Bidadi Industries Association Special Purpose Group (SPG) Progress

1 2 3 4

SAFE

TY &

EN

VIR

ON

MEN

T

5

5

Byramangala cross~ coca cola road relaying 3 KM

Byramangala PWD road

2

TKM

Project Area

No ACTIVITY CURRENT STATUSPHOTO

NEXT ACTIVITY

2 PWD road –Relaying

Mr.

Lakshminarayan, IASACS, PWD

Mr. Ravi KumarEE, Ramanagaram

File is with ACS for approval

ACS has forwarded proposal to MD ,KRDCL for consideration

Planning to meetMr.Krishana reddy ,MD ,KRDCL for approval by Oct end

Pot Holes & Undulations on road

Byramangala cross~ coca cola road relaying 3 KM

Road Up gradation : Phase II Road relying

4

Project Area

Project Cost : Rs 40 Million Target date for completion : Nov17 Activity is Started in April 17

Sub base preparation work is completedAsphalt is work delayed to continuous rain KIADB will take this Asphalting work after rainy season

Drain Connection work near RP metal

New Steet light erection by KIADB

5

LED STREET LIGHTS : 60 Number of 150W LED street light erection is completed in Phase # 2 Shifting of LT line poles from road to road shoulder activity is in progress in Phase # 2

Bangalore City

BIA

Stage 2 to Stage 4 Connection for BIA

Activity will be completed by end of Oct ‘17

Stage 2 to Stage 4 connection :

Work Order is released by BWSSB

Digital data logger has been installed

Connection will be completed by Oct 17 end

Bidadi Industries Association Special Purpose Group (SPG) Progress

21 3 4

SAFE

TY &

EN

VIR

ON

MEN

T

5

5

Pot Hole Repair Work

After Before

cold Asphalt activity will be carried out after rainy season

Pot hole repair work carried out by Using concrete due continuous rain

Old Coca cola road : Concreting for the road & walkway gap

Trial concreting completed for one side 100 M length from coca cola junction to coca cola Gate # 1 Target Date : 20th Nov

Project Area

Cover Slab Work Byramangala cross

Cover Slab work for byramangala cross drain completed

Project Area

Before After

Water Transmission Loss reduction

Next target to reduce

losses up to 8%

Bidadi Industries Association Special Purpose Group (SPG) Progress

31 2 4

SAFE

TY &

EN

VIR

ON

MEN

T

5

5

Ashoka Tree Plantation SA

FETY

& E

NV

IRO

NM

ENT

GAIL sponsored 150 Nos Ashoka Tress Plantation work carried out along GAIL compound wall

Sponsorship Activity

Project Area

Convex Mirror : To eliminate Blind spot SA

FETY

& E

NV

IRO

NM

ENT

PO released for the 6 Number as pilot project Target date for completion : 30th Oct 17

13

2

4 6

7

89

10

11

12

13

Phase # 1 6 No’s Phase # 2 7 No’sTotal 13 Numbers

Road STUDS for Hump – Night Visibility SA

FETY

& E

NV

IRO

NM

ENT

Total Hump : 7 No’s Stud Required : 56 No’s

PO releasedTarget date for completion : 30th Oct 17

Pylon Boards & pedestal SA

FETY

& E

NV

IRO

NM

ENT

12

PO released .Pedestal casting completed Target date for completion : 30th Oct 17

CCTV : 8 cameras SA

FETY

& E

NV

IRO

NM

ENT

1

Total Number of camera’s : 8

2

34

7

6

8

Work order released for additional 8 Number of wire less cameras activity will completed by 20th Nov 2017

7

Completed

FY 2018~2019

FY 2017 ~ 2018

PHASE # 1 230 Lamps Replaced with LED Lamp in July 17 As PHASE # 1 for Kadu mane road & BOSCH Road & TKM Gate # 6 Road

PHASE # 2 100 Lamp replacement by Oct ‘ 17 end

Energy conservation Street Light Changing to LED SA

FETY

& E

NV

IRO

NM

ENT

Road Safety : Road sign board Sponsorship By TLISA

FETY

& E

NV

IRO

NM

ENT

Sponsorship Activity

Target Date : Nov 17 End

Bidadi Industries Association Special Purpose Group (SPG) Progress

1 2 3

SAFE

TY &

EN

VIR

ON

MEN

T

5

5

4

51 55 61 65 67 73 75 77 78 84 89 91 93102

114 115 116 117 123125 127 128 130 131 134 136 137 138142

0

20

40

60

80

100

120

140

160

Oct

'14

De

c'1

4

Feb

'15

Ap

r'1

5

Jun

'15

Au

g'1

5

Oct

'15

De

c'1

5

july

,16

Sep

t,1

6

No

v, 1

6

Jan

, 17

May

,17

July

, 17

Sep

, 17

91 New Members

enrolled from Oct-2014

Target Industries for the year2

MEMBERSHIP ENROLMENT STATUS

150

Solid Waste Management : BASELINE STUDY COMPLETED

BOSCH ROAD TKM Gate 5 road BIA has enlisted Saahas Waste Management Pvt Ltd. as its exclusive partner in driving the waste management initiatives for Base line study.

Final design report submitted.

Summary of dry waste streams across detailed categories

Saahas – Solid waste management study

Disaster management program -7th and 8th Oct 2017

BOSCH ROAD TKM Gate 5 road Disaster management program is organized by District Administration Ramanagara – Total 32 members participated from all the member industries.

Sl No Name of the company No of

Participants

1Grupo Antolin India Pvt

Ltd.,1

2 Chemozol Additives pvt ltd 1

3Toyota Logistics Kishor

india pvt Ltd2

4Nxtgen Datacentre & Cloud

Technologies Pvt Ltd.1

5Bharatiyam Foods &

Beverages Pvt Ltd2

6 Minda Kyoraku Ltd 1

7Owari Precision Products

(India Pvt. Ltd.)1

8 Cauvery Motors Pvt Ltd  1

9 KAVERI PLASTO

CONTAINERS PVT LTD2

10 GAIL 2

11Jayalakshmi Poly Packs

Pvt.Ltd2

12    Transystem Logistics Intl. 2

13 TGSIN 2

14 Toyotetsu India 1

15TT Steel Service India Pvt

Ltd2

16 TTPI 3

17 Jtekt Sona Automotive

India Ltd1

18 TGSIN 3

19 TKAP 2

Total 32

Disaster management program

Bidadi Industries Association Special Purpose Group (SPG) Progress

1 2 3

SAFE

TY &

EN

VIR

ON

MEN

T

4

5

5

Water Drop Point Inauguration : Sponsored by TLI

Water Drop Point Inaugurated near TLI TLI initiative to provide potable water to industries

Honorable MLA Mr .Balakrishna visit to BIA Office

Honorable MLA ,Mr.Balakrishana visited BIA Office to understand the BIA activities & CSR

He assured to support in releasing the fund for road up gradation of Medanhalliroad 3 KM

Vision Mission

GoK organized vision2025 exercise to understand the industry requirement for creating better infrastructure

Mr .Hegde presented views of Industries on 16th

Oct to PS Mrs .RenukachoudharyPS well accepted the suggestions & views

Recommended