2 D1 R1 R2 A1 B2 C1 R1 R2
A1 B1 C2 D2 R1 R2 A1 B2 C2 R1 R2
A1 B2 C1 D1 R1 R2 A2 B1 C1 R1 R2
A1 B2 C1 D2 R1 R2 A2 B1 C2 R1 R2
A1 B2 C2 D1 R1 R2 A2 B2 C1 R1 R2
A1 B2 C2 D2 R1 R2 A2 B2 C2 R1 R2
A2 B1 C1 D1 R1 R2
A2 B1 C1 D2 R1 R2
A2 B1 C2 D1 R1 R2
A2 B1 C2 D2 R1 R2
A2 B2 C1 D1 R1 R2
A2 B2 C1 D2 R1 R2
A2 B2 C2 D1 R1 R2
A2 B2 C2 D2 R1 R2
Exercise for later – these are balanced experiments – equal number of each variable (A1, A2, B1, B2, C1, C2…), within all experiments that are also unique with respect to the arrangement of these variables – note: check out the colors.
ISandR@usa.com Copyright - ISandR Services and Accelper 35
6-Sigma & Lean 101Lean
Document the processFind the waste
Make a plan to eliminate the waste
ISandR@usa.com Copyright - ISandR Services and Accelper 36
6-Sigma & Lean 101What Are Key Concepts of Lean?
Get the big picture of the process to Improve Quality Eliminate Waste - ID Value Added vs. Non-Value Added Activities Reduce Lead Time Reduce Total Costs
Give customers what they want, when they want it, for what they want to pay, and without more inve$tment by your company
ISandR@usa.com Copyright - ISandR Services and Accelper 37
6-Sigma & Lean 101 Create a Value Stream Map – Present (Need Future State)item Description
1 ID Customer, Supplier, and Production
2 Customer Requirements per Time Interval
3 Production & Containment Requirements
4 Shipping
5 Delivery
6 Sequence of Processes
7 Data specific to each Sequence
8 Communication Methods
9 Process Attributes: times, Efficiency
10 Operator Symbol - number
11 Inventory & Work in Process (WIP)
12 "Push" vs "Pull" Operations
13 Other Info
14 Working Hours Availability
15 Cycle & Lead Times Example from - www.strategosinc.com
You will probably do this with pencil & paper
4 3
2
1 1
1
5
6
7
8
11
1210
14
14
15
159
This is the value stream process for the entire plant. You can also make a value stream map for a sub-process. Eventually you need to look at the entire process to make sure changes did not shift waste or problems to another process and only created a “local optimum”.
ISandR@usa.com Copyright - ISandR Services and Accelper 38
6-Sigma & Lean 101How to Identify Waste – TIMWOOD or DOWNTIME
TIMWOOD Transportation Inventory Motion Waiting Over-processing Over-production Defects
DOWNTIME Defects Over-production Waiting Not Utilizing Employees* Transportation Inventory Motion Excess processing*skills, ideas, creativity
Look for these forms of waste in the Value Stream Map
ISandR@usa.com Copyright - ISandR Services and Accelper 39
6-Sigma & Lean 101How does 5S Help Eliminate Waste? Makes Waste Visible. 5 S - seiri, seiton, seiso, seiketsu and shitsuke
Sort, separate needed from unneeded items & remove the latter Set-in-Order*/Straighten, arrange items for ease of use Shine/Scrub, means to cleanup Standardize/Systemize, disciplined structured routines Sustain/Self-Discipline, create a new habit
* “6 S” adds Safety (part of Set-in-Order) – make safety equipment easy to use
ISandR@usa.com Copyright - ISandR Services and Accelper 40
6-Sigma & Lean 101Relation of What We Learned wrt Process Improvement
6-Sigma
Lean
Other PI Contributions
There is more
ISandR@usa.com Copyright - ISandR Services and Accelper 41
6-Sigma & Lean 101Other Process Improvement Concepts/Tools
ISandR@usa.com Copyright - ISandR Services and Accelper 42
6-Sigma & Lean 101What is 6-Sigma? Components of Sustained Profitable Growth
Innovation
Good Management
Systems
Business Scorecard
6-Sigma Lean
Creating a culture to sustain & create new improvements
ISandR@usa.com Copyright - ISandR Services and Accelper 43
6-Sigma & Lean 101How to Sustain Progress with Lean & 6-Sigma
Keep employees motivated, customers happy,
processes running smoothly, and the company making money
LEAN is NOT MEAN
ISandR@usa.com Copyright - ISandR Services and Accelper 44
Business Scorecard
Management Provides Vision & Strategy so the Business Can: #1 Take Care of Customers (VOC), #2 Take Care of Employees (Training, Resources, Rewards)
Employees Take Care of Processes (Process Control & Improvement) Processes Take Care of Finances (Efficient Value Added Processes = $$s) Finances Take Care of Stakeholders and Provide $$s for Growth and
Improvements that add value for the customer
6-Sigma & Lean 101What are Components of Sustained Profitable Growth