View
0
Download
0
Category
Preview:
Citation preview
a
community story
by
HUL
General
• Site Size- 37 acres : Built up Area 17 acres
• INR 1092 Cr. Turnover in 2016 with a Volume of
107K tons
(Operates 24X7 – 8 hrs X 3 shifts per day)
Manufacturing
4 Plants (TSP, Dove, NSD and DFA )
TSP: 4 Cascades Skin Cleansing –
24 Base packs, 56 SKUs
Dove: 2 Cascades
NSD Bar- 2 Cascades – Laundry –
15 Base packs, 39 SKUs
DFA
Factory Passport
2003
ACPL factory commissioned as a JV with HUL (26%).
2008
End of Fiscal benefits for the site
2012
MoU signed with ACPL by HUL to takeover its 74%
stake
2013Acquisition by HUL on 1st AprilDove unit commissioned
2004
Glycerin plant installed2nd powder line started
2014High speed cascade in TSP COMPASS Award for PW categoryGMEA Leaders Award
2015ACPL merged into LLPLPPA signed with Continuum Wind EnergyGreen tech Environment. Gold Award 20153rd Rank in SU League
2016Greentech Gold safety award 2016.2nd Cascade in Dove
47 50 51 53 5240
0 1 6 8 98
47 5157 61 61
48
2012 2013 2014 2015 2016 YTD'17
PC Vol. (‘000 Ton)
PC - B&H Bars (Vol 000 Tons) Dove Bars ( Vol 000 Tons) PC Total
54 50 47 46 4730
9790
85
60
47
30
2012 2013 2014 2015 2016 YTD'17
HC Vol. (‘000 Ton)
HC Bar (Vol 000 Tons) HC Powder (Vol 000 Tons) HC Total
Factory progress with Time
2017Renewable energy touched 33% Fame Excellence Gold Award 2017
Our Purpose and Vision
=
Our Prabhat pillars based on USLP
The objective of Project Prabhat is to create a positive impact through sustainable
interventions, in and around the sites where Hindustan Unilever Limited has its
operations
Transforming lives by empowering communities for a sustainable future
Our Ambition is to touch the lives of 1 Million people by 2017
Community work
undertaken after
baseline survey
Water Harvesting
Soil and Moisture
Conservation
Animal Husbandry
Improved Agriculture practices
Prabhat in Gandhidham, Kutch
• Water Harvesting structures like farm ponds, common ponds, check dams
have been constructed in 6 villages
• Created 180 Million Litres water storage potential though water harvesting
activities
• 69.54 hectare land treated with improved agriculture package of practices
and 24.57 hectare land is brough under irrigation due to water harvesting
structures constructed through project
• This has resulted in 417.30 quintal additional agriculture production by
farmers
• Overall 463 families are impacted with Jal Prabandh Project initiatives
upto March 2016
ACHIEVEMENTS
Farm Pond - Crop Saving irrigation
Water harvesting
AGRICULTURE DEVELOPMENT
Soil and Water Testing
AGRICULTURE DEVELOPMENT
Farm Bunding –Soil moisture conservation
Sl No Name of Village TalukaNo. of
Households
1 Bhimasar Anjar 1731
2 Pashuda Anjar 171
3 Padana Gandhidham 432
4 Varshana Anjar 257
5 Ajapar Anjar 216
6 Tappar Anjar 874
Total 3681
PROJECT COVERAGE
Cattle cum Agriculture Development Centre
ANIMAL HUSBANDRY
SKILL DEVELOPMENT
Doot gathers children and adults in his village and plays out the
audio content
Doot receives audio stories on “Swacch Aadat” by calling toll
free number
Participants takes the Cleanliness Pledge.
Every factory worker in India can become a change agent
SWACHATA DOOT
Tailoring Course at Bhimasar Launch of Mguru app
Recommended