• The contract is in the process of being assumed by Constellation Energy Group

• Decreased sizing by 5% to ensure energy savings measures do not create over production

• Plans designed in tandem with principals and construction teams

2

Solar Update

3

• Coyote Hills, Zuni Hills and Peoria High School to begin construction April 1– Elementary schools completed August 2– High School completed August 30

• Cheyenne, Desert Harbor, and Santa Fe to begin construction May 27– All completed September 27