View
228
Download
2
Category
Tags:
Preview:
DESCRIPTION
Building Green 2013
Citation preview
SolarLeaf -from the idea to the first pilot project atIBA 2013 in Hamburg
Dr.-Ing. Jan Wurm, Arup Materials Consulting, Berlin
2 Think Global -Act Local
3 Arup Berlin – orchestra of disciplines
4
projects
5
CONCEPT SCHEME DETAIL DESIGN CONSTRUCTION OPERATIONS
Unser Leistungsumfang
66 NATIONAL GEOGRAPHICS KIDS
77
Percentage Renewable Energies of total energy consumption (BMU, 2012)
8
99
Ansicht “Zero Energy” Media Wall
1010
Solar Decathlon 2009, TU Darmstadt, Team Germany
1111
Percentage Renewable Energies of total energy consumption (BMU, 2012)
12
1313
1414 Francois Roche, Stephanie Cavuax, Jean Nauarro
1515
1616
1717
1818
1919
2020
2121
• Total budget DKK 16 million
• Building Lab DK: 50% support (max DKK 8 million)
International CompetitionSmart Material House IBA 2013
2009
Architects: SPLITTERWERK, Graz
Material Consulting / Facade / Building Physics: Arup, Berlin
Structures: Bollinger und Grohmann, Frankfurt
PBR Technology: SSC
2222
Dynamic transmission
2424
2525
2626 © SPLITTERWERK
2727
2828
2929
• Total budget DKK 16 million
• Building Lab DK: 50% support (max DKK 8 million)2010Product developmentArup, COLT, SSC
Funded by ZukunftBau
3030
3131
3232
Dimensions:• Height: ~ 2,6m• Width: ~ 0,7m• Volume ~ 24 l• Weight: ~ 160 kg
Functionalities:• PBR• Solar thermal collector• Dynamic shading
3333
‚solar conversion louvre‘: built-up
Isolierglas (4mm)
SZR (12mm)
Glas-Wandung (10mm)
Medium
Distanzprofil
Klemmrahmen
Überlauf
Anschluss
Steg
3434
‚solar conversion louvre‘: varianten
3535
‚solar conversion louvre‘: frame
Keine Isolation
Neopren Isolation
Schaumstoff Isolation
3636
heat exchangerfloatationCHPP
Energy controllerHeat PumpHot Water
HEAT
BIOMASS BIOGAS
Geothermal
3737
3838
• Total budget DKK 16 million
• Building Lab DK: 50% support (max DKK 8 million)
Aktueller Stand
• Total budget DKK 16 million
• Building Lab DK: 50% support (max DKK 8 million)
Aktueller Stand
• Total budget DKK 16 million
• Building Lab DK: 50% support (max DKK 8 million)
Aktueller Stand
• Total budget DKK 16 million
• Building Lab DK: 50% support (max DKK 8 million)
Aktueller Stand
• Total budget DKK 16 million
• Building Lab DK: 50% support (max DKK 8 million)
Aktueller Stand
• Total budget DKK 16 million
• Building Lab DK: 50% support (max DKK 8 million)
Aktueller Stand
4545
Integration
Integration
4848
jan.wurm@arup.com
4949
jan.wurm@arup.com2015
50
AnaerobicMembrane
BiogasReactor
WCwasteWC
waste
Bioreactor FacadeNutritients
Biomass
Methane
Concept for energetic and material recyling of waste water
Heat
Grey Water
Gas separation
CO2
COD 800mg/l, 60 L
140 g
Fluxes are given per person and day
4 m2
OrganicWaste
OrganicWaste
Industrial water
Industrial water
shredder
5151
jan.wurm@arup.com20??
5252
jan.wurm@arup.com
5353
jan.wurm@arup.com
jan.wurm@arup.com
Recommended