Active Target Multistatic Receiver Preliminary Design Review

Preview:

DESCRIPTION

Active Target Multistatic Receiver Preliminary Design Review. Group D: Sam Buchanan Haiji Wang Robby Willer. System analysis. ATMR calibration mode diagram (Level 0). System analysis. ATMR bistatic receiver mode diagram (Level 0). System analysis. ATMR system diagram (Level 1). - PowerPoint PPT Presentation

Citation preview

Project Renovatio

Joshua FraserAlastair FraserRuofei FuChao JiangCheng ZhenDacheng ZhengTien Truong

System-Level Schematic

WBS: System Decomposition

WBS: System Decomposition

WBS: System Decomposition

Testing PlansPower (Current/Volt meter & Management systems)

-Battery discharge and recharge rate and duration-Verify power conversion efficiencies

Motor (G sensors, GPS, Speedometer and/or Dynamometer)-Top speed, acceleration, duration, etc.

-Acceleration/Speed sustainability

Heat (Temperature sensors and IR Camera)-Max temperature of motor and charger-Water/coolant temperature-Temperature range of batteries

Testing PlansWater/Rain Susceptibility (Hose or Sprinkler)

-Power/battery systems are water tight-Wiring is properly insulated-No large potential differences between chassis and ground

Safety Shutoffs (Crash, Ground Fault, and Hand Switches)-Crash sensor works properly

-GFI’s properly detect current imbalances and shut off power-Hand switches properly disconnect power systems

Component Specifications

Risk Mitigation Plan

WBS: Project Organization

Organization Chart

Project Schedule

Questions?● Project Site:

o project-renovatio.bitballoon.com