Individual 3rd semester horizontal decisions

  • View
    238

  • Download
    0

  • Category

    Design

Preview:

Citation preview

Date: 09/01/2015

Location: KEA, Denmark

Presenter(s):Vladislav Nedelev

PRESENTATION INFO.

Аз се казвам Шарли

Vladislav NedelevStory partition

G:\E2014_Semester_3\Exam Projects ,3J A-2014\Group 4\Individual\Vladislav Nedelev© 2014 Modular One

Presenter
Presentation Notes
LORA

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

Standard construction

(99)3.21(99)5.11(99)5.12

(99)3.21(99)5.11(99)5.12

Documents:

Lima:

Crail:

Property analysis

© 2015 Modular One

Presenter
Presentation Notes
Crail & Lima All measurement for every 2/3 types that we have in this 2 projects

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

Standard construction

(99)5.12

(99)3.21

(99)5.22

Building part note Building element specification

© 2015 Modular One

Presenter
Presentation Notes
Fiber concrete + steel and grass fibes Rockwool | Fire резистънс 3 types of beam Клик-клак connections. I, O, T profile

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

Utilities

Electricity | Ventilation | Sewage | Domestic water

1.45m218 x 82 cm

Shaft In the internal walls

© 2015 Modular One

Presenter
Presentation Notes
Weak points in the electrycity Host ~1,50 m2 Soft conection Horizontal it okey, but not and vertical it is okey

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

Key junction

(99)4.22(99)5.33

© 2015 Modular One

Presenter
Presentation Notes
Floor, Foundation and Wall Resting on the beam to the grid line Here is one more key junction between 2 floors and foundation.

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

Key junction

(99)5.34© 2015 Modular One

Presenter
Presentation Notes
2 walls ceiling and floor 12 mm floor finishing Light hight 2600

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

Drawings

(99)5.99© 2015 Modular One

Presenter
Presentation Notes
Light hight 2600

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам ШарлиFactory flow Factory flow schedule Flow Process Chart

© 2015 Modular One

Presenter
Presentation Notes
NFC chip/Stickers in every corner of the control where is the floor and what kind it is? 4 lines producting ceiling 1 line dealing with concrete element 1 line insulation

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам ШарлиList of machines prices

© 2015 Modular One

Presenter
Presentation Notes
Loading

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

Presenter
Presentation Notes
Under pressure like pump placing the glue

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

Presenter
Presentation Notes
Air robot moving the insulation and pressing it afterwoods But how the insulation is coming in this boxes?

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

Presenter
Presentation Notes
1 working space for loading the production line

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

Presenter
Presentation Notes
Cutting machine

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

Presenter
Presentation Notes
Robot again with air ‘like vocum cleaner’ And placing them on anoter moving line

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли Control wasterecycling

© 2015 Modular One

Presenter
Presentation Notes
Another working space for a person. Manual Q check and waste in the same box

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

Presenter
Presentation Notes
Rotare the element to position ready for placing the floor

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

Presenter
Presentation Notes
3D scanners BIM project for every module

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

Presenter
Presentation Notes
Tiger Stone 1 more working space Flooring cutted in exact peaces and with numbering system so the person only place it in the machine.

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

Presenter
Presentation Notes
3 mm lyear of protection

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

Presenter
Presentation Notes
3 mm lyear of protection

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

Price & timing

Price:

Materials: 568.14 Equipments: 14.52 Labour: 7.38

Total: 590 04 €

Scheduleworkspaces

14.52 * 60 * 8 * 22 * 12 * 3 = Ʃ Equipments price +10%

45 min for 1 module = = 10 modules/day

Max capacity is 32 modules for 8 hours

© 2015 Modular One

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

© 2015 Modular One

CONTENTS

Individual

o Introo Whyo Standard construction o Key-junction o Factory layouto Production time frameo Price

Аз се казвам Шарли

Everything

Documents:

Property analysis

Drawings

(99)3.21

(99)5.11

(99)5.12

(99)5.22

(99)5.33

(99)5.34(99)5.99

(99)4.22

Building part note

Building element specification

List of machines prices

Direct costs Specifications Equipment

Direct Costs Specifications - Material

Direct Costs Specifications - Labour

Factory flow schedule

Factory flow

© 2015 Modular One