A dynamic CEG. Renewal plan. Presentation for the CEG staff meeting on 6-7-2009. 1. Renewal and realignment. Renewed CEG Substantive choices on the basis of a changing society and own strength. Clear profiling using themes linked to DRIs - PowerPoint PPT Presentation
Citation preview
A dynamic CEGRenewal plan
Presentation for the CEG staff meeting on 6-7-2009
2Inspiring Creativity
1.Renewal and realignment
3Inspiring Creativity
Renewed CEG Substantive choices on the basis of a changing society and own strength
• Clear profiling using themes linked to DRIs• Initiatives for new research programmes and
knowledge centres• Increased cooperation with the sector• Increased internal cooperation between
departments/research groups• Academic entrepreneurship• Increased efficiency facilities
4Inspiring Creativity
2.CEG in the changing environment
5Inspiring Creativity
The changing environment Trends
• Increasing international urgency of social problems: delta liveability, safety, water supply, sanitation, mobility, energy provision, scarcity of raw materials
• Reinforced by climate change with focus on mitigation and adaptation
• Changing role of the engineer: process-based operation in broad, multidisciplinary context with explicit attention paid to sustainability
• Fierce international competition for research and education
• Decreasing 1st money stream and increasing importance of other (European) funding
• Increasingly important role for customers and public-private cooperations.
6Inspiring Creativity
CEG FacultyUnique
• Strong international, scientific reputation in the fields of civil engineering and technical geosciences
• Unique national position in the field of the structural design of civil engineering works
• Unique laboratory facilities for large-scale mechanical testing, micro-materials and geo-mechanical research
• Unique study programmes in NL in the field of CT and TA
• Research and education with strong social orientation
• Excellent international job opportunities for graduates and PhDs.
7Inspiring Creativity
CEG’s visionCreating solutions for the future
In a changing society with challengers appearing all the time, we work on liveability, safety and accessibility. We carry out research and cooperate with companies, government bodies and top universities on the solutions our future society demands. With our years of experience, excellent facilities and research and education programmes are we (with our alumni) a source of innovative applications which are used around the world.
8Inspiring Creativity
CEG’s missionTo excel, inspire, innovate
• To excel on a global scale in research in the field of delta technology, water technology, civil infrastructure, transport and geothermal energy.
• To provide international students and staff with an inspiring learning and work environment thanks to state of the art (research)facilities and research-driven education programmes.
• To devise innovative solutions for our society in cooperation with our partners.
9Inspiring Creativity
3.CEG’s changing
10Inspiring Creativity
5 ThemesClear profiling for CEG
Objective:• Improving alignment with major social themes• Reinforcing internal cooperation across
research groups and departments
11Inspiring Creativity
Delta Technology
Geo-energy
Jan Dirk Jansen / Timo Heimovaara
Civil infrastructure
Aad van der Horst / Klaas van Breugel
Water technology
Hans van Dijk / Jules van Lier
Transport & Planning
Serge Hoogendoorn / Bart van Arem
5 themesClarify which fields we work in
Energy
Infrastructures
The Environment
Institute of Flood and Environmental Risk
Management
Matthijs Kok / Marcel Stive
12Inspiring Creativity
Partnerships and research programmes
Strategic partnerships:• Expertisecentrum Civiele Infrastructuur with
RWS/TNO• Construction lab as strategic TUD lab with BK and
TNO• KC Watermanagement/Waterbouw with Deltares• 3TU Speerpunt Bouw• EIT KIC Clima• Expertisecentrum Verkeersmanagement with RWS
and TNO• Delft Urban Water Cycle Research Centre with IHE,
TNW, TBM
Agenda-determining initiatives:• NWO-Bio-inspired civil engineering• Institute of Flood and Environmental Risk
Management• Cooperation with KWR and TTI Wetsus to arrive at EIT
Water
13Inspiring Creativity
Activities at faculty levelManagement and facilities
Management• Stimulating cooperation between
departments and faculties• Demands different competences/superiors
Facilities• Upgrade building and office space efficiency• Efficiency drive at departmental
laboratories
14Inspiring Creativity
Activities at faculty levelAcademic entrepreneurship
• Responsibility for individual and group targets
• Space for initiatives and implementation• Peer admonition and exemplary behaviour• Customer-oriented, commercial mindset• Culture of accountability
15Inspiring Creativity
Excellence indicators2012 KPIs in comparison to 2008
• Growth of influx by 15% in comparison to the 2008/2009 level• Improve the student satisfaction score by 0.3• Quality assessment of graduates by employers
EducationEducation
ResearchResearch
• Increase turnover from 2nd money stream projects by 40%• Increase coverage on 2nd and 3rd money stream funding to maximum matching from direct government funding• Increase share of European programmes in 3rd money stream funding to 25%• Increase the research output per tenured scientific staff FTE to the top 2 faculties of the TUD• Increase the number of PhDs per professor FTE to 8• Increase the scores for research visitations to a minimum of 4.0 and and average of 4.25
16Inspiring Creativity
4.Outline of renewal per department
17Inspiring Creativity
Department of Design and ConstructionInnovations
• Expertisecentrum Civiele Infrastructuur in cooperation with RWS and TNO • Construction lab becomes strategic TUD Macromechanical lab with the participation of CEG, BK and TNO• Efficiency drive at laboratory (Stevin II)• Reinforcement of cooperation with Architecture• Winding up of Design and Construction Processes and Building Informatics• Reinforce integral design• Reinforcement of the use of EU programmes and partnerships• Shift from materials orientation to construction orientation• Rejuvenate department management and professor complement
18Inspiring Creativity
Department of Hydraulic EngineeringInnovations
• Strategic partnerships with RWS and Deltares• Cooperation in the framework of EIT KIC Clima• Efficiency drive at Water laboratory (Stevin III)• Sharing large-scale model research with Deltares• Rejuvenating department management and professor complement• National cooperation in the field of education in Delta Technology and Climate with HBO Dutch Delta Academy, WUR, VU and UU• Reinforce the theme of Delta technology with the emphasis on safety, ecological hydraulic engineering and integral approach incl. water governance• Start new Institute for Flood and Environmental Risk Management
19Inspiring Creativity
Department of WatermanagementInnovations
• Preparation of Msc Environmental Engineering together with the departments of GT and the faculties of TNW and TBM• Aim to participate in water programme EZ (FES, Innowator, TTI Water)• Aim to participate in KP7 together with KWR and TTIWetsus, strive for EIT Water• Expand water theme into Delft Urban Water Cycle Research Centre (in cooperation with Unesco/IHE, TNW, TBM)
20Inspiring Creativity
Department of Transport & PlanningInnovations
• Reinforce mobility theme on the basis of the designing, development and management of transport/traffic networks • Expertisecentrum Verkeersmanagement in cooperation with RWS and TNO• Reinforce attention paid to goods transport • Aim to participate in NWO Sustainable Accessibility of the Randstad programme and fundamental research into traffic management• Rejuvenate department management
21Inspiring Creativity
Department of GeotechnologyInnovations
• Aim for to participate in NWO Bio-Inspired Civil Engineering programme• Sponsored chair for international study programme Resource Engineering• Aim to participate in follow-up to Delphi consortium, ISAPP-2 and CATO-2• Expand Deltares-TUD knowledge centre in the field of geo-engineering• Reinforce Delta Technology theme from Geo-engineering• Reinforce Geothermal Energy theme with shift in emphasis from optimising oil and gas production to gas hydrates, geothermal, CO2 sequestration, continuous monitoring and data integration
22Inspiring Creativity
5.Realignment
23Inspiring Creativity
Realignments (in 2011 in comparison to 2008)Balance between costs and proceeds in 2011
Faculty- Office accommodation- OverheadDepartments- Reduction in laboratories/O&O- Reduction tenured scientific staff- Reduction of other costs
0.50.5
1.42.61.0
Cost reductions: 6.0Cost reductions: 6.0
Income increase: 3.5Income increase: 3.5
Total: 9.5Total: 9.5
In M€
24Inspiring Creativity
RealignmentSummary
2009 2010 2011 2012 2013** 2014**Unchanged policy -6.920 -7.772 -8.638 -9.520 -10.417 -11.329Realignment 3.333 5.193 9.539 10.949 11.709 11.931Total* -3.587 -2.578 900 1.429 1.293 601* Downsizing of approx. 40 fte fully effected in 2012 ** excl. inflation compensation
Results unchanged policy and effects realign policy
25Inspiring Creativity
Reorganisation3 Scenarios
1. Scenario: natural wastage• Without forced redundancies, voluntary
departure
2. Scenario: extensive reorganisation for:• Design and Construction: sections SBE,
DCP, Construction laboratory• Transport & Planning: reduction in
infrastructure research• Geotechnology: reduction in Geolab staff
3. Scenario: limited reorganisation for:• Design and Construction: sections SBE,
DCP, Construction laboratory• The rest through natural wastage,
voluntary departure.
26Inspiring Creativity
ReorganisationNatural reduction
2009 2010 2011 2012 2013 2014
GT 5 1 0.8 1 1
T&P 4 1 1 0.8 1
Construction 33 2.4 2.4 4.2 7 1 1
Total 42 4.4 2.4 5.2 8.6 3 2
Required reduction 2011
Natural wastage
FTE
Conclusions:1. Natural wastage scenario insufficient for Department of
Design and Construction;2. Use natural wastage up until 2012 in connection with peak
numbers reaching pensionable age in 20123. Facilities required for severance payments (approx. 3 M € )
and benefit burden after dismissal.
27Inspiring Creativity
RealignmentInvestments
Severance costs 3,000Restructuring water lab and Stevin II+III 1,700Upgrade to 2+3+4th storeys 6,000Plint pmFire safety pm
Investments
28Inspiring Creativity
Risk analysis
Aspects Effect Measures in the event of ‘-‘
Responsibility at department/research group level
Targets not achieved Replacing superiors
Support from staff and Faculty Personnel Committee
Delays implementation
Communication
Government developments/allocation model for 1st money stream
+ and - Further realignment
Development of 2nd and 3rd money stream
+ and - Further realignment;more acquisition
Development of personnel costs Higher costs than the pension premium
Further realignment
Support campaign at faculty level + and - Further realignment
Means for investment in realignment operation and for severance
Delays implementation Negative faculty reserves
Top-up faculty reserves
Departure of key figures/key vacancies going unfilled
Decreased income and detriment to education
Tailor-made solutions for key figures
29Inspiring Creativity
CEG Renewal planFollow up
•Submit Renewal plan to the Executive Board – answer in early
July•Discuss Renewal plan with Faculty Personnel Committee
– consultation after the summer•Explain plan to the departments – August/September•Detailing where necessary – August/September•Decision making with regard to organisational change –