Seite: 1/127

Project Manual

Deliverables June, 2nd 2009 Project Manual

Technische Universität Darmstadt | FG ee | El-Lissitzky--Str. 1 | 64287 Darmstadt

Department of Architecture

Unit of Energy Efficient Building Design Prof. Manfred Hegger El-Lissitzky-Straße 1 64287 Darmstadt phone. +49 6151 16 - 2046 fax +49 6151 16 - 5247 henrich@ee.tu-darmstadt.de June, 2nd 2009 www.solardecathlon2009.de

ee

Seite: 2/127

Table of Contents 1.  Summary Of Changes ........................................................................................... 6 

2.  Rules Compliance Checklist .................................................................................. 7 

3.  Construction specifications ................................................................................. 11 

00  Procurement and Contracting Requirements ..................................... 11 

01  General Requirements ........................................................................ 23 

01 53 00 Temporary Construction ............................................................. 23 

01 54 00 Construction Aids ........................................................................ 25 

01 54 23 Temporary Scaffolding ................................................................ 27 

01 65 00 Product Delivery Requirements ................................................... 28 

02  Existing Conditions - no entries ....................................................... 28 

03  Concrete - no entries ........................................................................ 28 

04  Masonry - no entries ........................................................................ 28 

05  Metals ................................................................................................ 29 

05 05 23 Metal Fastening ........................................................................... 29 

05 14 00 Structural Aluminum Framing .................................................... 30 

05 20 00 Metal Joists ................................................................................. 31 

05 25 00 Aluminum Joist Framing ............................................................. 33 

05 25 00 Aluminum Joist Framing ............................................................. 33 

06  Wood, Plastics, and Composites ......................................................... 34 

06 05 00 Common Work Results for Wood, Plastics and Composites ........ 34 

06 11 00 Wood Framing ............................................................................. 36 

06 12 00 Structural Panels ......................................................................... 37 

06 16 00 Sheathing .................................................................................... 38 

06 17 33 Wood I-Joists ............................................................................... 39 

06 40 00 Architectural Woodwork ............................................................. 40 

06 60 00 Plastic Fabrications ...................................................................... 41 

06 60 00 Plastic Fabrications ...................................................................... 41 

07  Thermal and Moisture Protection ...................................................... 42 

07 21 00 Thermal Insulation ...................................................................... 42 

07 25 00 Weather Barriers ......................................................................... 44 

07 26 00 Vapor Retarders .......................................................................... 45 

07 55 00 Protected Membrane Roofing ...................................................... 46 

Seite: 3/127

07 62 00 Sheet Metal Flashing and Trim ................................................... 47 

07 71 23 Manufactured Gutters and Downspouts ...................................... 48 

07 90 00 Joint Protection ........................................................................... 49 

08  Openings ............................................................................................ 50 

08 10 00 Doors and Frames ....................................................................... 50 

08 50 00 Windows ..................................................................................... 51 

08 70 00 Hardware .................................................................................... 53 

08 80 00 Glazing ........................................................................................ 54 

09  Finishes .............................................................................................. 55 

09 20 00 Plaster and Gypsum Board .......................................................... 55 

09 60 00 Flooring ....................................................................................... 56 

09 80 00 Acoustic Treatment ..................................................................... 58 

09 90 00 Painting and Coating ................................................................... 59 

10  Specialties .......................................................................................... 60 

10 28 00 Toilet, Bath, and Laundry Accessories ......................................... 60 

10 70 00 Exterior Specialties ...................................................................... 61 

11  Equipment .......................................................................................... 62 

11 30 00 Residential Equipment ................................................................ 62 

12  Furnishings ........................................................................................ 63 

12 30 00 Casework ..................................................................................... 63 

12 40 00 Furnishings and Accessories ........................................................ 64 

12 50 00 Furniture ..................................................................................... 66 

13  Special Construction .......................................................................... 66 

14  Conveying Equipment ........................................................................ 67 

14 80 00 Scaffolding .................................................................................. 67 

21  Fire Suppression ................................................................................. 67 

22  Plumbing ............................................................................................ 68 

22 10 00 Plumbing Piping and Pumps ....................................................... 68 

22 40 00 Plumbing Fixtures ....................................................................... 70 

23  HVAC ................................................................................................. 72 

23 30 00 HVAC Air Distribution ................................................................. 72 

23 50 00 Central Heating Equipment ......................................................... 74 

23 70 00 Central HVAC Equipment ............................................................ 75 

24  --- ....................................................................................................... 75 

Seite: 4/127

25  Integrated Automation ....................................................................... 76 

25 30 00 Integrated Automation Instrumentation and Terminal Devices .. 76 

26  Electrical ............................................................................................ 78 

26 05 00 Common Work Results for Electrical ........................................... 78 

26 20 00 Low-Voltage Electrical Distribution ............................................. 79 

26 30 00 Facility Electrical Power Generating and Storing Equipment ...... 81 

26 50 00 Lighting ....................................................................................... 83 

27  Communications ................................................................................ 84 

27 40 00 Audio-Video Communications ..................................................... 84 

28  Electronic Safety and Security ........................................................... 86 

28 05 00 Common Work Results for Electronic Safety and Security .......... 86 

28 30 00 Electronic Detection and Alarm ................................................... 87 

29  --- ....................................................................................................... 88 

30  --- ....................................................................................................... 88 

31  Earthwork .......................................................................................... 88 

32  Exterior Improvement ........................................................................ 88 

33  Utilities ............................................................................................... 88 

34  Transportation ................................................................................... 88 

35  Waterway and Marine Construction .................................................. 88 

36  --- ....................................................................................................... 88 

37  --- ....................................................................................................... 88 

38  --- ....................................................................................................... 88 

39  --- ....................................................................................................... 88 

40  Process Integration ............................................................................. 88 

41  Material Processing and Handling Equipment ................................... 88 

42  Process Heating, Cooling, and Drying Equipment .............................. 89 

42 31 16 Dessicant Equipment ................................................................... 89 

43  Process Gas and Liquid Handling, Purification, and Storage Equipment .................................................................................................. 89 

44  Pollution Control Equipment ............................................................. 89 

45  Industry-Specific Manufacturing Equipment ...................................... 89 

46  --- ....................................................................................................... 89 

47  --- ....................................................................................................... 89 

48  Electrical Power Generation ............................................................... 90 

Seite: 5/127

48 10 00 Electrical Power Generation Equipment ...................................... 90 

4.  Structural Calculations ....................................................................................... 91 

5.  Detailed Water Budget ........................................................................................ 92 

6.  Summary of Unlisted Electrical Components ...................................................... 92 

7.  Retail PV Price Quote(s) ..................................................................................... 95 

8.  Summary of reconfigurable features ................................................................... 97 

9.  Interconnection Application Form .................................................................... 100 

10.  Energy Analysis Results and Discussion ............................................................ 101 

11.  Subjective Contest Support Documents ............................................................ 112 

11.1.  Architecture Design Narrative ..................................................................... 112 

11.2.  Market Viability Justification ...................................................................... 117 

Construction ............................................................................................. 117 

Liveability ................................................................................................. 117 

Marketability ............................................................................................ 118 

11.3.  Engineering Design Narrative ..................................................................... 121 

11.4.  Lighting Design Narrative ........................................................................... 126 

Seite: 6/127

1. Summary Of Changes

Since the last deliverables in December 2008 and the following workshop in Washington D.C. in January 2009 the complete set of Construction Documents of Team Germany has been revised. There has been an intensive design and optimization process within the last months bearing several new ideas and possibilities on different layers. We spent a long time developing a façade with PV-application. Manufacturers and sponsors guided and supported our research and design process for months before admitting that this idea of a smooth and lightweight façade is technically not yet producible. The consequence of this development and the most apparent change since December is that our façade had to become a new design. It is now a new interpretation of our ideas for a PV-activated façade which should be easily conceivable for other projects and adaptable for energetic renovations of building stock. (See also Architecture and Engineering Design Narratives) Other particular changes since December insist on our ceiling system that is now a crucial component of our energy concept. The window’s positions have changed due to further analysis and light-studies – attended by further analysis concerning effective sun control devices. Relating to the Rules Compliance Checklist the following changes have been made: 4-5 noise reduction for equipment 5-2 effect of reconfigurable louvers integral to the façade’s structure necessary revision of solar envelope 6-4 new public tour route due to crossing points in December’s proposal 8-3 cooling system integral to void ceiling 8-6 changed from 3-phase system to required 1-phase system for Photovoltaic connection Façade 9-6 effects of cooling system integral to void ceiling

Seite: 7/127

2. Rules Compliance Checklist

Rule # Rule Description Content Requirement(s) Drawing Sheet(s) Coordinate

s

4-2 Construction Equipment

Drawing(s) showing the assembly and disassembly sequences and the movement of heavy machinery on the competition site

O-210/O-229 O-310

4-2 Construction Equipment Specs for heavy machinery No forklifts, or similar planned

4-3 Ground Penetration Drawing(s) showing the locations and depths of all ground penetrations on the competition site

S-206, S-553, S-554

4-4 Impact on the Turf

Drawing(s) showing the location, contact area, and soil bearing pressure of every component resting directly on the turf

S-206

4-5 Generators Specifications for generators PM: 26 32 00 Specs

4-6 Spill Containment

Drawing(s) showing the locations of all equipment, tanks, and pipes that will contain fluids at any point during the event

P-111, P-211, P-311, P-411, P-421, P-431

4-6 Spill Containment Specifications for all equipment, tanks, and pipes that will contain fluids at any point during the event

PM: 22 10 00 Specs PM: 33 16 00 Specs

4-7 Lot Conditions

Calculations showing that structural design remains compliant even if 18 in. (45.7 cm) of vertical elevation change exists

S-301

4-7 Lot Conditions

Drawing(s) showing shimming methods and materials to be used if 18 in. (45.7 cm) of vertical elevation change exists on the lot

S-301

5-2 Solar Envelope Dimensions

Drawing(s) showing the location of all house and site components relative to the solar envelope

L-641

5-2 Solar Envelope Dimensions

List of solar envelope exemption requests accompanied by justifications and drawing references

No exemption requests

Seite: 8/127

6-1 Structural Design Approval

List of, or marking on, all sheets in the complete electronic Construction Documents that have been or will be stamped by the structural engineer in the hard-copy, stamped structural submission; the stamped submission shall consist entirely of sheets or pages that also appear in the complete electronic construction document set

S-201 – S-206 S-301 – S-303 S-401 – S-408

6-2 Maximum Architectural Footprint

Drawing(s) showing all information needed by the Rules Officials to measure the architectural footprint electronically

A-223

6-2 Maximum Architectural Footprint

Drawing(s) showing all movable components that may increase the footprint if operated during contest week

A-225

6-2 Maximum Architectural Footprint

Shading calculations and/or diagrams for components that DO NOT shade the building above its finished floor height between 9 a.m. and 5 p.m. EDT on October 1 (shading calculations and/or diagrams are not necessary for components that are either shorter than finished floor height or obviously do not shade the building)

A-225

6-3 Minimum Conditioned Space

Drawing(s) showing space conditioning means in primary living spaces

A-224

6-4 Entrance and Exit Routes

Drawing(s) showing the accessible public tour route and the ground surface area that will be covered by organizer-provided walkway material

X-211, X-311 X-312, X-511

7-1 Placement

Drawing(s) showing the location of all vegetation and, if applicable, the movement of vegetation designed as part of an integrated mobile system

L-511

7-2 Watering Restrictions Drawings showing the layout and operation of greywater irrigation systems

P-511, P-521 P-531, P-541 P-551

8-1 PV Technology Limitations

Specifications for photovoltaic components

PM: 26 31 00 Specs PV PM: 38 19 16 Specs Inverters

8-1 PV Technology Limitations

Retail price quote for photovoltaic components

Retail PV Price Quotes

Seite: 9/127

8-3 Thermal Energy Storage Drawing(s) showing the location of thermal energy storage components

M-231

8-3 Thermal Energy Storage Specifications for thermal energy storage components

PM: 23 56 00 Specs

8-3 Thermal Energy Storage Shading calculations and/or diagrams for thermal energy storage components (if necessary)

PM: 08 50 00 Specs

8-4 Batteries Drawing(s) showing the location(s) and quantity of stand-alone, PV-powered devices

No batteries used

8-4 Batteries Specifications for all stand-alone, PV-powered devices

No batteries used

8-5 Desiccant Systems Drawing(s) describing the operation of the desiccant system

M-222

8-5 Desiccant Systems Specifications for desiccant system components

PM: 23 56 00 PM: 42 31 16

8-6 Village Grid Completed Interconnection Application form.

Interconnection Application Form

8-6 Village Grid

Drawing(s) showing the locations of the photovoltaics, inverter(s), terminal box, meter housing, service equipment, and grounding means

A-225 A-841, A-842, A-844, A-852

8-6 Village Grid

Specifications for the photovoltaics, inverter(s), terminal box, meter housing, service equipment, and grounding means

PM: 26 31 00 Specs PV PM: 38 19 16 Specs Inverters

8-6 Village Grid One-line electrical diagram E-506

8-6 Village Grid Calculation of service/feeder net computed load per NEC 220

E-501, E-502, E-503, E-504

8-6 Village Grid Site plan showing the house, decks, ramps, tour paths, and terminal box

L-511

8-6 Village Grid

Elevation(s) showing the terminal box, meter housing, main utility disconnect, and other service equipment

L-641, L-642

9-4 Rainwater Collection Drawing(s) showing the layout and operation of rainwater collection systems

A-843

9-6 Thermal Mass Drawing(s) showing the locations of water-based thermal mass systems

M-321 – M-351

9-6 Thermal Mass Specifications for components of water-based thermal mass systems

PM: 23 71 13 Specs

10-2 Event Sponsor Recognition

Drawing(s) showing the dimensions, materials, artwork, and content of all communications materials, including signage

See: TUD_FINALCOMMPLAN_2009-06-02

Seite: 10/127

10-3 Team Sponsor Recognition

Drawing(s) showing the dimensions, materials, artwork, and content of all communications materials, including signage

See: TUD_FINALCOMMPLAN_2009-06-02

11-4 Public Exhibit Interior and exterior plans showing entire accessible tour route

X-211, X-311, X-312, X-511

11-4 Public Exhibit Drawing(s) showing the dimensions, materials, artwork, and content of the handout

Not yet designed

11-4 Public Exhibit Drawing(s) showing the artwork and content of the team uniform

See: TUD_FINALCOMMPLAN_2009-06-02

Seite: 11/127

3. Construction specifications

00 Procurement and Contracting Requirements

00 01 01 Project Title Page Title: TEAM GERMANY SOLAR DECATHLON 2009 |

Technische Universität Darmstadt

Date: April 2008 – October 2009 Construction Site: Petersenstrasse; 64287 Darmstadt; Parking Area between Cafeteria TU Lichtwiese and Department of Architecture

Student Team: Leader internal: Annika Gaigl | a.gaigl@solardecathlon2009.de Leader external: Sardika Meyer | s.meyer@solardecathlon2009.de Faculty Advisors: Architecture: Professor Manfred Hegger | hegger@ee.tu-darmstadt.de Organization: Dipl.-Ing. Johanna Henrich | henrich@ee.tu-darmstadt.de

Dipl.-Ing. Jörg Wollenweber | wollenweber@ee.tu-darmstadt.de Communications: Dipl.-Ing. M.A. Caroline Fafflok | fafflok@ee.tu-darmstadt.de Design and Engineering: Dipl.-Arch. Hans Drexler | Dipl.-Ing. Martin Zeumer Electr. Engineering: Dipl.-Ing. Lutz Steiner | steiner@re.tu-darmstadt.de Struct. Engineering: Dipl.-Ing. Jochen Stahl | stahl@baustatik.tu-darmstadt.de Team Germany Website, including Blog and Live-Webcam: http://www.solardecathlon2009.de Team Germany Contact: team@solardecathlon2009.de

Seite: 12/127

00 01 15 List of Drawing Sheets General G - 101 - Cover Sheet G - 102 - Table of Content G - 103 - Table of Content G - 104 - Table of Content G - 105 - Table of Content G - 106 - Table of Content G - 201 - Design Concept G - 202 - Strategies Of Energy Use G - 203 - Sustainable Design G - 204 - Symbols And Notes G - 301 - Abbreviations G - 401 - Target Market Description G - 501 - Exterior Rendering - South East G - 502 - Exterior Rendering - South West Civil C - 201 - Site 1:50 C - 301 - Grading 1:50 Lanscape L - 111 Symbols and Notes 1:50 L - 211 Grading 1:100 L - 321 Secondary Construction 1:100 L - 322 Planking 1:100 L - 351 Deck Construction Detail 1:100 L - 411 Lighting Design 1:100 L - 511 Planting 1:100 L - 641 Elevation - North East 1:50 L - 642 Elevation - South West 1:50 L - 711 Schedules - Landscape L - 712 Schedules - Landscape L - 713 Schedules - Landscape L - 714 Schedules - Landscape Structural - General S -101 - General Notes S -102 - General Notes S -103 - General Notes S -104 - General Notes Structural - Plans S - 201 - Roof Framing 1:50 S - 202 - Upper Wall Framing 1:50 S - 203 - 2nd Floor Framing 1:50 S - 204 - Floor Framing 1:50 S - 205 - Platform Framing 1:50 S - 206 - Foundation Plan 1:50

Seite: 13/127

Structural - Sections S - 301 - Longitudinal Section 1:50 S - 302 - Cross Section 1:50 S - 303 - Cross Section 1:50 Structural - Elevations S - 401 - Wall Construction North 1:50 S - 402 - Wall Construction East 1:50 S - 403 - Wall Construction South 1:50 S - 404 - Wall Construction West 1:50 S - 405 - Wall Sheathing North 1:50 S - 406 - Wall Sheathing East 1:50 S - 407 - Wall Sheathing South 1:50 S - 408 - Wall Sheathing West 1:50 Structural - VIP S - 421 - VIP Floor Plan 1:50 S - 422 - VIP Roof Plan 1:50 S - 441 - VIP Plan North 1:50 S - 442 - VIP Plan East 1:50 S - 443 - VIP Plan South 1:50 S - 444 - VIP Plan West 1:50 S - 451 - VIP Structure 1:7 S - 461 - Schedules - VIP Structural - Details S - 511 - Wall to Roof Connection E-W 1:5 S - 512 - Wall to Roof Connection 1:5 S - 513 - Post to Beam Connection 1:5 S - 521 - Module Connection 1:5 S - 522 - Module Connection S-E Corner 1:5 S - 523 - Module Connection S-W Corner 1:5 S - 524 - Module Connection N-W & N-E Corner 1:5 S - 525 - Built-up Column GL 5 North 1:10 S - 526 - Built-up Column GL 8 North 1:10 S - 527 - Built-up Column GL 12 North 1:10 S - 528 - Built-up Column GL F East 1:10 S - 529 - Built-up Column GL 8 South 1:10 S - 530 - Built-up Column GL 12 South 1:10 S - 531 - Built-up Column GL F West 1:10 S - 532 - Roof to Wall Connection Z-Section 1:10 S - 533 - Module Connectors @ Corner 1:5 S - 534 - Module Connectors @ Corner 1:5 S - 535 - Typ- Module Connectors 1:5 S - 541 - Steel Edge to Wall Connection 1:5 S - 542 - Connection Details of Second Floor 1:5 S - 543 - 2nd Floor Edge Angle to Wood Post 1:5 Connection S - 544 - 2nd Floor Connection @ Split of Building 1:5 S - 545 - 2nd Floor Opening for Mechanical 1:5 S - 546 - L- section 2nd fl oor North 1:20 S - 547 - L- section 2nd fl oor South 1:20

Seite: 14/127

S - 548 - 2nd fl oor to East wall connection South 1:20 S - 549 - 2nd fl oor to East wall connection center 1:5 S - 550 - 2nd fl oor to East wall connection North 1:10 S - 551 - 2nd fl oor to North & South wall connection 1:20 S - 552 - Holdown Anchor SW Corner 1:10 S - 553 - Central Wood Base 1:10 S - 554 - Northern Wood Base 1:10 S - 555 - Holdown Anchor SE Corner 1:5 S - 556 - Holdown anchor SE corner 1:5 S - 557 - Details Holdown Anchor 1:5 S - 561 - Wall to Floor Connection (West) 1:5 S - 562 - Section - Platform Connection 1:5 S - 563 - Connection of Steel Beam to Wall 1:5 S - 564 - Platform Module Connection 1:5 S - 565 - Temp - Bracing @ Platform Connection 1:5 S - 566 - Steel Beam to Wall Connection GL 11 1:5 S - 567 - Detail - Platform Connection GL 11 1:5 S - 568 - Section - Steel Beam @ Stairs 1:5 S - 569 - Steel Beam @ Ramp 1:5 S - 570 - Post to Steel Beam Connection 1:5 S - 571 - Platform Beam Connection 1.5 S - 572 - HEA 1 1:20 S - 573 - HEA 2 1:20 S - 574 - HEA 3 1:20 S - 575 - HEA 4 1:20 S - 576 - Steel Plate SB2 East & West Wall 1:5 S - 577 - Steel Plate SB1 North & South Wall 1:5 S - 578 - 2nd Floor Temp- Steel Post 1:20 Structural - Transport S - 611 - Axonometry Lower North Module 1:50 S - 612 - Axonometry Lower South Module 1:50 S - 613 - Axonometry Upper North Module 1:50 S - 614 - Axonometry Upper South Module 1:50 S - 621 - Floor Plan Lower Modules 1:50 S - 622 - Floor Plan Upper Modules 1:50 S - 631 - Longitudinal Section E-W 1:50 S - 632 - Longitudinal Section W-E 1:50 S - 633 - Cross Section N-S 1:50 S - 634 - Cross Section S-N 1:50 S - 651 - Typ- Trans- Brace To Wall Connection 1:5 S - 652 - Trans- Brace To Roof Connection 1:5 S - 653 - Trans- Brace To Platform Connection 1:5 S - 654 - Threaded Rod To Roof Connection 1:10 S - 655 - Cable To Wall Connection 1:5 S - 656 - Becket to Platform Connection West 1:10 S - 657 - Becket to Platform Connection East 1:10 S - 660 - Anchor Overview 1:100 S - 661 - Trans- Brace Manufacturer Spec S - 662 - Becket Manufacturer Spec S - 663 - Cable & Tightener Manufacturer Spec- S - 664 - Trans- Brace Platform Anchor West 1:5 S - 665 - Trans- Brace Platform Anchor West Rotated 1:5

Seite: 15/127

S - 666 - Trans- Brace Platform Anchor East 1:5 S - 667 - Trans- Brace Platform Anchor East Rotated 1:5 S - 668 - Trans- Brace East & West Wall Anchor 1:5 S - 669 - Trans- Brace North Wall Anchor 1:5 S - 670 - Trans- Brace Module Bonding Anchor 1:5 S - 671 - Trans- Brace South Wall Anchor# 1:5 S - 672 - Trans- Brace & Cable Anchor West Wall 1:5 S - 673 - Trans- Brace Roof Anchor 1:5 S - 674 - Trans- Brace Roof Anchor Rotated 1:5 S - 675 - Cable East Wall Anchor 1:5 S - 676 - Threaded Rod 1:10 S - 677 - Schedule - Transport S - 678 - Schedule - Transport S - 679 - Schedule - Transport Structural - Traverse S - 711 - Floor Plan Traverse 1:20 S - 712 - View From Below Traverse 1:20 S - 713 - Exploded Drawing 1:20 S - 714 - Axonometry Traverse S - 715 - Schedules - Temporary Construction Architectural - Plans A - 221 - Floorplan 1:50 A - 222 - 1stFloor 1:50 A - 223 - Minimum Conditioned Space 1:50 A - 224 - Maximum Architectural Footprint 1:50 A - 225 - Moveable Components Shading Deck 1:100 Architectural - Elevations A - 311 - Elevation North 1:50 A - 312 - Elevation East 1:50 A - 313 - Elevation South 1:50 A - 314 - Elevation West 1:50 Architectural - Sections A - 431 - Longitudinal Section - North 1:50 A - 432 - Longitudinal Section - South 1:50 A - 433 - Cross Section - East 1:50 A - 434 - Cross Section - West 1:50 Architectural - Details - Windows A - 510 - Key Plan Windows 1:100 A - 511 - Key Plan Windows 1:100 A - 520 - Window Elevation North 1:50 A - 521 - Window Elevation East 1:50 A - 522 - Window Elevation South 1:50 A - 523 - Window Elevation West 1:50 A - 540 - Window N1 Overview 1:20 A - 541 - Window N1 Detail 1 1:20 A - 542 - Window N1 Detail 2 1:20 A - 545 - Window N2 Overview 1:20 A - 546 - Window N2 Detail 1 1:20

Seite: 16/127

A - 550 - Window N3 Overview 1:20 A - 551 - Window N3 Detail 1 1:5 A - 552 - Window N3 Detail 2 1:2 A - 553 - Window N3 Lamella - A - 580 - Window SW1 Overview 1:20 A - 581 - Window SW1 Detail 1 1:5 A - 582 - Window SW1 Detail 2 1:5 A - 595 - Schedules - Windows A - 596 - Schedules - Opening Sun Control Devices Architectural - Details - PV Mounting A - 711 - PV Façade Elements - A - 712 - Mounting Cramp 1:1 A - 713 - Gusset Plate 1:2 A - 714 - PV-Module 1:5 A - 715 - Acrylic Glass 1:5 A - 716 - Substructure - Components 1:10 A - 721 - Surface 1:100 A - 731 - Detail Façade - Roof 1:2 A - 741 - Detail Connection Façade - Window 1:2 A - 751 - Detail Façade - Deck 1:2 A - 761 - Detail Corner - Substructure 1:5 A - 771 - PV Wiring Type 1 A - 772 - PV Wiring Type 2 A - 781 - Schedules Façade Architectural - Details - Roof A - 810 - Key plan roof 1:50 A - 811 - Roof System - general A - 831 - Sections Roof 1:20 A - 841 - Top View PV Modules 1:50 A - 842 - Top View PV Mounting System 1:50 A - 843 - Top View Drainage 1:50 A - 844 - Top View PV cable conduit 1:50 A - 851 - Detail roof system 1:2 A - 852 - Detail PV Mounting System Module Stoat 1:1 A - 853 - Detail PV fascia north-south 1:2 A - 854 - Detail drainage fascia north-south 1:2 A - 855 - Detail fascia east-west 1:2 A - 856 - Detail fall protection 1:5 A - 857 - Detail PV Mounting System section 1:1 A - 860 - Schedule - Roof 1 A - 861 - Schedule - Roof 2 Architectural - Details - Siding A - 911 - Key Plan Elevations 1:75 A - 951 - Siding Detail Ceiling Floor 1:5 A - 952 - Siding Detail Cut 1:5 A - 953 - Siding Detail 1:5 A - 954 – Schedules Siding

Seite: 17/127

Interiors - Living Space- General I - 200 - Body - Furniture Interior rendering I - 201 - Body - Furniture Areas Table of Contents I - 202 - Body - Furniture Structure Scheme I - 203 - Body - Furniture Cabinet Body Materials Interiors - Living Space- Plans I-210 - Body-Furniture Floor Plan 1st Floor 1:50 I-211 - Body-Furniture Floor Plan 2nd Floor 1:50 Interiors - Living Space- Sections I-220 - Body -Furniture Longitudinal Section South 1:50 I-221 - Body -Furniture Longitudinal Section North 1:50 I-222 - Detail Longitudinal Section North Storage 1:20 I-223 - Detail Elevation Longitudinal Section South Stairs 1:20 I-230 - Detail Body-Furniture Cross-Section Stairs 1:20 Interiors - Living Space- Elevations I - 240 - Body -Furniture Elevations 1:50 I - 241 - Detail Elevation South Stairs 1:20 I - 242 - Detail Elevation North Storage 1:20 Interiors - Living Space- Stairs I - 270 - Stairs Stairs 1:50 I - 271 - Scheme Stairs Sections 1:20 I - 272 - Overview Handrail 2nd Floor 1:20 I - 273 - Overview Handrail Stairs 1:20 I - 274 - Steelprofile Steelstring Stairs 1:20 I - 275 - Steelprofile Handrail 2nd Floor North 1:5 I - 276 - Steelprofile Handrail 2nd Floor South 1:10 I - 277 - Steelprofile Handrail Stairs 1:10 I - 278 - Detail Steelprofile Handrail 2nd Floor and Stairs 1:2 Interiors - Living Space- Schedules I - 280 - Schedules – Body Furniture I - 281 - Schedules – Body Furniture I - 282 - Schedules – Body Furniture Interiors - Kitchen I - 321 - Horizontal Section I 1:10 I - 322 - Horizontal Section II 1:10 I - 323 - Horizontal Section III 1:10 I - 331 - Vertical Section I 1:10 I - 332 - Vertical Section II 1:10 I - 341 - Elevation North 1:10 I - 342 - Elevation South 1:10 I - 351 - Technical Appliances I 1:10 I - 352 - Technical Appliances II 1:10 I - 353 - Schedules - Kitchen

Seite: 18/127

Interiors - Bedroom I - 411 - Concept Bedroom I - 412 - Manual Bed I - 421 - Floor Plan Bed 1:20 I - 431 - Longitudinal Section Bed 1:20 I - 432 - Across Section Bed 1:20 I - 451 - Construction Detail Bed 1:5 I - 452 - Ropes for Opening 1:5 Interiors - Bathroom I - 510 - Concept I - 521 - Floor Plan 1:20 I - 531 - Elevation North 1:20 I - 532 - Elevation East 1:20 I - 533 - Elevation South 1:20 I - 534 - Elevation West 1:20 I - 541 - Longitudinal Section 1:20 I - 551 - Detail Shower Tray 1:10 I - 561 - Schedules - Bathroom Interiors - Flooring I - 621 - Floor Plan level 0.5 1:50 I - 622 - Floor Plan level 1.5 1:50 I - 623 - Flooring Cable Conduit 1:50 I - 651 - Detail Cable Conduit 1:5 I - 652 - Detail Connection Wall / Window – Cable Conduit 1:5 I - 653 - Detail Connection Wall Level 0.0 + 1.5 1:5 I - 654 - Section - Stairs 1:5 I - 655 - Section - Ramp 1:5 I - 656 - Section Horizontale Module Cut Level 0.0 1:5 I - 657 - Section Horizontale Module Cut Level 0.5 1:5 I - 660 - Schedules - Flooring Interiors - Renderings I - 701 - Rendering I - 702 - Rendering I - 703 - Rendering Fire - Protection F - 111 - Symbols and Notes F - 211 - Detection and Alarm F - 311 - Suppression F - 411 - Egress Plumbing P - 111 - Symbols and notes P - 211 - Supply and Removal P - 311 - Schematic Diagram P - 411 - Water Supply P - 421 - Water Supply 1:50 P - 431 - Water Supply 1:50 P - 511 - Waste Water Disposal P - 521 - Waste Water Disposal 1:50

Seite: 19/127

P - 531 - Waste Water Disposal 1:50 P - 541 - Waste Water Disposal 1:10 P - 551 - Waste Water Disposal 1:10 P - 611 - Schedules - Plumbing P - 612 - Schedules - Plumbing Mechanical - Energy Concept M - 101 - Systems M - 102 - Flow Of Energy M - 103 - PCM System M - 104 - Heat Pump M - 105 - Energy Themes M - 106 - Scheme Summer Day M - 107 - Scheme Summer Night M - 108 - Scheme Winter Day M - 109 - Scheme Winter Night M - 110 - Scheme Spring Day M - 111 - Scheme Spring Night M - 112 - Planning Tools M - 113 - Energy Balance Mechanical - Drawings M - 211 - Heat Pump System Schematic Diagram M - 221 - Heat Pump System And Distribution Floorplan 1:50 M - 222 - Heat Pump System And Distribution Floorplan 1:50 M - 231 - Heat Pump System And Distribution Section 1:50 M - 271 - Heat Pump System And Distribution Isometric 1:50 M - 321 - Cooling Ceiling Section 1:50 M - 331 - Cooling Ceiling Section 1:50 M - 332 - Cooling Ceiling Section 1:20 M - 351 - Cooling Ceiling Detail 1:20 Mechanical - Schedules M - 411 - Schedules - Mechanical M - 412 - Schedules - Mechanical Electric E - 001 - Electrical Appliances And Installations E - 002 - Building Automation - Utilization Concept E - 121 - Electrical Appliances And Installations 1:50 E - 131 - Electrical Appliances And Installations 1:50 E - 132 - Electrical Appliances And Installations 1:50 E - 133 - Electrical Appliances And Installations 1:50 E - 141 - Placing Of Contest Sensors 1:50 E - 151 - Schedules - Electrical Appliances Electric - Artificial Light E-211 - Artificial Lighting Concept 1:100 E-212 - Functional Lighting Plan Upper Level 1:50 E-213 - Functional Lighting Plan Lower Level 1:50 E-214 - Functional Lighting - Sections 1:50 E-215 - Functional Lighting Integration LED strip E-216 - Lighting Renderings

Seite: 20/127

E-217 - Accent Lighting Concept 1:50 E-218 - Accent Lighting Concept - E-219 - Atmospheric Lighting Concept 1:50 E-220 - Multifunctional Body Illumination 1:1 E-221 - Light Switch Concept 1:50 E-222 - Lighting Schedules Electric- Electrical Cabinet Outside E - 301 - Electrical Cabinet Outside 1 E - 302 - Electrical Cabinet Outside 1 E - 303 - Electrical Cabinet Outside 2 E - 304 - Electrical Cabinet Outside 2 E - 305 - Electrical Cabinet Outside 2 E - 306 - Electrical Cabinet PV Inverter Joint E - 307 - Electrical Cabinet PV Inverter Joint E - 308 - Electrical Cabinet PV Inverter Joint Electric - PV Interconnection E - 309 - PV Interconnection Overview E - 310 - PV Interconnection Overview E - 311 - PV Interconnection Overview E - 312 - Design Of PV Roof E - 314 - PV Interconnection Overview Façade E - 315 - PV Interconnection Overview Façade E - 316 - PV Interconnection Overview Façade E - 317 - PV Interconnection Overview Façade E - 318 - PV Interconnection Overview Façade E - 319 - PV Interconnection Overview Façade E - 320 - PV Interconnection Overview Façade E - 321 - PV Interconnection Overview Façade E - 322 - PV Interconnection Overview Façade E - 323 - PV Interconnection Overview Façade E - 324 - PV Interconnection Overview Façade E - 325 - PV Interconnection Overview Façade E - 326 - PV Interconnection Overview Façade E - 327 - PV Interconnection Overview Façade E - 328 - Design Of PV Façade E - 329 - Design Of PV Façade E - 330 - Design Of PV Façade Electric - Electrical Cabinet Inside E - 401 - Electrical Cabinet Inside E - 402 - Electrical Cabinet Inside E - 403 - Electrical Cabinet Inside E - 404 - Electrical Cabinet Inside E - 405 - Electrical Cabinet Inside E - 406 - Electrical Cabinet Inside E - 407 - Electrical Cabinet Inside E - 408 - Electrical Cabinet Inside E - 409 - Electrical Cabinet Inside E - 410 - Electrical Cabinet Inside E - 411 - Electrical Cabinet Inside E - 412 - Electrical Cabinet Inside

Seite: 21/127

E - 413 - Electrical Cabinet Inside E - 414 - Electrical Cabinet Inside E - 415 - Electrical Cabinet Inside E - 416 - Electrical Cabinet Inside E - 417 - Electrical Cabinet Inside E - 418 - Electrical Cabinet Inside E - 419 - Electrical Cabinet Inside E - 420 - Room Control Unit E - 421 - Room Control Unit E - 422 - Design And Overcurrent Protection Electric - Load List E - 501 - Load List E - 502 - Load List E - 503 - Load List E - 504 - Load List E - 505 - KNX Busline Inside E - 506 - Cross Section And Wiring Overview E - 507 - Home Automation Overview E - 508 - Schedule - Load E - 509 - Schedule - Load Other Disciplines X - 111 - Site Accessibility 1:100 X - 211 - Public Exhibit Plan 1:50 X - 212 - Public Exhibit Deck 1:100 X - 213 - Public Exhibit Mock Ups 1:100 X - 311 - Schedule - Public Tour Operations O - 110 - Transport Germany-Washington O - 120 - Truck Layout O - 130 - Transport Details O - 140 - Modules Layout O - 210 - Site Operations Day 1 O - 220 - Site Operations Day 1 and 2 – O - 310 - Site Operations Day 1-7 and Disassembly O - 500 - Schedules - Operations Equipment Ressources R-101 - Client Site Elevations R-102 - Client Site Plan R-103 - Client Site Photographs

Seite: 22/127

00 01 20 List of Schedules L - 711 Schedules - Landscape L - 712 Schedules - Landscape L - 713 Schedules - Landscape L - 714 Schedules - Landscape S - 461 - Schedules - VIP S - 677 - Schedule - Transport S - 678 - Schedule - Transport S - 679 - Schedule - Transport S - 715 - Schedules - Temporary Construction A - 595 - Schedules - Windows A - 596 - Schedules - Opening Sun Control Devices A - 781 - Schedules Façade A - 860 - Schedules Roof A - 861 - Schedules Roof A - 954 - Schedules Siding I - 280 - Schedules – Body Furniture I - 281 - Schedules – Body Furniture I - 282 - Schedules – Body Furniture I - 353 - Schedules – Residential Kitchen Appliances I - 561 - Schedules Bathroom Plumbing I - 660 - Schedules Flooring P - 611 - Schedules - Plumbing P - 612 - Schedules - Plumbing M - 411 - Schedule HVAC Heat Pump M - 412 - Schedule HVAC PCM Ceiling E-151 - Schedules for Electrical Appliances and Installations E-222 - Lighting Schedules E-508 - Schedule for Electrical Diagrams E-509 - Schedule for Electrical Diagrams X -311 - Schedule - Public Tour O - 500 - Schedules - Operations Equipment

Seite: 23/127

01 General Requirements

01 53 00 Temporary Construction

Part 1 GENERAL 1.1 SECTION INCLUDES A. Transport Bracing B. Transport Braces C. Threaded Rods 1.2 SUBMITTALS

A. Product Datasheet (CD: Plan# S-661) B./C. No datasheets available; special design according to Construction Drawings S-661, S-664 – S-6616

Part 2 PRODUCTS 2.1 MANUFACTURER A. ROBUSTA-GAUKEL GMBH & CO. KG Brunnenstraße 36 D-71263 Weil der Stadt (Hausen) Phone: +49 (0)7033 5371-0 Fax +49 (0)7033 5371-31 E-Mail: info@robusta-gaukel.de Web: www.robusta-gaukel.de B./C. Internationaler Bund Darmstadt BaE Kooperative Ausbildung Metall / Elektro / Installation Advisor: Mr. Dilling Alsfelder Straße 3 64289 Darmstadt Deutschland Phone +49-6151-97154-14 Fax +49-6151-97154-29

Seite: 24/127

2.2 PRODUCTS A. Push-pull-props Type M Article No. 610130 and 610343 B. Transport Bracing – no article number C. Threaded rods – no article number

Seite: 25/127

01 54 00 Construction Aids

Part 1 GENERAL 1.1 SECTION INCLUDES A. Steel tie-bar (traverse) B. Trucks C. Crane D. Lifting loops E. Distribution Basin F. Cable ropes G. Tightener 1.2. SUBMITTALS

A. Special design from metalworkers according to Construction Drawings S-711 – S-714

B. Special design from metalworkers according to Construction Drawings O-110 – O-310 C. Special design from metalworkers according to Construction Drawings O-110 – O-310 D/E. Weblink Datasheet: www.jordahl-pfeifer.ro/documente/pfeifer/Lifting_Loops_11_2007.pdf (CD: Plan# S-662) F. Datasheet (CD: Plan# S-663) G. Datasheet (CD: Plan# S-663) Part 2 PRODUCTS 2.1 MANUFACTURER

A. Internationaler Bund Darmstadt Metall/Elektro/Installation Advisor: Mr. Dilling Alsfelder Straße 3 D-64289 Darmstadt phone +49-6151-97154-14 Fax +49-6151-97154-29 Web: www.internationaler-bund.de Information in English: www.internationaler-bund.de/fileadmin/user_upload/ib_englisch.pdf B/C. ---

Seite: 26/127

D/E. PFEIFER Holding GmbH & Co. KG Dr.-Karl-Lenz-Straße 66 D-87700 Memmingen phone +49 (0) 8331 - 937 - 0 Fax +49 (0) 8331 - 937 - 294 Web: www.pfeifer.de E-Mail: presse@pfeifer.de F/G. Carl Stahl GmbH Postweg 41 73079 Süßen phone. +49 (07162) 4007-3000 Fax +49 (07162) 4007-8830 Web: www.carlstahl.de E-Mail: carlstahl@carlstahl.com 2.2 PRODUCTS A.-C. no article number D. Pfeifer lifting loop 05.050.523. E. Pfeifer distribution basins 05.056.421 F. Carl Stahl 1621.21.00 G. Carl Stahl 5711.00.30

Seite: 27/127

01 54 23 Temporary Scaffolding

Part 1 GENERAL 1.1 SECTION INCLUDES A. Mobile Scaffolding 1.2 SUBMITTALS A. no datasheet available – see example: http://www.layher-fahrgeruest.de/layher-uni-leicht/layher-unileicht-fahrgeruest-3204-arbeitshoehe.html (CD: Plan# O-110-310)

Part 2 PRODUCTS 2.1 MANUFACTURER A. Wilhelm Layher GmbH & Co. KG

Ochsenbacher Straße 56 74363 Güglingen-Eibensbach, Deutschland

phone: +49 (0) 7135 70-0

Fax: + 49 (0) 7135 70-265 E-Mail: info@layher.com

Web: http://www.layher.de/ http://www.layherusa.com/

2.2 PRODUCTS A. Layher UniLeicht Mobile Scaffolding 3204 Working; Height:

max. 6.30m

Seite: 28/127

01 65 00 Product Delivery Requirements

Part 1 GENERAL 1.1 SECTION INCLUDES A. Packing 1.2 SUBMITTALS A. no datasheet available – see example: (CD: Plan# O-110-310)

Part 2 PRODUCTS 2.1/2.2 MANUFACTURER/ PRODUCTS A. not yet decided

02 Existing Conditions - no entries

03 Concrete - no entries

04 Masonry - no entries

Seite: 29/127

05 Metals

05 05 23 Metal Fastening

Part 1 GENERAL

1.1 SECTION INCLUDES

A. Mounting B. Screwing

1.2 SUBMITTALS

A. Product Data: Datasheet, Manufacturing Advices (CD: Plan# A-712, A-716, A-741, A-853, A-857) B. Weblink to Product Datasheet: http://www.wuerth.de/de/medien/holz/assy/de/assy-sk.pdf (CD: Plan# A-716, A-853, A-857)

Part 2 PRODUCTS

2.1 MANUFACTURER

A. Heroal-Johann Henkenjohann GmbH

Österwieher Straße 80 33415 Verl Phone: +49 (0)5246-507253 Fax: +49 (0)5246-507275 www.heroal.de

B. Adolf Würth GmbH & Co. KG

Reinhold-Würth-Str. 12 - 17 74653 KÜNZELSAU-GAISBACH DEUTSCHLAND phone: +49 7940 15-0 Fax +49 7940 15-1000 E-Mail: info@wuerth.com Web: www.wuerth.de

2.2 PRODUCTS A. 64031 Mounting Type C for horizontal Substructure 64015 Mounting cramp Type F, special design 64030 21 Mounting Clip Type M 64034 21 Mounting Clip Type A46

B. Wheel Head Screws Würth ASSY SK 200x8mm Art. No. 0184 608 200

Jacksrew

Seite: 30/127

05 14 00 Structural Aluminum Framing

Part 1 GENERAL 1.1 SECTION INCLUDES

A. Substructure PV roof B. Substructure PV facade

1.2 SUBMITTALS

A. Product Data: Datasheets (CD: Plan# A-853, A-857) B. Product Data: Datasheets (CD: Plan# A-716, A-731-734, A-761)

Part 2 PRODUCTS 2.1 MANUFACTURER

Heroal-Johann Henkenjohann GmbH Österwieher Straße 80 D-33415 Verl Phone: +49 (0)5246-507253 Fax: +49 (0)5246-507275 www.heroal.de

2.2 PRODUCTS – non standard – purpose-built items

A. 18023 21 aluminum sheath 80mm

18233 21 aluminum drawer profile B. 64007 aluminum sheath 60/40mm 64007 aluminum sheath welded corner --- Ridge clamp – custom-made

Seite: 31/127

05 20 00 Metal Joists

Part 1 GENERAL 1.1 SECTION INCLUDES

A. 05 20 00 Metal Joists B. 05 21 00 Steel Joist Framing

1.2 SUBMITTALS

A/B. Product Data: non standard articles without existing Datasheet– Special design from metalworkers according to

Construction Documents S-205, S-401-S-404 Product Datasheet for standard products (CD: Plan# S-205,

S-401-404)

Part 2 PRODUCTS 2.1 MANUFACTURER

A. Internationaler Bund Darmstadt Metall / Elektro / Installation Advisor: Mr. Dilling Alsfelder Straße 3 64289 Darmstadt Deutschland phone +49-6151-97154-14 Fax +49-6151-97154-29 Web: www.internationaler-bund.de Information in English: www.internationaler-bund.de/fileadmin/user_upload/ib_englisch.pdf

B. Holzbau Gröber GmbH

Biberacher Straße 19 D - 88436 Eberhardzell-Füramoos

Phone: +49 7358/ 960-0 Fax: +49 7358/ 960-60 E-Mail: info@groeber.de Web: www.groeber.de

SIMPSON STRONG-TIE® GmbH

Riederhofstrasse 27 D-60314 Frankfurt

Phone: +49 69/67737 89 - 0

Seite: 32/127

Fax: +49 69/67737 89 - 69 Web: www.strongtie.eu E-Mail: info@simpsonstrongtie.de

2.2 PRODUCTS

A. Steel angles B. Steel plates Locksmith stuff C. HTT 16 Tie Simpson Strong-Tie Joist Hangers Simpson Strong-Tie

Seite: 33/127

05 25 00 Aluminum Joist Framing

Part 1 GENERAL 1.1 SECTION INCLUDES

A. Substructure PV-façade

1.2 SUBMITTALS

A. Product Data: non standard articles without existing Datasheet– Special design from HEROAL according to

Construction Documents A-713, A-716

Part 2 PRODUCTS 2.1 MANUFACTURER

A. Heroal-Johann Henkenjohann GmbH Österwieher Straße 80 33415 Verl

Phone: +49 (0)5246-507253 Fax: +49 (0)5246-507275 Web: www.heroal.de

2.2 PRODUCTS

A. 64082 End Cap for Aluminium Sheath 60/40mm Aluminium Cable Clip Blinding

Seite: 34/127

06 Wood, Plastics, and Composites

06 05 00 Common Work Results for Wood, Plastics and Composites

Part 1 GENERAL 1.1 SECTION INCLUDES

A. 06 05 00 Common Work Results for W, P, and C B. 06 05 23 Wood, Plastics, and Composites Fastenings

1.2 SUBMITTALS

A. Product Datasheet (CD: Plan# I-203) B. Product Data: Datasheets (CD: Plan# I-203) (CD: Plan# S-205, S-401-404) (CD: Plan# I-652-657)

Part 2 PRODUCTS 2.1 MANUFACTURER

A. Häfele GmbH & Co KG Adolf-Häfele-Str. 1 72202 Nagold Germany Tel: +49 (0)74 52 / 95 - 0 Fax: +49 (0)74 52 / 95 - 2 00 E-Mail: info@haefele.de

Web: www.hafele.com B. Adolf Würth GmbH & Co. KG

Reinhold-Würth-Str. 12 - 17 74653 KÜNZELSAU-GAISBACH DEUTSCHLAND phone: +49 7940 15-0 Fax +49 7940 15-1000 E-Mail: info@wuerth.com Web: www.wuerth.de

SFS unimarket AG Nefenstrasse 30 CH-9435 Heerbrugg E-Mail: info.u@sfsunimarket.biz Web: www.sfsunimarket.biz

Seite: 35/127

2.2 PRODUCTS

A. Häfele Article No. 637.19.228 B. Wood Screws Würth ASSY ®3.0 SFS Screws intec see Datasheet Cocking pieces, bolts

Seite: 36/127

06 11 00 Wood Framing

06 11 13 Engineered Wood Products

Part 1 GENERAL 1.1 SECTION INCLUDES

A. 06 11 13 Ceiling and flooring elements B. 06 11 13 Timber Construction beams C. 06 11 13 Bearing D. 06 11 13 Oak Profiles, feet

1.2 SUBMITTALS

A. Product Datasheets (CD: Plan# S-205, S-401-S-404) B. Weblink to Product Data: http://www.rettenmeier.com/produkte/details/produkte/holzbau/kvh/1018.html (CD: Plan# S-205, S-401-S-404) C/D. no datasheet available – custom-made profiles made by

Team Germany and a professional carpenter according to Construction Documents S-205, S-401 – S-404

Part 2 PRODUCTS 2.1 MANUFACTURER

A. Lignotrend Produktions GmbH Landstrasse 25 D-79809 Weilheim-Bannholz

Phone: +49 (0)7755 9200-0 Fax: +49 (0)7755 9200-55 www.lignotrend.com

B-D. Rettenmeier Holding AG Industriestraße 1 D-91634 Wilburgstetten

Phone: +49 9853 338-0 Fax: +49 9853 338-100 www.rettenmeier.com/en/home.html

2.2 PRODUCTS

A. Lignotrend LIGNO Rippe Q3 (Ceiling element with acoustic components for large spans)

Lignotrend LIGNO Block Q 90 (Ceiling and Flooring element)

B. Rettenmeier Konstruktionsvollholz KVH®-1plus® (NSI) C/D. Rettenmeier Oak

Seite: 37/127

06 12 00 Structural Panels

Part 1 GENERAL 1.1 SECTION INCLUDES

A. Structural Panels for Framing B. Structural Panels for Flooring

1.2 SUBMITTALS

A. Weblink to Product Information: http://www.fh-finnholz.de/kerto-q.html

Weblink to Product certification: www.fh-finnholz.de/english/download.html

(CD: Plan# I-210-240) B. Datasheet Elka (CD: Plan# I-621, I-652-655)

Part 2 PRODUCTS 2.1 MANUFACTURER

A. FH-Finnholz GmbH Industriestraße 27 49536 Lienen Phone: +49 5483 1624 Fax: +49 5483 1245 Email: info@fh-finnholz.de Web: www.fh-finnholz.de

B. elka-Holzwerke Hochwaldstraße 44

D-54497 Morbach

Phone : +49 (0) 6533 / 956 0 Fax : +49 (0) 6533 / 956 220 E-Mail : info@elka-holzwerke.de Web: www.elka-Holzwerke.eu

2.2 PRODUCTS

A. Kerto Q B. Elka Honeycomp wooden board, Interlayer, 70mm

Seite: 38/127

06 16 00 Sheathing

Part 1 GENERAL 1.1 SECTION INCLUDES

A. 06 16 00 Sheathing B. 06 16 36 Wood Panel Product Sheathing

1.2 SUBMITTALS

A/B. Datasheet OSB 3 (CD: Plan# I-652-657)

Part 2 PRODUCTS 2.1 MANUFACTURER

A/B. Agepan Glunz AG Grecostraße 1 D-49716 Meppen Phone: +49 (59 31) 4 05-0 Fax: +49 (59 31) 4 05-2 99

E-Mail: info@glunz.de Web: www.agepan.de

2.2 PRODUCTS

A. OSB 3

Seite: 39/127

06 17 33 Wood I-Joists

Part 1 GENERAL 1.1 SECTION INCLUDES

A. Timber construction for double floor

1.2 SUBMITTALS

A. Datasheet

Part 2 PRODUCTS 2.1 MANUFACTURER

A. Finnforest Deutschland GmbH Louis-Krages-Str. 30 D-28237 Bremen

Phone: +49 421 6911 - 0 Fax: +49 421 6911 - 100 E-Mail: germany@finnforest.com Web: www.finnforest.de

2.2 PRODUCTS

A. Finnjoist FJI 58

Seite: 40/127

06 40 00 Architectural Woodwork

Part 1 GENERAL 1.1 SECTION INCLUDES

A. 06 41 00 Architectural Wood Casework B. 06 43 13 Wood Stairs

1.2 SUBMITTALS

A. Datasheet MDF (CD: Plan# I-210-I-240) Certificate MDF B. Datasheet (CD: Plan# I-270, I-271, I-278)

Part 2 PRODUCTS 2.1 MANUFACTURER

A. Agepan Glunz AG Grecostraße 1 D-49716 Meppen Phone: +49 (59 31) 4 05-0 Fax: +49 (59 31) 4 05-2 99

E-Mail: info@glunz.de Web: www.agepan.de

B. EGGER Holzwerkstoffe Brilon GmbH & Co. KG Im Kissen 19 D-59929 Brilon Phone: +49/29 61/770-0 Fax: +49/29 61/770-62 222 Email: info-bri@egger.com Web: www.egger.com

2.2 PRODUCTS

A. MDF 19 mm Agepan MDF 16 mm Agepan MDF 3 mm Agepan B. egger eurolight

Seite: 41/127

06 60 00 Plastic Fabrications

Part 1 GENERAL 1.1 SECTION INCLUDES

A. 06 63 00 Plastic Railing B. 06 64 00 Plastic Paneling

1.2 SUBMITTALS

A. Product Datasheet Plastic Railing (CD: Plan# I-210-I-240) B. Product Datasheet (LED Lighting) Plexiglas Panels (interior core CD: Plan# I-210-I-240) Product Datasheet Plexiglas (façade CD: Plan# A-714, A- 721-724)

Part 2 PRODUCTS 2.1 MANUFACTURER

A/B. Evonik Röhm GmbH Kirschenallee 64293 Darmstadt Deutschland phone: +49 (0) 61 51 - 18-01 Fax: +49 (0) 61 51 - 18-02

2.2 PRODUCTS

A. Plexiglas GS Evonik 0F00GT B. Interior Core Alternative 1: Evonik Plexiglas Crystal Ice WM500 DC Evonik Plexiglas Satinice WH10 DC Evonik Endlighten 0N002 XL Alternative 2: Evonik Plexiglas Crystal Ice WM500 DC Evonik Plexiglas Satinice WH10 DC Kobek Lightpanel Luxolution For façade-use Plexiglas XT 7mm

Seite: 42/127

07 Thermal and Moisture Protection

07 21 00 Thermal Insulation

Part 1 GENERAL 1.1 SECTION INCLUDES A/B. 07 21 00 Thermal insulation C. 07 21 00 Declining Roof Insulation D. 07 21 23 19 Mineral board Insulation 1.2 SUBMITTALS A. Datasheet Cellulose insulation (CD: Plan# I-621, I-652-655 / A-951) B. Datasheet Adhesive (Product Information from Internet shop) (CD: Plan# S-411-S-416) C. Datasheet Roof Insulation and Certificate (CD: Plan# A-831, A-843, A-851) D. Datasheets Vacuum Insulations Panels (CD: Plan# S-411-S- 416) Part 2 PRODUCTS 2.1 MANUFACTURER

A. Agepan Glunz AG Grecostraße 1 D-49716 Meppen Phone: +49 (59 31) 4 05-0 Fax: +49 (59 31) 4 05-2 99

E-Mail: info@glunz.de Web: www.agepan.de

B. Heinrich Dostmann GmbH Robert Ritschel Industriestraße 13 61449 Steinbach Deutschland C. Paul Bauder GmbH & Co. KG Korntaler Landstraße 63 D-70499 Stuttgart Phone: +49 711/69070 Fax: +49 711/6907300

Seite: 43/127

E-mail: Stuttgart@bauder.de Web: www.bauder.de

D. VARIOTEC GmbH & Co. KG Weißmarterstraße 3-5 D-92318 Neumarkt

phone.: +49 9181 6946-0 Fax: +49 9181 8825 E-Mail: info@variotec.de

www.variotec.de 2.2 PRODUCTS A. Agepan Cell B. NIBOFLOOR PK ELASTIC C. EPS Inclining Insulation EPS 040 DAA dm 100 kPa 20-

80mm D. Variotec Qasa – VIP

Seite: 44/127

07 25 00 Weather Barriers

Part 1 GENERAL 1.1 SECTION INCLUDES A. Vapor Barriers (CD: Plan# A-831, A-843, A-851) B. Water Barriers (CD: Plan# A-831, A-843, A-851) 1.2 SUBMITTALS A. Datasheet B. Datasheet Part 2 PRODUCTS 2.1 MANUFACTURER A/B. Paul Bauder GmbH & Co. KG Korntaler Landstraße 63 D-70499 Stuttgart Phone: +49 711/69070 Fax: +49 711/6907300 E-mail: Stuttgart@bauder.de Web: www.bauder.de 2.2 PRODUCTS A. Interlayer Polymer Bitumen TEC Sprint DUO B. Thermoplan Waterproofing FPO, incl. adhesive

Seite: 45/127

07 26 00 Vapor Retarders

Part 1 GENERAL 1.1 SECTION INCLUDES A. Vapor Retarder 1.2 SUBMITTALS A. Datasheet Vapor Retarder Doerken (CD: Plan# A-951; I-621, I-652-655) Part 2 PRODUCTS 2.1 MANUFACTURER A. Dörken GmbH & Co. KG Wetterstraße 58 D-58313 Herdecke Phone: +49 23 30/63-428 Fax: +49 23 30/63-355 Email: info@doerken.de Web: www.doerken.de 2.2 PRODUCTS A. DELTA®-REFLEX

Seite: 46/127

07 55 00 Protected Membrane Roofing

Part 1 GENERAL 1.1 SECTION INCLUDES A. Building Protection 1.2 SUBMITTALS A. Datasheets (CD: Plan# A-831, A-857) Part 2 PRODUCTS 2.1 MANUFACTURER A. Paul Bauder GmbH & Co. KG Korntaler Landstraße 63 D-70499 Stuttgart Phone: +49 711/69070 Fax: +49 711/6907300 E-mail: Stuttgart@bauder.de Web: www.bauder.de Frank Griebel Verkauf Bauder Werk Bochum Phone: +49 6071/36608 Fax: +49 6071/3444568 2.2 PRODUCTS A. Bauder FSM 1100 Article No.: 7450 0600

Seite: 47/127

07 62 00 Sheet Metal Flashing and Trim

Part 1 GENERAL 1.1 SECTION INCLUDES A. shop-formed accessories and trim, joint-covers, copings 1.2 SUBMITTALS

A. Product Data: non standard articles without existing Datasheet– Special design from Metalworker according to

Construction Documents A-851-855 Part 2 PRODUCTS 2.1 MANUFACTURER A. Stein und Sohn GmbH Rüdesheimer Straße 5 D-65239 Hochheim Phone: +49 6146/2269 Fax: +49 6146/3316 E-mail: info@steinundsohn.de Web www.steinundsohn.de 2.2 PRODUCTS A. Ridge bracket Ridge covering Fascia bracket

Façade completion sheets

Seite: 48/127

07 71 23 Manufactured Gutters and Downspouts

Part 1 GENERAL 1.1 SECTION INCLUDES A. 07 71 33 gutters and downspouts B. 07 72 00 roof accessories 1.2 SUBMITTALS

A/B. Product Data: non standard articles without existing Datasheet– Special design from Metalworker according to

Construction Documents A-854 Part 2 PRODUCTS 2.1 MANUFACTURER A/B. Huppers Udo Huppers GmbH Landwehr 130 D-46514 Schermbeck Telefon 0 28 53/91 46 10 Telefax 0 28 53/91 46 13 Email: huppers-dach@arcor.de 2.2 PRODUCTS A. Downspouts Gutters B. leaves catch tray

Seite: 49/127

07 90 00 Joint Protection

Part 1 GENERAL 1.1 SECTION INCLUDES A. Tapes for interior application B. Tapes for exterior application 1.2 SUBMITTALS

A. Weblink to Product Datasheets: http://www2.siga.ch/product/e_rissan.htm http://www2.siga.ch/product/e_sicrall.htm B. Weblink to Product Datasheets http://www.ts-udio.biz/tsshop2/WGS/1239/PRD/J999895/Alu-bedampftes_PP-Klebeband.htm

Part 2 PRODUCTS 2.1 MANUFACTURER A. SIGA Cover AG Rütmattstrasse 7 CH-6017 Ruswil Phone: + 41 (0) 41 496 62 62 Fax: + 41 (0) 41 496 62 63 Email: siga@siga.ch Web: www.siga.ch B. Trenkenchu & Stadler GbR Schwabenstraße 43 71101 Schönaich Phone: +49 7031/413371 Fax: +49 7031/413372 Email: mail@ts-audio.de Web: http://www.ts-audio.de 2.2 PRODUCTS A. Siga Rissan Siga Sicrall B. Aluminum Tape J999895

Seite: 50/127

08 Openings

08 10 00 Doors and Frames

Part 1 GENERAL 1.1 SECTION INCLUDES A. 08 14 00 Wood Doors B. 08 32 19 Wood-framed Glass doors (sliding and non-sliding) 1.2 SUBMITTALS

A. Product Datasheets (CD: Plan# A-545/546) B. Product Datasheets (CD: Plan# A-510/511, A-540, A-545)

Part 2 PRODUCTS 2.1 MANUFACTURER A/B. Ludwig Häußler GmbH Fenster- und Türenfabrik Draisstr. 48 Industriegebiet West D-67346 Speyer Phone: +49 (0) 6232 / 3144 – 0 Fax: +49 (0) 6232 / 3144 - 37 Email: info@haeussler-fenster.de Web: www.energate.com 2.2 PRODUCTS A. Entrance Door Oak B. Terrace Doors Oak-framed, 3-glass toughened safety glass

As Team Germany’s windows and doors are special designed and actually still in fabrication, the manufacturer is not able yet to publish accordant datasheets containing all values and correct specifications. The system of our windows is similar to the manufacturer’s “Energate”-series. You can find information about this series here: http://www.energate.com/index.php?id=79&L=1

Seite: 51/127

08 50 00 Windows

Part 1 GENERAL 1.1 SECTION INCLUDES A. 08 50 00 Operating Hardware 08 50 00 Louver blinds integral to window construction B. 08 52 00 Wood Windows 1.2 SUBMITTALS

A. Weblink to Window Opener: http://www.hautau.pl/produkte/pdf/Prospekte_PDF/Oberlicht/primat/primat_fl190_prospekt_d.pdf (CD: Plan# A-520/522) Product Datasheet motors (CD: Plan# A-520-523, A-536, A-540-546, A-550-552, A-580-582) Weblink to Motor Controller Datasheet: http://www.vestamatic.com/155/?L=1 (CD: Plan# A-520-523, A-540-542, A-546, A-580-582) Product Datasheets louver blinds (CD: Plan# A-520-523, A- 540-542, A-546, A-580-582) B. Datasheets (CD: Plan# A-510/511, A-540, A-550)

Part 2 PRODUCTS 2.1 MANUFACTURER A. HAUTAU GmbH Bahnhofstr. 56-60 D 31691 Helpsen Phone: +49 (0) 5724 / 393-0 Fax: +49 (0) 5724 / 393-125 E-Mail: info@HAUTAU.de Web: www.hautau.de

Maxon motor GmbH Truderinger Str. 210 D-81825 München phone: +49 89/420493- 0 Fax: +49 89/420493 - 40 E-Mail: info@maxonmotor.de Web: www.maxonmotor.de

Seite: 52/127

Vestamatic GmbH Dohrweg 27 D-41066 Mönchengladbach phone: +49 2161/29408-0 Fax: +49 2161/29408-20 www.vestamatic.com info@vestamatic.com Glas Hahn GmbH Kruppstrasse 6 D-67454 Haßloch / Pf. Phone: +49 (0)6324/92 45-0 Fax: +49 (0)6324/92 45-18

E-Mail: info@glas-hahn.de Web: www.glas-hahn.de

B. Ludwig Häußler GmbH Fenster- und Türenfabrik Draisstr. 48 Industriegebiet West D-67346 Speyer Phone: +49 (0) 6232 / 3144 – 0 Fax: +49 (0) 6232 / 3144 - 37 Email: info@haeussler-fenster.de Web: www.energate.com 2.2 PRODUCTS A. Hautau PRIMAT- FL 190 Motor: Amax22 + HallEnc + GP22A Motor: ASM 44 – SG 13 Controller: IF SMI KNX 24 VDC Louver blinds Ropaco Typ F B. Oak-framed Window, 3-glass toughened safety glass

As Team Germany’s windows and doors are special designed and actually still in fabrication, the manufacturer is not able yet to publish accordant datasheets containing all values and correct specifications. The system of our windows is similar to the manufacturer’s “Energate”-series. You can find information about this series here: http://www.energate.com/index.php?id=79&L=1

Seite: 53/127

08 70 00 Hardware

Part 1 GENERAL 1.1 SECTION INCLUDES A. 08 71 00 Door Hardware 1.2 SUBMITTALS

A. Product Datasheets (CD: Plan# I-210-240)

Part 2 PRODUCTS 2.1 MANUFACTURER

A. Häfele GmbH & Co KG Adolf-Häfele-Str. 1 72202 Nagold Germany Tel: +49 (0)74 52 / 95 - 0 Fax: +49 (0)74 52 / 95 - 2 00 E-Mail: info@haefele.de

Web: www.hafele.com 2.2 PRODUCTS

A. Concealed Hinges 329.07.xxx Spring Hinges 245.54.xxx

Seite: 54/127

08 80 00 Glazing

Part 1 GENERAL 1.1 SECTION INCLUDES A. 08 81 00 Glass Glazing 1.2 SUBMITTALS

A. not yet available Part 2 PRODUCTS 2.1 MANUFACTURER A. Glas Hahn GmbH Kruppstrasse 6 D-67454 Haßloch / Pf. Phone: +49 (0)6324/92 45-0 Fax: +49 (0)6324/92 45-18

E-Mail: info@glas-hahn.de Web: www.glas-hahn.de

2.2 PRODUCTS

A. 3-glass panes toughened safety glass

Seite: 55/127

09 Finishes

09 20 00 Plaster and Gypsum Board

Part 1 GENERAL 1.1 SECTION INCLUDES A. 09 22 00 Support for Gypsum Board B. 09 23 00 Gypsum Plastering 1.2 SUBMITTALS

A. Product Datasheets Plaster Profiles (CD: Plan# A-951) B. Product Datasheet Smartboard (CD: Plan# A-911)

Part 2 PRODUCTS 2.1 MANUFACTURER A. PROTEKTORWERK

Florenz Maisch GmbH & Co. KG Viktoriastraße 58 D-76571 Gaggenau Tel. (0 72 25) 977-0 Fax (0 72 25) 977-180 Email: info@protektor.com Web: www.protektor.com

B. Knauf Gips KG Am Bahnhof 7 D-97346 Iphofen phone: +49 (9323) 31-0 Fax: +49 (9323) 31-277 E-Mail: zentrale@knauf.de Web: www.knauf.de 2.2 PRODUCTS

A. Plaster Profile Profil-Nr. 1315 B. K764 Knauf PCM SmartboardTM 23/26

Seite: 56/127

09 60 00 Flooring

Part 1 GENERAL 1.1 SECTION INCLUDES A. 09 60 00 Flooring B. 09 64 00 Wood Flooring 09 64 23 Wood Parquet Flooring C. 09 68 00 Carpeting 1.2 SUBMITTALS

A. Weblink to Product Datasheet Parquet glue: http://www.wakol.com/de/verlegewerkstoffe/produktprogramm/kleben/parkett-und-kork/ms-260.html (CD: Plan# I-621, I-652-655)

Expansion Joint Cork: no datasheet (rest pieces of cork mats) (CD: Plan# I-621, I-653)

B. outside flooring: not definitely decided no datasheet/no manufacturer (CD: Plan# L-232) Inside flooring: Weblink to Product Information Wood Strip Flooring Parquet (CD: Plan# I-621-657)

http://www.druesedau.de/html/parkett_default.php?id=9&art=3 C. Weblink to Product Datasheet Rug for Galery: (CD: Plan# I-622)

http://www.vorwerk-teppich.de/sc/vorwerk/technische_daten/de/08957.pdf Part 2 PRODUCTS 2.1 MANUFACTURER

A. Wakol GmbH Bottenbacher Str. 30 D-66954 Pirmasens Phone: +49 (0) 63 31 80 01 0 Fax: +49 (0) 63 31 80 01 890

B. DRÜSEDAU - Parkett & Leistenfabrik GmbH & Co. KG.

Bahnhof Densberg D-34632 Jesberg-Densberg

Phone: +49 66 95 - 96 06 - 0 Fax: +49 66 95 - 96 06 - 22 E-Mail: Info@druesedau.de

www.druesedau.de C. Vorwerk & Co. Teppichwerke GmbH & Co. KG Kuhlmannstraße 11

Seite: 57/127

D-31785 Hameln Phone: +49 5151 103-0 Fax: +49 5151 103-377 2.2 PRODUCTS

A. Wakol MS 260 based on polymer B. Oak Terrace Decking Wood Strip Flooring Parquet Oak C. Vorwerk „elemento - Tundra“

Seite: 58/127

09 80 00 Acoustic Treatment

Part 1 GENERAL 1.1 SECTION INCLUDES A. 09 81 00 Acoustic Insulation 1.2 SUBMITTALS

A. Weblink to Product Data for Cork materials: http://www.kork-store.de/shop/product_info.php?products_id=94

(CD: Plan# I-621/622, I-652-655) Datasheet for Knauf insulation layer (CD: Plan# I-621, I-652-655) Weblink to WAKOL insulation mat (CD: Plan# I-621, I-652-655)

http://www.wakol.com/fileadmin/upload/pdf/Technische_Informationen/Verlegewerkstoffe/deutsch/5903D.pdf

Part 2 PRODUCTS 2.1 MANUFACTURER A. Kork-Store Potsdam Lindenstr. 60 D-14467 Potsdam Phone: +49 331 2706808 Fax: +49 331 2706383 E-mail : info@kork-store.de Web: www.kork-store.de Knauf Gips KG Am Bahnhof 7 D-97346 Iphofen phone: +49 (9323) 31-0 Fax: +49 (9323) 31-277 E-Mail: zentrale@knauf.de Web: www.knauf.de

Wakol GmbH Bottenbacher Str. 30 D-66954 Pirmasens Phone: +49 (0) 63 31 80 01 0

Seite: 59/127

Fax: +49 (0) 63 31 80 01 890 2.2 PRODUCTS A. Insulation Corkboard 10 mm Article no. 1210 Insulation Corkboard 5mm Article no. 1250 B. Knauf Brio 23 WF C. WAKOL EM 140

09 90 00 Painting and Coating

Part 1 GENERAL 1.1 SECTION INCLUDES A. 09 91 23 Interior Painting 1.2 SUBMITTALS

A. --- Part 2 PRODUCTS 2.1 MANUFACTURER A. not yet decided 2.2 PRODUCTS A. not yet decided color: white

Seite: 60/127

10 Specialties

10 28 00 Toilet, Bath, and Laundry Accessories

Part 1 GENERAL

1.1 SECTION INCLUDES A. 10 28 16.13 Residential Bath Accessories

1.2 SUBMITTALS

A. ---

Part 2 PRODUCTS

2.1 MANUFACTURER

A. not yet decided

2.2 PRODUCTS A. Towel bars Toilet paper dispensers Etc.

Seite: 61/127

10 70 00 Exterior Specialties

Part 1 GENERAL

1.1 SECTION INCLUDES A. 10 71 13 Exterior Sun Control Devises

1.2 SUBMITTALS

A. Weblink to Product Datasheet Substructure http://www.glashauskg.de/Glashaus-KG.pdf

(CD: Plan# A-520/523, A-536, A-550-552) Part 2 PRODUCTS

2.1 MANUFACTURER

A. Glashaus KG

Feilitzschstraße 21 D- 80802 München Phone: +49 89/33 03 81 85 Fax: +49 89/33 03 81 86 Email: info@glashauskg.de Web: www.glashauskg.de/index.html

2.2 PRODUCTS

A. System Brillona www.glashauskg.de/brillona.html

Seite: 62/127

11 Equipment

11 30 00 Residential Equipment

Part 1 GENERAL

1.1 SECTION INCLUDES A. 11 31 13 Residential Kitchen Appliances B. 11 31 23 Residential Laundry Appliances

1.2 SUBMITTALS

A. Datasheets for Kitchen Appliances (CD: Plan# I-331-I-351) B. Datasheets for Laundry Appliances (CD: Plan# I-331-I-351)

Part 2 PRODUCTS

2.1 MANUFACTURER

A/B. Miele & Cie. KG

Carl-Miele-Straße 29 D-33332 Gütersloh

Phone: +49 52 41/ 89 - 0 Fax: +49 52 41/ 89 - 20 90 E-Mail: info@miele.de Web: www.miele.de

2.2 PRODUCTS

A. Refrigerator/Freezer Combination Miele KF 9757 ID Dishwasher Miele G 1562 SCVi Steamer Miele Dgc 5080 Induction Cooker Miele KM 5975 Coffee Machine Miele CVA 5060 Fume Extraction Hood Miele DA 3190 B. Cloth Washer Miele W 3985 WPS or Allwater W3841 Laundry Dryer T 3841

Seite: 63/127

12 Furnishings

12 30 00 Casework

Part 1 GENERAL

1.1 SECTION INCLUDES A. 12 36 19 Manufactured Wood Casework

1.2 SUBMITTALS

A. Product Data: non standard articles without existing Datasheet– Special design from Team Germany according to Construction Documents I-331, I-332, I-322, I-351

Part 2 PRODUCTS

2.1/2.2 MANUFACTURER/PRODUCTS

A. Kitchen counter top; self made by Team Germany with support from a professional carpenter

Seite: 64/127

12 40 00 Furnishings and Accessories

Part 1 GENERAL

1.1 SECTION INCLUDES A. 12 42 00 Table Accessories B. 12 43 13.13 Desk Lamps C. 12 43 13.19 Floor Lamps D. 12 44 00 Bath Furnishings E. 12 45 00 Bedroom Furnishings

1.2 SUBMITTALS

A. Product Data: not yet decided B. Weblink to Datasheet for LED high power Desk lamp (CD: Plan# I-331-I-351)

http://engine.artemide.com/article.aspx?button=0&language=de&productids=art0829010A&product_level=artoneline_pr_tavolo_led

C. Datasheet for Floor Lamps (alternatives possible) (CD: Plan# I-331-I-351)

http://pdf.archiexpo.com/pdf/occhio/produkt-book/53078-25186.html D. Product Data: not yet decided E. Product Data: not yet decided

Part 2 PRODUCTS

2.1 MANUFACTURER A/D/E. not yet decided B. eventually: Artemide GmbH

Deutschland Hans-Böckler-Straße 2 D-58730 Fröndenberg

Phone: (+49) 02373/975-0 Fax: (+49) 02373/975-2-09 E-Mail: personal@artemide.de Web: www.artemide.de

C. Occhio axelmeiselicht AML Licht + Design GmbH Wiener Platz 7 Rgb. D-81667 München Phone: +49-89-44 77 86 30 Fax: +49-89-44 77 86 39 Email: info@occhio.de

Seite: 65/127

Web: www.occhio.de 2.2 PRODUCTS A/D/E. not yet decided B. eventually: Artemide One Line LED Tavolo C. probably: Occhio Sento lettura

Seite: 66/127

12 50 00 Furniture

Part 1 GENERAL

1.1 SECTION INCLUDES A. 12 58 00 Residential Furniture

1.2 SUBMITTALS

A. Product Data: not yet decided

Part 2 PRODUCTS

2.1/2.2 MANUFACTURER/PRODUCTS

A. Couch – not yet decided Dining Tables and Chairs – not yet decided

13 Special Construction

Seite: 67/127

14 Conveying Equipment

14 80 00 Scaffolding

Part 1 GENERAL

1.1 SECTION INCLUDES A. 14 81 16 Carriage Scaffolding

1.2 SUBMITTALS

A. Product Data: Datasheet (CD: Plan# L-501)

Part 2 PRODUCTS

2.1 MANUFACTURER A. Wilhelm Layher GmbH & Co. KG

Ochsenbacher Straße 56 D-74363 Güglingen-Eibensbach,

phone: +49 (0) 7135 70-0

Fax: + 49 (0) 7135 70-265 E-Mail: info@layher.com

Web: http://www.layher.de/ http://www.layherusa.com/

2.2 PRODUCTS A. Layher Allround System

21 Fire Suppression

Seite: 68/127

22 Plumbing

22 10 00 Plumbing Piping and Pumps

Part 1 GENERAL

1.1 SECTION INCLUDES A. 22 11 16 Domestic Water Piping B. 22 11 23 Domestic Water Pumps C. 22 12 00 Facility Potable-Water Storage Tank

1.2 SUBMITTALS

A. Product Data: Datasheets (CD: Plan# P-311-331, P-411-451) B. Product Data: Datasheets (CD: Plan# P-311/P-511) C. Weblink to Product Information: http://www.dlkunststofftechnik.com/html/produkte.php Cerificate

Part 2 PRODUCTS

2.1 MANUFACTURER A. REHAU AG + Co

Rheniumhaus D-95111 Rehau

Phone: +49 92/ 83-77 0 E-Mail: info@rehau.com Web: www.rehau.de

Abu-plast Kunststoffbetriebe GmbH Am Bahnhof 20 D-96472 Rödental Phone: +49 (0)9563/93-0 Fax +49 (0)9563/93-226 B. GRUNDFOS GMBH Schlüterstraße 33 D-40699 Erkrath Phone: +49 (0)211 92969 0 E-Mail: infoservice@grundfos.de

Seite: 69/127

Web: www.grundfos.de

C. DL-Kunststofftechnik Dietmar Leyh Ackerstr. 36

D-59423 Unna

Phone: +49 (23 03) 96 85 83 Fax: +49 (23 03) 87 19 22 E-Mail: info@dlkunststofftechnik.com Web: www.dlkunststofftechnik.com

2.2 PRODUCTS A. Versital Pipe – Rautitan Flex 130490-050 Sliding sleeve Rautitan PX 160002-001 Clip element 138043-001 T-piece, Rautitan PX 160032-001 Fitting, Rautitan PX 160011-001 Bridge – Rautitan MX 137134-001 Bridge Angle – Rautitan MX 137134-001 Bridge – Rautitan MX 139571-002 Angle – Rautitan PX, 90° 160022-001 Installation Angle – Rautitan MX 138491-405 Disposal Pipe, Raupiano Plus 12104-004 Disposal Pipe, Raupiano Plus 12184-004 Arc 45° Raupiano Plus 121114-001 Arc 45° Raupiano Plus 121164-001 Single Branch, Raupiano Plus 121264-001 Maintenance Pipe, 121524-002 Abu Pipeventilair Article No. 760099 Abu Pipeventilair Article No. 760399 B. Water pressure Pump Grundfos Jet Pump JP 5 Article No. 130490-050 Pump Add-on Grundfos

C. Wastewater Tank Freshwater Tank Irrigation Tank

Seite: 70/127

22 40 00 Plumbing Fixtures

Part 1 GENERAL

1.1 SECTION INCLUDES A. 22 40 00 Plumbing Fixtures

B. 22 41 00 Residential Plumbing Fixtures C. 22 41 13 Residential Water Closets, Urinals and Bidets D. 22 41 16 Residential Lavatories and Sinks E. 22 41 23 Residential Shower Receptors and Basins

1.2 SUBMITTALS

A. Product Data: Datasheets (CD: Plan# I-521, I-531, I-552) B. Product Data: Datasheets (CD: Plan# I-521, I-531, I-552) C. Product Data: Datasheets (CD: Plan# I-521, I-531, I-552) D. Product Data: bathroom sink: non standard articles without existing

Datasheet– Special design from KleinDesign according to Construction Documents I-521

kitchen sink: new Dornbracht series – actually no datasheets available: some Information and http://www.sadorex.ch/de/productdetail---1--1002--1007--1257--1--100378--0--0--0--0--0--378--0--0.html E. Product Data: non standard articles without existing

Datasheet– Special design from KleinDesign according to Construction Documents I-521

Part 2 PRODUCTS

2.1 MANUFACTURER

A/C. DURAVIT Aktiengesellschaft

Werderstraße 36 D-78132 Hornberg Phone: +49 7833/70-0 Fax: +49 7833/70-289

Email: info@duravit.de Web: www.duravit.de Geberit Vertriebs GmbH

Theuerbachstraße 1 D-88630 Pfullendorf

Phone: +49 75 52 934-01

Fax: +49 75 52 934-300

Seite: 71/127

E-Mail: sales.de@geberit.com Web: www.geberit.com

B. Aloys F. Dornbracht GmbH & Co. KG

Köbbingser Mühle 6 D-58640 Iserlohn Phone: +49 (0)2371-433-0 Fax: +49 (0)2371-433-232 E-Mail: info@dornbracht.de Web : www.dornbracht.de

D/E. Klaus Klein Gmbh

Zum Kaiserbusch 18 D-48165 Münster Phone: +49 251 - 61 70 79 Fax: +49 251 - 62 57 15 E-mail: info@klausklein-gmbh.de Web : http://www.kleindesign-muenster.de/index.htm

2.2 PRODUCTS

A/C. Toilet Duravit 221709

Toilet Seat Duravit 6769 Installation Geberit 458.103.00.1 Push-button Geberit 115.770.xx.1 B. Shower Disposer Dornbracht 41400979 Shower Disposer Sprinkler Dornbracht 27809980 Flush-mounting thermostat Dornbracht 36416780 Flush-mounting device Dornbracht 36310980 Mixing Valve Dornbracht 3552897090 Guiderail Dornbracht 1231097090 Wall bracket Dornbracht 3508597090 Faucet Dornbracht 13800980 Flush-mounting device Dornbracht 3569097090 Mixing Valve Dornbracht 36320980 Kitchen sink Dornbracht Prep DF 1110 Faucet Dornbracht 32800680 D/E. Lavotory Shower Basin

Seite: 72/127

23 HVAC

23 30 00 HVAC Air Distribution

Part 1 GENERAL

1.1 SECTION INCLUDES A. 23 30 00 HVAC Air Distribution B. 23 33 00 Air Duct Accessories C. 23 34 00 HVAC Fans D. 23 37 00 Air Outlets and Inlets

1.2 SUBMITTALS

A-D. Product Data: Datasheets

Part 2 PRODUCTS

2.1 MANUFACTURER A/D. Nilan Deutschland GmbH Schenkgasse 9 D - 96472 Rödental Phone: +49 9563 / 3075-0

Fax: +49 9563 / 3075-22 E-Mail: info@nilan.de

Web: www.nilan.de B. ebm-papst Mulfingen GmbH & Co. KG Bachmühle 2 D-74673 Mulfingen Phone: +49 7938 81-0 Fax: +49 7938 81-110 E-Mail: info1@de.ebmpapst.com Web: www.ebmpapst.com Robert Geiger Technische Bauteile GmbH Weiler Weg 14 D-89335 Ichenhausen Phone: +49 (0)8223 9688-0 Fax: +49 (0)8223 3764

Seite: 73/127

Ludwig Häußler GmbH Fenster- und Türenfabrik Draisstr. 48 Industriegebiet West D-67346 Speyer Phone: +49 (0) 6232 / 3144 – 0 Fax: +49 (0) 6232 / 3144 - 37 Email: info@haeussler-fenster.de Web: www.energate.com C. ebm Papst (see B)

2.2 PRODUCTS A. Air Distribution pipe ø 75mm W 420001 Air Distribution pipe ø 160 mm Air Distribution pipe ø 200 mm Connection sleeve ø 75 mm W 441001 B. Lamella flap Robert Geiger JK-A-06 L Facade flaps Energate (custom made, no datasheet) C. EC radial fan ebm Papst D3G 133-BF03 -02 D. Supply Air exhaust Nilan W 409002 Supply Air distributor W 401110 Supply Air distributor W 401202 Discharged Air Distributor (custom made, no datasheet) Grid for supply air exhaust (custom made, no datasheet)

Seite: 74/127

23 50 00 Central Heating Equipment

Part 1 GENERAL

1.1 SECTION INCLUDES A. 23 56 00 Solar Energy Heating Equipment

1.2 SUBMITTALS

A. Product Data: Datasheet

Part 2 PRODUCTS

2.1 MANUFACTURER A. Nilan Deutschland GmbH Schenkgasse 9 D - 96472 Rödental Phone: +49 9563 / 3075-0

Fax: +49 9563 / 3075-22 E-Mail: info@nilan.de

Web: www.nilan.de

2.2 PRODUCTS

A. Nilan VP 18 (C)

Seite: 75/127

23 70 00 Central HVAC Equipment

Part 1 GENERAL

1.1 SECTION INCLUDES A. 23 71 13 Thermal Heat storage

1.2 SUBMITTALS

A. Product Data: Datasheet

Part 2 PRODUCTS

2.1 MANUFACTURER A. Dörken GmbH & Co. KG Wetterstraße 58 D-58313 Herdecke Phone: +49 23 30/63-428 Fax: +49 23 30/63-355 Email: info@doerken.de Web: www.doerken.de

2.2 PRODUCTS A. Delta Cool 23 in Polycarbonate Profiles

24 ---

Seite: 76/127

25 Integrated Automation

25 30 00 Integrated Automation Instrumentation and Terminal Devices

Part 1 GENERAL

1.1 SECTION INCLUDES

A. 25 30 00 Integrated Automation Instrumentation and Terminal Devices

B. 25 35 16 Integrated Automation Sensors and Transmitters C. 25 37 00 Integrated Automation Instrumentation and

Terminal Devices for Communication Systems

1.2 SUBMITTALS

A. Product Data: Datasheets (CD: Plan# E-121/122, E-133, E- 502, E-507) Web:www.crestron.com/products B. Product Data: not yet decided C. Product Data: Datasheets (CD: Plan# E-401-403, E-411-417, E-420/421, E-501/503)

http://www.knx-gebaeudesysteme.de/sto_g/English/_HTML/rubric_list.htm

Part 2 PRODUCTS

2.1 MANUFACTURER A. Crestron Germany GmbH

Ringstr. 1 D-89081 Ulm-Lehr

Phone: +49 731-96 281 0 Fax: +49 731-96 281 50 Email: info@crestron.de Web: www.crestron-home.de

Busch-Jaeger Elektro GmbH

Freisenbergstraße 2 D-58513 Lüdenscheid Phone: +49 23 51/ 9 56-0 Fax: +49 23 51/ 9 56-1694 Email: info.bje@de.abb.com Web: www.busch-jaeger.de

Seite: 77/127

Apple Sales International Hollyhill Industrial Estate Hollyhill, Cork; Republic of Ireland

B. not yet decided C. ABB Joseph Hogan Affolternstrasse 44 CH-8050 Zurich Switzerland Phone: +41 43 317 7111 Fax: +41 43 317 4420

2.2 PRODUCTS

A. Wall Mount Touch Panel Crestron TPS-6L Wireless Touch Panel Crestron TPS-6X Rack Mount Shelf Crestron RMK5U Back Box Crestron BBI-4000 Gateway Crestron CEN-HPRFGW Control System Crestron CP2E Gateway EIB-Bus System Crestron CG-EIB Gateway DALI Bus System Crestron CG-DALI CG-DALI powersupply CG-DALI PS1 Powersupply CNPWS-75 LCD-touchpanel-4000L I-Pod Docking Station Crestron CENI-IDOC-DS Control Cable CRESNET-NP

Wall Mount Touch Panel BuschJäger Comfort Panel 8136-0-001 I-Phone

C. ABB FC/S 1.1 ABB IPS/S 2.1 ABB JA/S 4230 1M ABB JSB/S 1.1 ABB SA/S 8.16.5S ABB SV/S 30.320.5 ABB SV/S 30.640.5 ABB US/U 2.2 ABB US/U 4.2 ABB WES/A 1.1 ABB WZ/S 1.1 ABB RC/A 8.1 ABB SA/M 2.6.1 ABB SD/M 2.6.1 ABB JA/M 2.230.1

Seite: 78/127

26 Electrical

26 05 00 Common Work Results for Electrical

Part 1 GENERAL

1.1 SECTION INCLUDES

A. 26 05 13 Medium-Voltage Cables B. 26 05 36 Cable Trays for Electrical Systems

1.2 SUBMITTALS

A. Product Data: Datasheets (CD: Plan# E-301-E-421, E-501) B. Product Data: Datasheets (CD: Plan# I-623, I-651/652/656/657)

Part 2 PRODUCTS

2.1 MANUFACTURER

A. HELUKABEL GmbH Dieselstrasse 8-12 D - 71282 Hemmingen / Stuttgart Phone: + 49 (0) 7150 / 9209-0 Fax: + 49 (0) 7150 / 81 78 6 E-Mail: info@helukabel.de Web: www.helukabel.de B. Hager Tehalit Vertriebs GmbH & Co. KG

Zum Gunterstal D-66440 Blieskastel

Phone: +49 6842 945-0 Fax: +49 6842 945-7666 Email: info@hager.de Web: www.hager.de

2.2 PRODUCTS A. Helukabel NYM-J 3x1.5/3x2.5/5x2.5 (inflexible wire) Helukabel H07-BQ-F 3x1.5/3x2.5/5x2.5 (flexible wire) Helukabel J-Y (St)-Y 4x0.8 (KNX bus wire) B. Standard Cable Conduit

Seite: 79/127

26 20 00 Low-Voltage Electrical Distribution

Part 1 GENERAL

1.1 SECTION INCLUDES

A. 26 24 00 Switchboard and Equipment B. 26 27 16 Electrical Cabinets and Enclosures C. 26 27 26 Wiring Devices

1.2 SUBMITTALS

A. Product Datasheets (CD: Plan# E-301-307, E-401-410, E-418/419) B. Product Datasheets C. Product Data: Datasheets receptacles, switches (CD: Plan# E-502, E-507)

Part 2 PRODUCTS

2.1 MANUFACTURER

A. ABB Joseph Hogan Affolternstrasse 44 CH-8050 Zurich Switzerland Phone: +41 43 317 7111 Fax: +41 43 317 4420 B. Rittal GmbH & Co. KG Auf dem Stützelberg D-35745 Herborn Phone: +49 2772 - 505 - 0 Fax: +49 2772 - 505 - 2319 E-Mail: info@rittal.de Web: www.rittal.de ABB Striebel & John C. Busch-Jaeger Elektro GmbH

Freisenbergstraße 2 D-58513 Lüdenscheid Phone: +49 23 51/ 9 56-0 Fax: +49 23 51/ 9 56-1694

Seite: 80/127

Email: info.bje@de.abb.com Web: www.busch-jaeger.de

2.2 PRODUCTS A. ABB S 751-3-E35 ABB Limitor B TNS ABB ZS/S 1.1 ABB F 204

ABB S-800 PV ABB NEOZED ABB UD/S 2.300.3 ABB S 203-B 40 ABB DBB 13000 ABB F 271 A-B16/0,03 ABB F274 AB-20/0,03 ABB S 201-B 16 ABB S 201-B 20 ABB S 201-B 40 ABB S 203-B 20

B. Basis Rittal flexRack(i) WS –Wandschränke IP 5 5 3/2WS WS – Wandschränke IP 3/2FS C. Light Switch Busch future linear Shading Switch Busch KNX-sensor Isolated Ground Receptacle

Seite: 81/127

26 30 00 Facility Electrical Power Generating and Storing Equipment

Part 1 GENERAL

1.1 SECTION INCLUDES

A. 26 31 00 Photovoltaic Collectors Roof Photovoltaic Collectors Façade B. 26 32 00 Packaged Generator Assemblies

1.2 SUBMITTALS

A. Product Data: Datasheets (CD: Plan# E-309-311, E-314-319) B. Product Data: Datasheets (CD: Plan# O-110-O-310)

Part 2 PRODUCTS

2.1 MANUFACTURER A. SunPower GmbH

Wiesenstrasse 5 D- 60385 Frankfurt a.M.

Phone: +49 (0) 69 9563471-0 Fax: +49 (0) 69 9563471 99

E-Mail: solarde@sunpowercorp.com Web: www.sunpowercorp.de Home Website: www.sunpowercorp.com

Würth Solar GmbH & Co. KG

Alfred-Leikam-Str. 25 D-74523 Schwäbisch Hall

Phone: +49 (0) 7 91 946 00 – 0 Fax: +49 (0) 7 91 946 00 - 119 Email: wuerth-solar@we-online.de Web: www.wuerth-solar.de    

  B.   ENDRESS Elektrogerätebau GmbH Neckartenzlinger Straße 39 D-72658 Bempflingen

Seite: 82/127

Phone: +49 (0) 71 23 / 97 37 - 0 Fax +49 (0) 71 23 / 97 37 - 50 Email: info@endress-generators.de Web: www.endress-generators.de

  2.2 PRODUCTS A. Sunpower 300 Solar Panel WHT-300-l Würth Solar WSG00xx B. Endress Synchron Generator ESE 4500 T

Seite: 83/127

26 50 00 Lighting

Part 1 GENERAL

1.1 SECTION INCLUDES

A. 26 51 13 Interior Lighting Fixtures, Lamps and Ballasts B. 26 56 00 Exterior Lighting

1.2 SUBMITTALS

A. Product Data: Datasheets (CD: Plan# E-211, E-212) B. Product Data: Datasheets (CD: Plan# L-233)

Part 2 PRODUCTS

2.1 MANUFACTURER

A. Occhio AML Licht + Design GmbH Wiener Platz 7 Rgb. D-81667 München Phone: +49-89-44 77 86 30 Fax: +49-89-44 77 86 39 Email: info@occhio.de

Web: www.occhio.de A/B. LUMITRONIX® LED-Technik GmbH

Haigerlocher Str. 42 D-72379 Hechingen

Phone: +49 (0) 7471 / 96014 -0

Fax +49 (0) 7471 / 96014 -99 Email: mail@leds.de

Web: www.leds.de

2.2 PRODUCTS A. Occhio System Pendulum lamp Occhio System Wall lamp High Power LED-light stripes Lumitronix High Power LED-light spots Lumitronix B. High Power LED-light spots Lumitronix

Seite: 84/127

27 Communications

27 40 00 Audio-Video Communications

Part 1 GENERAL

1.1 SECTION INCLUDES

A. 27 41 00 Audio-Video Systems

1.2 SUBMITTALS

A. Product Data: Datasheets (CD: Plan# E-121, E-132/133, E-502, E-507)

Part 2 PRODUCTS

2.1 MANUFACTURER A. Crestron Germany GmbH

Ringstr. 1 D-89081 Ulm-Lehr

Phone: +49 731-96 281 0 Fax: +49 731-96 281 50 Email: info@crestron.de Web : www.crestron-home.de

Artison 774 Mays Blvd., Suite 10-183 Artison and Sonance Incline Village, Nevada 89451 Products are USA obtained through:

Mediacraft AG Phone: 775-833-4344 Gaugrafenstraße 19-23 Fax: 775-833-0223 D-60489 Frankfurt Phone: +49 69/3008800 Fax: +49 69/30854888

Sonance Office 212 Avenida Fabricante San Clemente, CA 92672-7531 U.S.A.

Phone: 1.800.582.7777 Email: tech@sonance.com

Seite: 85/127

Philips GmbH

Lübeckertordamm 5 D-20099 Hamburg Phone: +49 (0)40 - 28 99 0 Fax:+49 (0)40 - 28 99 28 29 Email: unternehmenskommunikation@philips.com Web: www.philips.de Loewe AG Industriestraße 11 D- 96317 Kronach Phone: +49 (0)9261 / 99-0 Fax: + 49 (0)9261 / 99-500 Email: ccc@loewe.de Apple Sales International Hollyhill Industrial Estate Hollyhill, Cork Republic of Ireland

2.2 PRODUCTS

A. Media Soundcontrol Crestron AMSI Front Speaker Artison Portrait LCR Satellite Speaker Sonance VP 65S SUR Subwoofer Sonance SAW Blu-Ray Player Philips BDP5000 Television Loewe 68436U42 Apple I-POD

Seite: 86/127

28 Electronic Safety and Security

28 05 00 Common Work Results for Electronic Safety and Security

Part 1 GENERAL

1.1 SECTION INCLUDES

A. 28 05 13 Conduction and Cables for Electronic Safety and Security

1.2 SUBMITTALS

A. Product Data: Datasheets (CD: Plan# A-781/782)

Part 2 PRODUCTS

2.1 MANUFACTURER A. LAGRA ELEKTROTECHNIK GMBH Bahnhofstrasse 8 D-69245 Bammental Phone: +49 (0) 6223 - 47101 Fax: +49 (0) 6223 - 49152 Email: info@lagra.de Web: www.lagra.de 2.2 PRODUCTS A. Lagra VS-505.1-M Conduit fitting Lagra VS-505-PG Conduit fitting Lagra VS-506-GAS Conduit fitting Lagra Junction Box Series T Lagra Conduit 5/LA Lagra Connector Box

Seite: 87/127

28 30 00 Electronic Detection and Alarm

Part 1 GENERAL

1.1 SECTION INCLUDES

A. 28 31 00 Fire Detection and Alarm

1.2 SUBMITTALS

A. Product Data: Datasheets (CD: Plan# F-211)

Part 2 PRODUCTS

2.1 MANUFACTURER

A. ABB Joseph Hogan Affolternstrasse 44 CH-8050 Zurich Switzerland Phone: +41 43 317 7111 Fax: +41 43 317 4420 2.2 PRODUCTS A. Optical Smoke Detection ORM 2151

Seite: 88/127

29 ---

30 ---

31 Earthwork

32 Exterior Improvement

33 Utilities

34 Transportation

35 Waterway and Marine Construction

36 ---

37 ---

38 ---

39 ---

40 Process Integration

41 Material Processing and Handling Equipment

Seite: 89/127

42 Process Heating, Cooling, and Drying Equipment

42 31 16 Dessicant Equipment

Part 1 GENERAL

1.1 SECTION INCLUDES

A. Dehumidifier Humidifier

1.2 SUBMITTALS

A. Product Data: Datasheets (CD: Plan# M-222)

Part 2 PRODUCTS

2.1 MANUFACTURER

A. ClimeTools Florian-Geyer-Weg 4a D-97204 Höchberg Phone: +49 931 4043743 Fax: +49 931 4043745 E-Mail: info@climetools.de Web: www.climetools.de 2.2 PRODUCTS A. Dehumidifier climetools CT-10+ Humidifier climetools CT-B450+

43 Process Gas and Liquid Handling, Purification, and Storage Equipment

44 Pollution Control Equipment

45 Industry-Specific Manufacturing Equipment

46 ---

47 ---

Seite: 90/127

48 Electrical Power Generation

48 10 00 Electrical Power Generation Equipment

Part 1 GENERAL

1.1 SECTION INCLUDES

A. 48 19 16 Electrical Power Generation Inverters

1.2 SUBMITTALS

A. Product Data: Datasheets for Inverters for roof-used PV (CD: Plan# E-309-311) Datasheets for Inverters for façade-used PV (CD: Plan# E-326/327)

Part 2 PRODUCTS

2.1 MANUFACTURER A. SMA Solar Technology AG Sonnenallee 1 D-34266 Niestetal Phone: +49 561 95 22-0 Fax: +49 561 95 22-100 E-Mail: info@SMA.de

Web: www.SMA.de Würth Solar GmbH & Co. KG

Alfred-Leikam-Str. 25 D-74523 Schwäbisch Hall

Phone: +49 (0) 7 91 946 00 – 0 Fax: +49 (0) 7 91 946 00 - 119 Email: wuerth-solar@we-online.de Web: www.wuerth-solar.de  

2.2 PRODUCTS

A. Sunny boy 1100/1700 Sunny Mini Central 5000A Würth Solar SolarMax IQ 1000/2000 WR10007

Seite: 91/127

4. Structural Calculations

Structural Calculations calculated and stamped by: Dipl.-Ing. Jochen Stahl, P.Eng. Department of Engineering and Geodesy Petersenstraße 12 64287 Darmstadt Phone: +49 6151/167436 Fax: +49 6151/162338 stahl@iwmb.tu-darmstadt.de Tragwerk+ Frankfurter Straße 15 Weiterstadt For calculations follow this link to Appendix!

Seite: 92/127

5. Detailed Water Budget

The Water budget is integrated in the Construction Drawings – subset Plumbing, Supply and Removal, Plan number: #P-211

6. Summary of Unlisted Electrical Components

According to the different Standards in America and Germany, many of our products will not have UL-Certification. Regarding the roof installation we will use SunPower PV-modules SPR-300E-WHT-U with UL-certification: UL-Certification http://us.sunpowercorp.com/downloads/product_pdfs/residential/SunPower_Safety_Installation_Manual_UL_certified_product_Letter_UL_0D_12.pdf IEC-Certification http://us.sunpowercorp.com/downloads/product_pdfs/residential/SunPower_Safety_and_Installation_Instructions_IEC_A.pdf The Inverters from SMA do not have UL-Certification. They meet several standards and regulations in Europe listed in the following graphic. SMA produces inverters for the U.S. market as well, which do have UL-certification UL-Certification of a comparable product of SMA http://download.sma.de/smaprosa/dateien/4752/SUNNYBOY567-DUS091314W.pdf Unlisted electrical components are used in the building façade. As pointed out during the Conference Call between Team Germany, John Wiles, Tom Meyers and Mike Wassmer, on Wednesday May, 27th and the following Emails we will deliver all necessary verifications for the National Mall event to prove the security for the visitors. Regarding the façade, we actually plan to use unlisted products for PV-modules and inverters. Further changes have to be done in coordination with John Wiles and Tom Meyers. The PV-module will be produced by Würth Solar. The standard size PV-module is certified in the IEC Standard. We will send a copy to John Wiles and Tom Meyers if document is available for us. The inverters are produced by Solar-Max. Similar to the actually chosen inverter, the products produced in Switzerland meet several standards and regulations in Europe listed in the following graphic.

Seite: 93/127

Seite: 94/127