3.6 Case Study Irrigation Improvement Project: Developing Water Users Organizations

Preview:

Citation preview

3.6 Case StudyIrrigation Improvement Project:Developing Water Users Organizations

New Intervention on Water Resources Management

Decentralization water service delivery. Involving users in planning and managing water projects

and. Encouraging stakeholders to contribute to policy

formulation.

New organizations at three levels

Irrigation Council

Water Users Groups

Water Users Association

Methodology of IIP towards the formation of farmer organizations

Formation of WUGsinitiated on March 2002

Wadi Tuban

• WUGs (20-50 farmers) at the level of the tertiary/ secondary canals or ma’aqem served by the same structure;• WUGs should have social cohesion, successful history of O&M within their canals and demonstrated ability to work together in a group to manage water;• WUAs at the level of the primary canals;• Irrigation Council at the level of the entire Wadi system

Formation of WUGs

June 2003

Wadi Zabid

Participation in Water Distribution

Traditional System

W. Zabid

Participation in Water Distribution

Wadi Tuban

Traditional System

Participation in Irrigation Management (PIM)

Modern System

Wadi Tuban

Participation in Irrigation Management

W. Hadramout

Advantages of Community Participation

Public Awareness Campaign in the Project villages

Village Meetings

Open Discussion

Direct Voting for WUG Representatives

W. ZabidW. Tuban

Formation of WUAsMain Purposes of WUA Formation:

To ensure the WUA shall be to safeguard and promote the common interests of the users of land in the command area of the WUA with regard to irrigation and agriculture.

WUA Formation Steps: - Preliminary Meeting; - Election of Preparatory committee; - Founding Meeting.

After the formation of WUA, a Farmer Design committee (FDC) has to be assigned for the purpose of defining priority ranking of rehabilitation needs and participate, agree in design and contribution.

Preliminary Meeting for forming Preparatory Committee

Founding Meetings for the WUAs in the project area

Wadi Tuban (June 1st, 2003) Wadi Zabid (October 1st, 2003)

Direct Voting for WUA Bylaws

W. Tuban

To accelerate the formation of Irrigation Council, the IC Bylaws have been drafted, legally revised, discussed with the related parties, approved by the Project Steering Committee and authorize the Governors in both Lahej and Hudeidah governorates to issue the required resolutions for establishment of the ICs. Finally, the ICs in Tuban and Zabid were formed on August and September 2005 respectively. To track the activity of IC, Executive Procedures and O&M Manual for WUAs have been drafted and under discussion now by IC members in both wadis. ) 2005

Objectives of the Irrigation CouncilProviding services which are related to the supply of irrigation water and which services shall benefit the water users at wadi level.

Main Tasks and Authority of the Irrigation Council

Setting a general policy for the whole wadi for achieving the demand of the water distribution program, monitor its distribution and increase its efficient use;

Approval and supervising the implementation of the annual irrigation plan;

Review and approve the annual maintenance plan; Inspect the implementation of the annual O&M activities

for all irrigation infrastructures, according to the approved plan;

Supervise the operation of diversion structures; Represents the water users as a united organization;

Prepared by:Ministry of Agriculture and IrrigationIrrigation Improvement ProjectPMU – Sana’a Participatory Irrigation Management (PIM)

Recommended