Primary Goals

1. To develop suggested route maps for 18 elementary and middle schools in GIS format.

2. Identify pedestrian and mobility enhancements for future capital projects.

• Total Project Budget: $125,000• Time to Complete: 16 months

Step 1: Signage and Striping Inventory

• Inventory of:– School area signs– Pavement markings– School crosswalk markings– Curb ramp presence/absence– Traffic Signals– Stop signs

• School signs identified by MUTCD sign code• Color (Yellow vs FYG) and condition (good, fair,

poor) noted

Step 1: Signage and Striping Inventory

Step 2: Draft Walking Route Maps

• Based on location of traffic controls, crosswalks, and crossing guards, Suggested Walking Routes maps were prepared

• Walking routes shown from all streets within school enrollment area

• Walking routes field checked at the same time signage/striping inventory conducted

Step 2: Draft Walking Route Maps

Step 3: Parent Surveys

• Developed parent survey distributed to all schools– Mode of travel to school– Reasons for not walking– Identified safety concerns in the area– Modifications to the draft walking routes

• Parent survey distributed on back side of Walking Route Map

• Both Spanish and English versions developed

English Survey

Spanish Survey

• Total number of Schools Responded: 13 out of 18

• Total number of responses: 309• Response rates ranged from 0.5% to

12% of enrollment.

Survey Response Language

English63%

Spanish37%

Survey Results: Entire District

Survey Results: Entire District

• Responses: 41• Enrollment: 900• Percent Responded: 5%

Survey Responses: Longfellow Elementary

Longfellow SchoolReasons for Not Walking to or from School

0%

2%

4%

6%

8%

10%

12%

14%

16%

18%

20%

Survey Responses: Longfellow Elementary

Requested Improvements: Longfellow Elementary

Step 4: Improvement Recommendations

• Fieldwork at identified hot spots• Citywide Program and Policy

Recommendations– Low-Cost Engineering Tools Matrix– Crosswalk Standard– Signage Plan Recommendations– Education and Encouragement Actions

• Developed Recommended Project List for each School

• Prepared Final Walking Route Maps• Prepared Final Report

Low-Cost Engineering Tools Matrix

Safe Routes to School Details

• Caltrans SR2S Funds: $396,000

• City Match: $104,000

• Total Project Budget: $500,000

• Components: Sidewalk Repairs and Transit Pads (20+) $40,000 Access Ramp Construction (24) $60,000 In-Roadway Lighted Crosswalks (3) $140,000 Bulb-out Treatments (2) $110,000 Traffic Sign Upgrades (400) $50,000

Contact InformationAlta Planning + DesignBerkeley, CaliforniaContact: Brett Hondorpbhondorp@altaplanning.com

City of PasadenaDepartment of TransportationPM: Richard Yee, PE, PTOEryee@cityofpasadena.net

Parisi AssociatesMill Valley, CaliforniaContact: David Parisi, PEdavid@parisi-associates.com

Recommended