Bernardo Avenue Undercrossing

Preview:

Citation preview

Partner Logo Placeholder in Slide Layout: Align with Left Edge of This Box

Max. H

eight

Bernardo Avenue Undercrossing

Joint BPAC MeetingDec. 2, 20205 to 6:30 p.m.

2Joint BPAC Meeting – December 2020

City of SunnyvaleNabilah Deen, Transportation Engineer

Ralph Garcia, Senior Transportation EngineerAngela Obeso, Principal Transportation Engineer

City of Mountain ViewRia Hutabarat Lo, Transportation ManagerRey Rodriguez, Senior Project Manager

Introductions

3Joint BPAC Meeting – December 2020

Project Team ConsultantsDave Dickinson, WMH – Project ManagerSteve Loupe, WMH – Civil Design Lead

Introductions

4Joint BPAC Meeting – December 2020

• Presentation (~10 minutes)

• BPAC Clarifying Questions (~15 minutes)

• Public Comments (~15 minutes)

• BPAC Comments (~40 minutes)

Agenda

5Joint BPAC Meeting – December 2020

• 2004 – Bernardo Avenue Bicycle Undercrossing Feasibility Study Report

• 2016 – One Bay Area Grant funding award

• 2017 – WMH Corporation hired for preliminary design and environmental analysis

• 2018 – Cost Sharing Agreement with Mountain View

• 2020 – Measure B funding award (for design and construction phase)

• Current – Development of preliminary designs

Project Background

6Joint BPAC Meeting – December 2020

Project Limits

7Joint BPAC Meeting – December 2020

Existing Conditions

Partner Logo Placeholder in Slide Layout: Align with Left Edge of This Box

Max. H

eight

Eastern Alignment

9Joint BPAC Meeting – December 2020

Eastern Option 1(Utilize Portion of Central Expressway)

Partner Logo Placeholder in Slide Layout: Align with Left Edge of This Box

Max. H

eight

Western Alignments

11Joint BPAC Meeting – December 2020

Western Option 1(With Bike Ramp Access to Central Expressway)

No Tunnel Opening

Bicycle ramp

12Joint BPAC Meeting – December 2020

Western Option 1(Without Bike Ramp Access to Central Expressway)

Tunnel Opening

No bicycle ramp

13Joint BPAC Meeting – December 2020

Western Option 2(With Stair access to 280 N. Bernardo)

Stairway connection to 280 N. Bernardo

Ramp landing connection to 280 N. Bernardo

280 N. Bernardo

14Joint BPAC Meeting – December 2020

Western Option 2(Without Stair access to 280 N. Bernardo)

No stairway connection to 280 N. Bernardo

Ramp landing connection to 280 N. Bernardo

280 N. Bernardo

15Joint BPAC Meeting – December 2020

Western Option 3(With Stair access to Evelyn Avenue)

Stair access to undercrossing

Dual crosswalk access points to undercrossing

16Joint BPAC Meeting – December 2020

Western Option 3(Without Stair access to Evelyn Avenue)

Single crosswalk access to undercrossing (no stair access).

Less impact to Evelyn Avenue

17Joint BPAC Meeting – December 2020

Upcoming Project Milestones

Select Project 

AlternativeSummer 2021

Community Meetingand BPAC Meeting

Spring 2021

Environmental Phase

Summer 2021 to 

Summer 2022

Final DesignSummer 2022 To

Fall 2024

Begin ConstructionLate 2024

18Joint BPAC Meeting – December 2020

How to Participate Today

19Joint BPAC Meeting – December 2020

1. What are the most important existing safety issues that concern you?

2. What features should be prioritized in the selected project alternative?

3. What additional features would you like to see included in the project alternatives and what features would you recommend for removal?

Discussion Questions

20Joint BPAC Meeting – December 2020

Thank You!

Questions or Comments?

Contact Nabilah Deen

Email: NDeen@sunnyvale.ca.gov

Visit  Sunnyvale.ca.gov

Search for Bernardo Undercrossing

Stay informed by Subscribing to the Mailing List