October 23, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 34 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG is hydrotesting approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 34 for the period of October 13, 2019 through October 19, 2019.
Federal Energy Regulatory Commission -2- October 23, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.
Respectfully submitted,
EL PASO NATURAL GAS COMPANY, L.L.C.
By__________/s/_______________ Francisco Tarin Director, Regulatory
Enclosures
EPNG We
Docket N
Project N
County/S
Reportin
Environm
1. Summ
Line NDurinCompwas tWink
MainconcrMLV wereKeystchain
Line sectiooccuralongMP 3watesurfareplaNew pipelComm
2. Relev
Durintwo Expan
All eq All opNo an
eekly Enviro
No. CP19‐28‐
Name:
State:
ng Period:
mental Inspe
mary of Con
No. 31111 Long this repopressor Statthen paddedk Compresso
nline Valve arete pad at 5, and the fo poured wittone and Linnlink fence a
No. 1105 Hon betweenrred along tg the second34+4170. Hr was deterce. Landowcement wopipe was bine replacemmission in 20
vant Environng this repor(702) peoplnsion Projec
quipment wa
pen ditch wnimals were
onmental Ins
‐000
Nor
WinCou
Oct
ector: Dav
nstruction Ac
oop Line: orting perioion was madd and backfor Station wa
and Pig Launthe end of orms for conth concrete.ne No. 1103 t Line No. 20
Hydrostatic T MLV 4 andthis segmentd section beHydrostatic trmined to bwners at therk was thenrought in, wments will b020.
nmental Actrting period,e have recect.
as checked f
as walked o noted in the
spector Rep
rthern Delaw
nkler, Ector,unties, Texas
tober 13, 201
vid McCullou
ctivity for In
d, the tie‐inde, the weldfilled. In adas replaced.
ncher/Receivthe pig launncrete suppo In additionwas sandbl000 MLV 1 w
Testing: On Hogg Metet at at appretween the test water sbe clear. Te sites of en initiated awelded up, ae reported i
ivities: no environeived enviro
for noxious w
on a daily bae ditch durin
port No. 34
ware Basin E
, Crane ands
19 to Octobe
ugh
nspection Pe
n of Line Nds were sandddition, the
ver Modificancher/receivorts of the Kn, the pipe aasted, primewas installed
n Sunday, Oer Station beroximate MPMP 41.0 tessamples weThe rupturesach ruptureand the ruptand weldedin EPNG’s an
mental trainonmental tra
weeds and fo
asis to ensurng this repor
Expansion Pr
d Upton D
er 19, 2019
eriod:
No. 31111 adblasted anchainlink fe
ations: Durinver barrel wKeystone Coat the intersed for paintd.
October 13,egan. A hydP 29+1268.st break sitere taken at s caused noe were conttured pipe w into Line Nnnual 2.55(b
ning was giveaining on th
ound to be c
re that no arting period.
roject
Date: 10/23/
and Line Nod coated anence along t
ng this repowas poured ampressor Stsection of thing and pain
2019, testdrostatic test A second re and MLV 4both ruptu
o contaminatacted. Emwas excavatNo. 1105. Tb) report to
en. A total ohe Northern
clean.
nimals had .
/2019
o. 3162 at nd the open the north sid
orting periodat Line No. tation bypashe bypass linted. Finally
ing on the t related ruprupture occu4 at approxiure sites andation to theergency pipted and cutThese emergbe filed wit
of seven‐hunn Delaware
been entrap
Wink ditch de of
d, the 1105 s line ne at y, the
third pture urred mate d the e soil peline t out. gency h the
ndred Basin
pped.
3. Envir
No en 4. Envir
No en 5. Issue
No la 6. Work
TaW
Tsase
Ex
ronmental Pnvironmenta
ronmental Cnvironmenta
es and Concendowner iss
k Planned fo
he chainlinkddition, it isWink Compre
he new pipandblasted, ections.
xposed pipin
Problems/Issal problems/
Compliance Ial complianc
erns Identifisues or conc
or the Follow
k fence alongs anticipatedessor Station
pe that wascoated and
ng for the by
sues and Co/issues were
Issues/Resoce issues we
ed by Landocerns were id
wing Reporti
g the east sid that paint ns.
s welded ind backfilled
ypass line at
rrective Acte identified d
lutions: re identified
owners: dentified du
ing Period:
ide of Wink will be tou
nto Line Noand prepar
Keystone C
ions Taken:during this re
d during this
ring this rep
Compressorched up on
o. 1105 at rations will
ompressor S
eporting per
s reporting p
porting perio
r Station wil the piping
both ruptubegin to re
Station will b
riod.
period.
od.
ll be installeat Keystone
ure sites wie‐test these
be painted.
ed. In e and
ill be e two
Report N
Photos
Location31111 atCompresDirectionNorth Descriptithe crossbetweenloop line 3162.
Location31111 atCompresDirectionNortheasDescriptiAbrasive the crossbetweenloop line 3162.
No. 34
: Line No. t Wink ssor Station n of Photo:
ion: Tying insover the new and Line No
: Line No. t Wink ssor Station n of Photo: st ion: blasting on sover welds the new and Line No
n
o.
o.
Photos
Location31111 atCompresDirectionNortheasDescriptiwelds oncrossovethe new Line No.
Location31111 atCompresDirectionSouth Descriptibackfilledcrossovethe new Line No.
: Line No. t Wink ssor Station n of Photo: st ion: Coatingn the r between loop line an3162.
: Line No. t Wink ssor Station n of Photo:
ion: Ditch d at the r between loop line an3162.
g
d
d
Photos
Location31111 atCompresDirectionNorthweDescriptiReplacingchainlinkthe northWink ComStation.
Location31111 atCompresDirectionNortheasDescriptiReplacedfence onside of WCompres
: Line No. t Wink ssor Station n of Photo: est ion: g the k fence on h side of mpressor
: Line No. t Wink ssor Station n of Photo: st ion: d chainlink the north
Wink ssor Station.
Photos
Location31111 at553+00 DirectionNortheasDescriptialong theline ROW
Location31111 at340+00 DirectionNortheasDescriptialong theline ROW
: Line No. t Station No.
n of Photo: st ion: View e new loop W.
: Line No. t Station No.
n of Photo: st ion: View e new loop W.
Photos
Location31111 at188+00 DirectionNorth Descriptialong theline ROW
Location31111 at5+00 DirectionWest Descriptialong theline ROW
: Line No. t Station No.
n of Photo:
ion: View e new loop W.
: Line No. t Station No.
n of Photo:
ion: View e new loop W.
Photos
Location1105 at approxim29+1268DirectionSoutheasDescriptisite on thexcavatewelding ointo Line
Location1105 at approxim34+4170DirectionNorthweDescriptisite on sesegment and new into Line
: Line No.
mately MP n of Photo: st ion: Rupturhird segmened and of new pipe No. 1105.
: Line No.
mately MP n of Photo: est ion: Ruptureecond excavated pipe weldedNo. 1105.
e t
e
d
Photos
LocationCompresDirectionNorth Descriptiline afterpainted aCompres
Location1105 at MDirectionWest Descriptiinstalled pad and basin at tthe pig launcherMLV 5.
: Keystone ssor Station n of Photo:
ion: Bypass r being at Keystone ssor Station.
: Line No. MLV 5 n of Photo:
ion: Newly concrete cachement the end of
r/receiver at
Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 23rd day of October 2019.
/s/ Francisco Tarin
Two North Nevada Avenue Colorado Springs, Colorado 80903 (719) 667-7517