WELCOME Implementation of Smart City Mission for Diu
UNDER FAST TRACK ROUND
Draft Upgraded Smart City Proposals of Diu Municipal Council
Smart City Mission
Observations on Smart City Proposal
Selection under fast
track
Smart City Proposal
Evaluation by Experts
(MoUD)
Selected Cities
100-97-20-23-57
Preparation of Upgraded Smart
City Proposal
Evaluation by experts
(MoUD)
Declaration of selected cities
Declaration of Selected Cities
(20 No.s)
Selected Cities set up SPV and
start implementation
of their SCP
Preparation of DPRs for SCP
Projects, tendering etc
Observations received on Diu Smart City Proposals
Observations Corrective actions carried out
City Profile
SWOT analysis is very weak with a lot of
repetitions
SWOT analysis is being strengthened with
specific notations.
Strategic focus and blueprint is very generic for
a sustainable city with a focus on sustainable
infrastructure and does not establish any
specific linkages with the SWOT
Infrastructure proposed are being correlated
with SWOT and the mapping for the same is
being prepared.
specific linkages with the SWOT
Only 8% of the household were covered during
surveys.
Detailed household surveys were carried out
and total 76.22% of household were covered
Area Based Proposal
The area based proposal does not clearly
demarcate any specific area for the area based
proposal. It rather proposes projects scattered
all over the ULB area.
The area based proposals are demarcated to
specific locations spreading over an extent of
823.65 Acres.
Wards covered are 3, 4, 5, 6, 7, 8, 9, 10, 11, 12
& 13
Observations received on Diu Smart City Proposals
Observations Corrective actions carried out
Area Based Proposal
It lacks a single comprehensive plan with clear
defined targets. The plan provided in the
annexure merely enlists proposed building
projects.
Comprehensive water supply & sewerage
projects are proposed within the area based
proposals to obtain 100% services.
The attached images of the proposed building
projects lack the coherence of being part of a
unified area development plan.
Although water supply has been limited, the
development of water theme parks especially
in an ecologically sensitive area is a mismatch.
Also while Diu is known for its built and
environmental heritage resources, the
introduction of a water theme park can be
reconsidered.
There is a complete absence of environment
conservation especially since Diu belongs to a
highly ecologically sensitive region.
Keeping in view of ecologically sensitive
region, coastal protection and green avenue
plantations projects along the sea front are
proposed
Observations received on Diu Smart City Proposals
Observations Corrective actions carried out
Area Based Proposal
The component on tourism/conservation of
heritage assets focuses on more on provision of
tourism related infrastructure like parking, food
courts, and recreational facilities. There is no
focus on built and cultural heritage.
Tourism and cultural preservations are two
important sectors for Diu development.
Hence projects like infrastructure,
entertainment & development /
improvement / protection of heritage
structures by integration with INTACH listing
monuments and heritage buildings are
proposed.proposed.
Pan City Proposal
With poor internet connectivity as mentioned in
the SWOT, the pan city proposal based on high
speed internet connectivity is a mismatch.
The high speed internet connectivity through
optical fiber is already existing with the BSNL,
Diu. But to attain the high speed internet
services laying of optical fiber distribution
network is being proposed in Diu Municipal
Area to strengthen all the IT enabled
proposals
Contents of 'Approach and Methodology' are
same for Area Based and Pan-City proposals.
Observations received on Diu Smart City Proposals
Observations Corrective actions carried out
Implementation Plan
While the implementation plan, scenarios
(short, medium and long term) and the timeline
provided are inconsistent. For example, the
Optical Fibre Cable, crucial for internet
connectivity would be completed in February
2018, which is a medium term scenario, this has
however been listed as a short term scenario.
The whole implementation plan is re
structured as the list of projects is revised.
Also in terms of timelines, creation of Wi-Fi The whole implementation plan is re Also in terms of timelines, creation of Wi-Fi
zones, information kiosks and citizen
information centers would be completed 15 - 18
months prior to the laying of the optical fiber
cables and improved public services delivery
system
The whole implementation plan is re
structured as the list of projects is revised.
Financial Plan
Financial plan is not adequately detailed out. The detailed financial plan is prepared in
consultation with the Diu Mentor (ASCI)
HOTEL
SUGGATI
60 Mts.
from
H.T.L
40 Mts
I T I
GHOGHLA
SHRIMP
FARM
SIDHDH
I
VINAYAK
TEMPL
E
GHOGHLA
SCHOOL
GHO
GHLA
BUS
STAND
SCHOOL
A
R
E
B
I
A
N
S
E
A
G
U
J
A
R A
T
S
A
T
T
E
M
A
R
S
H
Y
L
A
N
D
M U
N I
C I
P A
L
L A N D
M A R S H Y
B O
U N
D A
R Y
DIU
GH
OGH
LA B
RID
GE
A B C D E F G H I J K L M N O P Q R S T U V W
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
SMART CITY PROPOSALS FORDIU MUNICIPAL COUNCIL
SMART CITY PROPOSALS FORDIU MUNICIPAL COUNCIL
To Una
Proposed Indoor Sports Complex with Gym & Swimming Pool
Proposed Recreational
Centre with Laser
Show, Multiplex, Open
air theatre & Boating
Proposed Bus station at Ghoghla
Proposed Flood Protection Wall at Ghoghla
Beautification of Jogging Track at Ghoghla
Proposed Foot paths,
street furniture and
signage along fort
road, all tourist
locations, entry and
exit of Ghogla bridge
18
DIU
FORT
SCHOOL
PW
IREST
HOUSE
GOVT.
HOSPITAL
SUMMER
HOUSE
BAL
BHAVAN
DMCGARDEN
SPO
RTS
COMPL
EX
DIU
COURT
BUIL
D
GANDHIPARA
PWDWATERTANK
PWD
HOTEL
AZARO
SP
OFFICE
BRID
SANTUARY
FUDAM
GANGESHWARTEMPLE
FUDAM
ANNEXY
CIRCUIT
HOUSE
DEER
PARK
DMCOFFICE
KOHINORE
HOTEL
COLLECTORATE
GOVT.
GODOWN
DIU
CHURCH
SUVARN LAKE
GANDHIPARA
FUDAM
SCHOOLFUDAM
BUS
STAND
COM
. HA
LL
NEW
OID
C
HOUSIN
G P
ROJE
CT
GANDHIP
ARA
PWDWATERTANK
BAL SAMSAN
DIUCREMATORIUM
B O
U N
D A
R Y
60 Mts.
from
H.T.L
40 Mts
60 M
ts. from
H.T
.L
90 M
ts
60
Mts
. from
H.T
.L
90 M
ts
DIU
GH
OGH
LA B
RID
GE
10
11
12
13
14
15
16
17
18
10
11
12
13
14
15
16
17
18SMART CITY PROPOSALS OF DMC - AREA BASED DEVELOPMENT PLAN
A B C D E F G H I J K L M N O P Q R S T U V W
0 500 1000
Scale in Metres300
To Airport
PANIKOTA
New Vegetable & Fish Market
air theatre & Boating
Proposed Bus station at Diu
Proposed Viewing Deck on Heritage Wall
Proposed Sunset Point at Chakratirth Beach
Beautification of
Naida Caves
Proposed Vehicle Free Lane - Fort Road
Retrofitting of Foriegn Bazar with New Building
Proposed Cycle Track from Fort Road to Jalandhar Beach
Proposed Multi-Level Parking
Enhancement of Informal Sector at Bandhar Chowk
SMART CITY PROPOSALS OF DMC - AREA BASED DEVELOPMENT PLAN
Sl.No Project
1 Making fort road as Vehicle-free zone
2 Foot paths, street furniture and signage along fort road, all tourist locations, entry and exit of Ghogla bridge
3 Provision of cylce tourism - fort to jalandhar beach - Bandhar chowk to fort
4 Jogging tract at Ashok Nagar
5 Redevelopment of bus stations/terminus with smart display
6 Multi-level parking facilities at Bandar Chowk, behind the vegetable market near Diu-ghogla bridge
7 Retrofitting of foreign bazar with new building at fort road
8 Development of recreation center at Diu -Goghla bridge - Gandhipura by providing laser show, multiplex, open air theatre, boating including development of theme park(water)
9 Development of theme parks (water) at potential locations to form permanent revenue source to the ULB and boost tourism
10 Construction of Meat and Fish market
11 Safe- guarding of existing beaches by discouraging encroachments and new developments
12 Beautification of Naida caves
13 Color code for buildings
14 Improvement of major road intersections with urban elements - news paper/book stands, route map displays, history boards
15 Protecting the fort wall on seafront and the coastal belt from sea erosion including protection wall at Ghoghla
16 sunset point at chakrathirt
17 Viewing Deck at chandrikamata
18 construction of Gym, Swimming pool
AREA BASED DEVELOPMENT PROPOSALS
o Total Population of Diu Municipal Council - 24196 (As per 2011 Census)
- 27220 (As per 2016 Present)
o Total Numbers of Households - 6805 (Approximately)
o Total Number of Residential Properties/Assessments - 4823
Sample Size
Previous Present
�Households Covered – 480 � Households Covered - 5187 (76.22%)
DETAILS OF CITIZEN CONSULTATION IN DIU MUNICIPAL COUNCIL
�Households Covered – 480
�Upload on Mygov.in portal – 430
�Essay writing competition – 64
�Meeting with Ward Councilors – 02 No’s
�Focus Group Discussions – 06 No’s
�Expert interactions & Discussions – 08
No’s
� Households Covered - 5187 (76.22%)
� Upload on Mygov.in portal – 441
� Essay writing competition – 64
� Meeting with Ward Councilor – 06 No’s
� Focus Group Discussions – 09 No’s
� Expert interactions & Discussions – 10
No’s
� Interaction through E-mail – 416
� Interaction through Whatsapp – 724
Total % of Households Covered – 7.05% Total % of Households Covered –76.22%
Old Survey Data Analysis – Citizen Priority Wise
� Water Supply – 28% � Parks and Open spaces – 08%
� Sewerage – 24% � Employment Opportunities – 10%
� Solid Waste Management – 14 � Communication – 04%
� Transportation – 12%
Sewerage
Parks &
Open
spaces
Slum
improvem
ent Tourism
2%
Vertical
Developm
ent of
Water
supply
28%
Sewerage
4%
Srorm
water
drainage
6%
Electricity/
Solar
lighing
6%
Solid
waste
Managem
ent
5%
Communic
ation
3%
Smart
solutions
for
convenien
ce of
citizens
5%
Citizen
safety
5%
Health
7%
Education
8%
Recreation
al facilities
1%
Transport
& Mobility
2%
spaces
3%
ent
including
housing
5%Housing
for all
9%
2%ent of
Buildings
(residentia
l &
Commerci
al)
2%
Tourism
Vertical
Development of
New Survey Data Analysis – Citizen Priority Wise
� Water Supply – 11% � Citizen Safety– 7%
� Sewerage – 11% � Education – 6%
� Solid Waste Management – 10% � Electricity & Solar lighting – 4%
� Transport & Mobility – 9%
Water Supply
11%
Electricity/Solar
lighing
4%
Storm water
drainage
5%
Housing for all
4%
Education
6%
Communication
3%
Smart solutions
for convenience
of citizens
6%
Health
5%
Transport
& Mobility
9%
Citizen
safety
7%
Recreational
facilities
3%
Slum
improvement
including
housing
3%
Parks &
Open
spaces
3%
Solid waste
Management
10%
Sewerage
11%
Tourism
3%
Development of
Buildings
(residential &
Commercial)
6%
Preliminary Interactions
Purpose
• Preliminary interactions with stakeholders
• Sensitization on smart city mission
• Preliminary views on smart city Initiatives
Outcome
• Citizen engagement procedure
• Stakeholder list
• Schedule
Essay & Painting Competition
Purpose
• Sensitization on smart city mission
• Seeking views of all age groups
• Visualization of smart city
Outcome
• Awareness on smart city
• Reach out to wide public
• Vision Statement
Interaction with inter department officials
in presence of District Collector
Purpose• Introduction of initiative
• Seeking views from inter-
department
• Departmental vision
• Preparedness for mission
• Sector wise tentative
projects
Outcome• Tentative projects
• Baseline data
• Ongoing projects
• projects in pipeline
• Possible convergence
Interaction with inter departments
officials in presence of Dist. Collector
Interaction with Mentor &
Inter Department officials
Purpose Out Come
Discussion on observations made by
MoUD
Corrective actions and improvising the
proposals in guidance of mentor
STRENGTHS
Previous Present
Historical city with landmarks of history, which was a Portuguese
Colony for about 450 years, prior to its incorporation into the
Indian Union on December 19, 1961.
History, culture, geography and ambience including annual Diu
Festival attract 17 lakhs tourists contributing to its economy.
High potential for tourism development with scenic beauty,
wonderful sandy beaches and heritage structures
With a population density of only 14 persons per hectare, Diu has
vast wetlands, protected CRZ, the sixteenth century Portuguese
fort and a compact old city of historical and architectural value.
Small geographic area for better planning and implementation and
have good scope for managing future development of city
INTACH Delhi has surveyed and listed more than 300 buildings as
heritage buildings in Diu.
Popularly knows as Island of peace which has peaceful social life
with low crime rate
Diu fishing harbours is one of the key economic assets for the city.
with low crime rate
Steady population growth Given its small size, Diu has a much higher level of administration
and amenities including the airport because of its being a Union
Territory.
Potential Smart City - selected in the first round of challenge Crime rate in Diu is one fourth of the national average.
A city with administrative importance. The population of Diu has been steadily growing over the decades
despite migration of young educated population to other parts of
the country and abroad.
Proactive administrators & citizens with vision for development Inclusion of Diu as one among the Smart Cities can bolster the
idea that a smart city is not just high technology, high rise
buildings and extensive use of IT and communication. An
ecologically sustainable settlement with a human scale and the
least carbon footprint by way of recycling of resources, a low
energy way of life and a high degree of self-sufficiency is perhaps
smarter.
Previous Present
Limited availability of land The low population base cannot sustain high level of social and
physical infrastructure on its own steam. Higher level of government
funding to make projects and amenities economically viable is
therefore necessary.
Deficiency of infrastructure - due to old areas being congested The small size of Diu – 17.81 sq km for the municipal area and 40 sq
km for the whole district besides the physical barriers of the sea and
the creeks, draws a limit on its physical expansion. The restrictions of
Coastal Regulation Zone, the wetland guidelines, presence of
historical and archaeological monuments leaves very limited area for
new investments and industries.
Lack of industrial development Though the overall population density is very low, the population of
Diu is confined to only two localities: one the old city and the other
Ghoghla. This area is congested with narrow roads and winding lanes.
WEAKNESS
Ghoghla. This area is congested with narrow roads and winding lanes.
Skewed growth concentrated in center of city Further, Diu is dependent on the adjoining districts of Gujarat for
most supplies of daily need and for the operation of most business
and economic activities.
Migration of workforce to European countries Like most and much larger towns and cities of India, Diu is yet to
develop an underground sewerage system.
Dependence on mainland While fisheries are a major source of employment for the population,
the industry is not developed to its potential.
Lack of Irrigation facilities The current connectivity of Due though Internet is unreliable and
weak.
Narrow roads which meager scope for widening.
No sewerage system
limited exploration of fishing industry.
poor communication facilities like Internet
Fragile environment, being island it is prone to disasters
Previous Present
Development of tourism and fisheries Diu has considerable opportunities of economic
growth and employment in the areas of tourism
and fisheries.
As a union territory, ease of mobilization of
developmental budget
Being a union territory, Diu can have access to
much increased investment and budgetary support.
Use of renewable energy sources like solar power
leading to environmental conservation
The City can become a replicable source for small
settlements in the country for testing and
OPPORTUNITIES
leading to environmental conservation settlements in the country for testing and
developing the use of renewable energy sources
like solar power leading to environmental
conservation and economic growth in the long run.
Water front recreational developments for
attracting tourists
There is scope for better water front and
recreational developments to attract more tourists
while not exceeding the carrying capacity of the
town.
Diu can become a city with low carbon foot print
city due to its usage of solar energy
A viable sea connectivity with Mumbai and Daman
can turn Diu a major gateway to the region.
Opportunity for improvement of water sports and
to enhance the tourism
Previous Present
Susceptible to natural disasters like floods, high
tides, Tsunami, earthquakes etc.
According to the Disaster Action Plan 2012, Diu is
prone to Cyclones, floods and Earthquakes.
Non-sustainability of the economy and dependence
on grants
The old neighbourhoods in the walled city need to
be conserved and reused without destroying their
distinct organic character and by installing fire
safety systems and improved sanitation and
services.
THREATS
Migration of qualified citizens to the other parts of
India and Europe
Parts of the coastal belt have suffered extensive
erosion of the rocky shore leading to loss of scarce
sea-facing lands.
Old and dilapidated buildings with inadequate
safety equipment
Possibility of damage to the fragile ecological
balance due to unplanned development
Sea erosion observed on the coastal line of the city
To develop Diu as a Zero
Carbon Footprint city & to
promote it as tourist
destination, preserving its
cultural and architectural
heritage and to enhance the
social economic condition of
inhabitants by guiding
To develop Diu as a Zero
Carbon Footprint city & to
promote it as tourist
destination, preserving its
cultural and architectural
heritage and to enhance the
social economic condition of
inhabitants by guiding
Vision statement for Diu – Island of Peace
inhabitants by guiding
development in a
sustainable manner while
conserving eco-fragile areas
and attracting investments.
inhabitants by guiding
development in a
sustainable manner while
conserving eco-fragile areas
and attracting investments.
HOTEL
SUGGATI
60 Mts.
from
H.T.L
40 Mts
I T I
GHOGHLA
SHRIMP
FARM
SIDHDH
I
VINAYA
K
TEMPLE
GHOGHLA
SCHOOL
GHOGHLA
BUS
STA
ND
SCHOOL
A
R
E
B
I
A
N
S
E
A
G
U
J
A
R A
T
S
A
T
T
E
M
A
R
S
H
Y
L
A
N
D
M U
N I
C I
P A
L
M A R S H YL A N D
L A N D
M A R S H Y
B O
U N
D A
R Y
DIU
GH
OG
HLA B
RID
GE
A B C D E F G H I J K L M N O P Q R S T U V W
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
SMART CITY PROPOSALS FORDIU MUNICIPAL COUNCIL
SMART CITY PROPOSALS FORDIU MUNICIPAL COUNCIL
To Una
DIU
FORT
SCHOOL
PW
IREST
HOUSE
GOVT.
HOSPITAL
SUMMER
HOUSE
BAL
BHAVAN
DMCGARDEN
SPO
RTS
COMPL
EX
DIU
COURT
BUIL
D
GANDHIPARA
PWDWATERTANK
PWD
HOTEL
AZARO
SPOFFICE
BRIDSANTUARY
FUDAM
GANGESHWARTEMPLEFUDAM
ANNEXY
CIRCUIT
HOUSE
DEER
PARK
DMCOFFICE
KOHINORE
HOTEL
COLLECTORATE
GOVT.
GODOWN
DIU
CHURCH
SUVARN LAKE
GANDHIPARA
FUDAMSCHOOL
FUDAMBUS
STAND
COM
. HALL
NEW
OID
C
HOUSIN
G P
ROJE
CT
GANDHIP
ARA
PWD
WATERTANK
BAL SAMSAN
DIUCREMATORIUM
B O
U N
D A
R Y
60 Mts.
from
H.T.L
40 Mts
60 M
ts. from
H.T
.L
90 M
ts
60 Mts
. from
H.T
.L
90 Mts
DIU
GH
OG
HLA B
RID
GE
AR
E
B
IA
N
S
E
A
10
11
12
13
14
15
16
17
18
10
11
12
13
14
15
16
17
18
A B C D E F G H I J K L M N O P Q R S T U V W
0 500 1000
Scale in Metres300
To Airport
PANIKOTA
MUNICIPAL AREA ......................................
PROPOSED 90/60m CONTROL LINE FOR BUILDING CNSTRUCTION
FROM HIGHEST HIGH WATER TIDE LINE ........................................
ROADS / STREETS ...................................
Sector Boundary .......................................
LEGEND
823.65 AcresProposed Area
Plan Showing Exisiting Major Road Network of DIU Municipal Council (UT)
:
HOTEL
SUGGATI
60 Mts.
from
H.T.L
40 Mts
I T I
GHOGHLA
SHRIMP
FARM
SID
HDHI
VINAYAK
TEMPL
E
GHOGHLA
SCHOOL
GHOGHLA
BUS
STA
ND
SCHOOL
A
R
E
B
I
A
N
S
E
A
G
U
J
A
R A
T
S
A
T
T
E
M
A
R
S
H
Y
L
A
N
D
M U
N I
C I
P A
L
M A R S H YL A N D
L A N D
M A R S H Y
B O
U N
D A
R Y
60 Mts.
from
DIU
GHO
GH
LA B
RIDGE
A B C D E F G H I J K L M N O P Q R S T U V W
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
SMART CITY PROPOSALS FORDIU MUNICIPAL COUNCIL
SMART CITY PROPOSALS FORDIU MUNICIPAL COUNCIL
To Una
DIU
FORT
SCHOOL
PW
IREST
HOUSE
GOVT.
HOSPITAL
SUMMER
HOUSE
BAL
BHAVAN
DM
CGARDEN
SPO
RTS
COMPLE
X
DIU
COURT
BUIL
D
GANDHIPARA
PWDWATERTANK
PWD
HOTEL
AZARO
SPOFFICE
BRIDSANTUARY
FUDAM
GANGESHWARTEMPLEFUDAM
ANNEXY
CIRCUIT
HOUSE
DEER
PARK
DMCOFFICE
KOHINORE
HOTEL
COLLECTORATE
GOVT.
GODOWN
DIU
CHURCH
SUVARN LAKE
GANDHIPARA
FUDAMSCHOOL
FUDAMBUS
STAND
COM. HALL
NEW
OID
C
HOUSIN
G P
ROJE
CT
GAN
DHIP
ARA
PWDWATERTANK
BAL SAMSAN
DIUCREMATORIUM
60 Mts.
from
H.T.L
40 Mts
60 M
ts. from
H.T
.L
90 M
ts
60 M
ts. from
H.T
.L
90 M
tsD
IU G
HO
GH
LA B
RIDGE
AR
E
B
IA
N
S
E
A
10
11
12
13
14
15
16
17
18
10
11
12
13
14
15
16
17
18
A B C D E F G H I J K L M N O P Q R S T U V W
0 500 1000
Scale in Met res300
To Airport
PANIKOTA
MUNICIPAL AREA ......................................
PROPOSED 90/60m CONTROL LINE FOR BUILDING CNSTRUCTION
FROM HIGHEST HIGH WATER TIDE LINE ........................................
ROADS / STREETS ...................................
Sector Boundary .......................................
LEGEND
823.65 AcresProposed Area
Plan Showing Area Proposed for Area Based Development of DIU Municipal Council (UT)
:
Population(As Per Census-2011)
AreaCovered
Ward No.
19653.73 Sq.Kms1
14911.52 Sq.Kms2
29900.81 Sq.Kms3
16951.01 Sq.Kms4
13451.21 Sq.Kms5
9261.43 Sq.Kms6
18712.14 Sq.Kms7
12590.44 Sq.Kms8
31481.61 Sq.Kms9
31300.65 Sq.Kms10
18821.33 Sq.Kms11
12560.83 Sq.Kms12
123813
24196Total
0.68 Sq.Kms
17.39 Sq.Kms
HOTEL
SUGGATI
60 Mts.
from
H.T.L
40 Mts
I T I
GHOGHLA
SHRIMP
FARM
SIDHD
HI
VINAYA
K
TEM
PLE
GHOGHLA
SCHO
OL
GHOGHLA
BUS
STA
ND
R
E
B
I
A
N
S
E
A
M
A
R
S
H
Y
L
A
N
D
A B C D E F G H I J K L M N O P Q R S T U V W
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
SMART CITY PROPOSALS FORDIU MUNICIPAL COUNCIL
SMART CITY PROPOSALS FORDIU MUNICIPAL COUNCIL
To Una
HOTEL
SUGGATI
60 Mts.
from
H.T.L
40 Mts
I T I
GHOGHLA
SHRIMP
FARM
SIDHD
HI
VINAYA
K
TEM
PLE
R
E
B
I
A
N
S
E
A
M
A
R
S
H
Y
L
A
N
D
To Una
18
G u
j a r
a t
S t a
t e
Population(As Per Census-2011)
AreaCovered
Ward No.
29900.81 Sq.Kms3
DIU
FORT
SCHOOL
PW
IREST
HOUSE
GOVT.
HOSPITAL
SUMMER
HOUSE
BAL
BHAVAN
DMCGARDEN
SCHOOL
SPORTS
COMPL
EX
DIU
ANNEXY
DEER
PARK
DMCOFFICE
COLLECTORATE
GOVT.
GODOWN
DIU
CHURCH
A
R
60 Mts.
from
H.T.L
40 Mts
60 M
ts. from
H.T
.L
90 M
ts
DIU
GH
OGH
LA B
RID
GE10
11
12
13
14
15
16
17
18
10
11
12
13
14
15
16
17
18
A B C D E F G H I J K L M N O P Q R S T U V W
PANIKOTA
Plan Showing Area Proposed for Area Based Development of DIU Municipal Council (UT)
MUNICIPAL AREA ..........................................................................................
PROPOSED 90/60m CONTROL LINE FOR BUILDING CONSTRUCTION
FROM HIGHEST HIGH WATER TIDE LINE .......................................................
ROADS / STREETS .........................................................................................
Sector Boundary ...........................................................................................
LEGEND
0 500 1000Scale in Metres
300
823.65 Acres:TOTAL
DIU
FORT
SCHOOL
PW
IREST
HOUSE
GOVT.
HOSPITAL
SUMMER
HOUSE
BAL
BHAVAN
DMCGARDEN
SCHOOL
SPORTS
COMPL
EX
DIU
ANNEXY
CIRCUIT
HOUSE
DEER
PARK
DMCOFFICE
COLLECTORATE
GOVT.
GODOWN
DIU
CHURCH
A
R
60 Mts.
from
H.T.L
40 Mts
60 M
ts. from
H.T
.L
90 M
ts
DIU
GH
OGH
LA B
RID
GE
PANIKOTA
A r a b i a
n S e a
29900.81 Sq.Kms3
16951.01 Sq.Kms4
13451.21 Sq.Kms5
9261.43 Sq.Kms6
18712.14 Sq.Kms7
12590.44 Sq.Kms8
31481.61 Sq.Kms9
31300.65 Sq.Kms10
18821.33 Sq.Kms11
12560.83 Sq.Kms12
123813
20740Total
0.68 Sq.Kms
12.14 Sq.Kms
Area Based
Water
SupplySmart Mobility
Solid Waste Management
Tourism & Cultural
Preservation
Social Infrastructure
Sectors Proposed
Based Proposals
Sanitation
Sewerage System
Storm Water Drains
Energy
Street Furniture
Environmental Improvement / Conservation
Education
Water Supply
Strengthening Water Supply
System
Strengthening Water Supply
System
Smart Water Meters for bulk
water supply
Smart Water Meters for bulk
water supply
SCADASCADASCADASCADA
RWH & RRWCRWH & RRWC
Dual water pipe systemDual water pipe system
Desalination Plant
Desalination Plant
Smart Mobility
Grade Separator
Grade Separator
Multi Level Parking lotsMulti Level Parking lots
Pedestrian / Foot paths
Pedestrian / Foot paths
Battery Operated Battery Operated Battery Operated Vehicles
Battery Operated Vehicles
Redevelopment of Bus Terminus /
Stations
Redevelopment of Bus Terminus /
Stations
Bus Stops / Shelters with
GPS enabled PIS
Bus Stops / Shelters with
GPS enabled PIS
Fitment of GPS on buses and PIS
at bus shelter
Fitment of GPS on buses and PIS
at bus shelter
Solid Waste Management
Provision of bins
Provision of bins
Solid waste trucks & autos
Solid waste trucks & autos
Walky talky system
Walky talky system
Online monitoring
system
Online monitoring
system
Solid Waste Treatment Plant
Solid Waste Treatment Plant
Sanitation
Public Bio Toilets
Public Bio Toilets
Sewerage System
Sewerage Distribution
system
Sewerage Distribution
system
Storm Water Drains
Out fall drains
Out fall drains
Energy
Solar power plantSolar power plant
Roof top solar energy generation
Roof top solar energy generation
Replacement of Conventional street
lights with LED
Replacement of Conventional street
lights with LED
Solar LED in tourist places
Solar LED in tourist places
Street Furniture
Street furniture and signage
Street furniture and signage
Junctions Improvement
Junctions Improvement
Environmental Improvement / Conservation
Coastal protection
Coastal protection
Green Avenue Plantation
Green Avenue Plantation
Air quality monitoring
station
Air quality monitoring
station
Education
Reconstruction of two school buildings
Reconstruction of two school buildings
e- classroomse- classrooms
Tourism & Cultural Preservation
Tourism KiosksTourism Kiosks
Light & Sound ShowLight & Sound Show
Recreation CenterRecreation Center
Conservation of Heritage structures
Conservation of Heritage structures
Beautification of NaidaBeautification of NaidaBeautification of NaidaCaves
Beautification of NaidaCaves
Viewing Deck Viewing Deck
Development of Sea Fronts
Development of Sea Fronts
Solar powered LED Display
Solar powered LED Display
Development of cycle track, foot path
Development of cycle track, foot path
Jogging track Jogging track
Social Infrastructure
Wi-Fi Zones Wi-Fi Zones
Gym & Swimming PoolGym & Swimming Pool
Vegetable & Fish Market
Vegetable & Fish Market
Cold StorageCold Storage
Market, Library & Training Center
Market, Library & Training Center
Night / Foreign BazarNight / Foreign Bazar
Women’s Hostel & Senior Citizen HomeWomen’s Hostel &
Senior Citizen Home
PAN CITY PROPOSALS
Optical fiber Internet connection
Optical fiber Internet connection
Emergency Preparedness and Incident Response
Emergency Preparedness and Incident Response
Smart Governance Smart Governance
Projects Identified under Smart City Initiative for Diu Municipal Council
SCP Other Agencies /
Convergence
1 Grade separator to relieve traffic congestion at Diu
Ghoghla Bridge- main entry to the core city (2 Lane
divided CW - 7 mtrs)
400 Mtrs 24.00 24.00
2 Multi level parking lot near Diu - Ghoghla bridge &
near primary school Ghoghla
(210 Wheelers per floor & 900 Two Wheelers)
G+2 - 6750 Sq Mtrs
G+2 - 6750 Sq Mtrs
27.00 27.00
Area Based Development Proposals
Smart Mobility
Project Source of fundingUnitS. No. Project Cost
(Rs. In Crores)
(210 Wheelers per floor & 900 Two Wheelers)
3 Pedestrian path / Foot path from Bandar chowk to
Diu Fort.
1 Kms 0.27 0.27
4 Battery operated mini buses (14 Seaters) / auto
rikshaws ( 3 Seaters) along with charging stations
6 No.s / 20 No.s &
3 Charging Stations
1.91 1.91
5 Redevelopment of bus stations/terminus with smart
display (Diu & Ghoghla)
2 No.s - G+2
4500 Sq mtrs
2530 Sq mtrs
13.46 13.46
6 Bus stops/ shelters with information system and with
revenue generation by allowing advertisements with
GPS enabled system
12 No.s 2.00 2.00
7 Fitment of GPS on buses and Passenger information
system at sub shelters.
50 No.s 0.25 0.25
68.89 68.89 0.00Sub Total (A)
Projects Identified under Smart City Initiative for Diu Municipal Council
SCP Other Agencies /
Convergence
9 Strengthening of WS distribution system 8 MLD WTP 34.99 34.99
10 Smart water meters for bulk water supply
(32 Mtrs of varying size)
1.28 1.28
11 SCADA 24x7 WS 4.00 4.00
Area Based Development Proposals
Water Supply
Project Source of fundingUnitS. No. Project Cost
(Rs. In Crores)
11 SCADA 24x7 WS 4.00 4.00
12 Rain water harvesting & Roof Rain Water Collection
in all Government buildings & institutions.
60 No.s 3.50 3.50
13 Recycling of waste water in all Government buildings
& institutions.
60 No.s 2.40 2.40
14 Dual water pipe system in all Government buildings &
institutions.
60 No.s 1.20 1.20
15 Desalination Plant - A Pilot Projects as a contigency
plan
3 MLD 27.00 27.00
74.37 39.38 34.99Sub Total (B)
Projects Identified under Smart City Initiative for Diu Municipal Council
SCP Other Agencies /
Convergence
16 Provision of bins for segregation at source -
household level
6800 HH's 0.25 0.25
17 Solid waste trucks with separate bins for dry and wet
waste
3 trucks & 10
wagons
2.00 2.00
18 Walky - Talky system to get updates on management 0.10 0.10
Project Cost
(Rs. In Crores)
Unit
Area Based Development Proposals
Solid Waste Management
Project Source of fundingS. No.
18 Walky - Talky system to get updates on management
of solid waste.
0.10 0.10
19 Online monitoring system from Source to disposal
point
0.25 0.25
20 Solid waste treatment plant 1 No.s 13.50 13.50
16.10 2.60 13.50
21 Public Bio Toilets at all tourist locations and public
places with assured tie-up of finances and
identification of institutions for system upkeep for at
least five years.
70 No.s 0.59 0.59
0.59 0.59 0.00
Sanitation
Sub Total (C )
Sub Total (D)
Projects Identified under Smart City Initiative for Diu Municipal Council
SCP Other Agencies /
Convergence
22 Sewerage network 33 Kms Network &
10 MLD STP
30.39 0.25 30.14
30.39 0.25 30.14
23 Out fall drains 16 Kms 26.00 26.00
Project Cost
(Rs. In Crores)
Unit
Underground Sewerage System
Sub Total (E)
Storm Water Drains
Area Based Development Proposals
Project Source of fundingS. No.
26.00 26.00 0.00
24 Solar power plant to meet 100% of city power
demand- eventually making Diu a Zero Carbon
footprint settlement.
6 MW 36.00 36.00
25 Roof top solar energy generation in all government
and institutional buildings as an immediate measure.
985 KW 0.13 0.13
26 Replacement of Conventional street lights with LED
lights in all major roads
534 No.s 1.80 1.80
27 Replacement of exisiting electric poles 2100 No.s 6.30 6.30
28 Provision of Solar LED lights in all tourist places 225 No.s 0.72 0.72
44.95 8.82 36.13
Energy
Sub Total (F)
Sub Total (G)
Projects Identified under Smart City Initiative for Diu Municipal Council
SCP Other Agencies /
Convergence
29 Street furniture and signage at all tourist locations 16 kms 2.40 2.40
30 Junctions Improvement of all major intersections. 15 No.s 4.50 4.50
6.90 6.90 0.00
Area Based Development Proposals
Project Source of fundingUnit
Sub Total (H)
Street Furniture
S. No. Project Cost
(Rs. In Crores)
6.90 6.90 0.00
31 Coastal protection (Prevention of rock erosion) along
the stretch from Jalandhar Beach to Diu fort.
2.50 Kms 27.50 27.50
32 Coastal protection (Prevention of erosion and
beautification) retaining wall at Meethababa Ghoghla
0.95 Kms 46.00 46.00
33 Green Avenue Plantation from Jalandhar beach to
Diu Fort
1.77 Kms 0.15 0.15
34 Installation of real time ambient air quality
monitoring station
1 No.s 0.50 0.50
74.15 74.15 0.00
Sub Total (H)
Sub Total (I)
Environmental Improvement / Conservation
Projects Identified under Smart City Initiative for Diu Municipal Council
SCP Other Agencies /
Convergence
35 Tourism Kiosks 16 No.s 1.60 1.60
36 Light and Sound Show at Diu fort 1 No.s 7.00 7.00
37 Development of recreation center at Diu -Goghla
bridge - Gandhipurasectorby providing laser show,
multiplex and open air theatre.
1 No.s
4125 Sq mts - Built
area
20.00 20.00
38 Improvement/ Protection/ Conservation of Heritage 8.00 8.00
Project Cost
(Rs. In Crores)
Unit
Tourism & Cultural Preservation
Area Based Development Proposals
Project Source of fundingS. No.
structures by Integration with INTACH listing of
monuments and historic buildings already carried
out.
39 Beautification of Naida caves 1 No.s 2.00 2.00
40 Viewing Deck at Chandrikamata 1 No.s 4.00 4.00
41 Development of sea front near PWD office 2 No.s 5.00 5.00
42 Solar powered tourist information with LED Display 10 No.s 0.25 0.25
43 Development of cycle track, footpath and railing from
Jalandhar beach to Diu Fort
1.77 Kms 0.57 0.57
44 Construction of travellers bunglows in Ghoghla & Diu 2250 Sq. Mtrs &
4800 Sq. Mtrs
18.00 18.00
66.42 62.42 4.00Sub Total (J)
Projects Identified under Smart City Initiative for Diu Municipal Council
SCP Other Agencies /
Convergence
45 Wifi Zones 10 2.00 2.00
46 Skill development for tourism friendly workforce. 2.00 2.00
47 Construction of Gym & Swimming pool 1 Nos 9.50 0.50 9.00
48 Construction of Vegetable and Fish market 1 Nos 10.00 0.50 9.50
Project Cost
(Rs. In Crores)
Unit
Social Infrastructure
Area Based Development Proposals
Project Source of fundingS. No.
48 Construction of Vegetable and Fish market 1 Nos 10.00 0.50 9.50
49 Strengthening of fishing industry by providing cold
storage(2000 MT) and processing facilities near Diu /
Panjarapura
1 Nos 3.95 3.95
50 Construction of market, Library and training center
near PHC Ghoghla
1 Nos 20.00 20.00
51 Night Bazar/Foreign Bazar 1 Nos 0.50 0.50
52 Construction of Women Protection Home / Working
Women Hostel and Senior Citizens Home near
Ghoghla Bus Stand
G+2 - 4125 Sq. Mtrs
& interior furniture
1.00 1.00
48.95 30.45 18.50Sub Total (L)
Projects Identified under Smart City Initiative for Diu Municipal Council
SCP Other Agencies /
Convergence
53 Reconstruction of two school buildings as per RTE at
Kamaleshwar&Panjarapore
2 No.s 11.00 11.00
54 Improvement of education facilities by introducing e-
classrooms
12 Schools 1.20 1.20
12.20 1.20 11.00
Project Cost
(Rs. In Crores)
Unit
Pan City
Education
Sub Total (K)
Area Based Development Proposals
Project Source of fundingS. No.
55 Laying of Optical Fiber Internet Connectivity -
Distribution Network
55 kms 15.00 15.00
56 Emergency Preparedness and Incidence Response
(EPIR - Surveillance Cameras for incidence detection,
Emergency response intake through call, mobile app
or panic button, Computer aided dispatch & first
responder coordination)
5.00 5.00
57 Smart Governance & Management
(Website and Mobile Apps - Digitization of GIS Based
Map and linking it for all Online Tax & Bill
management system, Single Window Clearance
system for all Building Plan & Service Utility
approvals, Grievance & Smart pay cards)
8.50 8.50
28.50 28.50 0.00
498.41 350.15 148.26Grand Total
(A+B+C+D+E+F+G+H+I+J+K+L+M)
Sub Total (M)
Pan City
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
1 Grade separator to relieve traffic congestion at Diu Ghoghla Bridge- main entry to the core city (2 Lane divided CW - 7 mtrs)
2 Multi level parking lot near Diu - Ghoghla bridge & near primary school Ghoghla
Area Based Development Proposals
Smart Mobility
FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20
S. No. ProjectImplementation Schedule
Implementation Schedule for the Projects Identified under Smart City Initiative for
Diu Municipal Council
& near primary school Ghoghla (210 Wheelers per floor & 900 Two Wheelers)
3 Pedestrian path / Foot path from Bandar chowk to Diu Fort.
4 Battery operated mini buses (14 Seaters) / auto rikshaws ( 3 Seaters) along with charging stations
`
5 Redevelopment of bus stations/terminus with smart display (Diu & Ghoghla)
6 Bus stops/ shelters with information system and with revenue generation by allowing advertisements with GPS enabled system
7 Fitment of GPS on buses and Passenger information system at sub shelters.
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
9 Strengthening of WS distribution system
10 Smart water meters for bulk water supply(32 Mtrs of varying size)
11 SCADA 24x7 WS
12 Rain water harvesting & Roof Rain Water
Area Based Development Proposals
Water Supply
FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20
S. No. ProjectImplementation Schedule
Implementation Schedule for the Projects Identified under Smart City Initiative for
Diu Municipal Council
12 Rain water harvesting & Roof Rain Water Collection in all Government buildings & institutions.
13 Recycling of waste water in all Government buildings & institutions.
14 Dual water pipe system in all Government buildings & institutions.
15 Desalination Plant - A Pilot Projects as a contigency plan
16 Provision of bins for segregation at source - household level
17 Solid waste trucks with separate bins for dry and wet waste
18 Walky - Talky system to get updates on management of solid waste.
19 Online monitoring system from Source to disposal point
20 Solid waste treatment plant
Solid Waste Management
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
21 Public Bio Toilets at all tourist locations and public places with assured tie-up of finances and identification of institutions for system upkeep for at least five years.
22 Sewerage network
Sanitation
Underground Sewerage System
Area Based Development Proposals
FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20
S. No. ProjectImplementation Schedule
Implementation Schedule for the Projects Identified under Smart City Initiative for
Diu Municipal Council
22 Sewerage network
23 Out fall drains
24 Solar power plant to meet 100% of city power demand- eventually making Diu a Zero Carbon footprint settlement.
25 Roof top solar energy generation in all government and institutional buildings as an immediate measure.
26 Replacement of Conventional street lights with LED lights in all major roads
27 Replacement of exisiting electric poles
28 Provision of Solar LED lights in all tourist places
Energy
Storm Water Drains
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
29 Street furniture and signage at all tourist locations
30 Junctions Improvement of all major intersections.
Street Furniture
Environmental Improvement / Conservation
Area Based Development Proposals
FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20
S. No. ProjectImplementation Schedule
Implementation Schedule for the Projects Identified under Smart City Initiative for
Diu Municipal Council
31 Coastal protection (Prevention of rock erosion) along the stretch from Jalandhar Beach to Diu fort.
32 Coastal protection (Prevention of erosion and beautification) retaining wall at Meethababa Ghoghla
33 Green Avenue Plantation from Jalandhar beach to Diu Fort
34 Installation of real time ambient air quality monitoring station
Environmental Improvement / Conservation
Implementation Schedule for the Projects Identified under Smart City Initiative for
Diu Municipal Council
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
35 Tourism Kiosks
36 Light and Sound Show at Diu fort
37 Development of recreation center at Diu -Goghla
Tourism & Cultural Preservation
Area Based Development Proposals
FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20
S. No. ProjectImplementation Schedule
37 Development of recreation center at Diu -Goghla bridge - Gandhipurasectorby providing laser show, multiplex and open air theatre.
38 Improvement/ Protection/ Conservation of Heritage structures by Integration with INTACH listing of monuments and historic buildings already carried out.
39 Beautification of Naida caves
40 Viewing Deck at Chandrikamata
41 Development of sea front near PWD office
42 Solar powered tourist information with LED Display
43 Development of cycle track, footpath and railing from Jalandhar beach to Diu Fort
44 Construction of travellers bunglows in Ghoghla & Diu
Implementation Schedule for the Projects Identified under Smart City Initiative for
Diu Municipal Council
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
45 Reconstruction of two school buildings as per RTE at Kamaleshwar&Panjarapore
46 Improvement of education facilities by introducing e- classrooms
47 Wifi Zones
Education
Social Infrastructure
Area Based Development Proposals
FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20
S. No. ProjectImplementation Schedule
47 Wifi Zones
48 Skill development for tourism friendly workforce.
49 Construction of Gym & Swimming pool
50 Construction of Vegetable and Fish market
51 Strengthening of fishing industry by providing cold storage(2000 MT) and processing facilities near Diu / Panjarapura
52 Construction of market, Library and training center near PHC Ghoghla
53 Night Bazar/Foreign Bazar
54 Construction of Women Protection Home / Working Women Hostel and Senior Citizens Home near Ghoghla Bus Stand
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
55 Laying of Optical Fiber Internet Connectivity - Distribution Network
56 Emergency Preparedness and Incidence Response (EPIR - Surveillance Cameras for incidence detection, Emergency response intake through call, mobile app or panic button, Computer aided dispatch & first responder
Pan City
FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20
S. No. ProjectImplementation Schedule
Implementation Schedule for the Projects Identified under Smart City Initiative for
Diu Municipal Council
Computer aided dispatch & first responder coordination)
57 Smart Governance & Management(Website and Mobile Apps - Digitization of GIS Based Map and linking it for all Online Tax & Bill management system, Single Window Clearance system for all Building Plan & Service Utility approvals, Grievance & Smart pay cards)
� Total Project Cost : Rs. 498.41 Crores
� SCP Project Cost : Rs. 350.15 Crores
� Convergence Cost : Rs. 148.26 Crores
SCP Funds Sharing
� GoI Share : Rs. 175.08 Crores
Financial Details
� ULB Share : Rs. 175.08 Crores
Financial Schedule
Funds Share 2016-17 2017-18 2018-19 2019-20
GOI 42.08 56.84 46.28 29.87
ULB 42.08 56.84 46.28 29.87
Total 84.16 113.68 92.57 59.74
Proposals O&M
(In. Crs.)
Revenue Generation
(In. Crs.)
Area Based Proposals
Smart Mobility 0.4 1.46
Water Supply 1.57 1.10
Solid Waste Management 0.04 0.00
Sanitation 0.03 0.09
Sewerage System 0.76 0.54
Storm Water Drains 0.13 0.00
Energy 1.30 7.65
Operation, Maintenance & Revenue Generation
Street Furniture 0.01 0.00
Environmental Improvement / Conservation 0.07 0.00
Tourism & Cultural Preservation 0.72 5.49
Education 0.0012 0.00
Social Infrastructure 1.78 3.39
Pan City Proposals
Optical Fiber Internet Connectivity 0.30 0.00
Emergency Preparedness and Incidence Response 0.10 0.00
Smart Governance & Management 0.08 0.22
Total 7.30 19.94
Projects With Scope of Major Revenue Generation
S.NO ProjectRevenue Generated
(In Crores)
1. 6 MW Solar Power Plant 6.57
2. Recreation Center 3.20
3. Cold Storage (2000 MT Capacity) 2.16
4. Light & Sound Show Diu Fort 1.35
5. Desalination Plant 1.10
6. Roof top solar energy generation 1.08
Total 15.45
Committee approvals is required on ;
• Projects proposed by DIU Municipal Council in SCP
• SPV for implementation of Smart City Proposals
• Financial Resources Mobilisation (DMC/UT/GoI)Total Tourist: 2200000Total Tourist:
Vehicles Tourist Total
Cars 1320000 330000 165
Buses 880000 29333 59
TOTAL 2200000 224 220 444
No.of
Vehicles
No.of
Tourist
Revenue in Lakhs (Per Annum)Type of Vehicle
2200000
Recommended