View
215
Download
0
Category
Preview:
Citation preview
11 | 0
7w
ww
.ger
lach
-hof
fman
n.de
ALHO Space Factory –at home with modular building
ALHO Systembau GmbH
Hammer 1
D-51597 Morsbach
Tel. +49 [(0) 22 94] 6 96 -1 11
Fax +49 [(0) 22 94] 6 96 -2 95
e-mail: info@alho.de
ALHO Systembau GmbH
Sörnewitz
Köhlerstraße 1– 3
D-01640 Coswig
Tel. +49 [(0) 35 23] 8 18-0
Fax +49 [(0) 35 23] 8 18-90
e-mail: info@alho.de
ALHO Systeembouw
Industriepark Zone 2
Interleuvenlaan 62 / bus 44
B-3001 Leuven
Tel. +32 [(0) 16] 39 78 38
Fax +32 [(0) 16] 39 78 40
e-mail: info@alho.be
ALHO Construction
Modulaire S.A.S
Parc d’activités de la
Villette aux Aulnes
Rue Sophie Germain · BP 29
F-77291 Mitry Mory Cedex
Tel. +33 [(0)1] 60 21 68 68
Fax +33 [(0)1] 60 21 68 60
e-mail: accueil@alho.fr
ALHO AG
Industriestrasse 8 · Postfach 17
CH-4809 Wikon
Tel. +41 [(0) 62] 746 86 00
Fax +41 [(0) 62] 746 86 10
e-mail: info@alho.ch
Internet: www.alho.com
32
ALHO plants inMorsbach-HammerCoswig near DresdenMitry Mory, FranceWikon, Switzerland
● Production site Sales agency
Rental park
ALHO –Buildings from the space factory
Building systems as an idea. This has paved the way for the success of the company very early. In 1967 ALHO started the industrial production of prefab-ricated buildings. The first space modules in steel frame design followed in 1971.
The concept of system building was the foundation and driver for the continual development and systematic growth of the ALHO group. Today, space modules, which were prefabri-cated under optimal industrial conditions, are the foundation for individual buildings. E.g.
Office and administration buildingsKindergartensSchoolsLeisure facilitiesHospitals, nursing care homes and laboratoriesConstruction site accommoda-tions
It is not without reasons that ALHO and its approx. 500 quali-fied staff members rank among the market leaders in the industry. The ALHO capability reaches international stand-ards. The service also includes a rental park with more than 10,000 rental units.
Since the foundation of the company more than 200,000 system units left the 4 pro-duction plants in Germany, France and Switzerland.
The ALHO space factory continues to build – consist-ently and systematically.
ss
ss
ss
4 5
DIN 1052
ALHO Systembau GmbH�51597 Morsbach
Three series –A range full of possibilities
From the planning phase to acceptance –the quick way of safe construction
Every investor in a building requires fixed terms. Something the ALHO space factory can be relied upon – no matter whether for new buildings, extensions or adding storeys. Independently of the weather, the modules are produced in the ALHO space factory and then transported andassembled on site. After only a short period for works on site, the final building is prompt han-ded over in a turnkey fashion – with a fixed price guarantee.
The extraordinary quality is reliable as well. Our numerous test and certification marks are impressive proofs for this.
To meet all requirements, ALHO developed three construc-tion series – Basic, Classic and
Comfort-Line to ensure that the optimal space is available for each purpose.
The system behind the building technology consists of modular individual, three dimensional steel frames which – after assembling –shape the final building.
The interior of the building is com-pleted up to 90% in the factory before the modules are assembled on site within a few days.
Planning Production MountingTransport
Series ALHO Basic Line ALHO Classic Line ALHO Comfort Line
Time of use Temporary solution Temporary / permanent solution Permanent solution
Construction Visible steel frame, dual-pane windows, walls out of profiled steel sections.
Visible steel frame, large glass-surface elements on the front, sandwich type wall in combination with dry construction systems.
Steel frame U-section behind the façade system, e.g. curtain façade of aluminium, wood, steel or glass or plaster as a compound heat insulation system.
Type of use Construction site accommodations, construction site offices, temporary solution for reconstructions / rehabili-tation measures, trade fair applica-tion, schools and kindergartens.
Solution for a medium-term appli-cation in case of reconstructions / rehabilitation measures and / or as a quickly available office building, school or kindergarten.
New construction, addition, storey addition. Ideal solution for office and administration buildings, hospitals, nursing care homes and laboratories, schools, lunchrooms and canteens etc.
Availability Approx. 1 – 2 weeks Approx. 6 weeks From approx. 8 weeks
Financing Purchase / rent / leasing Purchase / rent / leasing Purchase / hire purchase / leasing
Equipment Functional High-quality individually
Special features Addition in width and length as desired, max. height 3 storeys. Exchangeable wall system, quickly available, can be dissassembled and re-installed quickly.
Addition in width and length as de-sired, max. height 3 storeys. Flexible wall system.
Addition in width and length as desired, max. height 6 storeys. Easily adaptable room structure for a possible change in usage.
Steel module construction
6 7
ALHO steel frame module construction –High degree of prefabrication, high efficiency
Whether you plan to build for a short-term, medium-term or long-term utilisation, whether you plan a purely functional or an addition-ally representative building, the three production series of stand-ardized ALHO steel frame modules always offer you the most suitable solution.The heavy steel frame structure of each module is the common denominator and forms the static foundation for the building. Within the type system the width, height, length and expansion standards are variable. The prefabricated modules can be assembled very quickly into rooms, storeys or buildings. If your requirements should change, additional modules can be easily added or detached. Even if you should change location, the building is so flexible that it can move along with you.
ALHO steel frame module type of constructionThe modules of the ALHO Basic, Classic and Comfort Line prefabricated up to 90% can be assembled on site within a few days.
8 9
From top to bottom:SchoolCH-Yverdon
Office buildingD-Hamburg
Office buildingD-Hamburg
ALHO Basic Line –the fast solution
Construction site accommodationsD-München
10 11
From top to bottom:Office buildingD-Kevelaer
Office buildingD-Gütersloh
ALHO Classic Line –the flexible solution
From top to bottom:SchoolD-Darmstadt
Office buildingL-Esch / Alzette
HostelD-Dortmund
Office buildingD-Hamburg
12 13
ALHO Comfort Line –building of high standard
From top to bottom:Office buildingD-Offenbach
HospitalCH-Zürich
OfficeD-Darmstadt
Laboratory buildingL-Luxemburg-City
From top to bottom:Office buildingD-Erlangen
SchoolD-Essen
Recommended