2014 H&S Town Hall Presentation

Dale Sundstrom, School Finance

dale.sundstrom@state.mn.us

(651)-582-8605

1. H&S Revenue Application

2. Legislative Update

3. H&S Timelines

4. H&S Data Submissions

5. FY 14 Closeout Activities

6. Regulatory Update

Today’s Agenda

education.state.mn.us 2

H&S Revenue Applicaiton

• Similar to last year’s revenue application

• For 2014 Payable 2015 districts apply for

H&S revenue by providing confirmation of:

1. A school board adopted “budget”

by finance code for 2014, 2015 & 2016

2. A school board adopted H&S policy

education.state.mn.us 3

H&S Application Submittal

• Submit electronic or hard copy of school

board minutes identifying an adopted FY

14-16 “budget” and adopted H&S policy to

regional management assistant

professionals by Friday, July 25th.

• Districts that aren’t members of a service

cooperative may submit their application

electronically to MDE at

dale.sundstrom@state.mn.us

education.state.mn.us 4

• 123B.57 Capital Expenditure; Health and Safety

Allows funding for:

Compliance with the National Emission Standards

for Hazardous Air Pollutants for school generators

established by the United States Environmental

Protection Agency

For fiscal 2014 – 2018 must reduce other approved

H&S funding to include emission compliance.

Effective the day after enactment.

2. Legislative Update

education.state.mn.us 5

• 123B.71 Review and Comment

Threshold $2,000,000 ($500,000 cap. loan district)

Exempts many state funded revenues including

H&S and Alt. Facilities from R&C at any amount.

Removes many description items from the R&C

submission and names documentation to be

submitted to verify compliance.

Adds requirement to identify the process used to

determine the need for a new or renovated facility

and list the deficiencies that will and will not be

addressed.

education.state.mn.us 6

• 123B.72 School Facility Commissioning

Retains $1,400,000 as the dollar amount where

school facility commissioning is required.

Previously required for projects subject to review

and comment but now specifies $1.4M.

education.state.mn.us 7

3. H&S Timelines

• Submit projects for FY 14, 15, and 16 & H&S Revenue Application by July 25th

• FY 2016 projects entered Summer 2014

– The Pay 15 levy is for 2015-16 school year and funds the FY16 costs.

–RMA’s and MDE will provide a list of common allowable expenditures (and not allowed) and work to develop project descriptions that streamline the approval process.

education.state.mn.us 8

• Projects can be entered January to July

• The H&S website is disabled at the end of

the day on July 25th for processing

• By August 30th the H&S website will be

restored to show project approvals &

assigned 5-digit project numbers:

–Yes, No, NMI (needs more information),

or PPA (provisional project approval)

H&S Timelines

education.state.mn.us 9

• Districts can make changes to the website

until September 5th

• From September 5th – 19th, MDE reviews

district provided information to finalize

approvals

• September 19th is the last day the capital

dataset is updated for levy limit

calculations

H&S Timelines

education.state.mn.us 10

• September 30th is the last day school

districts can certify their proposed levy to

the county auditor

• November 1st is the last day to submit

closeout documentation in support of

PPAs

H&S Timelines

education.state.mn.us 11

• FY 13-14 project closeout starts in June

and ends December 31

• Reconcile UFARS expenditures to FY14

project approvals

• MDE and RMA’s will be providing more

assistance this fall – many districts

lose revenue by not reconciling

H&S Timelines

education.state.mn.us 12

Data From An Actual School District

education.state.mn.us 13

• Projects are approved and pre-funded

• FY of actual expense is recorded the same year

as the estimated revenue

• The FY project amount and fiscal year UFARS

expense by finance code for the year ended

June 30 are intended to be exactly the same by

November 1 – drives revenue adjustments

• Actual revenue is almost always a different

amount than was estimated on the original levy

so a levy adjustment comes on a future levy

The H&S System Is Approval Based

education.state.mn.us 14

• Adjustments to revenue come from actual

results of projects

• Errors in revenue come from not reconciling

• Invoice is late, missing, miscoded – project

came in over estimate, entered in wrong Fin

code – approval is in wrong year – other reasons

• MDE will offer more assistance with reconciling

this fall. It is a team effort for district staff.

H&S System Is Approval Based

education.state.mn.us 15

• District receives lesser of project approval or

UFARS expenditure by finance code on

December 31. This is the actual revenue that will

be compared to the original levy revenue.

• District gets the correct amount of revenue in

the end when projects have been reconciled.

• Approval based means MDE funds the approved

amount and UFARS can decrease, equal, or

indicate a project approval increase is needed.

• WORK WITH BUSINESS MANAGERS TO MATCH

THE PROJECTS WITH THE UFARS

H&S Timelines

education.state.mn.us 16

4. H&S Data Submissions

• Moving a project that has not started to a

different fiscal year?

–E-MAIL MDE WITH THE 5-DIGIT

PROJECT NUMBER AND DESIRED

FISCAL YEAR

–District’s must verify data after MDE

edits project entry

education.state.mn.us 17

Project Continuations

• A project continues into one or more fiscal

year;

(H&S website approvals and reported

UFARS need to match per fiscal year)

• Reconcile the existing project to what was

spent, then create a new project to move

forward the balance with reference to the

previous project number.

education.state.mn.us 18

education.state.mn.us 19

14 363 Oak High School … 20000.00

Update GEN. Continuation of project #19561, fire

panel replacement 0.00

13 363 Oak High School yes 50000.00

Update 19561 Replace fire panel, SFM inspection

#18420, item #6 (SFM PLAN REVIEWED) 0.00

Project Continuation

13 363 Oak High School yes 30000.00

Update 19561 Replace fire panel, SFM inspection

#18420, item #6 (SFM PLAN REVIEWED) 0.00

Changing Project Cost

• Updated proposed amounts that

substantially increase from previous

approvals?

–E-mail MDE the 5-digit project number

–Provide contact information; including

the district # and phone #

–Explain to substantiate the new

proposed amount (scope of work

change, increased bids, etc.)

– Invoices may be requested

education.state.mn.us 20

Example H&S Project Descriptions

• To reduce administrative time and to

better facilitate the MDE approval

process, RMA’s and MDE are providing a

guide with common approved projects

and those commonly not approved

• Re-occurring H&S projects (FY 16) may be

submitted as district-wide entries!

• Projects not clearly identified will need

more information.

education.state.mn.us 21

Finance Code 347

• PPE, Elevator/Lift Inspections, and

MDH Inspections = District-wide

• Playground re-surfacing – material type

and total sq. ft. of playground area – FY 15 Pine Elem. Wood chips, 225 cubic yards to

cover 5,500 sq ft

• Playground repairs – Scope of work

and CPSI inspector # and date (insp.

rpt. may be requested) – FY 15 Maple Elem. Repair damaged fall

protection barrier per CPSI # 1004-01 3/26/13

inspection report

education.state.mn.us 22

Finance Code 347

• Pool/food code corrections – MN code

violation # and scope of work (scanned

copy of orders may be requested) – FY 14 Oak Elem. Provide No Diving signs per MN

Rule 4717.2450 3/26/13 inspection

– FY 15 Oak Elem. Replace wood shelving per MN

Rule 1304.12 3/26/14 inspection

• Machine guarding – Scope of work, and

location (insp. rpt. may be requested) – FY 14 Hickory HS Mount equipment in wood shop per

MA inspection on 3/26/13

education.state.mn.us 23

Finance Code 349

• Hazardous/Infectious Waste Disposal, Lead

in Water Testing, Radon Testing, RPZ

Backflow Inspections = District-wide

• Local Exhaust Ventilation – scope of work

and location – FY 15 Willow HS Install welding local exhaust system in

the Ind. Tech. metal shop

• Lead in Paint Abatement (must be > 1% by

weight or > 1mg/cm2) – scope of work and

location (lead analysis will be requested) – FY 15 Birch MS Gymnasium lead paint abatement

education.state.mn.us 24

Finance Code 352

• Capped H&S funding source

• Reference the advice entry (towards the

top) on the data submission website

• Capped biennium amount for FY 14 & FY

15; with a new capped biennium amount

for FY 16 & 17

• Possible issues with exceeding the 352

cap in the second year of the biennium

(FY 15 & FY 17)

education.state.mn.us 25

Finance Code 352

• HSEM, Safety Committees, AHERA 3-yr

Inspections, BBP, Emp. Right to Know,

IAQ Tools 4 Schools = District-wide

• HSEM – Contractor / Consultant name

• Identify Emergency Plan Equipment &

Supplies (AED battery/pads, 1st Aid/CPR Training,

Written Plan Development, etc.)

• In-house HSEM - Document FTE hours – FY 16 District-wide In-house HSEM, Bldgs &

Grounds Mngr. 300 hrs, Business Mngr. 100 hours,

Chemical Hygiene Officer, 32 hours

education.state.mn.us 26

FIN CODE 358

AHERA 6-month Periodic Inspections,

Worker Physicals and Asbestos

Training = Only District-wide Entries

• O&M projects must be clearly identified FY 14 patch/repair and glove bag removal in

Mechanical Room

• Asbestos abatement – Type of material,

quantity, and location FY 15 75 sq ft of floor tile in room 115 and

40 lf of pipe insulation in boiler room

education.state.mn.us 27

FIN CODE 363

• 3-yr SFM Fire Inspections, Fire Alarm

Inspections, Fire Extinguisher

Inspections = District-wide

• SFM Corrections – Scope of work,

inspection #, item #

• 363 projects > $20,000 in cost and all

egress projects are subject to SFM Plan

Review (PPA status)

education.state.mn.us 28

SFM Plan Review

• Contractors can send plans of the building

layout showing the scope of work to:

State Fire Marshal Division

Attn: John Swanson

8321 168th Street W

Lakeville, MN 55044

• Contact John if there are any questions:

john.swanson@state.mn.us or (651)-334-3217

education.state.mn.us 29

FIN CODE 363

• Costs to maintain/repair an operable fire

alarm system (emergency lighting, exit

signs, smoke/heat detectors,

horns/strobes etc.).

• SFM orders are needed for full

replacement of fire alarm equipment.

education.state.mn.us 32

FIN CODE 366

• No District-wide entries are acceptable

IAQ Project Management & Initial IAQ

Investigation = FIN 352

Must document the presence of mold!

Submittal of Attachment 7 for abatement if project

> $10,000.

Lab analysis or photo documentation for projects

< $10,000. (lab analysis is better)

FIN CODE 366

• Mechanical Ventilation Improvements

• Professional Engineer to complete

Attachment 7 providing detailed scope of

work and itemized project costs

(reference Attachment 8)

• Attachment 8 showing allowable/non-

allowable costs (completed by the district) – Alternative Facilities for projects > $500,000 in cost over

life of project (PPA/PPL/PPB status)

H&S Other Revenue SOURCE 629

--recording other revenue sources for health

and safety projects beyond state aid or levy

--Including, but not limited to:

• Utility rebates for approved lighting

replacement (metal halide) and/or

mechanical ventilation upgrades

• insurance and legal settlements, Petrofund

reimbursements (UST/AST remediation)

Reporting H&S Other Revenue SOU 629

• Must approve the full project amount, then

record additional revenue utilizing the

following UFARS dimension

• Health and Safety

Fund 1 PRO 850 FIN 347, 349, 352, 358, 363,

366 SOU 629

MATCHING THE NUMBERS

Approved H&S Projects

vs.

Reported UFARS Data

(FY 14 close-out)

education.state.mn.us 37

5) FY 14 Closeout Activities

FY 2014 Close-out

• H&S revenue is based on the lesser of

approved costs on the H&S website or

district-reported UFARS data.

• Project amounts on the H&S website

should be updated to equal audited

UFARS expenditures.

• The MFR System updates each time the

district loads UFARS.

• The Capital Expenditure Report will be

updated regularly through January. This

is a change from last year.

education.state.mn.us 38

• Work with accounting office to provide

UFARS reports

• Compare expenses to project approvals

• Accounts Payable has support

documentation for payments

• Projects completed and coded correctly?

• Get all the revenue you deserve!

education.state.mn.us 39

FY 2014 Close-out

3. H&S Administrative Information

• Replace with bullet points or subheading

education.state.mn.us 40

education.state.mn.us 41

education.state.mn.us 42

6) Regulatory Update

• MDH Radon Test Result Reporting

• MDH Indoor Ice Arenas

• Lead in Drinking Water Act

• OSHA Hazard Communication Standard

education.state.mn.us 43

• Minnesota Statutes, section 123B.571

• A school district shall:

1) Report the results radon testing to

the Department of Health; and

2) Report the results of its testing at a

school board meeting

MDH Radon Test Result Reporting

education.state.mn.us 44

Dan Tranter

Indoor Air Unit Supervisor

Minnesota Department of Health

daniel.tranter@state.mn.us

Or

651-201-4618

Radon Testing Plan information at MDH

http://www.health.state.mn.us/divs/eh/indoorair/

schools/radonschool.html

Radon Contact Information

education.state.mn.us 45

• MN Rule 4620.3900-4900

• Previous acceptable air quality standard:

– Carbon Monoxide (CO) = 30 ppm

– Nitrogen Dioxide (NO2) = 0.5 ppm

• Effective 5/20/13 air quality standard:

– Carbon Monoxide (CO) = 20 ppm

– Nitrogen Dioxide (NO2) = 0.3 ppm

• At least one trained responsible person on-site

when open to the public

• More frequent air quality testing requirements

MDH Indoor Ice Arenas

education.state.mn.us 46

John Olson

Indoor Air Unit

Minnesota Department of Health

john.olson@state.mn.us

Or

651-201-4614

Key Changes information at MDH

http://www.health.state.mn.us/divs/eh/indoorair

/arenas/forms/keychangestorule.pdf

Ice Arena Contact Information

education.state.mn.us 47

http://water.epa.gov/drink/info/lead/index.cfm

5/18/14 MDH defined elevated blood level 5 micrograms

lead per deciliter, MN144.9501Sub.(9), was 10 mcg/dcl.

Reduction of Lead in Drinking Water Act

education.state.mn.us 48

20 ppm of lead is still the action level; the new federal

legislation re-defines “lead free” that applies to new

piping, plumbing fittings, fixtures, solder and flux

• Enforced via Minnesota Plumbing Codes / DLI

• Reduction of Lead in Drinking Water Act (S3874-2010) - New “lead-free” definition

- Weighted average of not more than 0.25% lead containing for

piping, plumbing fittings and fixtures

- Not more than 0.2% lead for solder and flux

- Effective date: January 4, 2014 – no longer use old shelf inventory

Leslie Winter

Environmental Health Division

Minnesota Department of Health

leslie.winter@state.mn.us

651-201-4705

Lead in Drinking Water Contact Information

education.state.mn.us 49

• Globally Harmonized System of

Classification and Labeling of Chemicals

• Train employees by Dec 1, 2013 on the

new labeling system and Safety Data

Sheet (SDS) format

OSHA Hazard Communication (HazCom)

education.state.mn.us 50

• June 1, 2015 comply with all labeling and

SDS (Safety Data Sheet) requirements

(distributors allowed until December 1, 2015,

for labeling)

• June 1, 2016, fully implement HazCom

program

• MN OSHA did retain the annual training

requirement and physical and infectious

agent sections of the Employee Right To

Know rule (MN Rule 5206.0700, Subp. 3 & 4)

OSHA Hazard Communication Standard

education.state.mn.us 51

osha.consultation@state.mn.us

651-284-5060; ext. 3

MN OSHA Workplace Safety Consultation

Contact Information

education.state.mn.us 52

https://www.osha.gov/dsg/hazcom/index.html

Dale Sundstrom, School Finance

651/582-8605 or

dale.sundstrom@state.mn.us

Recommended