1 Access Line Operation Analysis & Case Study in Beijing Metro System Zhili Liu, Ph.D. School of...

Preview:

Citation preview

1

Access Line Operation Analysis & Case Study in Beijing Metro System

Zhili Liu, Ph.D.

School of Traffic and TransportationBeijing Jiaotong UniversityEmail: liuzl@bjtu.edu.cn

2

THE DEVELOPMENT OF BEIJING METRO NETWORK OVERVIEW

CALIFORNIA

GATEWAY CITIES

PORT OF LONG BEACH PORT OF LOS ANGELES

An Overview of Beijing Metro: 15 Lines, 192 stations and 372 km

(231 mi) of track ; 4th in track length, after Shanghai, London and Seoul.

2 operators: Beijing Mass Transit Railway Operation Corp. (state owned), Beijing MTR Corp. (public-private joint-venture with the Hong Kong MTR).

2.18 billion riders (2011), 4th in annual ridership after Tokyo, Seoul and Moscow.

A single-day record of 8.4 million (on April 28, 2012).

A flat fare of RMB(¥) 2.00 was introduced on October 7, 2007 before 2008 Beijing Summer Olympics except Airport Express ¥25.00.

3

PEAK HOUR TRAFFIC IN BEIJING METRO SYSTEM

CHALLENGE

Source: http://i2.feixin.10086.cn/feed/du32hypci7hv6?regid=405722

On the PlatformOn the Platform

Outside the Station

Beijing Jiaotong University

LineDirectio

n

Maximum Passenger Volume

(Passengers/h)

Headway Peak Hour Capacity (Ps)

PeriodPassenger/Capacity Ratio

1Westbound 45726 2'15'' 38556 7:30—8:30 120%

Eastbound 48613 2'15'' 38556 7:30—8:30 126%

5Northbound 30971 2'30'' 29904 7:30—8:30 106%

Southbound 41145 2'30'' 34176 7:30—8:30 120%

10

Counter-clockwise 31419 3' 29360 7:40—8:40 107%

Clockwise 31164 3' 29360 7:45—8:45 106%

BTEastbound 28941 3' 27132 18:00—19:00 107%

Westbound 38001 3' 27132 7:20—8:20 135%

PEAK HOUR TRAFFIC IN METRO CHALLENGE

BATONG LINE

6

• Opened in 2003, entirely above ground ,runs 18.9 km from Sihui (B) in the west to Tuqiao (A) in the east.

• Extends Line 1 further east from Chaoyang District to suburbs in Tongzhou District across E 4th,E5th to E 6TH .

THE DEVELOPMENT OF BATONG LINE OVERVIEW

E. 4th Ring Road

E. 5th Ring Road

E. 6th Ring Road

7

Nearly 100% transfer to Line1 during AM rush hours

8

• Upgrade signal system to reduce headways (76.4%)• Enlarge fleet size 4 cars to 6 cars (164%)• Control traffic on platforms • Control traffic outside stations• Open a BRT on Jingtong Expressway

ENHANCING THE CAPACITY IN BATONG LINE MEET THE CHALLENGE

9

ENHANCING THE CAPACITY IN BATONG LINE MEET THE CHALLENGE

JINGTONG BRT

11

JINGTONG BRTOVERVIEW

SihuiDawangqiaoJianguomen Shuanghuiqiao

Outside BRT (WB)

7:00-9:00 AM Westbound5:00-7:00 PM Eastbound

CL

BRT Phase IBRT Phase II

Inside BRT (WB)

Outside BRT (EB)

Inside BRT (EB)

JINGTONG BRTOPERATION

28 bus routes run on the BRT lanes, 10 on inside BRT lanes and 18 on outside BRT lanes.

Buses run on the BRT lanes at the speed of 50 km/h, an increase of 108% of speed since BRT lanes were operated.

Over 120,000 people take buses during AM and PM peak hours. Passenger volume going the downtown area by bus increases 8,000 during AM peak hours.

Private vehicle keeps speed unchanged during AM peak hours, but in the PM peak hours the speed of private vehicles reduces 30%.

BATONG Line OPERATION

After

Before

Passenger volume on the Batong line reduces more than 6,000 passengers /day during the AM peak hour of the first 3 days.

Passenger volume was reduced in the stations close to the departure stops of BRT.

JINGTONG BRTOPERATION

MODE SHIFT64% from existing bus services

15% from Metro

10% from bus+Metro

6% from private vehicles

Bus

Metro

Bus+Metro

Car

Taxi

Others

The study has showed that the Batong line has experienced heavy congestion in the AM and PM peak hours.

A number of solutions has been implemented to reduce the congestion on the Batong line.

The BRT lines has attracted the traffic from the Metro system.

Further research is needed to study the impacts of BRT services on the Metro system.

CONCLUSIONS

15

THANK YOUZhili Liu, Ph.D.

Email: liuzl@bjtu.edu.cn

School of Traffic and TransportationBeijing Jiaotong University

Recommended