1

New Rule for Steel New Rule for Steel ErectionErection

WAC 296-155-701 through -724

The Standard

On the web GO

2

Do you want a short Do you want a short lesson on how to navigate lesson on how to navigate

through this program?through this program?

If you want to see which buttons to click on to get through the presentation, click here

If you’re confident that you can

navigate through a web-based

presentation on your own, click on the “next” button.

3

Navigational Symbols Used in Navigational Symbols Used in this Presentationthis Presentation

Next slide

• Return to the program, usually from “additional information”

• Definitions, more information, FAQs, etc

• Read the actual Standard on line

• Back to the Outline

4

Why the new rules??Why the new rules??

•OSHA studies of 673 fatalities among ironworkers highlighted common hazards

•Deaths were largely preventable by engineering & regulatory changes

5

= Outline= Outline-703 - Site layout, site specific erection plan & construction sequence

-704 - Hoisting & rigging-706 - Structural steel assembly details-707 - Column anchorage-708 - Beams & columns-709 - Open web steel joists-711 - Systems engineered metal buildings-714 - Falling object protection-716 - Fall protection-717 - Training

6

Site layout, site-specific erection Site layout, site-specific erection plan & construction sequenceplan & construction sequence

•Controlling contractor must provide written notification that concrete has attained

– 75% of design strength, or– Sufficient strength to

support the loads

7

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund. All rights reserved.

Site layout, site-specific erection Site layout, site-specific erection plan & construction sequenceplan & construction sequence

•Controlling contractor must ensure that adequate access roads are provided and maintained

8

Site layout, site-specific erection Site layout, site-specific erection plan & construction sequenceplan & construction sequence

Controlling contractor must ensure that a suitable space is provided for

–storage of materials and–safe operation of hoisting operations

9

Site layout, site-specific erection Site layout, site-specific erection plan & construction sequenceplan & construction sequence

All hoisting operations must be preplanned to ensure all “working under loads” requirements are met

10

Site layout, site-specific erection Site layout, site-specific erection plan & construction sequenceplan & construction sequence

•A site-specific erection plan may be developed to provide alternate means to protect employees

•Appendix A contains guidelines

Example

App A

12

Site layout, site-specific erection Site layout, site-specific erection plan & construction sequenceplan & construction sequence

“Steel erection must be done under the supervision of a competent person who is present at the worksite.”

TOC

Next Section

14

Hoisting & RiggingHoisting & Rigging

•The new section (WAC 296-155-704) and

•WAC 296-155-525 & -526

Both apply to hoisting and rigging

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund. All rights reserved.

15

Hoisting & RiggingHoisting & Rigging Crane preshift visual inspection Crane preshift visual inspection

must be visually inspected by a competent person

•rule gives inspection minimums•deficiencies must be evaluated immediately

•equipment posing a hazard must be placed out of service

•operator has authority to stop and refuse any loads until safety is assured

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and

Journeyman Upgrading Fund. All rights reserved.

17

Hoisting & RiggingHoisting & Rigging•A qualified rigger must inspect the rigging prior to each shift

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading

Fund. All rights reserved.

19

Hoisting & RiggingHoisting & Rigging Working under loadsWorking under loads

Routes for suspended loads must be preplanned to avoid endangering workers

20

Hoisting & RiggingHoisting & Rigging When working under loadsWhen working under loads

•materials must be rigged to prevent unintentional displacement

•hooks must have self-closing safety latches or equivalent

•all loads must be rigged by a qualified rigger

21

Hoisting & RiggingHoisting & Rigging Multiple lift rigging procedureMultiple lift rigging procedure

only when:– a multiple lift rigging

assembly is used– specifically within

manufacturer’s specifications & limitations

– maximum of 5 members hoisted per lift

– only beams & similar structural members are lifted

– only trained employees involved

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund. All rights reserved.

22

Hoisting & RiggingHoisting & Rigging Multiple lift rigging procedureMultiple lift rigging procedure

– Bundles of decking are NOT appropriate for multiple lift.

– Even though metal decking meets the definition of structural members

23

Hoisting & RiggingHoisting & Rigging Multiple lift rigging procedureMultiple lift rigging procedure

•Components of the multiple lift rigging assembly must be specifically designed and assembled with a maximum capacity for total assembly and for each individual attachment point.

•Based on manufacturer’s specifications with a 5 to 1 safety factor on all components

24

Hoisting & RiggingHoisting & Rigging Multiple lift rigging procedureMultiple lift rigging procedure

Total load must not exceed•rated capacity as specified in the hoisting equipment load charts and

•rigging capacity specified in the rigging-rating charts

25

Hoisting & RiggingHoisting & Rigging Multiple lift rigging procedureMultiple lift rigging procedure

Controlled load lowering must be used whenever the load is over the connectors

TOC

Next Section

26

Structural Steel AssemblyStructural Steel AssemblyStructural stability maintained at all times Structural stability maintained at all times

during the erection processduring the erection process

Multistory structures have permanent floors installed as the erection of structural members progresses

•Within 8 floors of the concrete, or

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading

Fund. All rights reserved.

27

Structural Steel AssemblyStructural Steel AssemblyStructural stability maintained at all times Structural stability maintained at all times

during the erection processduring the erection process

Multistory structures have permanent floors installed as the erection of structural members progresses

•Within 8 floors of the concrete, or

•no more than 4 floors (or 48’) of unfinished bolting or welding above secured floor

28

Structural Steel AssemblyStructural Steel AssemblyWalking/working surfacesWalking/working surfaces

Elimination of tripping hazards:

•no shear connectors or other similar devices …until after walking/working surface has been installed.

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading

Fund. All rights reserved.

29

Structural Steel AssemblyStructural Steel AssemblyPlumbing upPlumbing up

When deemed necessary by a competent person: Plumbing up equipment must be installed in conjunction with the steel erection process to ensure stability of the structure. Photo courtesy of National Ironworkers & Employers

Apprenticeship Training and Journeyman Upgrading Fund. All rights reserved.

30

Structural Steel AssemblyStructural Steel AssemblyPlumbing upPlumbing up

•When necessary, plumbing up equipment must be in place and properly installed before the structure is loaded with construction material

31

Structural Steel AssemblyStructural Steel AssemblyPlumbing upPlumbing up

•Plumbing up equipment must be removed only with the approval of a competent

person

32

Structural Steel AssemblyStructural Steel AssemblyMetal deckingMetal decking

Hoisting, landing & placing of metal decking bundles

– provisions to prevent “displacement” of decking during handling/storage

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund.

All rights reserved.

33

Structural Steel AssemblyStructural Steel AssemblyMetal deckingMetal decking

•Roof & floor holes and openings Must be installed as described:

Para 706(4)(b)

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund. All rights reserved.

35

Structural Steel AssemblyStructural Steel AssemblyMetal deckingMetal decking

•Covering roof and floor openings

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund. All rights reserved.

36

Structural Steel AssemblyStructural Steel AssemblyMetal deckingMetal decking

Decking gaps around columns

where there are gaps between columns, the “falling objects hazards” must be eliminated

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading

Fund. All rights reserved.

37

Structural Steel AssemblyStructural Steel AssemblyMetal deckingMetal decking

During installation, metal decking must be laid tightly & immediately secured to prevent movement

38

Structural Steel AssemblyStructural Steel AssemblyMetal deckingMetal decking

During installation, metal decking panels must be placed to ensure full support by structural members

39

Structural Steel AssemblyStructural Steel AssemblyMetal deckingMetal decking

Derrick floors must be fully decked or planked & connections completed

40

Structural Steel AssemblyStructural Steel AssemblyMetal deckingMetal decking

Temporary loads placed on derrick floors must be distributed over the underlying support to prevent local overloading

TOC

Next Section

41

Column anchorageColumn anchorage

Insufficient column anchorage is a

primary cause of column failure and a large contributor to fatalities among

ironworkers!Photo courtesy of National Ironworkers & Employers Apprenticeship

Training and Journeyman Upgrading Fund. All rights reserved.

42

Column anchorageColumn anchorageErection Stability Erection Stability

All columns must be anchored by a minimum of four anchor bolts

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund. All rights reserved.

43

All columns must be anchored by a minimum of four anchor bolts

all anchor rod assemblies must meet strength criteria listed in the rule

Column anchorageColumn anchorageErection Stability Erection Stability

45

Column anchorageColumn anchorageErection Stability Erection Stability

Columns must be

•set on level, finished floors

•pregrouted leveling plates

•leveling nuts, or

•shim packsPhoto courtesy of National Ironworkers & Employers Apprenticeship

Training and Journeyman Upgrading Fund. All rights reserved.

46

All columns must be evaluated by a competent person to determine if guying or bracing is needed.

If guying or bracing is needed, it must be installed

Column anchorageColumn anchorageErection Stability Erection Stability

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund.

All rights reserved.

47

Anchor rods/bolts must not be repaired, replaced or field modified without approval of the project structural engineer of record

Column anchorageColumn anchorageAnchor rods (bolts) Anchor rods (bolts)

48

Controlling contractor must provide written notification to the steel erector if there has been any repair, replacement or modification of the anchor rods/bolts

Column anchorageColumn anchorageAnchor rods (bolts)Anchor rods (bolts)

TOC

Next Section

49

Beams & ColumnsBeams & ColumnsFinal placing of solid web structural Final placing of solid web structural

membersmembers

The load must not be released until members are secured with at least 2 bolts per connection

50

The load must not be released until members are secured with at least 2 bolts per connection

Bolts must beSame size and strength shown in the

erection drawings

Drawn up wrench tight, or equivalent specified

Beams & ColumnsBeams & ColumnsFinal placing of solid web structural Final placing of solid web structural

membersmembers

51

A competent person must determine if more than 2 bolts are needed

Beams & ColumnsBeams & ColumnsFinal placing of solid web structural Final placing of solid web structural

membersmembers

52

Beams & ColumnsBeams & ColumnsDiagonal bracingDiagonal bracing

Solid web structural members used as diagonal bracing must be secured by at least one bolt per connection

Wrench tight or equivalent

53

Beams & ColumnsBeams & ColumnsDouble connections at columns and/orDouble connections at columns and/or

beam webs over a columnbeam webs over a column

When making connections sharing common connection holes, at least one bolt with its wrench-tight nut must remain connected to the first member Diagram

Exception

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund.

All rights reserved.

57

Beams & ColumnsBeams & ColumnsColumn splicesColumn splices

Each column splice must be designed to resist a minimum eccentric gravity load of 300#

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading

Fund. All rights reserved.

58

Beams & ColumnsBeams & ColumnsPerimeter columnsPerimeter columns

Must extend a minimum of 48” above the finished floor to permit installation of perimeter safety cables prior to erection of the next tier

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading

Fund. All rights reserved.

59

Beams & ColumnsBeams & ColumnsPerimeter columnsPerimeter columns

Must have holes or other devices for attaching perimeter cables

TOC

Next Section

60

Open Web Steel JoistsOpen Web Steel Joists

“Open web steel joists must be secured before releasing the load.”

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund. All rights reserved.

61

Open Web Steel JoistsOpen Web Steel JoistsLanding and placing loadsLanding and placing loads

No bundle of decking may be placed on steel joists until all bridging has been installed and anchored and all joist bearing ends attached,

UNLESSUNLESS

Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund. All rights reserved.

63

Systems-Engineered Metal Systems-Engineered Metal BuildingsBuildings

“Package Building”“Package Building”

Before releasing hoisting equipment:

•Columns– minimum 4 bolts at base

•Rigid frames– 50% of the bolts– or as specified by manufacturer TOC

Next Section

64

Falling Object ProtectionFalling Object Protection

All materials, equipment, & tools which are not in use while aloft must be secured against accidental displacement

65

Falling Object ProtectionFalling Object Protection

The controlling contractor must bar other construction processes from below steel erection unless overhead protection for the employees below is provided

TOC

Next Section

66

Fall ProtectionFall Protection

•Must be in accordance with WAC 296-155,

– Part C-1 &

– Part K

TOC

Next Section

67

TrainingTraining

•Fall hazard training

•Special training in multiple lift rigging procedure

TOC

End

68

• Photos courtesy of Pacific Northwest Ironworkers and Employers Apprenticeship and Training Committee -86

• Very special thanks to Douglas Smith and Kevin McGee

• And thanks also to Jerry Rowland, Corona Steel and Ironworkers Local #86

70

Navigational Symbols Used in Navigational Symbols Used in this Presentationthis Presentation

Next slide

• Return to the program, usually from “additional information”

• Definitions, more information, FAQs, etc

• Read the actual Standard on line

• Back to the Outline

71

-703 - Site layout, site specific erection plan & construction sequence

-704 - Hoisting & rigging-706 - Structural steel assembly details-707 - Column anchorage-708 - Beams & columns-709 - Open web steel joists-711 - Systems engineered metal buildings-714 - Falling object protection-716 - Fall protection-717 - Training

links back to this page

Each line

Hyperlinks to the module listed

72

Behind the scenes - Behind the scenes - how things are how things are

arranged:arranged:

You get back and forth from

the Outline

Outline

Section -703

Section -704

Section -705

73

Links to other informationLinks to other information

“Steel erection must be done under the supervision of a competent person who is present at the worksite.”

Clicking here or else on the “i” will link you to the definition

74

NEXT: Going from the presentation to web pages to read or print out the actual Standard

This is how the program looks “behind the scenes”

Going to the Web to read the actual

Standard is easy: • to go forward, use the

hyperlink provided• to go back, use the “

back arrow”

What’s a “Hyperlink”?

What’s a “Back Arrow”?

75

Navigation – Part IINavigation – Part IIThe The diagram of how things can be linked of how things can be linked

Course List

Section -703

Section -704

Section -705

Section –703 on the Web

Other Web Page if you want

And anotherWeb PageSection –704

on the Web

Section –705 on the Web

76

Clicking here would hyperlink to the web

page

Clicking here would return to the Presentation

77

Navigation – Part IINavigation – Part II

Outline

Another way of moving back to the presentation

• Just close the web page

Section -704

Section –704 on the Web

78

Clicking here would hyperlink to the web page

Clicking here would close

the Web page; return

to the Presentation

79

Ready to start??Ready to start??

YES! Run it!Not really.

I’d like to go through

this “navigation thing”

one more time.

80

HyperlinkHyperlink• An item (word, icon, button, etc) that will

take you to another location (page in the document, web page, other program, etc)

• Hyperlinks are identified by the fact that when your cursor passes over them, it changes from an arrow to a hand.– Sometimes they’re even underlined

81

This is a “Back Arrow”

Recommended