City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
11
APRIL 30, 2012 PRESENTATIONAPRIL 30, 2012 PRESENTATIONAT DISCOVERY WORLDAT DISCOVERY WORLD
BY ZAFAR YOUSUF, P.E.BY ZAFAR YOUSUF, P.E.SEWER DESIGN MANAGERSEWER DESIGN MANAGER
CITY OF MILWAUKEECITY OF MILWAUKEE
CITY-MMSD PARTNERSHIPCITY-MMSD PARTNERSHIP
CITY-MMSD PARTNERSHIP TO CITY-MMSD PARTNERSHIP TO IMPLEMENT I/I REDUCTION IMPLEMENT I/I REDUCTION PROJECTPROJECT
IN THE AREA BOUNDED BY: N. IN THE AREA BOUNDED BY: N. 8282ndnd ST. TO N. 92ND ST. FROM W. ST. TO N. 92ND ST. FROM W. CENTER ST. TO W. BURLEIGH ST.CENTER ST. TO W. BURLEIGH ST.
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
22
CITY BACKGROUNDCITY BACKGROUND THE CITY HAS 96 SQUARE MILES AREA, WITH THE CITY HAS 96 SQUARE MILES AREA, WITH
ABOUT 600,000 POPULATION AS PER 2010 ABOUT 600,000 POPULATION AS PER 2010 CENSUS DATACENSUS DATA
THERE ARE 940 MILES OF SANITARY THERE ARE 940 MILES OF SANITARY SEWERS IN THE CITY COMPRISING OF SEWERS IN THE CITY COMPRISING OF ABOUT 850 SYSTEMS. ABOUT 850 SYSTEMS.
A SANITARY SYSTEM IS DEFINED WHERE A A SANITARY SYSTEM IS DEFINED WHERE A CITY SEWER MAIN NETWORK CONNECTS CITY SEWER MAIN NETWORK CONNECTS DIRECTLY TO THE MMSD’S OWNED AND DIRECTLY TO THE MMSD’S OWNED AND MAINTAINED METROPOLITAN INTERCEPTOR MAINTAINED METROPOLITAN INTERCEPTOR SEWER (MIS)SEWER (MIS)
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
33
I/I in the City of MilwaukeeI/I in the City of Milwaukee Systems are monitored to compare sanitary base flow to Systems are monitored to compare sanitary base flow to
peak flows during rain eventspeak flows during rain events
Based on the data and subsequent modeling, 8% of Based on the data and subsequent modeling, 8% of sanitary systems showed high levels of I/I and were sanitary systems showed high levels of I/I and were determined to be non-compliant by Milwaukee determined to be non-compliant by Milwaukee Metropolitan Sewerage District (MMSD).Metropolitan Sewerage District (MMSD).
* * Non Compliant meter sheds are those meter sheds that Non Compliant meter sheds are those meter sheds that exceed the maximum flows established by MMSD's rules.exceed the maximum flows established by MMSD's rules.
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
44
Where does I/I come from ?Where does I/I come from ? Cracks in pipesCracks in pipes
Roots thru jointsRoots thru joints
Storm Water InflowStorm Water Inflow
Sanitary Sewer Sanitary Sewer Foundation Drain Foundation Drain ConnectionsConnections
Storm Sewer Downspout Storm Sewer Downspout ConnectionsConnections
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
55
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
66
Area Bounded by:N. 82nd St to N. 92nd St from W.
Center St to W. Burleigh St
I/I InvestigationI/I Investigation Non-Compliant sanitary Non-Compliant sanitary
sewer system showing sewer system showing high levels of I/I were high levels of I/I were dye testeddye tested
The storm sewer was The storm sewer was flooded with dye and the flooded with dye and the sanitary sewer was sanitary sewer was examinedexamined
Dye testing Results Dye testing Results showed private laterals showed private laterals as a source of 75% of as a source of 75% of the I/Ithe I/I
Dye Flooding Video ExaminationDye Flooding Video Examination
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
77
Why was this area chosen?Why was this area chosen? This area was identified by the Wisconsin Department of Natural This area was identified by the Wisconsin Department of Natural
Resources (WDNR) and the Milwaukee Metropolitan Sewerage Resources (WDNR) and the Milwaukee Metropolitan Sewerage District (MMSD) as having high levels of Inflow and Infiltration (I/I)District (MMSD) as having high levels of Inflow and Infiltration (I/I)
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
88
24-times base flow26-times base flow
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
99
I/I Demonstration ProjectI/I Demonstration Project This project consists of inspecting and rehabilitating the This project consists of inspecting and rehabilitating the
sanitary building sewers (laterals) of homessanitary building sewers (laterals) of homes
This program was 100% voluntary and homeowners will This program was 100% voluntary and homeowners will not incur any costsnot incur any costs
This area has reported numerous basement backups over This area has reported numerous basement backups over the last few yearsthe last few years
SANITARY SYSTEM INFORMATIONSANITARY SYSTEM INFORMATION THIS SYSTEM IS COMPRISED OF APPROXIMATELY THIS SYSTEM IS COMPRISED OF APPROXIMATELY
18,500 FEET OF 8-INCH TO 12 INCH DIAMETER 18,500 FEET OF 8-INCH TO 12 INCH DIAMETER SANITARY SEWERS ORIGINALLY BUILT IN THE SANITARY SEWERS ORIGINALLY BUILT IN THE 1940’S1940’S
ALL SANITARY SEWER MAINS WERE CURED-IN-ALL SANITARY SEWER MAINS WERE CURED-IN-PLACE LINED IN 2010PLACE LINED IN 2010
THERE ARE 70 SANITARY MANHOLES THAT WERE THERE ARE 70 SANITARY MANHOLES THAT WERE ALSO LINED IN 2010ALSO LINED IN 2010
THERE ARE 563 PROPERTIES IN THIS SYSTEMTHERE ARE 563 PROPERTIES IN THIS SYSTEMCity of Milwaukee, Environmental City of Milwaukee, Environmental
EngineeringEngineering1010
PURPOSEPURPOSE REDUCE SANITARY SEWER OVERFLOWSREDUCE SANITARY SEWER OVERFLOWS
REDUCE BASEMENT BACKUPSREDUCE BASEMENT BACKUPS
REDUCE MAINTAINANCE COSTSREDUCE MAINTAINANCE COSTS
REDUCE WASTE WATER TREATMENT REDUCE WASTE WATER TREATMENT
COSTSCOSTSCity of Milwaukee, Environmental City of Milwaukee, Environmental
EngineeringEngineering1111
Project DetailsProject Details Letters were sent to all 563 home owners Letters were sent to all 563 home owners
regarding inspection and rehabilitation of their regarding inspection and rehabilitation of their sanitary sewer lateral. As of April 24, 2012, 512 sanitary sewer lateral. As of April 24, 2012, 512 home owners , approximately (91%), have home owners , approximately (91%), have consented for the rehabilitation.consented for the rehabilitation.
The City has worked with residents to minimize The City has worked with residents to minimize disruptions and inconvenience during the projectdisruptions and inconvenience during the project
Post rehabilitation flow monitoring data will be Post rehabilitation flow monitoring data will be compared with pre-rehabilitation data to estimate compared with pre-rehabilitation data to estimate the effectiveness that lateral lining has on flow the effectiveness that lateral lining has on flow reductionreduction
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
1212
What is being done?What is being done? A 4-Step ProcessA 4-Step Process
1. Sanitary Lateral Inspection1. Sanitary Lateral Inspection
2. Cleanout Installation2. Cleanout Installation
3. Roof drain dye testing3. Roof drain dye testing
4. Lateral Rehabilitation4. Lateral Rehabilitation
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
1313
1. 1. Sanitary Lateral InspectionSanitary Lateral Inspection
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
1414
A camera is A camera is inserted in the inserted in the lateral from the lateral from the sewer in the streetsewer in the street
The lateral The lateral condition is condition is assessed for assessed for rehabilitationrehabilitation
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
1515
2. Cleanout Installation2. Cleanout Installation
2. Cleanout Installation2. Cleanout Installation A hole is hydro-A hole is hydro-
excavated as close to excavated as close to the house as possiblethe house as possible
A Vac-A-Tee is A Vac-A-Tee is installed on the installed on the sanitary lateralsanitary lateral
The hole is then The hole is then backfilled to gradebackfilled to grade
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
1616
VAC-A TEEVAC-A TEE
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
1717
3. Roof drain dye testing3. Roof drain dye testing
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
1818
A green dye is pumped into the roof gutters
A video camera is inserted in the sanitary lateral to detect any dye leaking in the sanitary lateral
Lateral RehabilitationLateral Rehabilitation
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
1919
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
2020
4. Sanitary Lateral Rehabilitation4. Sanitary Lateral Rehabilitation The existing sanitary The existing sanitary
laterals were televisedlaterals were televised
(roots and cracks are evident)(roots and cracks are evident)
The sanitary lateral is The sanitary lateral is rehabilitated with a cured-rehabilitated with a cured-in-place lining method in-place lining method from the public sewer from the public sewer main in the streetmain in the street
The liner is installed to The liner is installed to the cleanoutthe cleanout
Before
During
After
INSTALLED CONNECTIONINSTALLED CONNECTION
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
2121
CURRENT PROJECT STATUSCURRENT PROJECT STATUS
512 HOME OWNERS CONSENTED FOR 512 HOME OWNERS CONSENTED FOR LATERAL REHABILITATION (91%)LATERAL REHABILITATION (91%)
382 LATERALS HAVE BEEN LINED (75%)382 LATERALS HAVE BEEN LINED (75%)
PROJECT COMPLETION DATE IS MAY 25 PROJECT COMPLETION DATE IS MAY 25
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
2222
PROJECT COSTSPROJECT COSTS TOTAL PROJECT COST=$ 3.8 MILLIONTOTAL PROJECT COST=$ 3.8 MILLION
MMSD ALLOCATED FUNDS= $ 3.4 MMSD ALLOCATED FUNDS= $ 3.4 MILLIONMILLION
CITY FUNDS= $ 0.4 MILLION CITY FUNDS= $ 0.4 MILLION (In addition, city spent $ 600,000 for mainline lining)(In addition, city spent $ 600,000 for mainline lining)
AVERAGE COST PER HOME=$ 7,700AVERAGE COST PER HOME=$ 7,700City of Milwaukee, Environmental City of Milwaukee, Environmental
EngineeringEngineering2323
COST BREAKDOWNCOST BREAKDOWN TV CAMERA INSPECTION-$ 5 PER LIN. FT. (Average TV CAMERA INSPECTION-$ 5 PER LIN. FT. (Average
lateral length 60 lin. ft per home)= $ 300lateral length 60 lin. ft per home)= $ 300
LATERAL TRACING- $ 200 EACHLATERAL TRACING- $ 200 EACH
CLEAN OUT- $ 1,600 EACHCLEAN OUT- $ 1,600 EACH
ROOF DRAIN DYE TEST- $ 200ROOF DRAIN DYE TEST- $ 200
LATERAL LINER INSTALLATION LATERAL LINER INSTALLATION
$ 80 PER LIN. FT x 60 = $ 4,800$ 80 PER LIN. FT x 60 = $ 4,800
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
2424
EXAMPLES OF OTHER CITIES DOING SUCH EXAMPLES OF OTHER CITIES DOING SUCH PROJECTS PROJECTS
CITY OF NEW CASTLE, DELAWARE REDUCED ITS CITY OF NEW CASTLE, DELAWARE REDUCED ITS TOTAL FLOWS BY 73 PERCENT IN A SANITARY BASIN*TOTAL FLOWS BY 73 PERCENT IN A SANITARY BASIN*
ACHIEVED A 55 PERCENT REDUCTION IN PEAK FLOW ACHIEVED A 55 PERCENT REDUCTION IN PEAK FLOW RATES OF THE SANITARY BASIN*RATES OF THE SANITARY BASIN*
* TO JUDGE THE REHABILITATION EFFECTIVENESS, PRE-* TO JUDGE THE REHABILITATION EFFECTIVENESS, PRE-REHABILITATION FLOWS WERE COMPARED WITH REHABILITATION FLOWS WERE COMPARED WITH POST-REHABILITATION FLOWSPOST-REHABILITATION FLOWS
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
2525
EXAMPLES OF OTHER CITIES DOING SUCH EXAMPLES OF OTHER CITIES DOING SUCH PROJECTS PROJECTS
CITY OF NAPERVILLE, ILLINOIS REDUCED ITS TOTAL CITY OF NAPERVILLE, ILLINOIS REDUCED ITS TOTAL YEARLY FLOW TO THE TREATMENT PLANT BY 192 YEARLY FLOW TO THE TREATMENT PLANT BY 192 MILLION GALLONS IN ONE YEARMILLION GALLONS IN ONE YEAR
THEY ACHIEVED THIS BY LINING 65 MILES OF THEY ACHIEVED THIS BY LINING 65 MILES OF SANITARY MAIN LINES AND REHABILITATING 3,000 SANITARY MAIN LINES AND REHABILITATING 3,000 LATERALS SINCE 2002LATERALS SINCE 2002
DOING SUCH IMPROVEMENTS ALLOWED THEM TO DOING SUCH IMPROVEMENTS ALLOWED THEM TO DEFER CONSTRUCTION OF A NEW TREATMENT PLANTDEFER CONSTRUCTION OF A NEW TREATMENT PLANT
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
2626
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
2727City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
2727
Our GoalsOur Goals Reduce chances of sanitary sewer overflows and Reduce chances of sanitary sewer overflows and
basement backups during heavy rain eventsbasement backups during heavy rain events
Reduce the maximum amount of I/I in the sanitary Reduce the maximum amount of I/I in the sanitary sewer systemsewer system
Judge the rehabilitation effectiveness by analyzing Judge the rehabilitation effectiveness by analyzing pre-rehabilitation flows with post- rehabilitation flows. pre-rehabilitation flows with post- rehabilitation flows.
Improve public health and the overall quality of life in Improve public health and the overall quality of life in the Citythe City
Follow upFollow up
A post rehabilitation survey A post rehabilitation survey was sent to all residents for was sent to all residents for comments and concerns comments and concerns regarding the projectregarding the project
To date, approximately 95% To date, approximately 95% of responses have been of responses have been positive regarding the project positive regarding the project (50% response rate)(50% response rate)
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
2828
USEFUL WEBSITES USEFUL WEBSITES MILWAUKEE METROPOLITAN SEWERAGE DISTRICT MILWAUKEE METROPOLITAN SEWERAGE DISTRICT
(MMSD) (MMSD) http://basementconnection.mmsd.com/
PRIVATE PROPERTY VIRTUAL LIBRARY (PPVL)PRIVATE PROPERTY VIRTUAL LIBRARY (PPVL) http://www.wef.org/PrivateProperty/
LMK ENTERPRISES, INC.LMK ENTERPRISES, INC.
http://www.performanceliner.com/City of Milwaukee, Environmental City of Milwaukee, Environmental
EngineeringEngineering2929
City of Milwaukee, Environmental City of Milwaukee, Environmental EngineeringEngineering
3030
QUESTIONS ?
Recommended