Boat Lashing ProcessBoat Lashing Process
Curio Pack Curio Pack SdnSdn BhdBhdPenang OfficePenang Office
Curio Pack Sdn Bhd Curio Pack Sdn Bhd -- by WK Leeby WK Lee 22
4040’’Flat Rack Container on Flat Rack Container on TraillerTrailler
Curio Pack Sdn Bhd Curio Pack Sdn Bhd -- by WK Leeby WK Lee 33
View From SideView From Side
Lashing Points
Curio Pack Sdn Bhd Curio Pack Sdn Bhd -- by WK Leeby WK Lee 44
Lifting the Boat via ForkliftLifting the Boat via Forklift
Note that the forks are positioned at the centre of gravity of the boat. It is also raised by 2 timber blocks to support the boat’s trailer. If the boat is without trailer, a cradle has to be made to support the boat and a crane with sling and spreader bar to do the lifting.
Curio Pack Sdn Bhd Curio Pack Sdn Bhd -- by WK Leeby WK Lee 55
Positioning Is ImportantPositioning Is Important
Curio Pack Sdn Bhd Curio Pack Sdn Bhd -- by WK Leeby WK Lee 66
Timber BracingTimber BracingTriangle stoppers for horizontal and side movements
Curio Pack Sdn Bhd Curio Pack Sdn Bhd -- by WK Leeby WK Lee 77
More Pictures Of BracingsMore Pictures Of Bracings
Curio Pack Sdn Bhd Curio Pack Sdn Bhd -- by WK Leeby WK Lee 88
Belt Lashings Front and BackBelt Lashings Front and Back
Belt lashings boat to trailer
Belt lashings boat to container
Curio Pack Sdn Bhd Curio Pack Sdn Bhd -- by WK Leeby WK Lee 99
Wire Rope and Turnbuckle Wire Rope and Turnbuckle LashingsLashings
Wire rope lashing trailer to container
Curio Pack Sdn Bhd Curio Pack Sdn Bhd -- by WK Leeby WK Lee 1010
More Wire Rope LashingsMore Wire Rope Lashings
Curio Pack Sdn Bhd Curio Pack Sdn Bhd -- by WK Leeby WK Lee 1111
Loading Back to TrailerLoading Back to Trailer
Curio Pack Sdn Bhd Curio Pack Sdn Bhd -- by WK Leeby WK Lee 1212
The EndThe End
With proper planning, this job only With proper planning, this job only takes 4 hours to complete.takes 4 hours to complete.
A presentation by Curio Pack A presentation by Curio Pack SdnSdn BhdBhd